10 years of implied metrology - ths...gyro headings and depth loops • observations are grouped...

38
10 Years of Implied Metrology Stewart Cannon 4D Nav

Upload: others

Post on 17-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

10 Years of Implied Metrology

Stewart Cannon

4D Nav

Page 2: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• Green Canyon Area of Gulf of Mexico

• 150 miles south of New Orleans

• First oil 2007 • Oil and Gas

exported via Caesar and Cleopatra pipeline systems

Page 3: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• Two producing drill centers, DC1 & DC3.

• Production and Quarters (PQ) platform 2 miles south of DC1

• Water depth ranges from 1600m at DC3 to 2100m at the PQ.

• PQ processes 200,000 barrels/day

Page 4: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

DC 1

Page 5: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• DC1 - 5 manifolds, 5 PLEMs and 11 trees all installed on 36 inch foundation piles.

• 300m along its north south axis

• Permanently installed tripods for LBL positioning

Page 6: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

DC 3

Page 7: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• DC3 - 2 manifolds, 1 PLEM and 3 trees, also installed on foundation piles

• Permanently installed tripods for LBL positioning at each drill centre

• 4 additional wells planned

Page 8: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

8

Pre-Fabricated Jumper Metrology

Page 9: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

9

Pre-Fabricated Jumper Metrology

Page 10: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

10

Pre-Fabricated Jumper Metrology

Page 11: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

11

Pre-Fabricated Jumper Metrology - Offshore

X,Y,Z Pitch Roll Heading

Page 12: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

12

.

Pre-Fabricated Jumper Metrology – fabrication yard

• Perform dimensional control survey of structure to be landed on the foundation pile.

• Determine XYZ coordinates of jumper hubs, hub pitch and hub roll relative to the point where the structure interfaces with the subsea pile

• Additional receptacles installed on the structure provide additional datum points when structures are installed subsea.

Page 13: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Install Structure

Metrology

Issue Metrology Drawings

Isometric Drawings

Fabrication

Pressure Test

Load Out & Transport to Field

Install Jumper

Well Start Up

13

Pre-Fabricated Jumper Metrology

• 3 to 4 weeks from metrology to jumper load out

• Critical path to well start up

Page 14: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Install Structure

Install Jumper

Issue Metrology Drawings

Isometric Drawings

Fabrication

Pressure Test

Load Out & Transport to

Field

Install Jumper

Well Start Up

14

Pre-Fabricated Jumper Metrology

• Perform metrology to subsea foundation piles

1st Oil accelerated 4 weeks

Page 15: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Metrology calculator software developed to allow data to be viewed and analyzed plus provide an input to real-time software

Dimensional Control Data

Baselines

Depth Loops

Inclinations

Gyro Data

Metrology Calculator

RigNav

Quality Control

Forensic Analysis

Page 16: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Data Model Piles and Tripods • Model includes piles,

tripods, structures, metrology tools and hubs/receptacles

• Piles and Wellheads are fixed to the seabed and may be keyed

• Tripods may have different positions at different times to accommodate movement

Page 17: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Data Model Structures and Hubs

• Structures sit on piles or mudmats, may be keyed or able to rotate and have hubs and receptacles

• Hubs and receptacles are defined by coordinates and attitudes in a structure based system

• Metrology tools sit on piles or hubs and have receptacles

Page 18: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Data Model Jumpers

• Jumpers connect one hub to another

• Coordinates and attitude of both hubs computed

• Implied metrology developed from the hub-to-hub relationship

• Vertical profile of jumper added for 3D viewing and clearance calculations

Page 19: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Data Model: Observations • Observations include

baselines, attitudes, gyro headings and depth loops

• Observations are grouped into data sets and campaigns

• Observed data imported into MC to eliminate transcription errors

• Observations collected over 10 years

Page 20: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Metrology Calculator was subsequently used to perform a complete adjustment with no scale factor using all the baselines Some pile-to-wellhead baselines were collected but not used in the initial adjustment As piles and wellheads were installed baselines were collected to tripods Initial calibration was done with Mk 4 Compatts and WF and adjusted using a scale factor DC 1 was much better for implied metrology as the longer distances make sound velocity the dominant error source DC 1 spaced about 250m and DC 3 about 500m with 8 tripods at each site Tripods set to form a near-field array and an initial calibration was performed with the existing well set at the fiduciary point

Page 21: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Network adjustment solution based on land techniques used Reduced by pro-rating the misclosure by the amount of time spent on a segment of a loop to correct for tide Depth loops measured between piles Paroscientific pressure sensor used to measure depth loops Initially used Pressure Sensor on Compatts for Depths but not reliable enough

Page 22: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Heading was measured on slotted piles Observations were collected on different quadrants and reduced to attitude and heading of the pile and offsets between the stab and inclinometer Metrology tools used for mechanical interface between Compatt stab and top of pile or wellhead Gyro or Inclinometer Compatt data collected on each pile or wellhead Piles were keyed and wellheads were not so trees had to be landed with a precise tolerance Pile and wellhead heading and attitude determination required to compute real-world coordinates of hubs and receptacles

Page 23: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• Heading measured in multiple

quadrants

• C-O of slots measured with DC

survey

• Meridian Convergence computed

and applied

• All heading observations reduced to

one quadrant and averaged

• Also possible to compute headings

with observations to at least two

receptacles or hubs on a structure

Heading Calculation

Page 24: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Dimensional Control • Locations and attitudes

of hubs and receptacles surveyed into a structure-oriented coordinate system for structures and metrology brackets

• Orientation of key surveyed precisely

Page 25: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Dimensional Control • Coordinates entered

into MC

• .dwg outline of structure and 3D model also entered

• Report and page number referenced in MC for easy access

Page 26: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Implied Metrology • Given position and

attitude of two hubs we can determine the metrology between them

• In the case of trees the wellheads were not slotted so they had to be placed within a couple of degrees of planned heading

• Jumpers were pre-fabricated

Page 27: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

A total of 14 observation campaigns were conducted at DC 3 over 7 years A total of 27 observation campaigns were conducted at DC1 over 9 years with each campaign typically having multiple baseline data sets Most measurements were observed with Mk 5 Compatts and all adjustments were done without a scale factor Issues with initial manifold headings required collection of baselines and a network solution for heading and position to check gyro observations Multi-path from measuring baselines through structures was observed and it became evident that the tripods should have been higher Checks around the network were made as infrastructure was installed or if high residuals were seen during a measurement campaign Baselines were generally observed between hubs to confirm implied metrology prior to jumper installation

Page 28: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Compatt Transducer to Receptacle Reduction

• The position of interest is the receptacle and not the transducer

• The Compatt may be mounted on a metrology bracket due to accessibility issues

• These calculations were added as part of the network adjustment

Page 29: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• Network adjustments were performed

using all available data to QC results

• Incorporates all dimensional control and

holds lever arms fixed

• Network adjustment considered all

baselines and headings

• Used tripod model that allowed for tripod

movement through time

• Combined solution for position and

heading of structures

• Cascaded calculation technique was

developed that feeds output from attitude

calculations to depth network calculation

to network adjustment

Horizontal Network Adjustment

Page 30: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Baseline Measurements • 1028 Baselines

• Weighted by standard deviation which combined detection accuracy and sound velocity accuracy

• All residuals for baselines less than 30m were less that 2cm

1 4 9 19

55

168

279

218

169

74

21 5 4 1

0

50

100

150

200

250

300

-12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 More

FREQ

UEN

CY

BIN

Baselines (cm)

Frequency

Page 31: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Gyro Measurements • 67 heading

measurements in slotted piles and receptacles

• Heading was computed by a weighted combination or baselines and gyro measurements

• Larger spread than anticipated indicates accuracy expectations not met

• Analysis showed this to be due to a combination of mechanical and procedural issues

3

0

1 1

2

4

3

5

7

9

5

6

9

5

3

2

0 0

1

0 0 0

1

2

3

4

5

6

7

8

9

10

FREQ

UEN

CY

BIN

Heading Residuals

Frequency

Page 32: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Vertical Network Adjustment

• Used least squares techniques developed for land differential level networks

• Provides redundancy and an indication of accuracy via residuals

• Observations were the differential depth between two points after misclosure was distributed

• All depth loop segments used the same weighting

Page 33: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Depth Loop Measurements

• 611 Depth Loop segments

• Most residuals within 2cm

• There were some cases of depth loops between the same two points measured at different times having a difference of 15cm

• Could have been caused by pile settlement

0 3

15

30

101

180

150

83

28

15

5 0

0

20

40

60

80

100

120

140

160

180

200

-10 -8 -6 -4 -2 0 2 4 6 8 10 More

FREQ

UEN

CY

BIN

Depth Loops (cm)

Frequency

Page 34: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

• Headings of four structures measured by gyro were determined to be in error by over two degrees by using baselines to compute independent headings

• A tripod was suspected of moving several times due to high baseline residuals. Analysis determined it was a combination of one movement and multipath.

• Initial observations used a scale factor and subsequent data sets didn’t. With the site at the border of UTM zone there was a noticeable difference in the tripod coordinates.

• Sound velocity issues were noted in some data sets when a velocimeter was used instead of a CTD

Forensic Metrology

Page 35: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

RigNav: Real-time Application for Rig Safety

• The positions, headings and attitudes derived from the metrology are used to generate 3D scenes describing the fields in detail

• Used by Drilling group to monitor spatial relations between BOP and the infrastructure

• DROP model used to predict landing spot for dropped objects

Metrology Calculator

RigNav real-time software

Positions, attitudes and

headings 3D Models

Page 36: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

RigNav: Vertical Clearance Planning

Page 37: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

RigNav: Vertical Clearance Monitoring

Page 38: 10 Years of Implied Metrology - THS...gyro headings and depth loops • Observations are grouped into data sets ... into MC to eliminate transcription errors • Observations collected

Commercialization of Technology • Metrology Calculator

developed into a commercial job-oriented software package called Connect in partnership with Sonardyne

• Planning tools to generate steps for metrology process

• In addition to calculations collects all data in real-time