1101 thorpe lane - loopnet · texture, 1/2" gap between boards. planter walls are to be...
TRANSCRIPT
www.cbre.com/ucr
SAN MARCOS, TEXAS 78666
FOR LEASE
1101 THORPE LANE
conceptual rendering
FOR LEASE | 1101 THORPE LANE | SAN MARCOS, TEXAS 78666
www.cbre.com/ucr
PROPERTY INFO + 8,516 SF Building
+ Less than 1/2 mile from Texas State University
+ Over 38,000 students and 3,300 faculty and staff
+ 2,443 prime end cap across from HEB
+ Adjacent to HEB Grocery Store, Gold’s Gym and The Spot Cinema/Entertainment Center
+ Please call for rates.
2017 Demographics
1 Mile 3 Miles 5 Miles
Total Population 11,365 49,294 68,526
Pop Growth 2017-2022 2.13% 2.90% 13.06%
Daytime Population 14,951 52,519 70,607
Average Age 23.5 24.0 24.4
Total Households 4,374 18,830 25,291
Traffic Counts
Thorpe Lane 10,241 vpd
E Hopkins Street 22,898 vpd
I-35 118,902 vpd
Source: MPSI 2013
CONTACT US
Bryan McMurrey
Vice President 512 482 [email protected]
John Heffington
Vice President512 482 [email protected]
FOR LEASE | 1101 THORPE LANE | SAN MARCOS, TEXAS 78666
KEYNOTESTAGCOLUMN 1
CONCRETE 1
DOOR
GRAVEL 1
PAINT 1
PAINT 2
PAINT 3
PARAPET 1
PARAPET 2
PARAPET 3
PLANTER 1
ROOF 1
ROOF 2
STUCCO 1
STUCCO 2
WINDOW
DESCRIPTIONEXISTING STUCCO COLUMN TO BE PATCHED AND PAINTED WITH 'PAINT 1'.
NEW CONCRETE FLATWORK, FINISH AND COLOR TO MATCH EXISTINGSIDEWALK.
REF. DOOR SCHEDULE.
DECOMPOSED GRANITE, USE STEEL EDGING ON SIDES THAT TOUCH GROUNDCOVER.
PAINT, COORDINATE FIN. COLOR SELECTION WITH OWNER AND ARCHITECT.
PAINT, COORDINATE FIN. COLOR SELECTION WITH OWNER AND ARCHITECT.
PATCH AND REPAIR EXIST. SOFFIT. PAINT, COORDINATE FIN. COLOR SELECTIONWITH OWNER AND ARCHITECT.
BOARD FORMED CONCRETE PLANTER, 4" HORIZONTAL BOARDS WITH HEAVYTEXTURE, 1/2" GAP BETWEEN BOARDS. PLANTER WALLS ARE TO BE 6" THICK.PLANTER TO BE FILLED WITH 'GRAVEL 1'.EXISTING TPO ROOF TO BE RE-ROOFED WITH 'ROOF 2'.
NEW TPO ROOF: TPO ROOFING MEMBRANE OVER WATER BARRIER ON RIGIDINSULATION OVER 3/4" DECKING.
2 COAT STUCCO WITH SMOOTH FIN. TO BE PAINTED W/ 'PAINT 1'. COORD.CONTROL JOINTS WITH ARCH.
2 COAT STUCCO WITH SMOOTH FIN. TO BE PAINTED W/ 'PAINT 2'. COORD.CONTROL JOINTS WITH ARCH.
REF. WINDOW SCHEDULE.
A1.03
SITE PLAN
(SET NAME)
ISSUED SETS DATE
XX/XX/XX
© MARK ODOM STUDIO, INC. 2017
IF THIS DOCUMENT IS NOT SIGNED, SEALED, ANDDATED, IT MAY NOT BE USED FOR REGULATORYAPPROVAL, PERMIT, OR CONSTRUCTION.
KEY PLAN
PROJECT NUMBER: 2016-028
BIM
Ser
ver:
mod
m.d
yndn
s.or
g - B
IM S
erve
r 18/
TRR
/TR
R |
Ver.
18.0
01 |
Wed
nesd
ay, M
ay 1
0, 2
017
| 10:
36 A
M
DRAFT: NOT FORFINAL
CONSTRUCTION/PERMITTING/
PRICING
1101
THO
RPE
LN., S
AN M
ARCO
S, T
EXAS
7866
6TH
ORPE
RET
AIL
RENO
VATI
ON
3'-3 1
/2"
1'-7" 5'-8"
3'-5"
(2 E
Q.)
8'-4"
S45°45'W 250'
N44°
15'W
151.8
5'
N45°45'E 244.03'
S46°30'E 151.97'
LOT 1-A
EXIST. DRIVE AISLE TOREMAIN
EXIST. DRIVEAISLE TOREMAIN
+/- 50'-3/4" 14'-4" 34'-10 1/2" 5'-11" 19'-5 1/2" 6'-6" 17'-8" 6'-6" 13'-4" 2'-6" 5'-6 1/2"
5'-2 1
/2"2'-
6"
176'-8 1/4"
9'-3 1
/2"
3'-0"
3'-0"
3'-5"
(2 E
Q.)
COLUMN 1
COLUMN 1
COLUMN 1
COLUMN 1
COLUMN 1
PLANTER 1
COLUMN 1
PLANTER 1 PLANTER 1
COLUMN 1
DOOR
WINDOW DOOR
WINDOW
WINDOW
GRAVEL 1
GRAVEL 1 GRAVEL 1
GRAVEL 1
CONCRETE 1 CONCRETE 1
GRAVEL 1
THORPE LANE
ROBB
IE L
ANE
25' UTILITY EASEMENT
5' UT
ILITY
EAS
EMEN
T
UP UP
UP
BUILDINGTO REMAIN
8,562 SF
EXIST.DUMPSTER
NEW SIDEWALK TO BEFLUSH WITH EXIST.SIDEWALK
EXIST. RAMP
EXIST.TRANSFORMER
EXIST. TREEEXIST. TREE
EXIST. TREE
EXIST. TREE
EXIST.SIDEWALK
EXIST. SIDEWALK
EXIST. UTILITIES
EXIST. BUS STOP
NEW BIKERACKS
EXIST. BUSHESTO BE TRIMMED
EXIST. RAMP
EXIST. PARKING TOREMAIN
EXIST. ACCESSIBLEPARKING
(44 TOTAL ON SITE)
UP
IT IS THE ARCHITECT'S AND OWNER'S INTENT TO PROTECT ALL TREES IN PROXIMITY TO CONSTRUCTION AREA FROMDAMAGE OR INJURY DUE TO CONSTRUCTION. THE SUGGESTIONS FOR TREE PROTECTION PROVIDED ABOVE ARE EXPLICITLYNOT GUARANTEED TO FULLY PROTECT THE TREES. IT IS HIGHLY RECOMMENDED THAT A TREE SPECIALIST BE HIRED ANDTHAT SUCH COST BE REVIEWED WITH OWNER FOR APPROVAL PRIOR TO PROCUREMENT OF TREE SPECIALIST SERVICES. IFCONTRACTOR DOES NOT REVIEW WITH OWNER HIS OR HER WILLINGNESS OR NON-WILLINGNESS TO HIRE SUCH SPECIALIST,THEN IT WILL BE CONSTRUED AS CONTRACTOR'S WILLINGNESS TO ACCEPT LIABILITY FOR PROTECTING THE TREES FROMANY DAMAGE THROUGHOUT THE CONSTRUCTION PROCESS.
TREE PROTECTION BARRIERTREE TRUNK PROTECTION
BARRIER TO EXTEND FULLDIAMETER OF TREE CROWN
6'-0"
RECO
MMEN
DED
GALVANIZED CHAIN LINKFENCE SUPPORTED BYGALVANIZED METAL FENCEPOSTS OR EQUIVALENTCONSTRUCTION FENCE. THISMETHOD PROTECTS TREEFROM ROOT COMPACTIONFROM CONSTRUCTIONEQUIPMENT.
12 GA. WIRE (OR STRAPS)STAPLED TO 2X6s. THISMETHOD PROTECTS TRUNKFROM DAMAGE BYCONSTRUCTIONEQUIPMENT. IT DOES NOTPROTECT ROOTS FROMCOMPACTION.
SCALE: 3/32" = 1'-0" 1 NSITE PLAN_NEW
1TREE PROTECTION
GENERAL PLAN NOTES01_ ALL EXISTING DIMENSIONS TO BE VERIFIED IN FIELD.
Suite B1,861 SF Organic
Nails and Spa
Suite A2,443 SFAvailable
Suite C1,257 SFPakMail
Suite D3,217 SF
Cici’s Pizza
www.cbre.com/ucr
FOR LEASE | 1101 THORPE LANE | SAN MARCOS, TEXAS 78666
www.cbre.com/ucr
© 2017 CBRE, Inc. This information has been obtained from sources believed reliable. We have not verified it and make no guarantee, warranty or representation about it. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the property to determine to your satisfaction the suitability of the property for your needs. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners.