    DAVIS LANGDON & SEAH VIETNAM

    Q2 2011

    QUARTERLY

    CONSTRUCTION COST REVIEW

    IN VIETNAM

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    2/11

    Q2 2011

    OVERVIEW

    APPROXIMATE BUILDING COST IN VIETNAM

    AVERAGE DAILY LABOUR COST

    MATERIAL COST TREND IN VIETNAM

    STATUS OF VIETNAM PRICE MOVEMENTS

    GOVERNMENTS SUBSIDIZED MATERIALS

    TABLE OF CONTENTS

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    3/11

    Whilst sovereign debt seems to be the primary issue concerning world economics at present, it would

    seem from an international perspective that this scenario has already played out in Vietnam and as a

    function of reduced Foreign Direct Investment (FDI).

    As this paper has frequently stated, FDI commitments had reduced markedly since the end of 2008

    however FDI disbursement as a function of the reduced FDI commitments have been notably

    depreciating over the past 12 months.

    Reduced FDI is a key reason why construction grown in 2011 will most likely be less than in 2010 but

    it is certainly not the only contributing factor.

    Fiscal measure currently being adopted by the Government and in an effort to curtail the growing

    trade deficit are having a significant effect on; infrastructure, property and ultimately construction. High

    Central Bank and Commercial Rates are affecting both demand and supply for property in terms of

    buyers and in terms of project start ups. Not only do the high interest rates increase the cost of

    borrowing to house owners and businesses but they also have detrimental impacts upon project

    feasibilities and hence reduce new developments

    OVERVIEW

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    4/11

    US$ PSM, CONSTRUCTION FLOOR AREA

    RESIDENTIAL Q1 10 Q2 10 Q3 10 Q4 10 Q1 11 Q2 11

    Detached Houses and Bungalows 485 490 497 507 520 520-620

    Average Standard Apartment, High rise 615 620 629 642 655 662-782

    Luxury Apartments, High rise 780 788 808 815 835 850-980

    Terraced Houses 400 403 408 417 425 439-496

    Specification1. Average Standard Apartments to be 30-50 storey 60-90 m2 per flat.2. Average Luxury Apartment to be 30-50 storey 100-150 m2 per flat.3. Apartments and Houses include air conditioning, kitchen cabinets, kitchen cooktop, exhausted hood but exclude loose furniture and home

    appliances.

    OFFICE /COMMERCIAL Q1 10 Q2 10 Q3 10 Q4 10 Q1 11 Q2 11

    Prestige Offices, High Rise 885 900 913 930 950 926-1,156

    Average Standard Office, High Rise 720 730 740 757 770 787-907

    Shopping Centers 665 675 684 697 715 720-835

    Specification1. Offices based on buildings 20-30 storeys high with floor plans minimum 1,000m2 per level.2. Shopping centres and average standard offices exclude finishes, A/C ducting and light fittings to tenant areas, standard faade.3. Prestige offices are fitted with raised floor, suspended ceiling, A/C ducting and light fittings to tenant areas, standard faade.

    INDUSTRIAL Q1 10 Q2 10 Q3 10 Q4 10 Q1 11 Q2 11

    APPROXIMATE BUILDING COSTIN VIETNAM Q2/2011

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    5/11

    Description Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

    General Worker10.32 10.55 10.77 11.17 11.42 11.54

    Concretor11.65 11.90 12.15 12.60 12.88 13.01

    Bar Bender and Fixer12.49 12.76 13.03 13.51 13.81 13.95

    Carpenter (formwork)11.65 11.90 12.15 12.60 12.88 13.01

    Plumber16.64 17.00 17.36 17.99 18.39 18.59

    Electrical Fitter16.64 17.00 17.36 17.99 18.39 18.59

    Brick layer13.31 13.60 13.89 14.39 14.71 14.87

    Metal Worker13.31 13.60 13.89 14.39 14.71 14.87

    Construction Plant Mechanic24.12 24.64 25.16 26.08 26.66 26.94

    AVERAGE DAILY LABOUR COST IN

    PRIVATE SECTOR CONSTRUCTIONPROJECT IN VIETNAM Q2/2011

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    6/11

    AVERAGE PRICE (USD)

    Excluded:

    1. Labour, plant, transport, wastage and other incidentals (and is ex-works price).2. Tax (VAT, Import tax).

    NO Description Unit2011

    Jan Feb Mar Apr May Jun

    ex-rate 19,500 20,395 20,874 20,868 20,700 20,645

    1 Portland Cement (PCB40) Bags 3.25 3.30 3.25 3.64 3.65 3.66

    2 Mild steel round bars Kg 0.78 0.79 0.79 0.80 0.80 0.81

    3 High tensile steel bars Kg 0.77 0.75 0.77 0.78 0.78 0.79

    4 40mm aggregate Cum 6.44 6.15 6.01 6.61 7.32 7.34

    5 20mm aggregate Cum 8.63 8.25 8.06 8.48 9.46 9.48

    6 Yellow sand Cum 9.74 9.32 9.34 9.58 9.66 9.69

    7 Clay brick units Pcs 0.23 0.22 0.21 0.21 0.21 0.21

    8 Concrete blocks Pcs 0.53 0.51 0.49 0.54 0.54 0.55

    9 Structural Steel MT 885.79 936.06 914.58 958.41 966.18 968.76

    AVERAGE MATERIAL COST TRENDIN VIETNAM Q2/2011

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    7/11

    Davis Langdon & Seah Vietnam Copyright Page | 7 of 11

    2.00

    3.00

    4.00

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    2010 2011

    USD/BAG

    Portland Cement (PCB40)

    Portland Cement (PCB40)

    -

    0.50

    1.00

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    2010 2011

    USD/

    KG

    Steel Bars

    Mild steel round bars (6-20mm)

    High tensile steel bars (10-40mm)

    -

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    2010 2011

    USD/CUM

    Ready Mixed Concrete

    RMC M20 Grade RMC M35 Grade RMC M40 Grade

    -

    0.20

    0.40

    0.60

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    2010 2011

    USD/pcs

    Clay Brick + Concrete

    Clay brick units Concrete blocks

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    8/11

    Davis Langdon & Seah Vietnam Copyright Page | 8 of 11

    2005 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

    HN 100.00 146.96 149.72 147.90 148.71 149.53 151.35 152.56 151.84 152.86 153.03 154.65 158.24 159.15 164.37 166.84 166.74 167.88 168.61 169.13 169.78 173.65 177.61 184.41 191.50 198.11 206.26 215.80 230.27 239.50 245.04

    HCMC 100.00 146.60 150.18 148.04 149.25 150.11 150.89 153.06 151.46 152.91 152.86 155.91 159.34 159.11 162.88 165.38 166.00 167.25 168.20 168.16 168.12 171.97 174.55 180.87 187.41 192.59 199.78 208.59 222.33 232.67 236.84

    VN 100.00 146.54 148.25 148.00 148.52 149.17 149.99 150.77 151.13 152.07 152.63 153.47 155.00 157.11 160.19 161.39 161.62 162.06 162.42 162.52 162.89 165.02 166.75 169.85 173.21 176.22 179.90 183.80 189.90 194.10 196.22

    100%

    120%

    140%

    160%

    180%

    200%

    220%

    240%

    260%CONSUMER PRICE INDEX

    CONSUMER PRICE INDEX

    for whole country and major cities of Hanoi and Ho Chi Minh

    (Source: GSO of Vietnam)

    STATUS OF VIETNAM PRICE MOVEMENTS

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    9/11

    Davis Langdon & Seah Vietnam Copyright Page | 9 of 11

    PRICE INDEX: HOUSING AND CONSTRUCTION MATERIALSfor whole country and major cities of Hanoi and Ho Chi Minh

    (Source: GSO of Vietnam)

    2005 Jan-09 Feb-09Mar-09Apr-09May-09 Jun-09 Jul-09 Aug-09Sep-09 Oct-09Nov-09Dec-09 Jan-10 Feb-10Mar-10Apr-10May-10 Jun-10 Jul-10 Aug-10Sep-10 Oct-10Nov-10Dec-10 Jan-11 Feb-11Mar-11Apr-11May-11 Jun-11

    HN 1 00 . 1 46 . 1 51 . 1 47 . 1 47 . 1 49 . 1 53 . 1 54 . 1 53 . 1 53 . 1 53 . 1 54 . 1 58 . 1 59 . 1 63 . 1 67 . 1 70 . 1 74 . 1 74 . 1 74 . 1 73 . 1 77 . 1 82 . 1 89 . 1 99 . 2 05 . 2 10 . 2 21 . 2 38 . 2 51 . 2 55 .

    HCMC 1 00 . 1 47 . 1 50 . 1 49 . 1 49 . 1 51 . 1 52 . 1 53 . 1 52 . 1 53 . 1 53 . 1 54 . 1 58 . 1 60 . 1 63 . 1 66 . 1 70 . 1 73 . 1 75 . 1 74 . 1 76 . 1 79 . 1 83 . 1 89 . 1 98 . 2 06 . 2 11 . 2 21 . 2 38 . 2 50 . 2 53 .

    VN 1 00 . 1 38 . 1 41 . 1 41 . 1 42 . 1 43 . 1 45 . 1 48 . 1 49 . 1 49 . 1 49 . 1 49 . 1 51 . 1 53 . 1 56 . 1 58 . 1 62 . 1 64 . 1 65 . 1 64 . 1 64 . 1 66 . 1 67 . 1 70 . 1 75 . 1 77 . 1 78 . 1 85 . 1 93 . 1 99 . 2 01 .

    100%

    120%

    140%

    160%

    180%

    200%

    220%

    240%

    260%

    280%

    HOUSING & CONSTRUCTION MATERIALS

    STATUS OF VIETNAM PRICE MOVEMENTS

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    10/11

    Davis Langdon & Seah Vietnam Copyright Page | 10 of 11

    0.40

    0.45

    0.50

    0.55

    0.60

    0.65

    0.70

    0.75

    0.80

    0.85

    0.90

    0.95

    1.00

    1.05

    1.10

    1.15

    1.20

    1.25

    USD/Liter

    Month

    DIESEL PRICE 2007 - 2011

    World market VN market

    DIESEL PRICE in Vietnam market against the world price market

    GOVERNMENTS SUBSIDIZED MATERIALS

  • 7/29/2019 110826_-_Vietnam_Construction_Cost_Review_-_Q2-2011.pdf

    11/11

    Davis Langdon & Seah Vietnam Copyright Page | 11 of 11

    0.40

    0.45

    0.50

    0.55

    0.60

    0.65

    0.70

    0.75

    0.80

    0.85

    0.90

    0.95

    1.00

    1.05

    1.10

    1.15

    1.20

    1.25

    USD/Liter

    Month

    GASOLINE PRICE 2007 - 2011

    World market VN market

    GASOLINE PRICE in Vietnam market against the world price market

    GOVERNMENTS SUBSIDIZED MATERIALS