10.323.3-81.56_01.06.11
DESCRIPTION
drgTRANSCRIPT
-
( 1 : 5 )
A-A
AA
Lechler0,009 kg 1.4305AV-632.767.17xx.90CIP-nozzel1010Lechler0,015 kg 1.4305AV-460.646.17.xx.90CIP nozzel269 0,165 kgSMSRd. 70 x 1/6"1.4301Gew. St. 2 Zoll SMSThreaded neck18 0,110 kgDIN 1013round 10,01.430110.323.3-81.54Bolt27 0,03 kgDIN EN 10131sheet 2,01.430110.323.3-81.29Disc26 0,198 kgISO 2851 - 75?51,0/1,65-75 r=76,21.4301Elbow-75 2 ISO2851Elbow15 0,068 kgISO 2851pipe ?51x1,651.430110.323.3-81.55Pipe14 3,400 kgISO 2851pipe ?51x1,651.430110.323.3-81.57Pipe13 0,551 kgISO 2851pipe ?51x1,651.430110.323.3-81.53Pipe12 2,661 kgDIN EN 10029sheet 12,01.430110.323.3-81.51Flange11
RemarkWeightStandardRaw materialMaterialNumberNameQty.Pos.
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
?0,3
to 3
?0,2?0,1
f fine
General tolerances ISO 2768-1 (linear dimensions in mm)
m middle
Tolerance class
c coarse
to 400over 120
?0,3to 1000
?0,8
over 400
?3?1,2
?2
over 1000to 2000
?0,5?0,2
to 30over 6
?0,15
?0,8
over 30to 120
?0,5?0,2
?1,2?0,3
?0,1?0,05?0,1
to 6over 30,5
?0,05?3
to 4000??0,5
?4?2
over 2000
?to 8000
?5
over 4000
Name: Number:
Protected according to DIN ISO 16016
Drawn:
Merk ProcessLippersmatt 2
D-79725 Laufenburg
Project:
Weight:
Version:
Predecessor:
Released:
24.05.2011WPh
NT
1 1
KF VBD 113-CT
10.323.3-81.56CIP-pipe
1 : 2
7,79 kg
A2 31.05.2011
vertical CIP, door
von
Form and location tolerances DIN ISO 1101
Surfaces DIN ISO 1302
Assembly:
cGeneral tolerances DIN ISO 2768 -
Process
11?
27
(12)
2x45?
52?
280
(20)
R76,2
75?
5060?
30
?10
180
11?
27
?11
?175
60?
60?
70(SMS Rd. -1/6")
?200
welded to the door on site
welded to the door on sitea2
a2
adjusted in position on site
305
17402
0 15 205
395
585
640
775
965
1155
1345
1535
1725
(15?)
Welding procedure: 131/141 (ISO 4063)Welded connection: quality level B (ISO 5817)All welding seams even or radius-shaped slurredFinishing: pickled, passivated and grinded (Ra0,8)
Execution of the weldT-joint
0,7xS2
S1
S2
Execution of the weldButt joint pipe
1,0xS1
S1
outer side
inner side
8
1
2
5
4
73
9
10
9
10 9
6
?50
5252