101714 tec
TRANSCRIPT
-
7/27/2019 101714 Tec
1/5
Technical SpecificationNo. 101714
24.03.2007
rotary drilling with direct mud circulation, with reverse mud circulation by airlifting
and also DTH-Hammer drill ing and dry drill ing.
0.0 PRINCIPAL FEATURESHook load gross capacity : 250 kN
Mast length : 11.5 m
Max. torque : 16,000 Nm
Carrier truck : Daimler Chrysler
Additional aggregates : Decks motor
1.0 CARRIER
1.1 Carrier tr uckManufacturer : Daimler Chrysler
Type : Actros 3340 AK
Engine capacity : 290 kW
Speed of vehicle : 80 km/h
Gross weight : 33,000 kgs
Number of axles : 3 (6 x 6)
Tyres in front : 12.00 x R 20
Tyres in rear : 12.00 x R 20
Full hydraulic operated drill ing rig , type VB 400, const ructed and designed for
TPR Fiberdur GmbH +Co. KGIndustriepark Emil-MayrischD-52457 Aldenhoven
Tel.: +49 (0) 2464-972-0Fax: +49 (0) 2464-972-118
-
7/27/2019 101714 Tec
2/5
Technical SpecificationNo. 101714
24.03.2007
1.2 Prime Mover, driven by deck engine via distributing gear to the hydraulic pumpsmanufacturer : KHD Deutz
type : BF 6 M 1015 C
power : 269 kW at 2100 min -1
engine design : in-line, 6 cylinder, 4-stroke, turbo charged
cooling system : water cooled
2.0 MAST; FRAME AND FEED DEVICE2.1 Mast
Mast length : 12.4 m
Operation clearance with power swivel : appx. 7.0 m
Hook load capacity, nominal : 250 kN
Distance from front of mast to center of the well : appx. 620 mm
Mast design : high tensile steel, rectangular tubes
Mast crown : hydraulic collapsible
Mast crown block : pulleys for main winch
Mast achoring : 2 ropes
Mast lifting : 2 hydraulic cylinders
2.3 Main f rame
Sectional steel design fixed to the carrier, for the assembly of all mounted aggregates.
With rigidly welded mast bock, front mast support and leader on each side to climb on the rig
2.4 Frame support
Hydraulic jacks single controlled : 4 pcs.with support plates and unlocking
non return valves
2.5 Feed Device, via hydraulic cylinder with rop and pulleys
Pull-down force : appx. 100 kN (dependent from the total weight)
Pull-back force : 200 kN
Rate of feed : 0 - 0.6 m/s
2.6 Carriage
Sectional steel frame. Connected with the rope. Guided alongside mast guide rails
via encapsulated heavy-duty bearings
TPR Fiberdur GmbH +Co. KGIndustriepark Emil-MayrischD-52457 Aldenhoven
Tel.: +49 (0) 2464-972-0Fax: +49 (0) 2464-972-118
-
7/27/2019 101714 Tec
3/5
Technical SpecificationNo. 101714
24.03.2007
carriage
Swing-out frame : hollow steel construction
Swing-out device : hydraulic swing-out the power swivel90 out of drill center area
Locking mechanism : hydraulic-machanical to lock the swing-out
frame to the carriage
Tilting device : 2 hydraulical operated cylinders for tilting
the power swivel in a horizontal position
to pick up drill pipes or collars
3.0 POWER SWIVEL
3.1 Power Swivel (top-drive hydraulic power-head)
Type : 16.1 R-160
Clear passage : 168 mm
Operation torque : 1st gear 16.000 Nm by n =0 - 60 min -1
: 2nd gear 8.000 Nm by n =0 - 120 min -1
Drill rod connection : for 4" DP
3.2 Clamping Chuck
Position : below the power swivel
Size : to clamping 4" DP
Inserts, 1 set including : for DP 4" DP
4.0 CLAMPING DEVICE
4.1 Clamping device, foldable, at mast base
Max. free passage - when closed : 250 mm
Max. clamping capacity : 200 kN
Clamping jaw inserts : 1 set for 4" DP
5.0 HOISTING EQUIPMENT5.1 Main winch
Drive : hydraulic
Max. line pull : 50 kN,
Rope diameter : 16 mm
Rope capacity / length : 120 m / 120 m
Brake device : hydraulic release
TPR Fiberdur GmbH +Co. KGIndustriepark Emil-MayrischD-52457 Aldenhoven
Tel.: +49 (0) 2464-972-0Fax: +49 (0) 2464-972-118
-
7/27/2019 101714 Tec
4/5
Technical SpecificationNo. 101714
24.03.2007
6.0 CIRCULATION SYSTEM6.1 Piston pump
Manufacturer : Gardner Denver
Type : 7 x 8 FY-FXX
Max. flow rate : 1500 l/min
Max. operating pressure : 13 bar
Drive : hydraulic
7.0 HYDRAULIC SUPPLY; CONTROL TECHNIC7.1 Hydraulic supply , driven by PTO, cardan shaft and di stribut ing gear
Drive capacity : 269 kW
Hydraulic line system consisting of pipes, hoses and fittings
Oil tank, content : approx. 300 l
Filtration purity classification : class 9 according to NAS 1638
Oil cooler : 38 kW for t =30C
18/15 according to ISO 4406
7.2 Operation panelAt the left rear side of the carrier truck, foldable, with free view to the drilling hole and machinery,
Driller will stand in safe area during the drilling
Working platform : foldable, fastened at mainframe with
slip-proof floor coveringInstrument panel : with all necessary operation levers,
emergency stop, control and measuring
devices including the control panel for the
carrier engine with rev counter and revolution
adjustment. Marking all instuments in Englishand Arabic
8.0 OTHER DEVICES AND EQUIPMENT
8.1 Lighting
Voltage : 24 V
Flood light : 4 pcs.
instrument panel lightning
TPR Fiberdur GmbH +Co. KGIndustriepark Emil-MayrischD-52457 Aldenhoven
Tel.: +49 (0) 2464-972-0Fax: +49 (0) 2464-972-118
-
7/27/2019 101714 Tec
5/5
Technical SpecificationNo. 101714
24.03.2007
8.2 Painting
Carrier frame : black
Driver cabin : white
Rig, mast and aggregates : blue
9.0 DOCUMENTATIONOperation and maintenance manual : 2 x English
Spare parts book : 2 x English
11.0 ADDITIONAL DEVICE11.1 PRE-HEATING SYSTEMS
11.1.1 Pre-heating syst em for the hydraulic system
All hydraulic motors and hydraulic pumps will be passed from the warm up hydraulic oil through
an external circle and come back in the tank through the leckage hoses.
(Same system as on the VB 500)
11.1.2 Pre-heating system for the engines
An elctrical heating system will warm up the lub oil of the engines
11.2 Addi tional weather cabine for the dril ler
rig mounted and removable while transport. Covering the control panel, equipped with heater.
11.3 PVC spoi ler around the rig mounted on the frame, cover the chassis of the rig.
The pvc spoiler is assembled on the rig frame.
(Through a heater the rig can warm up with a external convector)
Including direct fired oil heater, Wilms B 350 including 2 sets of spare parts .
TPR Fiberdur GmbH +Co. KGIndustriepark Emil-MayrischD-52457 Aldenhoven
Tel.: +49 (0) 2464-972-0Fax: +49 (0) 2464-972-118