11 inspection of erection prj 11 r1

2
FMT : PRJ: 11 (R1) CHECKLIST FOR RJIL GBM DOOR REPAIR WORKS PROJECT NO : NIL CLIENT : RJIL CONSULTANT/ARCHITECT : LOCATION : DATE : Tower Number: SNO DESCRIPTION COMMENTS FROM SITE 1 RJIL GBM TOWER WORK RECTIFICATION RJIL INCHRAGE PSL CCS LIMITED NAME NAME

Upload: prafulla-patil

Post on 12-Dec-2015

213 views

Category:

Documents


1 download

DESCRIPTION

Inspection of Erection PRJ 11 R1

TRANSCRIPT

Page 1: 11 Inspection of Erection PRJ 11 R1

FMT : PRJ: 11 (R1)

CHECKLIST FOR RJIL GBM DOOR REPAIR WORKS

PROJECT NO : NIL

CLIENT : RJIL

CONSULTANT/ARCHITECT :

LOCATION : DATE :

Tower Number:

SNO DESCRIPTION

1 RJIL GBM TOWER WORK RECTIFICATION

RJIL INCHRAGE PSL CCS LIMITED

NAME NAME

COMMENTS FROM SITE

Page 2: 11 Inspection of Erection PRJ 11 R1

FMT : PRJ: 11 (R1)

CHECKLIST FOR RJIL GBM DOOR REPAIR WORKS

DATE :

Tower Number:

REMARKS