TOPS Offshore Production Systems

(TOPS)4th April 2011

Thursday, 28 July 11

Page 2: 110515 0445 Tops

Contact• Inventor: Pat Haynes

• Organisations: A.P.Haynes Consulting/Eboroil Ltd

• Norwegian Org nr 986455744

• Address: Jon Smørsv 4A, 1397 Nesøya

• Tel: +47 66847068 Mob Tel: +47 45275598

• Skype name : eboroil

• E-mail [email protected]

Thursday, 28 July 11

Page 3: 110515 0445 Tops

The TOPS Concept

• The average water depth in the world is 3795m and this is a solution for the future

• all offshore oil and gas will based on having a continuous process including exploration, production, and refining and for certain fields, transport ship (TOPS)

• most of the patents have lapsed

Thursday, 28 July 11

Page 4: 110515 0445 Tops

TOPS Eliminates

• delay in appraisal and development

• conventional rigs and platforms

• refineries

• over balanced drilling as per the BP GOM blow-out

• significantly lowers blow out and pollution risk in arctic areas and in deep water

Thursday, 28 July 11

Page 5: 110515 0445 Tops

Schedule• Site survey and studies -

15 months

• Construct Mooring tower - six months

• Install riser tower - 1 day weather window

• Pre-Install production template - 60 days

• Drill - 15 plus days

• Start Production5

Thursday, 28 July 11

Page 6: 110515 0445 Tops

Preliminaries• establish bottom conditions, sea water

properties as well as wave and current profile at the site (GEMS)

• establish if affecting marine mammals, seabed corals and migratory bird paths (NPL)

• shoot 3D seismic of the area

• establish that when the reservoir is de-pressurised that there is no earthquake risk (Geomec)

Thursday, 28 July 11

Page 7: 110515 0445 Tops

Components• Mooring tower in steel in shallower waters

and Titanium in deep water (Mercon)

• Well template with co-mingled production, water and gas injection services and heavy oil splitting services together with subsea processing (FMC/others ?)

• Aframax sized TOPS with dp 2 providing direct well access for drilling and intervening throughout the field life

Thursday, 28 July 11

Page 8: 110515 0445 Tops

Exploration Phase• Design site specific TOPS mooring tower in

steel/Ti with 2000 ton barytes ballasted base and hydrogen generators to suit location (Mercon with SBM as subcontractor)

• Install ocean energy generators, template and flowlines (Technip/others?)

• Mobilise the TOPS ship and drill first well

• In event of dry well redeploy equipment

Thursday, 28 July 11

Page 9: 110515 0445 Tops

Financing

• in 1980 TOPS was based on paying the shipowner 20% rate of return on the equity in the original acquisition cost of the reuseable components of the project

• The oilco requires to pay for the lower buoy, the installation work and 90 days of operations

• The leasing partners in TOPS are sought

Thursday, 28 July 11

Page 10: 110515 0445 Tops

TOPS Mooring Tower• 2000 tons of barytes ballast in the base

• Upper buoy contains ballast tanks to allow for installation and removal - reuseable

• Lower buoy at minus 160 ft have hose take offs to the TOPS ship - site specific ( Contitech)

• Ocean power to generate H2 (Magnomatics/ITM Power)

Thursday, 28 July 11

Page 11: 110515 0445 Tops

TOPS Template (FMC)• 4 by 8 on 8’6” centres well slots

• each Christmas tree to incorporate shear and blind rams and to be connected to a co-mingling distribution manifold on the central two rows for production at the flowing wellhead pressure of the best well and subsea separation.

• use duplex acoustic controls with hydraulic accumulators on the template

Thursday, 28 July 11

Page 12: 110515 0445 Tops

Subcontractors to FMC• Advance Energy Systems to crack heavy oil

to C13 and gases as appropriate

• Nemo Engineering - pipeline sledges

• Acoustic controls - used Cameron successfully before and Kongsberg

• Water injection pumps, artificial lift, gas injection and compression - Clavis are developing a unique pump technology

Thursday, 28 July 11

Page 13: 110515 0445 Tops

TOPS• station keeping by Dp2 with constant

tension mooring winch working at between 70 and 90 tons (Huismann/AXTech)

• Converted Aframax or OBO which can have LNG tanks put in the holds for later life operations (previous model in Eboroil jv m.v.Arctic which was 25,000 dwt)

• Receive oil, gas, water and distribute oil, gas, drill cuttings removal and pigging services

Thursday, 28 July 11

Page 14: 110515 0445 Tops

Drilling

• 30” conductors installed on all wells in the construction phase (Technip)

• use Casing Drilling technology to drill underbalanced in a closed loop to contain kicks (Schlumberger)

• use composite cable based push/pull wireline (supplier yet to be chosen) to retrieve bits etc

Thursday, 28 July 11

Page 15: 110515 0445 Tops

Drilling Operations

• Mount Helirig on the Port side of the ship to work in the lee based on heading bow quarter into the weather

• Have top drive and coil for intervention

• Recover and treat drill cuttings with biodegradable oil solvent and dump cuttings

• have slip joint design by Aker accepted by Schlumberger

Thursday, 28 July 11

Page 16: 110515 0445 Tops

Thoughts

• Stern into weather towards SALM

• Accommodation at stern

• Shottels bow and stern instead of Becker/other rudders such as Schilling from main engines

• New build

Thursday, 28 July 11

Page 17: 110515 0445 Tops

Process plant• Have main processing subsea for separation

of oil, gas and water

• Mount equipment 3 m above cargo holds

• Have surface oil treatment as heating to 80 deg C to remove metals with activated charcoal and then crack at 400 deg C to diesel product specifications with a catalyst

• Have chemical injection and pigging services

Thursday, 28 July 11

Page 18: 110515 0445 Tops

Maximise Oil Recovery• Continuous monitoring of reservoir behaviour and

optimisation of offtake using multiple realisation of static and dynamic reservoir models.

• Continuously drill and intervene guided by 4D seismic

• To inject gas super critically until reservoir until dry

• Inject cation rich sea water to recover oil prior to low surface tension water to break up macro oil in water emulsions

Thursday, 28 July 11

Page 19: 110515 0445 Tops

Ship Operations• Have Captain in charge of all operations

• Change crew every three weeks and recharge activated charcoal using the dry evacuation system (GEC)

• Have unidirectional currents and wave energy generate hydrogen for dp system (Magnomatics/Pulse Tidal/Green Fuel/ITM Power)

• Be a zero emission ship

• Have shuttle tankers use a Remora unit

Thursday, 28 July 11

Page 20: 110515 0445 Tops

Ocean Energy• Install wave energy

generators to provide power in storms

• Install unidirectional current generators for mid-water installations for constant power load

• install in 90deg arc

Thursday, 28 July 11

Page 21: 110515 0445 Tops

Contingencies• Have two dp UT 705 offshore platform support

vessels with active stability tanks and acoustic responders to shut down the template in case of problems

• Have oil skimming with a biodegradable oil dispersant, bulk barytes, cement, fi-fi services, anti collision radar, dry evacuation transfer services

• in the arctic amphibious life-boats and infra red satellite based radar to navigate in minimum ice

Thursday, 28 July 11

Page 22: 110515 0445 Tops

The First Project

• The Irish Authorities have been approached to develop Barryroe in conjunction with the current Option holders

• All contracts will be at cost plus 20% and there will be no bidding with technical excellence deciding the contract award

• Intend to work with Lloyds Registry and have IOM flag

Thursday, 28 July 11