11-07-17 weekly construction activities - mgm springfield...11/10/17 9:39 am page 2 of 3 street work...
TRANSCRIPT
11/10/179:39AM Page1of3
MGM SPRINGFIELD CONSTRUCTION ACTIVITIES -11/7/17-11/21/17
WORK HOURS: 7:00 AM - 7:00 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
FULL CONSTRUCTION BUILD OUT
ZONE LOCATION STATUS
1 95 and 101 State Street 95 State Interior fit out is underway along with exterior façade work, and loading materials via crane into site. Some noise and vibration may result.
2 Hotel Interior fit-out is underway. Exterior façade work is underway. Fixed window installation is underway.
3 Casino Interior fit-out is underway. Exterior façade work is underway. Fixed window installation is underway.
4 Da Vinci Park No work anticipated
5 Dave's Furniture No work anticipated
6 Armory Exterior masonry work and interior demolition are underway.
7 Plaza No work anticipated
8 Church No work anticipated
9 Entertainment Interior fit-out is underway. Exterior façade work is underway. Fixed window installation is underway.
10 Parking Garage Interior painting is underway. Garage is now being utilized for craft labor parking.
11 Support AreaWork will begin on the surface parking lot on the north side of Howard Street. This will necessitate the removal of the fencing adjacent to and directly behind the Michelman/Burstein building, along with the removal of soil, grading, curb installation, paving and line striping. The initial work will take place internal to the site and not include work directly on Howard Street. Noise and vibration will result.
12 MGM Way Exterior façade work is underway. Fixed window installation is underway. Receiving deliveries and staging of material/equipment.
Early Childhood Center (off map) Foundation work is underway.
11/10/179:39AM Page2of3
STREET WORK
State Street No work anticipated
Main StreetReflectorized drums will intermittently be placed in the south bound lane to shift traffic from 6am-6pm Monday through Friday to allow for the unloading of certain materials onto the construction site. The barrels will be moved out of the road at the end of each day to allow parking during non-working hours. Two way traffic will be maintained at all times and two police details will be present. This traffic shift is currently underway.
Union Street
Union St between Main St & E. Columbus is now reopened to through traffic. The following work will remain ongoing in the area: reconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise and vibration may result. A police detail is anticipated. Activity will proceed on an intermittent basis due to normal sequencing of work tasks, subcontractors, & coordination of work.
Union Street is anticipated to remain closed between E. & W. Columbus through mid-November. Access to Pride Gas Station, the Colvest Building, and 55 State Street will be maintained at all times. Signage will be in place to direct patrons and drivers accordingly. E. Columbus Ave. will be open to through traffic throughout the project. At times, lanes will need to be reduced to accommodate utility crossings at the intersections. Police details will be present throughout the summer to help traffic flow as efficiently as possible.
East Columbus Avenue Water main testing and road restoration work is underway. A police detail is anticipated.
Bliss StreetBliss Street reclamation work is anticipated to take place on Monday Nov 13th and Tuesday Nov 14th to prepare new roadway. One lane of traffic will be maintained at all times, and a police detail will be present. Noise and vibration will result. Road grading and paving is also anticpated to take place later in November.
Howard Street Turn Around No work anticipated
Howard Street No work anticipated
UTILITY ACTIVITY
UTILITY PROVIDER WORK TO BE PERFORMED
Eversource No work anticipated
Verizon No work anticipated
Comcast No work anticipated
Columbia Gas No work anticipated
Springfield Water & Sewer No work anticipated
11/10/179:39AM Page3of3
MISCELLANEOUS ACTIVITY
LOCATION WORK TO BE PERFORMED
York Street Lot Construction material staging is underway.
Zorzi Lot Established as parking for craft labor foreman and superintendents.
Offsite Parking Lots Established for site orientation parking and oversized vehicles.
EAST COLUMBUS AVENUE
HOW
ARD
TURN
ARO
UND
195/101 STATE
2HOTEL
3CASINO
12MGM WAY
7PLAZA
6ARMORY
8CHURCH
5DAVE’S
FURNITURE
4DA VINCI
PARK
9ENTERTAINMENT
10PARKING GARAGE
11SUPPORT
AREA
BLIS
S ST
REET
HOW
ARD
STRE
ET
STAT
E ST
REET
UNIO
N ST
REET
THE PORTION OF UNION ST BETWEEN MAIN ST & E. COLUMBUS IS NOW REOPENED TO THROUGH TRAFFIC. THE FOLLOWING WORK WILL REMAIN ONGOING IN THE AREA: RECONSTRUCTION OF SIDEWALKS AND CURBING, ALONG WITH INSTALLATION OF WHEELCHAIR CURB RAMPS, SIGNAL CONDUITS, FOUNDATIONS, AND PULL BOXES. LANE SHIFTS AND/OR ALTERNATING ONE WAY TRAFFIC WILL BE REQUIRED. PEDESTRIAN ACCESS WILL BE REROUTED. SOME NOISE, DUST AND VIBRATION MAY RESULT. A POLICE DETAIL IS ANTICIPATED. ACTIVITY WILL PROCEED ON AN INTERMITTENT BASIS DUE TO NORMAL SEQUENCING OF WORK TASKS, SUBCONTRACTORS, & COORDINATION OF WORK.
UNION STREET IS ANTICIPATED TO REMAIN CLOSED BETWEEN E. & W. COLUMBUS THROUGH MID-NOVEMBER. ACCESS TO PRIDE GAS STATION, THE COLVEST BUILDING, AND 55 STATE STREET WILL BE MAINTAINED AT ALL TIMES. SIGNAGE WILL BE IN PLACE TO DIRECT PATRONS AND DRIVERS ACCORDINGLY. E. COLUMBUS AVE. WILL BE OPEN TO THROUGH TRAFFIC THROUGHOUT THE PROJECT. AT TIMES, LANES WILL NEED TO BE REDUCED TO ACCOMMODATE UTILITY CROSSINGS AT THE INTERSECTIONS. POLICE DETAILS WILL BE PRESENT TO HELP TRAFFIC FLOW AS EFFICIENTLY AS POSSIBLE.
MAIN STREETTRAFFIC WILL BEINTERMITTENTLYSHIFTED FROM THESOUTHBOUND LANEBETWEEN 6AM-6PMDURING THE WORKWEEK TO ALLOW FORMATERIALS LOADING.TWO WAY TRAFFICWILL BE MAINTAINEDAND A POLICE DETAILIS ANTICIPATED.