HEP - New Control Centers for Croatia’s Distribution GridProject Realization, Transition Phase to Network Manager
Boris Krstulja, Krunoslav Slivaric (HEP ODS), Zagreb
Boris Njavro (Koncar), Zagreb
![Page 2: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/2.jpg)
CROATIAN DSO (HEP – ODS d.o.o.)
21 distribution areas from 400.000 to 40.000 customers Zagreb area 25% of consumption 4 biggest areas (Zagreb, Rijeka, Split and Osijek) 50% of
consumption Total:
– 2,3 mil customers, – 17 TWh of consumption
![Page 3: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/3.jpg)
PARTNERS IN PROJECT
HEP – ODS as Investor
KONČAR as Main Supplier
ABB Sweden as subsupplier for Network Manager SCADA/DMS system (Release 2.3)
HP Hardware equipment (Alpha and Proliant servers)
![Page 4: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/4.jpg)
OLD SCADA SYSTEMS
PDP 11/44 computers supplied and installed by Končar in 1980s
ADLP 80 (SINDAC) communication protocol Mostly DS -8 family of RTUs produced in KONČAR Only SCADA functions (PROZA D/R)
![Page 5: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/5.jpg)
PROJECT FOR NEW CENTERS
Long story started in 1994 and ended in 2004
Features:– SCADA with DMS functions for 110, 30(35) and 10(20) kV
network– Protocol conversion ADLP and IEC 101 to IEC 104– ICCP connections– Uninterupted operation – paralel opeartion of old and new
center
![Page 6: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/6.jpg)
TIME SHEDULE
SITE FAT SAT 1 SAT 2Warranty
start
Zagreb Feb. 06 Sept. 06 March 06 June 07
Rijeka July 06 Feb. 07 Oct. 07 Dec. 07
Split Nov. 06 March 07 Oct. 07 Dec. 07
Osijek Feb. 07 May 07 Oct. 07 Dec. 07
![Page 7: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/7.jpg)
CONFIGURATION
![Page 8: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/8.jpg)
IMPORT PROCEDURE
MDF files from PDP computers (ADLP 80 communication) CSV files with process data and new ASDU and IOA
information Plausibility and uniqueness checks Import to DE database
Protocol Communication addressADLP 80 No. of comm. unit (1-9) RTU address (1-15)
IEC 101 No. of serial port (1-9) Device link address (1-255)
Protocol Default ASDU address in new systemADLP 80 No. of comm. unit * 100 + address of RTU (101-915)
IEC 101 No. Of serial port * 1000 + link address of device (1001-9255)
![Page 9: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/9.jpg)
9
TESTING (SAT1 AND SAT2)
Communication (interoperability)
Functions (SCADA, NMS, ICCP)
User interface Historical DB Reports Performance
2200 hours Point to point testing – NO
ERRORS! No interuptions of
operations with old system
![Page 10: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/10.jpg)
CONFIGURATION FOR TESTING
SCADA SERVERS
COMM. INTERFACEPROTOCOL CONVERSION
PDP COMPUTER RTUS OR SAS
FIREWALL
IEC 60870-5-104
IEC 60870-5-101 OR ADLP-80
«PC» CONNECTION
IEC 60870-5-104
![Page 11: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/11.jpg)
Control Center Zagreb
![Page 12: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/12.jpg)
Control Room Rijeka
![Page 13: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/13.jpg)
![Page 14: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/14.jpg)
DMS FUNCTIONS
Dynamic Network coloring Load Calibration Load Flow Short Circuit Analisys Load Forecast
![Page 15: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/15.jpg)
DATA ENGINEERING FOR MV NETWORK
Limitation of 8096 substations– 2500 MV substations + connections of cables and OH lines (ZG)
Introduction of Site concepts and Feeder lines inside one big substation representing area of MV network
Development of Wireless connectors from HV to MV substation Overview pictures (limit of 29 subpictures with 1000 dynamic
elements) - maximum of 500 sites in one substation Modelling of grounding of transformer neutral point! Technical data must be very detailed:
– tap changers on transformers– Parallel susceptance on lines– Compensators,…
![Page 16: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/16.jpg)
DE CONCEPT
![Page 17: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/17.jpg)
DECLUTERING
![Page 18: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/18.jpg)
DECLUTER LEVEL 6-22
![Page 19: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/19.jpg)
DMS MODELLING
![Page 20: Hep](https://reader035.vdocuments.net/reader035/viewer/2022062405/557776d1d8b42a56728b4c34/html5/thumbnails/20.jpg)
THE RESULT AFTER 2 YEARS!