North Dakota Department of Transportation 1/12/2017 Page 1 of 21 01/12/2017 Price Sheet List For 2016 , Totals Last Calculated English Spec Code Item Description Total Quantity Total Cost Ave. Price Unit 103 100 CONTRACT BOND 181.00 $2,508,346.84 $13,858.27 L SUM 103 200 ESCROW OF BID DOCUMENTATION 10.00 $25,730.00 $2,573.00 L SUM 107 100 RAILWAY PROTECTION INSURANCE 22.00 $87,546.00 $3,979.36 L SUM 107 101 RAILWAY PROTECTION INSURANCE-2 LOCATIONS 5.00 $51,000.00 $10,200.00 L SUM 107 103 RAILWAY PROTECTION INSURANCE-SITE 1 8.00 $21,158.00 $2,644.75 EA 107 104 RAILWAY PROTECTION INSURANCE-SITE 2 7.00 $21,740.00 $3,105.71 EA 107 105 RAILWAY PROTECTION INSURANCE-SITE 3 1.00 $2,500.00 $2,500.00 EA 201 300 CLEARING & GRUBBING 41.00 $4,018.00 $98.00 ACRE 201 330 CLEARING & GRUBBING 23.00 $132,315.78 $5,752.86 L SUM 201 350 REMOVAL OF TREES 0.91 $17,290.00 $19,000.00 ACRE 201 352 REMOVAL OF TREES & BRUSH 3.00 $36,100.00 $12,033.33 L SUM 201 370 REMOVAL OF TREES 10IN 30.00 $11,805.21 $393.51 EA 201 380 REMOVAL OF TREES 18IN 41.00 $10,550.00 $257.32 EA 201 390 REMOVAL OF TREES 30IN 13.00 $2,600.00 $200.00 EA 201 395 STUMP REMOVAL 28.00 $5,040.00 $180.00 EA 202 21 REMOVE AGGREGATE BASE & SURFACING 112,243.20 $506,260.42 $4.51 TON 202 101 REMOVAL OF CONCRETE 4.00 $28,937.00 $7,234.25 EA 202 102 REMOVAL OF BOX CULVERT 1.00 $3,616.30 $3,616.30 EA 202 104 REMOVAL OF STRUCTURE 1.00 $4,000.00 $4,000.00 EA 202 105 REMOVAL OF STRUCTURE 12.00 $1,479,000.00 $123,250.00 L SUM 202 108 REMOVAL OF STRUCTURE-SITE 1 3.00 $286,654.30 $95,551.43 L SUM 202 109 REMOVAL OF STRUCTURE-SITE 2 4.00 $462,136.75 $115,534.19 L SUM 202 110 REMOVAL OF STRUCTURE-SITE 3 3.00 $23,016.50 $7,672.17 L SUM 202 111 REMOVAL OF CONCRETE 4.00 $829,290.00 $207,322.50 L SUM 202 112 REMOVAL OF CONCRETE 4,170.80 $76,635.85 $18.37 SY 202 113 REMOVAL OF CONCRETE 148.00 $5,640.00 $38.11 CY 202 114 REMOVAL OF CONCRETE PAVEMENT 36,599.80 $380,324.47 $10.39 SY 202 115 REMOVAL OF CONCRETE-SITE 1 2.00 $42,960.00 $21,480.00 L SUM 202 116 REMOVAL OF CONCRETE-SITE 2 1.00 $18,400.00 $18,400.00 L SUM 202 119 SAW CONCRETE 7,862.00 $44,566.00 $5.67 LF 202 120 REMOVE AGGREGATE BASE & SURFACING 2.00 $6,270.00 $3,135.00 L SUM 202 121 REMOVE & SALVAGE BITUMINOUS SURFACING 17,890.00 $155,502.00 $8.69 TON 202 123 REMOVE & SALVAGE AGGREGATE BASE 16,935.80 $94,095.60 $5.56 TON 202 127 REMOVE & SALVAGE CULVERT-ALL TYPES & SIZES 441.00 $4,257.50 $9.65 LF 202 128 REMOVE AGGREGATE BASE 1,967.10 $23,547.98 $11.97 TON 202 129 REMOVAL OF CURB 50.00 $262.50 $5.25 LF 202 130 REMOVAL OF CURB & GUTTER 29,974.00 $181,435.31 $6.05 LF 202 131 REMOVAL OF CURB-TYPE 1 2,371.00 $10,866.00 $4.58 LF 202 132 REMOVAL OF BITUMINOUS SURFACING 91,755.00 $443,292.43 $4.83 SY 202 135 REMOVAL OF BITUMINOUS SURFACING 153,361.70 $928,244.55 $6.05 TON 202 136 REMOVAL OF PAVEMENT 232,800.00 $1,906,762.67 $8.19 TON 202 137 REMOVAL OF PAVEMENT 36,244.00 $270,750.63 $7.47 SY 202 151 REMOVE PRECAST CONCRETE BARRIER 50.00 $350.00 $7.00 LF 202 152 REMOVAL OF BRIDGE RAIL 1.00 $2,000.00 $2,000.00 L SUM 202 153 SAW BITUMINOUS SURFACING-FULL DEPTH 5,119.00 $19,639.35 $3.84 LF 202 165 REMOVE & SALVAGE BASE & SURFACING 6,629.00 $51,374.75 $7.75 TON 202 166 REMOVE & SALVAGE BASE & SURFACING 288,014.00 $2,116,902.90 $7.35 SY 202 169 REMOVAL OF END SECTION-ALL TYPES & SIZES 414.00 $99,128.98 $239.44 EA 202 170 REMOVAL OF CULVERTS-ALL TYPES & SIZES 7,717.00 $163,290.42 $21.16 LF 202 174 REMOVAL OF PIPE ALL TYPES AND SIZES 28,618.90 $468,019.92 $16.35 LF 202 210 REMOVAL OF MANHOLES 27.00 $15,850.00 $587.04 EA 202 230 REMOVAL OF INLETS 69.00 $38,998.00 $565.19 EA

Upload: others

Post on 17-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 1 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

103 100 CONTRACT BOND 181.00 $2,508,346.84 $13,858.27 L SUM

103 200 ESCROW OF BID DOCUMENTATION 10.00 $25,730.00 $2,573.00 L SUM

107 100 RAILWAY PROTECTION INSURANCE 22.00 $87,546.00 $3,979.36 L SUM

107 101 RAILWAY PROTECTION INSURANCE-2 LOCATIONS 5.00 $51,000.00 $10,200.00 L SUM

107 103 RAILWAY PROTECTION INSURANCE-SITE 1 8.00 $21,158.00 $2,644.75 EA

107 104 RAILWAY PROTECTION INSURANCE-SITE 2 7.00 $21,740.00 $3,105.71 EA

107 105 RAILWAY PROTECTION INSURANCE-SITE 3 1.00 $2,500.00 $2,500.00 EA

201 300 CLEARING & GRUBBING 41.00 $4,018.00 $98.00 ACRE

201 330 CLEARING & GRUBBING 23.00 $132,315.78 $5,752.86 L SUM

201 350 REMOVAL OF TREES 0.91 $17,290.00 $19,000.00 ACRE

201 352 REMOVAL OF TREES & BRUSH 3.00 $36,100.00 $12,033.33 L SUM

201 370 REMOVAL OF TREES 10IN 30.00 $11,805.21 $393.51 EA

201 380 REMOVAL OF TREES 18IN 41.00 $10,550.00 $257.32 EA

201 390 REMOVAL OF TREES 30IN 13.00 $2,600.00 $200.00 EA

201 395 STUMP REMOVAL 28.00 $5,040.00 $180.00 EA

202 21 REMOVE AGGREGATE BASE & SURFACING 112,243.20 $506,260.42 $4.51 TON

202 101 REMOVAL OF CONCRETE 4.00 $28,937.00 $7,234.25 EA

202 102 REMOVAL OF BOX CULVERT 1.00 $3,616.30 $3,616.30 EA

202 104 REMOVAL OF STRUCTURE 1.00 $4,000.00 $4,000.00 EA

202 105 REMOVAL OF STRUCTURE 12.00 $1,479,000.00 $123,250.00 L SUM

202 108 REMOVAL OF STRUCTURE-SITE 1 3.00 $286,654.30 $95,551.43 L SUM

202 109 REMOVAL OF STRUCTURE-SITE 2 4.00 $462,136.75 $115,534.19 L SUM

202 110 REMOVAL OF STRUCTURE-SITE 3 3.00 $23,016.50 $7,672.17 L SUM

202 111 REMOVAL OF CONCRETE 4.00 $829,290.00 $207,322.50 L SUM

202 112 REMOVAL OF CONCRETE 4,170.80 $76,635.85 $18.37 SY

202 113 REMOVAL OF CONCRETE 148.00 $5,640.00 $38.11 CY

202 114 REMOVAL OF CONCRETE PAVEMENT 36,599.80 $380,324.47 $10.39 SY

202 115 REMOVAL OF CONCRETE-SITE 1 2.00 $42,960.00 $21,480.00 L SUM

202 116 REMOVAL OF CONCRETE-SITE 2 1.00 $18,400.00 $18,400.00 L SUM

202 119 SAW CONCRETE 7,862.00 $44,566.00 $5.67 LF

202 120 REMOVE AGGREGATE BASE & SURFACING 2.00 $6,270.00 $3,135.00 L SUM

202 121 REMOVE & SALVAGE BITUMINOUS SURFACING 17,890.00 $155,502.00 $8.69 TON

202 123 REMOVE & SALVAGE AGGREGATE BASE 16,935.80 $94,095.60 $5.56 TON

202 127 REMOVE & SALVAGE CULVERT-ALL TYPES & SIZES 441.00 $4,257.50 $9.65 LF

202 128 REMOVE AGGREGATE BASE 1,967.10 $23,547.98 $11.97 TON

202 129 REMOVAL OF CURB 50.00 $262.50 $5.25 LF

202 130 REMOVAL OF CURB & GUTTER 29,974.00 $181,435.31 $6.05 LF

202 131 REMOVAL OF CURB-TYPE 1 2,371.00 $10,866.00 $4.58 LF

202 132 REMOVAL OF BITUMINOUS SURFACING 91,755.00 $443,292.43 $4.83 SY

202 135 REMOVAL OF BITUMINOUS SURFACING 153,361.70 $928,244.55 $6.05 TON

202 136 REMOVAL OF PAVEMENT 232,800.00 $1,906,762.67 $8.19 TON

202 137 REMOVAL OF PAVEMENT 36,244.00 $270,750.63 $7.47 SY

202 151 REMOVE PRECAST CONCRETE BARRIER 50.00 $350.00 $7.00 LF

202 152 REMOVAL OF BRIDGE RAIL 1.00 $2,000.00 $2,000.00 L SUM

202 153 SAW BITUMINOUS SURFACING-FULL DEPTH 5,119.00 $19,639.35 $3.84 LF

202 165 REMOVE & SALVAGE BASE & SURFACING 6,629.00 $51,374.75 $7.75 TON

202 166 REMOVE & SALVAGE BASE & SURFACING 288,014.00 $2,116,902.90 $7.35 SY

202 169 REMOVAL OF END SECTION-ALL TYPES & SIZES 414.00 $99,128.98 $239.44 EA

202 170 REMOVAL OF CULVERTS-ALL TYPES & SIZES 7,717.00 $163,290.42 $21.16 LF

202 174 REMOVAL OF PIPE ALL TYPES AND SIZES 28,618.90 $468,019.92 $16.35 LF

202 210 REMOVAL OF MANHOLES 27.00 $15,850.00 $587.04 EA

202 230 REMOVAL OF INLETS 69.00 $38,998.00 $565.19 EA

Page 2: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 2 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

202 231 REMOVE & RESET INLETS 1.00 $1,450.00 $1,450.00 EA

202 235 REMOVAL OF CATCH BASIN 2.00 $700.00 $350.00 EA

202 269 REMOVAL OF STRUCTURE-SITE 4 2.00 $5,844.67 $2,922.34 L SUM

202 270 REMOVAL OF STRUCTURE-SITE 5 1.00 $500.00 $500.00 L SUM

202 285 REMOVAL OF FOUNDATIONS-ALL SIZES 2.00 $1,600.00 $800.00 EA

202 288 EXCAVATION & DISPOSAL OF CONTAMINATED SOIL 1,100.00 $143,000.00 $130.00 CY

202 289 REMOVE APPROACH 3.00 $4,350.00 $1,450.00 EA

202 293 REMOVE RETAINING WALL 189.00 $850.50 $4.50 LF

202 295 REMOVAL OF OBSTRUCTIONS 4.00 $42,531.33 $10,632.83 L SUM

202 310 REMOVAL OF CHAIN LINK FENCE 192.00 $2,112.00 $11.00 LF

202 312 REMOVE EXISTING FENCE 162,468.00 $122,534.32 $0.75 LF

202 350 REMOVAL OF TEMPORARY BYPASS 18.00 $924,230.76 $51,346.15 EA

202 400 REMOVAL OF RIPRAP - LOOSE ROCK 1,470.00 $14,700.00 $10.00 CY

202 812 DISPOSAL OF CONTAMINATED WATER 43,500.00 $2,175.00 $0.05 GAL

203 101 COMMON EXCAVATION-TYPE A 2,469,208.00 $9,585,649.92 $3.88 CY

203 102 COMMON EXCAVATION-TYPE B 44,723.00 $241,033.95 $5.39 CY

203 103 COMMON EXCAVATION-TYPE C 373,714.00 $699,225.90 $1.87 CY

203 104 COMMON EXCAVATION-TYPE A 1.00 $9,000.00 $9,000.00 L SUM

203 108 TOPSOIL-BORROW AREA 156,782.00 $340,804.19 $2.17 CY

203 109 TOPSOIL 1,398,079.00 $4,721,552.90 $3.38 CY

203 110 ROCK EXCAVATION 1,000.00 $4,000.00 $4.00 CY

203 113 COMMON EXCAVATION-WASTE 101,424.00 $662,952.90 $6.54 CY

203 114 COMMON EXCAVATION-WASTE 5,115.00 $70,002.00 $13.69 TON

203 116 TOPSOIL MANDATORY BORROW AREA 815.00 $3,463.75 $4.25 CY

203 117 MANDATORY BORROW 3,570.00 $19,992.00 $5.60 CY

203 119 TOPSOIL-IMPORTED 12,205.00 $225,629.90 $18.49 CY

203 121 TOPSOIL-WETLAND 32,522.62 $209,059.99 $6.43 CY

203 122 TOPSOIL-DEPT OPTION BORROW AREA 141,285.00 $159,412.50 $1.13 CY

203 126 REMOVE & SALVAGE TOPSOIL 2,301.60 $3,797.64 $1.65 SY

203 138 COMMON EXCAVATION-SUBCUT 72,645.00 $657,773.60 $9.05 CY

203 140 BORROW-EXCAVATION 2,676,467.00 $15,564,598.51 $5.82 CY

203 180 ROADWAY OBLITERATION 4,260.00 $50,896.50 $11.95 LF

203 196 EMBANKMENT-TYPE B 8.00 $42,308.00 $5,288.50 EA

203 218 GUARDRAIL EMBANKMENT 43.00 $268,093.57 $6,234.73 EA

203 505 EXPLORATORY EXCAVATION 25.00 $10,447.00 $417.88 HR

203 710 DRAINAGE DITCH EXC 200.00 $1,350.00 $6.75 LF

210 50 BOX CULVERT EXCAVATION 9.00 $96,556.54 $10,728.50 EA

210 51 BOX CULVERT EXCAVATION - SITE 1 3.00 $55,008.50 $18,336.17 EA

210 52 BOX CULVERT EXCAVATION - SITE 2 3.00 $22,038.50 $7,346.17 EA

210 53 BOX CULVERT EXCAVATION - SITE 3 1.00 $14,008.50 $14,008.50 EA

210 54 BOX CULVERT EXCAVATION - SITE 4 1.00 $19,628.13 $19,628.13 EA

210 99 CLASS 1 EXCAVATION 1.00 $15,000.00 $15,000.00 L SUM

210 100 CLASS I EXCAVATION 3,164.00 $316,400.00 $100.00 CY

210 101 CLASS I EXCAVATION 6.00 $59,972.00 $9,995.33 L SUM

210 102 CLASS 1 EXCAVATION-SITE 1 1.00 $33,000.00 $33,000.00 L SUM

210 103 CLASS 1 EXCAVATION-SITE 2 1.00 $83,000.00 $83,000.00 L SUM

210 109 CLASS 2 EXCAVATION-BOX CULVERT 4.00 $80,840.00 $20,210.00 EA

210 110 CLASS 2 EXCAVATION 310.00 $1,007.50 $3.25 CY

210 111 CLASS 2 EXCAVATION 4.00 $74,801.00 $18,700.25 L SUM

210 127 CHANNEL EXCAVATION 7.00 $268,500.00 $38,357.14 L SUM

210 128 CHANNEL EXCAVATION-SITE 1 1.00 $3,500.00 $3,500.00 L SUM

210 129 CHANNEL EXCAVATION-SITE 2 1.00 $1,800.00 $1,800.00 L SUM

Page 3: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 3 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

210 201 FOUNDATION PREPARATION 9.00 $716,500.00 $79,611.11 EA

210 202 FOUNDATION PREPARATION-SITE 1 4.00 $84,928.00 $21,232.00 L SUM

210 203 FOUNDATION PREPARATION-SITE 2 3.00 $19,240.80 $6,413.60 L SUM

210 204 FOUNDATION PREPARATION-SITE 3 1.00 $10,370.80 $10,370.80 L SUM

210 205 FOUNDATION PREPARATION-SITE 4 1.00 $10,370.80 $10,370.80 L SUM

210 209 FOUNDATION FILL 23,908.00 $351,294.30 $14.69 TON

210 210 FOUNDATION FILL 15,037.00 $648,075.67 $43.10 CY

210 212 FLOWABLE FILL 75.00 $13,125.00 $175.00 CY

210 225 FOUNDATION FILL-TYPE 1 2,128.80 $135,315.20 $63.56 CY

210 405 FOUNDATION PREPARATION-BOX CULVERT 13.00 $138,411.78 $10,647.06 EA

210 411 FOUNDATION PREPARATION 1.00 $10,000.00 $10,000.00 L SUM

216 100 WATER 112,874.30 $2,489,363.19 $22.05 M GAL

220 100 PREPARE STOCKPILE SITE 4.00 $168,350.00 $42,087.50 L SUM

220 200 RESTORE STOCKPILE SITE 3.00 $95,000.00 $31,666.67 L SUM

230 106 RESHAPING ROADWAY 45.92 $115,371.50 $2,512.45 MILE

230 107 RESHAPING DITCH 0.17 $850.00 $5,000.00 MILE

230 111 FORESLOPE RESHAPING 1,168.00 $85,497.60 $73.20 STA

230 125 SHOULDER PREPARATION 658.63 $271,119.37 $411.64 MILE

230 165 SUBGRADE PREPARATION-TYPE A-12IN 885.76 $415,878.28 $469.52 STA

230 300 SUBGRADE PREPARATION-TYPE A 76.35 $40,182.47 $526.29 STA

230 302 SUBGRADE PREPARATION-TYPE A-SHOULDERS 85.50 $73,073.50 $854.66 STA

230 303 SUBGRADE PREPARATION-TYPE A-SHOULDERS 3.55 $16,638.92 $4,687.02 MILE

230 320 SUBGRADE PREPARATION-TYPE C-12IN 53.70 $45,913.50 $855.00 STA

230 330 SUBGRADE PREPARATION-TYPE C-18IN 645.28 $480,896.03 $745.25 STA

234 104 HYDRATED LIME 1,154.90 $228,243.29 $197.63 TON

234 106 SS1H OR CSS1H EMULSIFIED ASPHALT 380.00 $798.00 $2.10 GAL

251 100 SEEDING CLASS I 18.24 $33,093.50 $1,814.34 ACRE

251 200 SEEDING CLASS II 1,712.17 $725,989.37 $424.02 ACRE

251 300 SEEDING CLASS III 624.33 $253,424.21 $405.91 ACRE

251 350 SEEDING CLASS III 0.40 $5,120.00 $12,800.00 MILE

251 1000 WETLAND SEED 39.23 $25,646.03 $653.74 ACRE

251 2000 TEMPORARY COVER CROP 2,291.82 $211,079.04 $92.10 ACRE

251 2001 TEMPORARY COVER CROP 0.57 $2,310.50 $4,053.51 MILE

252 100 SOD 6,348.00 $46,797.75 $7.37 SY

253 101 STRAW MULCH 4,147.39 $1,298,022.62 $312.97 ACRE

253 200 HYDRAULIC MULCH 1,135.16 $4,370.37 $3.85 SY

253 201 HYDRAULIC MULCH 116.26 $247,465.04 $2,128.55 ACRE

253 301 BONDED FIBER MATRIX 92.45 $317,528.38 $3,434.60 ACRE

255 101 ECB TYPE 1 666,179.04 $812,768.44 $1.22 SY

255 102 ECB TYPE 2 19,574.00 $44,514.28 $2.27 SY

255 103 ECB TYPE 3 79,593.00 $164,689.92 $2.07 SY

255 104 ECB TYPE 4 9,177.00 $18,941.19 $2.06 SY

255 151 REMOVE ECB TYPE 1 5,955.00 $3,493.35 $0.59 SY

255 201 TRM TYPE 1 13,737.00 $55,233.41 $4.02 SY

255 202 TRM TYPE 2 1,963.00 $10,604.65 $5.40 SY

256 100 RIPRAP GRADE I 3,071.00 $327,643.42 $106.69 CY

256 200 RIPRAP GRADE II 24,454.00 $1,270,548.23 $51.96 CY

256 201 RIPRAP GRADE II 91,154.00 $3,272,413.09 $35.90 TON

256 300 RIPRAP GRADE III 5,932.00 $374,036.80 $63.05 CY

256 501 RIPRAP-SPECIAL 2,800.00 $324,100.00 $115.75 TON

256 600 RIPRAP-SALVAGED 1,784.00 $31,455.00 $17.63 CY

258 100 CONCRETE SLOPE PROTECTION 421.00 $52,625.00 $125.00 SY

Page 4: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 4 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

260 100 SILT FENCE UNSUPPORTED 75,580.00 $146,748.08 $1.94 LF

260 101 REMOVE SILT FENCE UNSUPPORTED 75,580.00 $24,219.62 $0.32 LF

260 200 SILT FENCE SUPPORTED 198,323.00 $492,073.67 $2.48 LF

260 201 REMOVE SILT FENCE SUPPORTED 197,439.00 $100,859.65 $0.51 LF

261 106 FIBER ROLLS 6IN 3,528.00 $12,628.26 $3.58 LF

261 107 REMOVE FIBER ROLLS 6IN 2,798.00 $2,933.38 $1.05 LF

261 112 FIBER ROLLS 12IN 1,245,000.00 $2,659,242.55 $2.14 LF

261 113 REMOVE FIBER ROLLS 12IN 567,543.00 $241,526.54 $0.43 LF

261 120 FIBER ROLLS 20IN 177,416.00 $521,821.61 $2.94 LF

261 121 REMOVE FIBER ROLLS 20IN 169,419.00 $51,579.40 $0.30 LF

261 200 WEIGHTED FIBER ROLLS 144.00 $1,296.00 $9.00 LF

262 100 FLOTATION SILT CURTAIN 38,748.00 $466,812.45 $12.05 LF

262 101 REMOVE FLOTATION SILT CURTAIN 36,186.00 $57,562.53 $1.59 LF

265 100 STABILIZED CONSTRUCTION ACCESS 21.00 $61,328.72 $2,920.42 EA

265 101 REMOVE STABILIZED CONSTRUCTION ACCESS 21.00 $25,856.47 $1,231.26 EA

302 50 TRAFFIC SERVICE AGGREGATE 95,983.70 $1,547,259.22 $16.12 TON

302 99 SALVAGE AGGREGATE BASE COURSE 17,441.00 $212,615.50 $12.19 CY

302 100 SALVAGED BASE COURSE 988,702.40 $9,814,454.15 $9.93 TON

302 101 SALVAGED BASE COURSE 21,316.00 $722,590.90 $33.90 CY

302 113 AGGREGATE BASE COURSE CL 3 26,069.90 $278,566.25 $10.69 TON

302 114 AGGREGATE BASE COURSE CL 3 16,493.00 $578,491.00 $35.07 CY

302 115 AGGREGATE BASE COURSE CL 4 61,436.00 $804,525.50 $13.10 TON

302 120 AGGREGATE BASE COURSE CL 5 1,179,845.03 $16,060,468.19 $13.61 TON

302 121 AGGREGATE BASE COURSE CL 5 1,745.73 $63,283.11 $36.25 CY

302 129 AGGREGATE BASE COURSE CL 7 1,910.00 $80,104.00 $41.94 TON

302 160 AGGREGATE BASE COURSE CL 13 348.00 $22,272.00 $64.00 TON

302 161 AGGREGATE BASE COURSE CL 13 248.00 $9,920.00 $40.00 CY

302 244 GRANULAR MATERIAL FOR SUBGRADE REPAIR 64,762.00 $304,381.40 $4.70 TON

302 314 TEMPORARY TRAFFIC SURFACE AGGREGATE 4,960.00 $87,422.30 $17.63 TON

302 315 TRAFFIC SERVICE AGGREGATE SURFACE COURSE 1,600.00 $20,800.00 $13.00 TON

302 316 TRAFFIC SERVICE GRAVEL 200.00 $8,000.00 $40.00 CY

302 318 AGGREGATE SURFACE COURSE CL 4 8,221.00 $203,880.80 $24.80 TON

302 320 AGGREGATE SURFACE COURSE CL 5 43.00 $1,720.00 $40.00 TON

302 321 AGGREGATE SURFACE COURSE CL 5 465.00 $13,950.00 $30.00 CY

302 356 AGGREGATE SURFACE COURSE CL 13 100,445.00 $1,560,967.98 $15.54 TON

302 357 AGGREGATE SURFACE COURSE CL 13 32,956.00 $530,109.00 $16.09 CY

302 405 SALVAGE & RELAY AGGREGATE SURFACE COURSE 49.00 $1,421.00 $29.00 CY

302 408 RESHAPE AGGREGATE BASE COURSE-SHOULDER 17.95 $14,362.40 $800.13 MILE

302 8999 PITRUN GRAVEL 9,548.00 $186,567.92 $19.54 TON

302 9002 SUBCUT GRAVEL 1,000.00 $50,400.00 $50.40 TON

302 9010 AGGREGATE FOR REINFORCED FABRIC CL 5 11,370.00 $341,100.00 $30.00 TON

306 370 REMOVE AND RELAY BLENDED MATERIAL 8,000.00 $10,000.00 $1.25 SY

306 510 FULL DEPTH RECLAMATION 764,004.00 $845,051.48 $1.11 SY

401 50 TACK COAT 1,435,069.90 $2,544,587.70 $1.77 GAL

401 60 PRIME COAT 430,950.60 $1,336,827.50 $3.10 GAL

401 70 FOG SEAL 450,195.00 $1,261,151.86 $2.80 GAL

401 150 SS1H OR CSS1H OR MS1 EMULSIFIED ASPHALT 33,250.00 $104,006.20 $3.13 GAL

401 160 BLOTTER MATERIAL CL 44 13,381.00 $431,494.52 $32.25 TON

408 198 HOT BITUMINOUS PAVEMENT PATCHING 29.00 $6,719.00 $231.69 TON

408 1230 HOT BIT PAVEMENT CRACK CLEANING & SEALING 41,466.00 $30,270.18 $0.73 LF

411 100 MILLING PAVEMENT SURFACE 288,901.00 $2,622,723.30 $9.08 TON

411 105 MILLING PAVEMENT SURFACE 3,583,098.90 $3,242,234.26 $0.90 SY

Page 5: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 5 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

411 110 MILLING PCC PAVEMENT 20,922.40 $190,123.96 $9.09 SY

411 112 MILLING PAVEMENT SURFACE - 1 INCH 135,806.00 $59,754.64 $0.44 SY

411 114 MILLING PAVEMENT SURFACE - 2 INCH 279,189.00 $302,796.41 $1.08 SY

411 130 RELAYING MILLED MATERIAL 22.04 $132,240.00 $6,000.00 MILE

411 132 RELAYING MILLED MATERIAL 34.00 $612.00 $18.00 TON

411 602 MILLING 2IN BITUMINOUS PAVEMENT 17.00 $508.30 $29.90 SY

420 101 CRS2 EMULSIFIED ASPHALT 251,087.00 $490,303.70 $1.95 GAL

420 108 PASS-CR 52,765.00 $203,145.25 $3.85 GAL

420 111 CRS2P EMULSIFIED ASPHALT 3,204,489.30 $6,195,071.81 $1.93 GAL

420 112 HFMS2 EMULSIFIED ASPHALT 48,546.00 $115,054.02 $2.37 GAL

420 118 CHFRS-2P EMULSIFIED ASPHALT 261,526.00 $613,167.04 $2.34 GAL

420 125 COVER COAT MATERIAL CL 41 65,399.00 $2,335,775.89 $35.72 TON

420 126 COVER COAT MATERIAL CL 41 32,420.00 $14,589.00 $0.45 SY

420 127 COVER COAT MATERIAL CL 41-M 24,099.00 $707,835.00 $29.37 TON

420 128 COVER COAT MATERIAL CL 41-M 653,840.00 $292,442.19 $0.45 SY

420 130 COVER COAT MATERIAL CL 43 3,781.00 $4,159.10 $1.10 SY

420 143 COVER COAT MATERIAL CL 42-MODIFIED 1,583.00 $47,331.70 $29.90 TON

420 144 COVER COAT MATERIAL CL 43-MODIFIED 1,217.00 $43,812.00 $36.00 TON

420 146 COVER COAT MATERIAL CL 45 3,370.20 $193,432.00 $57.39 TON

420 160 BLOTTER MATERIAL CL 44 1,457.75 $42,846.70 $29.39 TON

421 11 AGGREGATE FOR MICROSURFACING TYPE III 29,146.60 $1,964,869.98 $67.41 TON

421 20 ASPHALT EMULSION FOR MICROSURFACING 961,978.90 $1,578,048.95 $1.64 GAL

422 10 AGGREGATE FOR SLURRY SEAL-TYPE II 17,978.00 $1,580,759.00 $87.93 TON

422 11 AGGREGATE FOR SLURRY SEAL-TYPE III 13,166.00 $876,158.00 $66.55 TON

422 20 ASPHALT EMULSION FOR SLURRY SEAL 1,031,663.00 $1,415,520.60 $1.37 GAL

430 40 SUPERPAVE FAA 40 74,355.00 $2,901,860.05 $39.03 TON

430 42 SUPERPAVE FAA 42 101,033.00 $2,949,443.96 $29.19 TON

430 43 SUPERPAVE FAA 43 231,965.00 $6,496,844.17 $28.01 TON

430 44 SUPERPAVE FAA 44 63,568.00 $1,846,160.00 $29.04 TON

430 45 SUPERPAVE FAA 45 957,259.67 $34,212,448.34 $35.74 TON

430 140 RAP - SUPERPAVE FAA 40 31,990.00 $828,541.00 $25.90 TON

430 142 RAP - SUPERPAVE FAA 42 88,928.00 $2,275,363.98 $25.59 TON

430 143 RAP - SUPERPAVE FAA 43 343,769.00 $10,114,371.61 $29.42 TON

430 145 RAP - SUPERPAVE FAA 45 777,899.20 $22,237,185.73 $28.59 TON

430 200 HOT MIX ASPHALT - STONE MATRIX ASPHALT 20,223.00 $1,092,042.00 $54.00 TON

430 400 HMA INTELLIGENT COMPACTION 1.00 $169,550.00 $169,550.00 L SUM

430 450 FIBER HMA ADDITIVE 15,038.00 $173,989.66 $11.57 LBS

430 500 COMMERCIAL GRADE HOT MIX ASPHALT 43,599.20 $5,144,234.75 $117.99 TON

430 1000 CORED SAMPLE 12,894.00 $287,568.28 $22.30 EA

430 2000 PATCHING 896.00 $145,559.30 $162.45 TON

430 5828 PG 58-28 ASPHALT CEMENT 66,812.40 $22,601,763.07 $338.29 TON

430 6428 PG 64-28 ASPHALT CEMENT 74,092.84 $30,793,999.08 $415.61 TON

430 6434 PG 64-34 ASPHALT CEMENT 3,170.80 $1,589,241.40 $501.21 TON

430 7028 PG 70-28 ASPHALT CEMENT 77.52 $49,717.45 $641.35 TON

550 104 7IN NON-REINF CONCRETE PAVEMENT CL AE 4,370.20 $301,543.80 $69.00 SY

550 105 6IN NON-REINF CONCRETE PAVEMENT CL AE 3,959.00 $247,833.40 $62.60 SY

550 107 6IN REINF CONCRETE PAVEMENT CL YE 27.00 $3,292.00 $121.93 SY

550 117 9IN NON-REINF CONCRETE PAVEMENT CL AE 5,948.00 $435,653.00 $73.24 SY

550 129 9IN REINF CONCRETE PVMT CL AE-COLORED & TEXT 2,576.20 $351,780.11 $136.55 SY

550 131 9IN REINF CONCRETE PAVEMENT CL AE 6,080.00 $560,516.50 $92.19 SY

550 145 8IN CONTINUOUS REINF CONCRETE PAVEMENT CL AE 720.00 $79,200.00 $110.00 SY

550 210 PCC PAVEMENT GRINDING 75,175.00 $296,650.75 $3.95 SY

Page 6: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 6 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

550 300 8IN NON-REINF CONCRETE PVMT CL AE-DOWELED 6,982.00 $558,215.00 $79.95 SY

550 302 8.5IN NON-REINF CONCRETE PVMT CL AE-DOWELED 154,297.00 $8,748,533.40 $56.70 SY

550 305 9IN NON-REINF CONCRETE PVMT CL AE-DOWELED 149,365.30 $10,673,954.47 $71.46 SY

550 307 9.5IN NON-REINF CONCRETE PVMT CL AE-DOWELED 217,564.00 $9,431,399.40 $43.35 SY

550 310 10IN NON REINF CONCRETE PVMT CL AE-DOWELED 128,521.00 $6,488,893.25 $50.49 SY

550 312 10.5IN NON REINF CONCRETE PVMT CL AE-DOWELED 13,358.00 $1,536,170.00 $115.00 SY

550 320 12IN NON REINF CONCRETE PVMT CL AE-DOWELED 164.00 $33,128.00 $202.00 SY

550 330 NON-REINF CONCRETE PVMT CL AE-DOWELED-COLORED 501.00 $72,645.00 $145.00 SY

550 355 CONCRETE OVERLAY 34,871.70 $4,034,655.69 $115.70 CY

550 365 CONCRETE PLACEMENT - DOWELED 167,384.00 $1,657,101.60 $9.90 SY

550 968 PCC PAVEMENT CRACKING & SEATING 249,762.40 $95,347.12 $0.38 SY

550 2040 PORTLAND CEMENT 5,331.00 $881,731.50 $165.40 TON

550 3005 CONCRETE MEDIAN PAVEMENT 1,356.90 $77,085.49 $56.81 SY

560 2051 COARSE AGGREGATE SIZE 3 170.00 $5,440.00 $32.00 CY

570 210 PCC PAVEMENT GRINDING 617,834.00 $1,473,087.94 $2.38 SY

570 240 DOWELED CONTRACTION JOINT ASSEMBLY 5,817.00 $46,685.60 $8.03 LF

570 424 DOWEL BARS 1,656.00 $14,706.00 $8.88 EA

570 646 FULL DEPTH REPAIR-END PREP-MECH SPLICE 54.00 $84,072.60 $1,556.90 EA

570 648 FULL DEPTH REPAIR-END PREPARATION 68.00 $48,225.60 $709.20 EA

570 652 CONCRETE PAVEMENT REPAIR-FULL DEPTH-CONTINUOUS 2,603.00 $679,954.00 $261.22 SY

570 700 CONC PVMT REPAIR-SPOT FULL DEPTH 804.00 $18,081.00 $22.49 SF

570 709 11IN CONCRETE PAVEMENT REPAIR-FULL DEPTH-DOWELED 98.00 $12,250.00 $125.00 SY

570 710 10IN CONC PVMT REPAIR-FULL DEPTH-DOWELED 8,806.00 $1,265,831.00 $143.75 SY

570 711 9IN CONCRETE PAVEMENT REPAIR-FULL DEPTH-DOWELED 7,894.00 $1,336,044.70 $169.25 SY

570 713 8IN CONCRETE PAVEMENT REPAIR-FULL DEPTH-DOWELED 8,519.00 $992,663.50 $116.52 SY

570 950 1/2IN TRANSVERSE PCC JOINT CLEAN & SEALING 2,000.00 $7,000.00 $3.50 LF

570 963 TRANSVERSE PCC JOINT CLEANING & SEALING 151,423.00 $234,705.65 $1.55 LF

570 965 LONGITUDINAL PCC JOINT CLEANING & SEALING 76,554.00 $120,198.70 $1.57 LF

570 966 RANDOM PCC CRACK CLEANING & SEALING 8,540.00 $36,450.27 $4.27 LF

570 1512 SPALL REPAIR-PARTIAL DEPTH 46,895.00 $1,871,011.45 $39.90 SF

570 1600 EPOXY COATED DEFORMED BARS 2,513.00 $65,007.05 $25.87 EA

575 100 DOWEL BAR RETROFIT 22,896.00 $870,048.00 $38.00 EA

602 130 CLASS AAE-3 CONCRETE 6,465.68 $6,659,634.73 $1,030.00 CY

602 1130 CLASS AE-3 CONCRETE 4,790.70 $3,502,048.60 $731.01 CY

602 1131 CLASS AE-3 CONCRETE-BOX CULVERT 385.00 $474,786.00 $1,233.21 CY

602 1133 CONCRETE BRIDGE APPROACH SLAB 813.20 $250,267.00 $307.76 SY

602 1134 PILE SUPPORTED APPROACH SLAB 1,084.20 $325,417.00 $300.14 SY

602 1135 BRIDGE APPROACH SLAB-REMOVE & REPLACE 3,007.30 $1,547,721.05 $514.65 SY

602 1200 JERSEY BARRIER FORMED OR SLIP FORMED 1,267.00 $729,604.80 $575.85 LF

602 1208 CONCRETE BRIDGE BARRIER 1,746.00 $301,550.00 $172.71 LF

602 1250 PENETRATING WATER REPELLENT TREATMENT 12,989.00 $68,179.90 $5.25 SY

602 6001 PRECAST PIER CAP 8.00 $400,000.00 $50,000.00 EA

602 6002 PRECAST ABUTMENT 4.00 $160,000.00 $40,000.00 EA

602 6005 PRECAST CONCRET WING WALL 4.00 $100,000.00 $25,000.00 EA

602 7000 SPECIAL SURFACE FINISH 22,000.00 $90,200.00 $4.10 SF

602 7001 SPECIAL SURFACE FINISH 1.00 $142,750.00 $142,750.00 L SUM

602 8000 PEDESTAL 12.00 $30,000.00 $2,500.00 EA

604 9550 PRESTRESSED CONCRETE FASCIA GIRDER 360.00 $450,000.00 $1,250.00 LF

604 9610 PRESTRESSED BOX BEAM-27IN 626.00 $134,590.00 $215.00 LF

604 9620 PRESTRESSED BOX BEAM-33IN 1,005.00 $211,670.00 $210.62 LF

604 9910 PRESTRESSED I-BEAM-45IN 698.70 $160,701.00 $230.00 LF

606 806 8FT X 6FT PRECAST RCB CULVERT 46.00 $50,140.00 $1,090.00 LF

Page 7: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 7 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

606 1012 10FT X 12FT PRECAST RCB CULVERT 174.00 $222,300.00 $1,277.59 LF

606 1108 11FT X 8FT PRECAST RCB CULVERT 110.00 $124,569.50 $1,132.45 LF

606 1211 12FT X 11FT PRECAST RCB CULVERT 120.00 $137,660.48 $1,147.17 LF

606 1212 12FT X 12FT PRECAST RCB CULVERT 110.00 $132,000.00 $1,200.00 LF

606 1311 13FT X 11FT PRECAST RCB CULVERT 64.00 $87,834.24 $1,372.41 LF

606 1404 14FT X 4FT PRECAST RCB CULVERT 142.00 $130,498.00 $919.00 LF

606 1406 14FT X 6FT PRECAST RCB CULVERT 131.00 $174,885.00 $1,335.00 LF

606 1410 14FT X 10FT PRECAST RCB CULVERT 126.00 $133,182.00 $1,057.00 LF

606 1411 14FT X 11FT PRECAST RCB CULVERT 150.00 $142,500.00 $950.00 LF

606 3006 DBL 10FT X 6FT PRECAST RCB CULVERT 252.00 $337,806.00 $1,340.50 LF

606 3108 DBL 11FT X 8FT PRECAST RCB CULVERT 110.00 $155,914.00 $1,417.40 LF

606 3112 DBL 11FT X 12FT PRECAST RCB CULVERT 284.00 $489,048.00 $1,722.00 LF

606 3206 DBL 12FT X 6FT PRECAST RCB CULVERT 128.00 $204,807.68 $1,600.06 LF

606 3211 DBL 12FT X 11FT PRECAST RCB CULVERT 120.00 $200,089.60 $1,667.41 LF

606 3212 DBL 12FT X 12FT PRECAST RCB CULVERT 110.00 $231,000.00 $2,100.00 LF

606 3311 DBL 13FT X 11FT PRECAST RCB CULVERT 64.00 $115,843.20 $1,810.05 LF

606 3404 DBL 14FT X 4FT PRECAST RCB CULVERT 142.00 $219,390.00 $1,545.00 LF

606 3406 DBL 14FT X 6FT PRECAST RCB CULVERT 131.00 $301,300.00 $2,300.00 LF

606 3412 DBL 14FT X 12FT PRECAST RCB CULVERT 220.00 $550,000.00 $2,500.00 LF

606 4806 8FT X 6FT PRECAST RCB END SECTION 2.00 $43,400.00 $21,700.00 EA

606 5012 10FT X 12FT PRECAST RCB END SECTION 2.00 $109,500.00 $54,750.00 EA

606 5211 12FT X 11FT PRECAST RCB END SECTION 2.00 $31,100.00 $15,550.00 EA

606 5410 14FT X 10FT PRECAST RCB END SECTION 4.00 $119,718.00 $29,929.50 EA

606 5411 14FT X 11FT PRECAST RCB END SECTION 6.00 $68,019.96 $11,336.66 EA

606 7006 DBL 10FT X 6FT PRECAST RCB END SECTION 2.00 $56,000.00 $28,000.00 EA

606 7108 DBL 11FT X 8FT PRECAST RCB END SECTION 2.00 $65,063.08 $32,531.54 EA

606 7112 DBL 11FT X 12FT PRECAST RCB END SECTION 2.00 $92,000.00 $46,000.00 EA

606 7206 DBL 12FT X 6FT PRECAST RCB END SECTION 2.00 $61,367.08 $30,683.54 EA

606 7211 DBL 12FT X 11FT PRECAST RCB END SECTION 4.00 $139,020.82 $34,755.21 EA

606 7212 DBL 12FT X 12FT PRECAST RCB END SECTION 2.00 $84,000.00 $42,000.00 EA

606 7311 DBL 13FT X 11FT PRECAST RCB END SECTION 2.00 $83,270.84 $41,635.42 EA

606 7404 DBL 14FT X 4FT PRECAST RCB END SECTION 2.00 $30,000.00 $15,000.00 EA

606 7406 DBL 14FT X 6FT PRECAST RCB END SECTION 4.00 $148,000.00 $37,000.00 EA

606 7412 DBL 14FT X 12FT PRECAST RCB END SECTION 2.00 $90,000.00 $45,000.00 EA

612 114 REINFORCING STEEL-GRADE 60-BOX CULVERT 53,870.00 $172,115.52 $3.20 LBS

612 115 REINFORCING STEEL-GRADE 60 1,098,104.00 $1,352,774.70 $1.23 LBS

612 116 REINFORCING STEEL-GRADE 60-EPOXY COATED 990,241.00 $1,322,347.75 $1.34 LBS

616 360 STRUCTURAL STEEL 2,568,046.00 $4,586,235.50 $1.79 LBS

616 364 STRUCTURAL STEEL M270-GRADE 36 3,821.50 $25,063.65 $6.56 LBS

616 5890 STRUCTURAL STEEL 4.00 $3,046,077.40 $761,519.35 L SUM

618 110 TREATED TIMBER 12.00 $120,000.00 $10,000.00 MBM

618 115 UNTREATED TIMBER 51.70 $103,400.00 $2,000.00 MBM

622 20 STEEL PILING HP 10 X 42 5,912.00 $197,644.00 $33.43 LF

622 40 STEEL PILING HP 12 X 53 7,564.00 $316,615.30 $41.86 LF

622 60 STEEL PILING HP 14 X 73 20,994.00 $1,055,404.60 $50.27 LF

622 68 STEEL PILING HP 14 X 89 12,880.00 $644,000.00 $50.00 LF

622 70 STEEL PILING HP 14 X 102 8,494.00 $547,863.00 $64.50 LF

622 6760 STEEL SHEET PILING 9,622.00 $288,660.00 $30.00 SF

624 121 RESET PEDESTRIAN RAILING 69.50 $6,950.00 $100.00 LF

624 123 PEDESTRIAN RAILING 1,987.40 $266,986.00 $134.34 LF

624 124 PEDESTRIAN FENCE 1,725.00 $378,750.00 $219.57 LF

624 128 TRAFFIC RAIL-STEEL 358.70 $39,457.00 $110.00 LF

Page 8: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 8 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

624 151 RAILING 478.80 $55,856.00 $116.66 LF

624 3001 DOUBLE BOX BEAM RAIL RETROFIT-FREE STANDING 876.50 $112,251.29 $128.07 LF

624 3002 DOUBLE BOX BEAM RAIL RETROFIT - E-RAIL 756.00 $91,087.92 $120.49 LF

624 3005 CONNECTION PLATE MODIFICATION 8.00 $7,464.00 $933.00 EA

626 100 COFFERDAM 5.00 $49,446.00 $9,889.20 EA

626 120 PIER COFFERDAM 6.00 $370,000.00 $61,666.67 EA

630 100 SAND BLASTING & PAINTING 4.00 $643,300.00 $160,825.00 L SUM

630 9000 CONTAINMENT SYSTEM 4.00 $608,205.00 $152,051.25 L SUM

650 704 OVERLAY CONCRETE 1,230.80 $2,610,818.12 $2,121.24 CY

650 710 CLASS 1-H REMOVAL 3,381.00 $310,239.00 $91.76 SY

650 711 CLASS 2-H REMOVAL 682.00 $39,320.80 $57.66 SY

650 712 CLASS 3-H REMOVAL 108.00 $13,208.60 $122.30 SY

650 720 CLASS 1 REMOVAL 17,504.00 $432,112.06 $24.69 SY

650 721 CLASS 2 REMOVAL 4,173.70 $534,631.51 $128.10 SY

650 722 CLASS 2-A REMOVAL 7,510.80 $58,398.51 $7.78 LF

650 723 CLASS 3 REMOVAL 940.60 $188,754.88 $200.67 SY

650 724 CLASS 4 REMOVAL 144.60 $38,936.30 $269.27 SY

650 805 DECK SPALL REPAIR 360.00 $40,458.00 $112.38 SF

702 100 MOBILIZATION 181.00 $34,047,158.51 $188,105.85 L SUM

704 100 FLAGGING 129,125.00 $4,568,354.95 $35.38 MHR

704 1000 TRAFFIC CONTROL SIGNS 456,948.00 $932,692.10 $2.04 UNIT

704 1018 LANE CLOSURE-SIGNAL CONTROL/FLAGGING CONTROL 24.00 $250,162.22 $10,423.43 EA

704 1035 ATTENUATION DEVICE-TYPE B-25 10.00 $23,400.00 $2,340.00 EA

704 1036 ATTENUATION DEVICE-TYPE B-30 2.00 $10,000.00 $5,000.00 EA

704 1037 ATTENUATION DEVICE-TYPE B-35 6.00 $11,188.20 $1,864.70 EA

704 1039 ATTENUATION DEVICE-TYPE B-45 19.00 $66,668.20 $3,508.85 EA

704 1041 ATTENUATION DEVICE-TYPE B-55 4.00 $13,000.00 $3,250.00 EA

704 1043 ATTENUATION DEVICE-TYPE B-65 28.00 $86,519.15 $3,089.97 EA

704 1044 ATTENUATION DEVICE-TYPE B-70 2.00 $4,381.96 $2,190.98 EA

704 1045 ATTENUATION DEVICE-TYPE B-75 23.00 $72,590.93 $3,156.13 EA

704 1050 TYPE I BARRICADE 437.00 $17,721.20 $40.55 EA

704 1051 TYPE II BARRICADE 18.00 $1,345.50 $74.75 EA

704 1052 TYPE III BARRICADE 2,447.00 $274,194.06 $112.05 EA

704 1055 PEDESTRIAN LONGITUDINAL BARRICADE 3,041.00 $55,615.15 $18.29 LF

704 1060 DELINEATOR DRUMS 12,778.00 $353,470.80 $27.66 EA

704 1065 TRAFFIC CONES 96.00 $613.20 $6.39 EA

704 1067 TUBULAR MARKERS 30,335.00 $268,226.90 $8.84 EA

704 1070 DELINEATOR 803.00 $14,202.00 $17.69 EA

704 1072 FLEXIBLE DELINEATORS 2,489.00 $124,718.00 $50.11 EA

704 1080 STACKABLE VERTICAL PANELS 10,978.00 $351,729.90 $32.04 EA

704 1081 VERTICAL PANELS-BACK TO BACK 888.00 $13,548.64 $15.26 EA

704 1086 SEQUENCING ARROW PANEL-TYPE B 8.00 $11,150.00 $1,393.75 EA

704 1087 SEQUENCING ARROW PANEL-TYPE C 110.00 $147,607.62 $1,341.89 EA

704 1088 SEQUENCING ARROW PANEL-TYPE C-CROSSOVER 10.00 $12,818.00 $1,281.80 EA

704 1090 FLASHING BEACON 8.00 $10,902.00 $1,362.75 EA

704 1100 TRAFFIC CONTROL 6.00 $33,475.00 $5,579.17 L SUM

704 1185 PILOT CAR 23,968.00 $973,667.76 $40.62 HR

704 1500 OBLITERATION OF PAVEMENT MARKING 92,378.00 $199,402.80 $2.16 SF

704 3501 PORTABLE PRECAST CONCRETE MED BARRIER 190.00 $3,875.00 $20.39 LF

704 3510 PRECAST CONCRETE MED BARRIER-STATE FURNISHED 2,712.00 $823,073.14 $303.49 EA

704 4011 PORTABLE CHANGEABLE MESSAGE SIGN 23.00 $161,199.12 $7,008.66 EA

704 9100 VIDEO MONITORING SYSTEM 3.00 $67,500.00 $22,500.00 EA

Page 9: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 9 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

706 400 FIELD OFFICE 18.95 $334,480.49 $17,650.69 EA

706 500 AGGREGATE LABORATORY 36.31 $426,445.43 $11,744.57 EA

706 550 BITUMINOUS LABORATORY 64.00 $331,631.19 $5,181.74 EA

706 600 CONTRACTOR'S LABORATORY 67.00 $342,931.40 $5,118.38 EA

708 903 BEDDING STONE GRADATION III 1,229.00 $40,249.75 $32.75 TON

708 1010 RIPRAP-GROUTED JOINT 60.00 $4,500.00 $75.00 SY

708 1095 FLUME CONCRETE 65.00 $55,250.00 $850.00 LF

708 1200 SMALL ROCK COVER 693.00 $24,695.00 $35.63 TON

708 1530 INLET PROTECTION-FIBER ROLL 6IN 39.00 $3,829.80 $98.20 EA

708 1531 INLET PROTECTION-FIBER ROLL 12IN 19.00 $1,488.00 $78.32 EA

708 1532 REMOVAL INLET PROTECTION-FIBER ROLL 6IN 30.00 $907.40 $30.25 EA

708 1533 REMOVAL INLET PROTECTION-FIBER ROLL 12IN 17.00 $311.50 $18.32 EA

708 1540 INLET PROTECTION-SPECIAL 732.00 $113,173.24 $154.61 EA

708 1541 REMOVE INLET PROTECTION-SPECIAL 642.00 $33,109.28 $51.57 EA

708 5810 CONCRETE EROSION CONTROL BLANKET 3,408.00 $368,064.00 $108.00 SY

708 8500 STABILIZED CONSTRUCTION ACCESS 2.00 $8,424.00 $4,212.00 EA

708 8501 REMOVAL STABILIZED CONSTRUCTION ACCESS 2.00 $2,340.00 $1,170.00 EA

709 100 GEOSYNTHETIC MATERIAL TYPE G 110,397.00 $269,024.29 $2.44 SY

709 151 GEOSYNTHETIC MATERIAL TYPE R1 274,606.00 $587,005.61 $2.14 SY

709 155 GEOSYNTHETIC MATERIAL TYPE RR 177,600.00 $369,689.61 $2.08 SY

709 161 GEOSYNTHETIC MATERIAL TYPE S1 29,780.00 $60,121.00 $2.02 SY

709 162 GEOSYNTHETIC MATERIAL TYPE S2 12,131.40 $27,078.66 $2.23 SY

709 200 GEOSYNTHETIC REINFORCEMENT 113,488.00 $268,664.06 $2.37 SY

709 501 GEOTEXTILE FABRIC-TYPE D1 518.00 $1,036.00 $2.00 SY

709 600 GEOTEXTILE FABRIC-TYPE RR 5,078.00 $10,539.00 $2.08 SY

709 702 GEOTEXTILE FABRIC-TYPE R2 122.00 $1,232.20 $10.10 SY

710 250 TEMPORARY BYPASS DRAINAGE SYSTEM 2.00 $3,000.00 $1,500.00 EA

710 410 REMOVAL OF TEMP CONNECTION 11.00 $207,725.00 $18,884.09 EA

714 105 PIPE CONC REINF 12IN CL II-STORM DRAIN 146.00 $6,862.00 $47.00 LF

714 110 PIPE CONC REINF 12IN CL III 576.00 $32,590.00 $56.58 LF

714 115 PIPE CONC REINF 12IN CL III-STORM DRAIN 50.00 $6,006.40 $120.13 LF

714 205 PIPE CONC REINF 15IN CL III 636.00 $33,468.00 $52.62 LF

714 210 PIPE CONC REINF 15IN CL III-STORM DRAIN 2,837.00 $283,486.10 $99.92 LF

714 305 PIPE CONC REINF 18IN CL II-STORM DRAIN 20.00 $3,434.00 $171.70 LF

714 310 PIPE CONC REINF 18IN CL III 236.00 $36,229.56 $153.52 LF

714 315 PIPE CONC REINF 18IN CL III-STORM DRAIN 1,938.00 $111,469.44 $57.52 LF

714 400 PIPE CONC REINF 21IN CL III 40.00 $14,472.00 $361.80 LF

714 500 PIPE CONC REINF 24IN CL II-45DEG BEND 3.00 $3,150.00 $1,050.00 EA

714 615 PIPE CONC REINF 24IN CL III 3,055.00 $473,997.52 $155.15 LF

714 620 PIPE CONC REINF 24IN CL III-STORM DRAIN 902.00 $94,639.10 $104.92 LF

714 705 PIPE CONC REINF 27IN CL III 100.00 $10,000.00 $100.00 LF

714 710 PIPE CONC REINF 27IN CL III-STORM DRAIN 456.00 $33,561.60 $73.60 LF

714 820 PIPE CONC REINF 30IN CL III 3,893.00 $645,819.72 $165.89 LF

714 825 PIPE CONC REINF 30IN CL III-STORM DRAIN 949.00 $73,973.50 $77.95 LF

714 905 PIPE CONC REINF 36IN CL III 766.00 $155,271.48 $202.70 LF

714 910 PIPE CONC REINF 36IN CL III-STORM DRAIN 1,509.00 $134,473.70 $89.11 LF

714 1005 PIPE CONC REINF 42IN CL III 1,472.00 $298,110.00 $202.52 LF

714 1010 PIPE CONC REINF 42IN CL III-STORM DRAIN 136.00 $17,462.40 $128.40 LF

714 1105 PIPE CONC REINF 48IN CL III 212.00 $59,088.00 $278.72 LF

714 1210 PIPE CONC REINF 54IN CL III 86.00 $26,629.04 $309.64 LF

714 1212 PIPE CONC REINF 54IN CL III-STORM DRAIN 419.00 $67,780.50 $161.77 LF

714 1310 PIPE CONC REINF 60IN CL III 834.00 $242,524.76 $290.80 LF

Page 10: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 10 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

714 1313 PIPE C R 60IN CL III-STORM DRAIN 7.5DEG BEND 2.00 $3,762.00 $1,881.00 EA

714 1510 PIPE CONC REINF 72IN CL III 202.00 $84,415.84 $417.90 LF

714 1512 PIPE CONC REINF 72IN CL III STORM DRAIN 662.00 $172,120.00 $260.00 LF

714 1710 PIPE CONC REINF 84IN CL III 100.00 $47,000.00 $470.00 LF

714 2071 PIPE CONC REINF ARCH 138IN X 88IN CL III 10.00 $23,700.00 $2,370.00 LF

714 2101 PIPE CONC REINF ARCH 22IN X 13IN CL III-S DRAIN 30.00 $2,568.00 $85.60 LF

714 2111 PIPE CONC REINF ARCH 29IN X 18IN CL III-S DRAIN 12.00 $4,508.40 $375.70 LF

714 2130 PIPE CONC REINF ARCH 44IN X 27IN CL III 48.00 $8,817.60 $183.70 LF

714 2161 PIPE CONC REINF ARCH 58IN X 36IN CL III 42.00 $14,238.00 $339.00 LF

714 2165 PIPE CONC REINF ARCH 65IN X 40IN CL III 826.00 $281,666.00 $341.00 LF

714 2166 PIPE CONC REINF ARCH 65IN X 40IN CL III S DR 99.00 $22,968.00 $232.00 LF

714 2524 CURED-IN-PLACE PIPE-24IN 158.00 $38,105.00 $241.17 LF

714 2542 CURED-IN-PLACE PIPE-42IN 232.00 $97,440.00 $420.00 LF

714 3005 END SECT-CONC REINF 15IN 1.00 $1,395.35 $1,395.35 EA

714 3010 END SECT-CONC REINF 18IN 5.00 $6,215.00 $1,243.00 EA

714 3011 END SECT-CONC REINF 18IN CL III-STORM DRAIN 1.00 $1,449.00 $1,449.00 EA

714 3013 END SECT-TRAVERSABLE REINF. CONC.18IN 5.00 $6,891.00 $1,378.20 EA

714 3015 END SECT-CONC REINF 21IN 2.00 $2,950.00 $1,475.00 EA

714 3018 END SECT-TRAVERSABLE REINF. CONC.21IN 3.00 $5,190.00 $1,730.00 EA

714 3020 END SECT-CONC REINF 24IN 54.00 $71,794.76 $1,329.53 EA

714 3023 END SECT-TRAVERSABLE REINF. CONC.24IN 123.00 $109,674.30 $891.66 EA

714 3030 END SECT-CONC REINF 30IN 27.00 $35,312.03 $1,307.85 EA

714 3031 END SECT-CONC REINF 30IN CL III-STORM DRAIN 1.00 $1,985.70 $1,985.70 EA

714 3033 END SECT-TRAVERSABLE REINF. CONC.30IN 40.00 $34,296.00 $857.40 EA

714 3035 END SECT-CONC REINF 36IN 14.00 $26,534.22 $1,895.30 EA

714 3036 END SECT-TRAVERSABLE REINF. CONC.36IN 33.00 $50,208.65 $1,521.47 EA

714 3040 END SECT-CONC REINF 42IN 11.00 $26,190.00 $2,380.91 EA

714 3045 END SECT-CONC REINF 48IN 1.00 $2,780.00 $2,780.00 EA

714 3055 END SECT-CONC REINF 60IN 3.00 $8,415.02 $2,805.01 EA

714 3065 END SECT-CONC REINF 72IN 4.00 $16,015.38 $4,003.85 EA

714 3075 END SECT-CONC REINF 84IN 4.00 $16,000.00 $4,000.00 EA

714 3110 END SECT-CONC REINF ARCH 65IN X 40IN 2.00 $5,727.20 $2,863.60 EA

714 3125 END SECT-CONC REINF ARCH 138IN X 88IN 1.00 $15,800.00 $15,800.00 EA

714 3151 HEADWALL-PRECAST CONCRETE 6IN 4.00 $5,220.00 $1,305.00 EA

714 3412 8FT STR PLATE PIPE .168IN 108.00 $126,486.36 $1,171.17 LF

714 3417 8FT 6IN STR PLATE PIPE .138 50.00 $55,224.00 $1,104.48 LF

714 3445 11FT 6IN STR PLATE PIPE .168IN 52.00 $74,529.00 $1,433.25 LF

714 4090 PIPE CONDUIT 12IN 1,700.00 $71,400.00 $42.00 LF

714 4091 PIPE CONDUIT 12IN-APPROACH 43.00 $1,720.00 $40.00 LF

714 4095 PIPE CONDUIT 15IN 84.00 $6,720.00 $80.00 LF

714 4096 PIPE CONDUIT 15IN-APPROACH 51.00 $1,328.55 $26.05 LF

714 4097 PIPE CONDUIT 15IN-STORM DRAIN 2,878.00 $464,234.70 $161.30 LF

714 4099 PIPE CONDUIT 18IN-APPROACH 4,211.00 $169,980.86 $40.37 LF

714 4100 PIPE CONDUIT 18IN 1,990.00 $160,957.55 $80.88 LF

714 4101 PIPE CONDUIT 18IN-STORM DRAIN 3,743.00 $447,618.06 $119.59 LF

714 4105 PIPE CONDUIT 24IN 2,822.00 $455,928.45 $161.56 LF

714 4106 PIPE CONDUIT 24IN-APPROACH 16,584.00 $775,948.16 $46.79 LF

714 4107 PIPE CONDUIT 24IN-STORM DRAIN 946.00 $133,397.00 $141.01 LF

714 4110 PIPE CONDUIT 30IN 3,738.00 $754,971.12 $201.97 LF

714 4112 PIPE CONDUIT 30IN-STORM DRAIN 3,548.00 $364,343.00 $102.69 LF

714 4113 PIPE CONDUIT 30IN-APPROACH 2,125.00 $142,197.76 $66.92 LF

714 4115 PIPE CONDUIT 36IN 1,898.00 $409,045.40 $215.51 LF

Page 11: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 11 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

714 4116 PIPE CONDUIT 36IN-APPROACH 824.00 $80,456.65 $97.64 LF

714 4117 PIPE CONDUIT 36IN-STORM DRAIN 1,116.00 $127,584.00 $114.32 LF

714 4120 PIPE CONDUIT 42IN 1,135.00 $288,896.00 $254.53 LF

714 4121 PIPE CONDUIT 42IN-STORM DRAIN 84.00 $10,896.00 $129.71 LF

714 4122 PIPE CONDUIT 42IN-APPROACH 614.00 $61,769.60 $100.60 LF

714 4124 PIPE CONDUIT 36IN-JACKED OR BORED 286.00 $115,830.00 $405.00 LF

714 4125 PIPE CONDUIT 48IN 3,075.00 $715,847.52 $232.80 LF

714 4126 PIPE CONDUIT 48IN-STORM DRAIN 336.00 $36,624.00 $109.00 LF

714 4127 PIPE CONDUIT 48IN-JACKED OR BORED 152.00 $69,312.00 $456.00 LF

714 4128 PIPE CONDUIT 48IN-APPROACH 1,353.00 $79,332.00 $58.63 LF

714 4130 PIPE CONDUIT 54IN 253.00 $160,986.00 $636.31 LF

714 4131 PIPE CONDUIT 54IN-STORM DRAIN 412.00 $52,900.80 $128.40 LF

714 4132 PIPE CONDUIT 54IN-APPROACH 74.00 $6,581.56 $88.94 LF

714 4133 PIPE CONDUIT 54IN-JACKED OR BORED 1,272.00 $677,976.00 $533.00 LF

714 4140 PIPE CONDUIT 66IN 520.00 $135,240.00 $260.08 LF

714 4145 PIPE CONDUIT 72IN 32.00 $12,960.00 $405.00 LF

714 4155 PIPE CONDUIT 84IN 48.00 $20,160.00 $420.00 LF

714 4165 PIPE CONDUIT 24IN-JACKED OR BORED 304.00 $102,290.40 $336.48 LF

714 4166 PIPE CONDUIT 30IN-JACKED OR BORED 1,369.00 $515,806.00 $376.78 LF

714 4167 PIPE CONDUIT 42IN-JACKED OR BORED 132.00 $56,760.00 $430.00 LF

714 4990 PIPE CORR STEEL .064IN 10IN 24.00 $1,080.00 $45.00 LF

714 5000 PIPE CORR STEEL .064IN 12IN 98.00 $5,068.00 $51.71 LF

714 5010 PIPE CORR STEEL .064IN 15IN 79.00 $12,166.00 $154.00 LF

714 5015 PIPE CORR STEEL .064IN 18IN 1,971.00 $126,134.02 $63.99 LF

714 5035 PIPE CORR STEEL .064IN 24IN 1,438.00 $91,557.14 $63.67 LF

714 5040 PIPE CORR STEEL .064IN 30IN 15.00 $3,350.00 $223.33 LF

714 5045 PIPE CORR STEEL .064IN 36IN 5.00 $1,000.00 $200.00 LF

714 5210 PIPE CORR STEEL .079IN 30IN 190.00 $9,215.00 $48.50 LF

714 5215 PIPE CORR STEEL .079IN 36IN 347.00 $17,681.20 $50.95 LF

714 5220 PIPE CORR STEEL .079IN 42IN 64.00 $3,401.60 $53.15 LF

714 5225 PIPE CORR STEEL .079IN 48IN 386.00 $24,688.56 $63.96 LF

714 5320 PIPE CORR STEEL .109IN 48IN 127.00 $18,210.53 $143.39 LF

714 5325 PIPE CORR STEEL .109IN 54IN 116.00 $9,920.32 $85.52 LF

714 5331 PIPE CORR STEEL .138IN 60IN 200.00 $52,520.00 $262.60 LF

714 5340 PIPE CORR STEEL .109IN 84IN 178.00 $43,913.00 $246.70 LF

714 5350 PIPE CORR STEEL .109IN 96IN 364.00 $84,812.00 $233.00 LF

714 5724 24IN GRATES FOR REINF CONC END SECTION 2.00 $1,400.00 $700.00 EA

714 5800 END SECT CORR STEEL .064IN 12IN 1.00 $300.00 $300.00 EA

714 5810 END SECT CORR STEEL .064IN 18IN 19.00 $3,646.64 $191.93 EA

714 5820 END SECT CORR STEEL .064IN 24IN 23.00 $9,087.08 $395.09 EA

714 5825 END SECT CORR STEEL .079IN 30IN 6.00 $9,888.00 $1,648.00 EA

714 5830 END SECT CORR STEEL .079IN 36IN 2.00 $1,100.00 $550.00 EA

714 5840 END SECT CORR STEEL .109IN 48IN 2.00 $1,615.60 $807.80 EA

714 5850 END SECT CORR STEEL .109IN 60IN 4.00 $7,255.20 $1,813.80 EA

714 5857 END SECT CORR STEEL .109IN 84IN 1.00 $5,150.00 $5,150.00 EA

714 5950 CORR STEEL PIPE ELBOW 18IN 1.00 $1,315.00 $1,315.00 EA

714 6496 END SECT-TRAVERSABLE METAL 15IN 10.00 $1,930.00 $193.00 EA

714 6500 END SECT METAL 18IN 2.00 $378.94 $189.47 EA

714 6501 END SECT-TRAVERSABLE METAL 18IN 66.00 $12,001.68 $181.84 EA

714 6506 END SECT-TRAVERSABLE METAL 24IN 37.00 $12,849.65 $347.29 EA

714 6511 END SECT-TRAVERSABLE METAL 30IN 4.00 $5,600.00 $1,400.00 EA

714 6581 PIPE POLYETHYLENE CORR PERF 6IN DRAIN 2,277.00 $23,370.90 $10.26 LF

Page 12: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 12 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

714 6589 PIPE PVC 4IN DRAIN 83.40 $2,096.39 $25.14 LF

714 6590 PIPE PVC 6IN DRAIN 110.00 $1,327.50 $12.07 LF

714 7030 PIPE PVC 12IN 710.00 $14,981.00 $21.10 LF

714 7033 PIPE PVC 15IN 54.00 $6,264.00 $116.00 LF

714 7036 PIPE PVC 18IN 770.00 $18,095.00 $23.50 LF

714 7042 PIPE PVC 24IN 679.00 $25,292.75 $37.25 LF

714 8498 CASING PIPE 18IN 368.00 $46,000.00 $125.00 LF

714 8516 CASING PIPE 36IN 68.00 $34,680.00 $510.00 LF

714 9200 CATTLE PASS CONC INTERMED SECTION 1,039.00 $477,274.52 $459.36 LF

714 9220 CATTLE PASS CONC PLUG 2.00 $14,000.00 $7,000.00 EA

714 9300 STOCK PASS CONC INTERMED SEC CONC 12.00 $6,924.00 $577.00 LF

714 9350 END SECTION CONC CATTLE PASS 24.00 $82,433.63 $3,434.73 EA

714 9370 END SECTION CONC STOCK PASS 1.00 $7,830.00 $7,830.00 EA

714 9611 REMOVE & RELAY CONC CATTLE PASS END SECTION 10.00 $21,750.00 $2,175.00 EA

714 9630 RELAY END SECTION-ALL TYPES & SIZES 7.00 $6,575.00 $939.29 EA

714 9656 INSTALL END SECTION-ALL TYPES & SIZES 8.00 $1,256.00 $157.00 EA

714 9659 REMOVE & RELAY PIPE-ALL TYPES & SIZES 601.00 $42,105.64 $70.06 LF

714 9660 REMOVE & RELAY END SECTION-ALL TYPE & SIZES 226.00 $139,710.14 $618.19 EA

714 9680 PLUG PIPE-ALL TYPES & SIZES 18.00 $88,584.08 $4,921.34 EA

714 9685 TRENCH PLUG 6.00 $15,600.00 $2,600.00 EA

714 9696 EDGEDRAIN NON PERMEABLE BASE 3,612.00 $12,280.80 $3.40 LF

714 9700 UNDERDRAIN FILL GRANULAR MATERIAL 45.00 $2,205.00 $49.00 CY

714 9705 UNDERDRAIN CLEANOUT RISER 7.00 $3,086.10 $440.87 EA

714 9720 UNDERDRAIN PIPE PVC PERFORATED 4IN 7,758.00 $57,953.00 $7.47 LF

714 9730 UNDERDRAIN PIPE PVC PERFORATED 6IN 400.00 $1,700.00 $4.25 LF

714 9770 UNDERDRAIN PIPE PVC NON-PERFORATED 4IN 80.00 $2,400.00 $30.00 LF

714 9916 FLAP GATE 36IN 1.00 $7,500.00 $7,500.00 EA

714 9918 FLAP GATE 48IN 5.00 $64,000.00 $12,800.00 EA

720 110 RIGHT OF WAY MARKERS 2,249.00 $315,238.48 $140.17 EA

720 125 ALIGNMENT MONUMENTS 508.00 $72,273.15 $142.27 EA

720 130 IRON PIN R/W MONUMENTS 1,822.00 $94,216.49 $51.71 EA

720 135 IRON PIN REFERENCE MONUMENTS 501.00 $25,920.12 $51.74 EA

722 100 MANHOLE 48IN 25.00 $75,212.50 $3,008.50 EA

722 107 MANHOLE 54IN 6.00 $16,800.00 $2,800.00 EA

722 110 MANHOLE 60IN 30.00 $86,963.40 $2,898.78 EA

722 115 MANHOLE 66IN 2.00 $7,810.35 $3,905.18 EA

722 120 MANHOLE 72IN 16.00 $68,837.00 $4,302.31 EA

722 130 MANHOLE 84IN 10.00 $52,290.00 $5,229.00 EA

722 140 MANHOLE 96IN 4.00 $26,270.92 $6,567.73 EA

722 200 MANHOLE 108IN 1.00 $13,273.65 $13,273.65 EA

722 202 MANHOLE 120IN 1.00 $7,975.00 $7,975.00 EA

722 237 MANHOLE TEE 54IN X 48IN 2.00 $6,450.00 $3,225.00 EA

722 239 MANHOLE TEE 60IN X 48IN 2.00 $11,600.00 $5,800.00 EA

722 243 MANHOLE TEE 72IN X 48IN 3.00 $15,225.00 $5,075.00 EA

722 300 MANHOLE SANITARY 1.00 $4,280.00 $4,280.00 EA

722 315 MANHOLE CASTING 9.00 $6,482.96 $720.33 EA

722 1100 MANHOLE RISER 48IN 192.90 $37,877.32 $196.36 LF

722 1106 MANHOLE RISER 54IN 11.00 $2,057.00 $187.00 LF

722 1110 MANHOLE RISER 60IN 181.70 $54,672.85 $300.90 LF

722 1115 MANHOLE RISER 66IN 19.00 $7,422.00 $390.63 LF

722 1120 MANHOLE RISER 72IN 99.40 $42,931.23 $431.90 LF

722 1130 MANHOLE RISER 84IN 66.30 $37,461.14 $565.02 LF

Page 13: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 13 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

722 1140 MANHOLE RISER 96IN 36.40 $25,627.98 $704.07 LF

722 1200 MANHOLE RISER 108IN 14.00 $13,136.76 $938.34 LF

722 1205 MANHOLE RISER 120IN 8.00 $6,160.00 $770.00 LF

722 2490 MANHOLE STORM CONNECTION 1.00 $1,022.00 $1,022.00 EA

722 2500 MANHOLE SPECIAL 3.00 $17,100.00 $5,700.00 EA

722 3291 ABANDON SANITARY SEWER MANHOLE 1.00 $2,000.00 $2,000.00 EA

722 3296 ABANDON STORM SEWER SYSTEM 1.00 $4,250.00 $4,250.00 L SUM

722 3410 MANHOLE REPAIR 12.00 $19,316.00 $1,609.67 EA

722 3453 GRATE-TYPE 1 2.00 $16,260.00 $8,130.00 EA

722 3455 CASTING INLET-TYPE 1 15.00 $14,216.08 $947.74 EA

722 3460 CASTING INLET-TYPE 2 1.00 $511.18 $511.18 EA

722 3461 CASTING INLET-TYPE 2-DOUBLE 7.00 $11,206.44 $1,600.92 EA

722 3470 CASTING CATCH BASIN-TYPE A 1.00 $853.00 $853.00 EA

722 3475 CASTING CATCH BASIN 6IN BEEHIVE 2.00 $1,706.00 $853.00 EA

722 3500 INLET-TYPE 1 14.00 $50,400.00 $3,600.00 EA

722 3510 INLET-TYPE 2 222.00 $606,460.68 $2,731.80 EA

722 3520 INLET-TYPE 2 DOUBLE 50.00 $225,721.92 $4,514.44 EA

722 3701 INLET SPECIAL-TYPE 2 48IN 20.00 $76,794.80 $3,839.74 EA

722 3713 INLET SPECIAL MOUNTABLE-TYPE B 48IN 6.00 $26,813.00 $4,468.83 EA

722 3760 INLET SPECIAL-TYPE 1 60IN 1.00 $5,029.00 $5,029.00 EA

722 3761 INLET SPECIAL-TYPE 2 60IN 4.00 $41,600.00 $10,400.00 EA

722 3766 INLET SPECIAL-TYPE 2 72IN 1.00 $3,600.00 $3,600.00 EA

722 3768 INLET SPECIAL-TYPE 2 84IN 1.00 $9,767.00 $9,767.00 EA

722 3790 INLET SPECIAL CATCH BASIN 9IN BEEHIVE 60IN 2.00 $8,500.30 $4,250.15 EA

722 3900 INLET SLOTTED DRAIN 12IN 30.00 $5,298.00 $176.60 LF

722 3910 INLET SLOTTED DRAIN 15IN 460.00 $92,871.00 $201.89 LF

722 3920 INLET SLOTTED DRAIN 18IN 180.00 $23,112.00 $128.40 LF

722 4010 INLET CATCH BASIN 6IN BEEHIVE 5.00 $13,500.00 $2,700.00 EA

722 4020 INLET CATCH BASIN 9IN BEEHIVE 8.00 $17,150.00 $2,143.75 EA

722 4060 INLET MOUNTABLE CURB-TYPE B 10.00 $30,094.00 $3,009.40 EA

722 4565 MEDIAN DRAIN PRECAST CONCRETE-TYPE A 7.00 $26,280.00 $3,754.29 EA

722 4580 RESET PRECAST CONCRETE MEDIAN DRAIN 2.00 $3,400.00 $1,700.00 EA

722 6140 ADJUST GATE VALVE BOX 154.00 $111,191.00 $722.02 EA

722 6160 ADJUST INLET 101.00 $38,799.45 $384.15 EA

722 6200 ADJUST MANHOLE 140.00 $129,990.60 $928.50 EA

722 6201 ADJUST MANHOLE SPECIAL 3.00 $2,463.00 $821.00 EA

722 6240 ADJUST UTILITY APPURTENANCE 65.00 $25,743.25 $396.05 EA

722 6241 ADJUST SPRINKLER SYSTEM 1.00 $10,735.00 $10,735.00 L SUM

722 6248 ADJUST 3IN WATERMAIN 1.00 $2,650.00 $2,650.00 EA

722 6695 AIR RELIEF VALVE & MANHOLE 2.00 $19,432.01 $9,716.01 EA

724 210 FITTINGS-DUCTILE IRON 4,868.00 $56,887.60 $11.69 LBS

724 270 REMOVE GATE VALVE & BOX 6.00 $1,200.00 $200.00 EA

724 280 GATE VALVE & BOX 3IN 1.00 $1,200.00 $1,200.00 EA

724 300 GATE VALVE & BOX 6IN 40.00 $66,192.50 $1,654.81 EA

724 310 GATE VALVE & BOX 8IN 10.00 $21,395.00 $2,139.50 EA

724 314 GATE VALVE & BOX 12IN 29.00 $108,490.04 $3,741.04 EA

724 400 HYDRANT-INSTALL 6IN 5.00 $26,778.50 $5,355.70 EA

724 411 6IN HYDRANT 28.00 $171,750.00 $6,133.93 EA

724 420 HYDRANT-RELOCATE 7.00 $35,105.00 $5,015.00 EA

724 427 ADJUST HYDRANT 1.00 $1,160.00 $1,160.00 EA

724 430 REMOVE HYDRANT 18.00 $17,916.00 $995.33 EA

724 611 WATER SERVICE LINE 1IN 45.00 $1,444.50 $32.10 LF

Page 14: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 14 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

724 621 WATER SERVICE LINE 2IN 14.00 $700.00 $50.00 LF

724 626 WATER SERVICE LINE 3IN 26.00 $1,300.00 $50.00 LF

724 636 WATER SERVICE LINE 6IN 595.00 $29,750.00 $50.00 LF

724 800 WATERMAIN 6IN 39.00 $1,353.30 $34.70 LF

724 810 WATERMAIN 6IN PVC 564.00 $30,409.60 $53.92 LF

724 820 WATERMAIN 8IN 763.00 $31,570.00 $41.38 LF

724 850 WATERMAIN 12IN PVC 4,746.00 $296,046.62 $62.38 LF

724 851 BORE & PUSH 12IN PVC WATER 317.00 $141,065.00 $445.00 LF

724 855 12IN WATERMAIN 3,562.00 $125,382.40 $35.20 LF

724 892 RELOCATE WATERMAIN 3.00 $18,745.00 $6,248.33 EA

724 940 RELOCATE CURB STOP & BOX 1.00 $710.00 $710.00 EA

724 944 CONNECTION TO EXISTING MAIN 8.00 $12,953.08 $1,619.14 EA

724 1000 WATER SERVICE LINE ADJUSTMENTS 2.00 $8,000.00 $4,000.00 EA

724 1025 UNDERGROUND IRRIGATION SYSTEM 1.00 $12,000.00 $12,000.00 L SUM

724 1095 BORE SANITARY SEWER PIPE 212.00 $98,580.00 $465.00 LF

724 1110 8IN SANITARY SEWER PIPE 556.00 $27,800.00 $50.00 LF

724 1118 15IN SANITARY SEWER PIPE 479.00 $45,984.00 $96.00 LF

724 1120 6IN SEWER SERVICE PIPE 329.00 $16,450.00 $50.00 LF

724 1138 PIPE DUCTILE IRON 6IN 96.00 $12,000.00 $125.00 LF

724 1143 PIPE DUCTILE IRON 10IN 92.00 $18,860.00 $205.00 LF

724 1180 1 1/4IN SEWER CURB STOP AND CHECK VALVE 1.00 $400.00 $400.00 EA

724 2120 36IN X 23IN ARCH SANITARY SEWER PIPE 155.00 $43,121.00 $278.20 LF

724 6013 ABANDON VALVE BOX 3.00 $300.00 $100.00 EA

724 6030 ABANDON WATER MAIN/SERVICE LINE 6.00 $2,100.00 $350.00 EA

724 6840 12IN 11.25DEG BEND 2.00 $1,783.66 $891.83 EA

724 6842 12IN 22.5DEG BEND 4.00 $4,047.44 $1,011.86 EA

724 6846 12IN TEE 1.00 $1,500.00 $1,500.00 EA

724 6980 8IN X 8IN X 6IN TEE 2.00 $1,500.00 $750.00 EA

724 6986 12IN X 12IN X 6IN TEE 11.00 $13,200.00 $1,200.00 EA

724 6987 12IN X 12IN X 8IN TEE 1.00 $1,200.00 $1,200.00 EA

724 6995 12IN X 8IN X 8IN TEE 1.00 $2,000.00 $2,000.00 EA

724 7004 6IN TEE 8.00 $4,800.00 $600.00 EA

724 7008 6IN 90DEG BEND 1.00 $500.00 $500.00 EA

724 7010 8IN X 6IN REDUCER 4.00 $1,600.00 $400.00 EA

724 7011 8IN TEE 1.00 $800.00 $800.00 EA

724 7031 2IN CURB STOP & BOX 1.00 $500.00 $500.00 EA

724 8095 12IN X 8IN CROSS 1.00 $1,300.00 $1,300.00 EA

724 9014 FORCEMAIN 1 1/4IN 9.00 $270.00 $30.00 LF

724 9016 FORCEMAIN 2IN 1,531.00 $53,585.00 $35.00 LF

724 9300 UTILITY TRENCH DAM 59.00 $53,100.00 $900.00 EA

744 50 INSULATION BOARD 84.00 $2,268.00 $27.00 CF

744 100 POLYSTYRENE INSULATION BOARD 18,012.00 $28,663.00 $1.59 BD FT

748 100 CURB & GUTTER 4,411.00 $149,651.82 $33.93 LF

748 120 CURB & GUTTER MOUNTABLE-TYPE I 3,268.00 $114,467.34 $35.03 LF

748 140 CURB & GUTTER-TYPE I 120,483.60 $2,876,153.27 $23.87 LF

748 141 CURB & GUTTER-TYPE 1 SPECIAL 1,208.00 $103,486.68 $85.67 LF

748 151 MOUNTABLE CURB & GUTTER-TYPE 1 SEC B 253.00 $6,578.00 $26.00 LF

748 520 CURB-TYPE I 762.00 $23,115.20 $30.33 LF

748 540 CURB 251.00 $10,583.00 $42.16 LF

748 1000 VALLEY GUTTER 36IN 538.00 $28,468.00 $52.91 LF

748 1020 VALLEY GUTTER 36IN 22.00 $3,400.00 $154.55 SY

748 1030 VALLEY GUTTER 72IN 295.00 $34,007.30 $115.28 SY

Page 15: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 15 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

748 1260 VALLEY GUTTER 144IN 22.00 $2,420.00 $110.00 SY

750 20 PIGMENTED CONCRETE 391.00 $44,965.00 $115.00 SY

750 30 PIGMENTED IMPRINTED CONCRETE 1,878.00 $213,896.38 $113.90 SY

750 100 SIDEWALK CONCRETE 12,249.00 $794,339.80 $64.85 SY

750 105 SIDEWALK CONCRETE BIKEWAY 1,994.00 $89,789.08 $45.03 SY

750 110 SIDEWALK BRICK PATTERN 136.00 $11,288.00 $83.00 SY

750 115 SIDEWALK CONCRETE 4IN 14,922.54 $767,161.77 $51.41 SY

750 125 SIDEWALK CONCRETE 5IN 2,444.00 $209,377.48 $85.67 SY

750 140 SIDEWALK CONCRETE 6IN 1,226.00 $94,722.40 $77.26 SY

750 150 SIDEWALK TRENCH DRAIN 5.00 $11,540.00 $2,308.00 EA

750 200 CONCRETE MEDIAN PAVING 5,721.80 $361,950.18 $63.26 SY

750 210 CONCRETE MEDIAN NOSE PAVING 353.80 $44,360.93 $125.38 SY

750 245 CONCRETE PAVING COLORED 213.00 $16,614.00 $78.00 SY

750 1000 DRIVEWAY CONCRETE 3,762.00 $275,162.55 $73.14 SY

750 1016 DRIVEWAY CONCRETE 6IN REINFORCED 932.00 $49,396.00 $53.00 SY

750 1020 DRIVEWAY CONCRETE 8IN 269.00 $30,935.00 $115.00 SY

750 2115 DETECTABLE WARNING PANELS 7,352.60 $317,998.90 $43.25 SF

752 100 FENCE BARBED WIRE 3 STRAND 11,084.00 $21,940.40 $1.98 LF

752 110 FENCE BARBED WIRE 3 STRAND-STEEL POST 10,515.00 $18,579.25 $1.77 LF

752 200 FENCE BARBED WIRE 4 STRAND 84,161.00 $210,174.02 $2.50 LF

752 201 FENCE SMOOTH WIRE 4 STRAND 540.00 $1,080.00 $2.00 LF

752 300 FENCE BARBED WIRE 4 STRAND-WOOD POST 375.00 $1,106.65 $2.95 LF

752 320 FENCE BARBED WIRE 4 STRAND-STEEL POST 61,031.00 $139,865.66 $2.29 LF

752 600 FENCE CHAIN LINK 3,603.00 $88,670.27 $24.61 LF

752 660 FENCE CHAIN LINK REMOVE & RESET 100.00 $15,500.00 $155.00 LF

752 700 FENCE WOVEN WIRE 1,533.00 $4,276.49 $2.79 LF

752 900 FENCE TEMPORARY INSTALL & REMOVE 17,069.00 $32,393.90 $1.90 LF

752 905 TEMPORARY FENCE 8,110.00 $16,652.30 $2.05 LF

752 910 SAFETY FENCE 808.00 $1,648.20 $2.04 LF

752 911 TEMPORARY SAFETY FENCE 12,623.00 $34,622.50 $2.74 LF

752 920 FENCE REMOVE & RESET 1.00 $12,000.00 $12,000.00 L SUM

752 922 FENCE REMOVE & RESET 2,458.00 $31,603.60 $12.86 LF

752 995 FENCE TERMINAL-WOOD POSTS 55.00 $9,500.00 $172.73 EA

752 2100 VEHICLE GATE 22.00 $15,280.00 $694.55 EA

752 2110 RESET VEHICLE GATE 16.00 $3,860.00 $241.25 EA

752 2120 REMOVE VEHICLE GATE 20.00 $1,710.00 $85.50 EA

752 2995 CORNER ASSEMBLY-WOOD POST 1.00 $240.00 $240.00 EA

752 3100 CORNER ASSEMBLY CHAIN LINK 12.00 $8,020.00 $668.33 EA

752 3120 CORNER ASSEMBLY WOVEN WIRE 3.00 $935.00 $311.67 EA

752 3140 CORNER ASSEMBLY BARBED WIRE 264.00 $79,930.00 $302.77 EA

752 3150 CORNER ASSEMBLY BARBED WIRE-WOOD POST 250.00 $64,852.12 $259.41 EA

752 3160 CORNER ASSEMBLY BARBED WIRE-STEEL POST 17.00 $16,835.00 $990.29 EA

752 4100 DOUBLE BRACE ASSEMBLY BARBED WIRE 41.00 $10,130.00 $247.07 EA

752 4120 DOUBLE BRACE ASSEMBLY WOVEN WIRE 2.00 $250.00 $125.00 EA

752 4140 DOUBLE BRACE ASSEMBLY BARBED WIRE-WOOD POST 230.00 $29,500.00 $128.26 EA

752 4150 DOUBLE BRACE ASSEMBLY BARBED WIRE-STEEL POST 25.00 $25,000.00 $1,000.00 EA

752 4160 DOUBLE BRACE ASSEMBLY CHAIN LINK 2.00 $1,720.00 $860.00 EA

754 110 FLAT SHEET FOR SIGNS-TYPE XI REFL SHEETING 29,402.20 $620,603.46 $21.11 SF

754 112 FLAT SHEET FOR SIGNS-TYPE IV REFL SHEETING 26,535.50 $546,933.62 $20.61 SF

754 115 FLAT SHEET FOR SIGNS-TYPE IX REFL SHEETING 264.80 $6,842.94 $25.84 SF

754 117 FLAT SHEET FOR SIGNS-TYPE 3A REFL SHEETING 57.00 $1,077.30 $18.90 SF

754 137 ROADWAY TERMINATION-TYPE A 4.00 $5,133.34 $1,283.34 EA

Page 16: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 16 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

754 150 DELINEATORS-TYPE A 376.00 $19,078.40 $50.74 EA

754 151 RESET DELINEATOR POST-TYPE A 1.00 $89.55 $89.55 EA

754 162 REMOVE & RESET DELINEATORS 224.00 $7,645.34 $34.13 EA

754 168 DELINEATORS-TYPE D 6.00 $330.00 $55.00 EA

754 170 FLEXIBLE DELINEATORS 59.00 $3,598.70 $60.99 EA

754 193 FLEXIBLE DELINEATORS-TYPE D 21.00 $1,431.40 $68.16 EA

754 195 DIAMOND GRADE DELINEATORS-TYPE A 320.00 $18,609.00 $58.15 EA

754 196 DIAMOND GRADE DELINEATORS-TYPE B 24.00 $1,975.00 $82.29 EA

754 198 DIAMOND GRADE DELINEATORS-TYPE D 9.00 $945.00 $105.00 EA

754 199 DIAMOND GRADE DELINEATORS-TYPE E 24.00 $2,880.00 $120.00 EA

754 206 STEEL GALV POSTS-TELESCOPING PERFORATED TUBE 52,203.40 $957,869.73 $18.35 LF

754 207 STEEL GALV POSTS-FLANGE CHANNEL 42.00 $378.00 $9.00 LF

754 210 GALV STEEL POST-STANDARD PIPE 413.20 $28,114.60 $68.04 LF

754 214 GALV STEEL POSTS-W-SHAPE POSTS(TWO OR MORE) 3,826.00 $293,107.47 $76.61 LF

754 530 PANEL FOR SIGNS-TYPE XI REFLECTIVE SHEETING 54.00 $1,390.50 $25.75 SF

754 534 PANEL FOR SIGNS-TYPE IV REFLECTIVE SHEETING 4,368.00 $136,956.00 $31.35 SF

754 541 OVERLAY PANEL-TYPE IV REFLECTIVE SHEETING 2,469.80 $44,032.45 $17.83 SF

754 542 OVERLAY PANEL-TYPE XI REFLECTIVE SHEETING 2,371.10 $46,165.32 $19.47 SF

754 556 INTERSTATE MILE POSTS-TYPE B 11.00 $1,705.00 $155.00 EA

754 557 INTERSTATE MILE POSTS-TYPE C 15.00 $2,641.00 $176.07 EA

754 561 REFERENCE MARKER-TYPE A 22.00 $3,555.75 $161.63 EA

754 562 REFERENCE MARKER-TYPE B 28.00 $4,708.50 $168.16 EA

754 563 REFERENCE MARKER-TYPE C 75.00 $11,839.00 $157.85 EA

754 592 RESET SIGN PANEL 684.00 $41,195.22 $60.23 EA

754 593 RESET SIGN SUPPORT 142.00 $24,613.40 $173.33 EA

754 596 RESET MILE POST 13.00 $1,941.00 $149.31 EA

754 801 OBJECT MARKERS - TYPE I 4.00 $620.00 $155.00 EA

754 803 OBJECT MARKERS - TYPE III 68.00 $11,818.34 $173.80 EA

754 805 OBJECT MARKERS - CULVERTS 1,451.00 $81,190.70 $55.95 EA

754 1100 CLASS AE CONCRETE-SIGN FOUNDATIONS 15.20 $29,199.66 $1,921.03 CY

754 1104 REMOVE SIGN FOUNDATION 109.00 $58,385.55 $535.65 EA

754 8005 PORTABLE CHANGEABLE MESSAGE SIGN 1.00 $10,000.00 $10,000.00 EA

754 8020 DYNAMIC MESSAGE SIGN 1.00 $200,000.00 $200,000.00 EA

754 8021 DYNAMIC MESSAGE SIGN-POST MOUNTED 3.00 $396,000.00 $132,000.00 EA

760 1 RUMBLE STRIPS - CONCRETE SHOULDER 53.06 $95,361.75 $1,797.24 MILE

760 3 RUMBLE STRIPS - CONCRETE CENTERLINE 2.60 $4,810.00 $1,850.00 MILE

760 5 RUMBLE STRIPS - ASPHALT SHOULDER 1,327.96 $1,167,990.43 $879.54 MILE

760 7 RUMBLE STRIPS - ASPHALT CENTERLINE 587.89 $643,190.05 $1,094.07 MILE

760 9 RUMBLE STRIPS - INTERSECTION 24.00 $55,976.58 $2,332.36 EA

760 10 RUMBLE STRIPS - INTERSECTION 13.67 $45,361.50 $3,318.32 SET

762 100 PAVEMENT MARKING GROOVE 413,558.00 $153,016.46 $0.37 LF

762 103 PVMT MK PAINTED-MESSAGE 48,789.00 $164,296.99 $3.37 SF

762 107 PVMT MK INSTALLATION 12,683.50 $3,386,059.02 $266.97 MILE

762 110 EPOXY PVMT MK 4IN LINE-GROOVED 867,071.00 $601,852.59 $0.69 LF

762 111 EPOXY PVMT MK 12IN LINE 1,404.00 $13,722.00 $9.77 LF

762 112 EPOXY PVMT MK MESSAGE 26,259.00 $258,766.99 $9.85 SF

762 113 EPOXY PVMT MK 4IN LINE 10,444,078.00 $2,886,090.78 $0.28 LF

762 114 EPOXY PVMT MK 6IN LINE 470,942.00 $165,758.43 $0.35 LF

762 115 EPOXY PVMT MK 8IN LINE 250,942.00 $191,799.54 $0.76 LF

762 117 EPOXY PVMT MK 24IN LINE 7,021.00 $96,259.61 $13.71 LF

762 118 EPOXY PVMT MK CURB TOP & FACE 4,299.00 $26,765.12 $6.23 LF

762 122 PREFORMED PATTERNED PVMT MK-MESSAGE(GROOVED) 14,748.00 $374,660.12 $25.40 SF

Page 17: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 17 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

762 131 EPOXY PVMT MK 6IN LINE-GROOVED 4,973.00 $34,184.64 $6.87 LF

762 132 EPOXY PVMT MK 8IN LINE-GROOVED 46,428.00 $99,346.16 $2.14 LF

762 134 EPOXY PVMT MK 12IN LINE-GROOVED 923.00 $13,752.70 $14.90 LF

762 135 EPOXY PVMT MK 24IN LINE-GROOVED 8,597.00 $110,773.16 $12.89 LF

762 136 EPOXY PVMT MK MESSAGE-GROOVED 7,092.00 $95,065.84 $13.40 SF

762 200 RAISED PAVEMENT MARKERS 90,171.00 $146,171.50 $1.62 EA

762 405 SHORT TERM 4IN BROKEN LINE-PNT TAPE OR RSD MRK 85,178.00 $15,843.01 $0.19 LF

762 410 SHORT TERM 4IN LINE NPZ-PN TP OR RS MRK 63,925.00 $11,602.25 $0.18 LF

762 420 SHORT TERM 4IN LINE-TYPE R 150,175.00 $202,946.20 $1.35 LF

762 422 SHORT TERM 6IN LINE-TYPE R 6,283.00 $12,197.55 $1.94 LF

762 424 SHORT TERM 8IN LINE-TYPE R 1,661.00 $2,480.00 $1.49 LF

762 425 SHORT TERM 16IN LINE-TYPE R 88.00 $440.00 $5.00 LF

762 426 SHORT TERM 24IN LINE-TYPE R 536.00 $6,152.78 $11.48 LF

762 430 SHORT TERM 4IN LINE-TYPE NR 10,541,363.00 $1,302,931.35 $0.12 LF

762 434 SHORT TERM 8IN LINE-TYPE NR 155,206.00 $42,098.07 $0.27 LF

762 436 SHORT TERM 24IN LINE-TYPE NR 7,880.00 $26,152.57 $3.32 LF

762 437 SHORT TERM 12IN LINE-TYPE NR 923.00 $2,584.40 $2.80 LF

762 440 SHORT TERM MESSAGE-TYPE R 294.00 $4,497.00 $15.30 SF

762 442 SHORT TERM MESSAGE-TYPE NR 10,619.00 $35,277.97 $3.32 SF

762 460 SHORT TERM PAINTED LINE-SEAL JOBS 1,070,287.00 $102,700.56 $0.10 LF

762 804 METHYL METHACRYLATE PVMT MK 4IN LINE 290.00 $1,740.00 $6.00 LF

762 806 METHYL METHACRYLATE PVMT MK 6IN LINE 186.00 $3,720.00 $20.00 LF

762 808 METHYL METHACRYLATE PVMT MK 8IN LINE 64.00 $1,920.00 $30.00 LF

762 816 METHYL METHACRYLATE PVMT MK 16IN LINE 220.00 $6,380.00 $29.00 LF

762 824 METHYL METHACRYLATE PVMT MK 24IN LINE 1,656.00 $63,480.00 $38.33 LF

762 1104 PVMT MK PAINTED 4IN LINE 16,337,528.00 $1,287,765.86 $0.08 LF

762 1106 PVMT MK PAINTED 6IN LINE 15,030.00 $28,357.80 $1.89 LF

762 1108 PVMT MK PAINTED 8IN LINE 352,944.30 $92,994.37 $0.26 LF

762 1112 PVMT MK PAINTED 12IN LINE 1,883.00 $6,796.40 $3.61 LF

762 1124 PVMT MK PAINTED 24IN LINE 21,454.50 $115,719.27 $5.39 LF

762 1140 PVMT MK PAINTED CURB TOP & FACE 3,388.00 $16,323.57 $4.82 LF

762 1304 PREFORMED PATTERNED PVMT MK 4IN LINE 100.00 $1,000.00 $10.00 LF

762 1305 PREFORMED PATTERNED PVMT MK 4IN LINE-GROOVED 532,444.00 $1,870,744.16 $3.51 LF

762 1307 PREFORMED PATTERNED PVMT MK 6IN LINE-GROOVED 7,782.00 $69,650.17 $8.95 LF

762 1309 PREFORMED PATTERNED PVMT MK 8IN LINE-GROOVED 61,333.00 $528,182.94 $8.61 LF

762 1315 PREFORMED PATTERNED PVMT MK 12IN LINE-GROOVED 540.00 $7,860.00 $14.56 LF

762 1317 PREFORMED PATTERNED PVMT MK 16IN LINE-GROOVED 54.00 $1,350.00 $25.00 LF

762 1324 PREFORMED PATTERNED PVMT MK 24IN LINE 55.00 $2,823.70 $51.34 LF

762 1325 PREFORMED PATTERNED PVMT MK 24IN LINE-GROOVED 4,208.00 $133,366.06 $31.69 LF

762 1340 PREF PATT PVMT MK 4IN LINE CONTRAST-GROOVED 511.00 $4,088.00 $8.00 LF

762 1363 PAVEMENT MARKING 24IN LINE-MASKING 300.00 $3,600.00 $12.00 LF

762 1500 OBLITERATION OF PVMT MK 18,064.00 $48,951.55 $2.71 SF

764 115 3-CABLE GUARDRAIL 5,500.00 $110,305.00 $20.06 LF

764 131 W-BEAM GUARDRAIL 12,329.71 $494,609.70 $40.12 LF

764 145 W-BEAM GUARDRAIL END TERMINAL 138.00 $331,694.52 $2,403.58 EA

764 150 REMOVE & RESET GUARDRAIL 487.00 $9,283.50 $19.06 LF

764 151 REMOVE W-BEAM GUARDRAIL & POSTS 23,974.30 $74,230.90 $3.10 LF

764 1010 RESET 3-CABLE GUARDRAIL 156.00 $1,622.40 $10.40 LF

764 1050 RESET W-BEAM GUARDRAIL 13,501.60 $177,624.39 $13.16 LF

764 1059 RESET W-BEAM GUARDRAIL END TERMINAL 15.00 $17,650.00 $1,176.67 EA

764 1990 REMOVE CONCRETE SAFETY SHAPE TRANSITION 6.00 $7,808.00 $1,301.33 EA

764 2020 REMOVE 3-CABLE GUARDRAIL & POSTS 12,842.00 $50,074.50 $3.90 LF

Page 18: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 18 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

764 2080 REMOVE BOX BEAM GUARDRAIL 1,977.00 $10,417.46 $5.27 LF

764 2081 REMOVE END TREATMENT & TRANSITION 126.00 $36,805.56 $292.11 EA

764 2090 REMOVE BARREL ATTENUATION DEVICE 4.00 $2,000.00 $500.00 EA

764 8071 BARREL ATTENUATION DEVICE-TYPE B-75 14.00 $140,564.00 $10,040.29 EA

764 8080 MODIFY BARREL ATTENUATION DEVICE 5.00 $8,750.00 $1,750.00 EA

764 9011 ATTENUATING CRASH CUSHION TL-3 1.00 $24,246.00 $24,246.00 EA

766 100 MAILBOX-ALL TYPES 199.00 $46,403.00 $233.18 EA

766 120 RESET MAILBOX 7.00 $1,701.90 $243.13 EA

770 1 LIGHTING SYSTEM 27.00 $3,966,120.13 $146,893.34 EA

770 3 LIGHTING SYSTEM A 1.00 $88,787.00 $88,787.00 EA

770 4 LIGHTING SYSTEM B 2.00 $214,400.00 $107,200.00 EA

770 5 LIGHTING SYSTEM C 2.00 $240,180.00 $120,090.00 EA

770 7 DESTINATION LIGHTING 18.00 $296,457.70 $16,469.87 EA

770 20 CONCRETE FOUNDATION-HIGHWAY LIGHTING 58.00 $59,140.00 $1,019.66 EA

770 25 SCREW IN BASE FOUNDATION 40.00 $33,120.00 $828.00 EA

770 60 CONCRETE FOUNDATION-FEED POINT-TYPE B 3.00 $1,897.00 $632.33 EA

770 100 PULL BOX 18.00 $28,437.00 $1,579.83 EA

770 110 JUNCTION BOX 6.00 $5,152.00 $858.67 EA

770 210 CABLE TRENCH-TYPE I 2,370.00 $6,399.00 $2.70 LF

770 320 1.5IN DIAMETER RIGID CONDUIT 9,304.00 $47,890.00 $5.15 LF

770 330 2IN DIAMETER RIGID CONDUIT 8,551.00 $58,669.05 $6.86 LF

770 392 5IN DIAMETER RIGID CONDUIT-BRIDGE MOUNTED 8,028.00 $256,896.00 $32.00 LF

770 423 MULTIPLE UNDERGROUND CABLE 2NO2-1NO6 STYLE USE 2,839.00 $16,324.25 $5.75 LF

770 503 UNDERGROUND CONDUCTOR NO2-TYPE RHW 3,618.00 $5,427.00 $1.50 LF

770 504 UNDERGROUND CONDUCTOR NO4-TYPE RHW 45,486.00 $62,156.68 $1.37 LF

770 505 UNDERGROUND CONDUCTOR NO6-TYPE RHW 340.00 $1,700.00 $5.00 LF

770 604 UNDERGROUND CONDUCTOR NO4-TYPE THW 3,172.00 $5,123.60 $1.62 LF

770 605 UNDERGROUND CONDUCTOR NO6-TYPE THW 17,734.00 $20,437.52 $1.15 LF

770 700 FEED POINT-TYPE I-POLE MOUNTED 1.00 $5,000.00 $5,000.00 EA

770 730 FEED POINT-TYPE I-PAD MOUNTED 1.00 $8,300.00 $8,300.00 EA

770 735 FEED POINT-TYPE II-PAD MOUNTED 2.00 $11,327.90 $5,663.95 EA

770 745 FEED POINT-TYPE IV-PAD MOUNTED 2.00 $19,475.00 $9,737.50 EA

770 1066 LT STD 6FT MA 30FT MT HT 3.00 $4,260.00 $1,420.00 EA

770 1218 LT STD 12FT MA 32FT MT HT 2.00 $5,600.00 $2,800.00 EA

770 1660 LT STD 6FT MA 25FT MT HT BREAKAWAY 8.00 $10,080.00 $1,260.00 EA

770 1666 LT STD 6FT MA 30FT MT HT BREAKAWAY 17.00 $26,775.00 $1,575.00 EA

770 1676 LT STD 6FT MA 40FT MT HT BREAKAWAY 44.00 $93,486.00 $2,124.68 EA

770 1718 LT STD 8FT MA 32FT POLE BREAKAWAY 6.00 $15,840.00 $2,640.00 EA

770 1726 LT STD 8FT MA 40FT MT HT BREAKAWAY 1.00 $6,000.00 $6,000.00 EA

770 2260 LT STD TWIN 6FT MA 30FT MT HT 12.00 $20,400.00 $1,700.00 EA

770 4091 ORNAMENTAL LT STD 17FT MT HT 4.00 $6,000.00 $1,500.00 EA

770 4120 HP SODIUM VAPOR LUMINAIRE-150 WATT 12.00 $4,140.00 $345.00 EA

770 4140 HP SODIUM VAPOR LUMINAIRE-250 WATT 15.00 $5,475.00 $365.00 EA

770 4170 HP SODIUM VAPOR LUMINAIRE-400 WATT 9.00 $2,700.00 $300.00 EA

770 4210 LED LUMINAIRE 38.00 $37,862.50 $996.38 EA

770 4220 LED LUMINAIRE - 150 WATT 31.00 $25,979.00 $838.03 EA

770 4495 ORNAMENTAL LIGHT FIXTURE-250 WATT 4.00 $4,360.00 $1,090.00 EA

770 4501 TEMPORARY LIGHTING SYSTEM 1.00 $1,000.00 $1,000.00 EA

770 4523 REVISE HIGHWAY LIGHTING FEED POINT 1.00 $2,280.00 $2,280.00 EA

770 4525 REVISE LIGHTING SYSTEM 12.00 $378,537.92 $31,544.83 EA

770 4540 RELOCATE LIGHT STANDARD 1.00 $1,050.00 $1,050.00 EA

770 4560 REMOVE LIGHT STANDARD 45.00 $21,805.60 $484.57 EA

Page 19: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 19 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

770 4566 REMOVE BRIDGE LIGHTING SYSTEM 1.00 $8,700.00 $8,700.00 EA

770 4567 REMOVE LIGHTING SYSTEM 1.00 $4,500.00 $4,500.00 EA

770 9270 MODIFY EXISTING FEED POINT 1.00 $6,885.00 $6,885.00 EA

772 1 TRAFFIC SIGNALS SYSTEM 4.00 $965,722.73 $241,430.68 EA

772 220 1.5IN DIAMETER RIGID CONDUIT 100.00 $430.00 $4.30 LF

772 400 NO12 AWG 2 CONDUCTOR CABLE 100.00 $215.00 $2.15 LF

772 450 INTERCONNECT CABLE 6,590.00 $79,080.00 $12.00 LF

772 1812 1-WAY 3 SEC HEAD W/12IN LENS-MA MTD 2.00 $2,600.00 $1,300.00 EA

772 1822 1-WAY 4 SEC HEAD W/12IN LENS-MA MTD 2.00 $2,760.00 $1,380.00 EA

772 2060 PEDESTRIAN COUNTDOWN SIGNAL HEAD-POST MTD 2.00 $1,640.00 $820.00 EA

772 2110 FLASHING BEACON-POST MOUNTED 7.00 $62,678.89 $8,954.13 EA

772 2120 FLASHING BEACON-POST MOUNTED-SCHOOL 1.00 $24,848.48 $24,848.48 EA

772 2200 PEDESTRIAN PUSHBUTTON POST 2.00 $640.00 $320.00 EA

772 2215 PEDESTRIAN PUSHBUTTON & SIGN 2.00 $5,400.00 $2,700.00 EA

772 2265 VIDEO DETECTION SYSTEM 1.00 $36,500.00 $36,500.00 EA

772 2350 CONTROLLER TYPE 1 3.00 $48,000.00 $16,000.00 EA

772 2790 TRAFFIC SIGNAL SYSTEM - SPAN WIRE MOUNTED 1.00 $217,777.78 $217,777.78 EA

772 2810 TEMPORARY TRAFFIC SIGNALS 20.00 $381,871.21 $19,093.56 EA

772 2904 REVISE TRAFFIC SIGNAL SYSTEM 2.00 $36,196.97 $18,098.49 EA

772 2906 REVISE TRAFFIC SIGNAL SYSTEM-SITE 1 24.00 $469,105.57 $19,546.07 EA

772 2907 REVISE TRAFFIC SIGNAL SYSTEM-SITE 2 6.00 $351,908.98 $58,651.50 EA

772 2908 REVISE TRAFFIC SIGNAL SYSTEM-SITE 3 2.00 $324,641.85 $162,320.93 EA

772 2909 REVISE TRAFFIC SIGNAL SYSTEM-SITE 4 1.00 $161,777.66 $161,777.66 EA

772 2911 REVISE TRAFFIC SIGNAL SYSTEM-SITE 5 1.00 $163,799.88 $163,799.88 EA

772 2912 REVISE TRAFFIC SIGNAL SYSTEM-SITE 6 1.00 $78,529.57 $78,529.57 EA

772 2935 REVISE FLASHING BEACON SYSTEM 3.00 $14,632.00 $4,877.33 EA

772 2953 REVISE PULL BOX 2.00 $480.00 $240.00 EA

772 2990 REVISE CONTROLLER 1.00 $8,800.00 $8,800.00 EA

772 3002 RELOCATE CONTROLLER CABINET 1.00 $6,885.00 $6,885.00 EA

772 3005 RELOCATE FEED POINT 1.00 $325.00 $325.00 EA

772 3125 REMOVE TRAFFIC SIGNAL SYSTEM 4.00 $19,400.00 $4,850.00 EA

772 3128 REMOVE EMERGENCY VEHICLE DETECTOR 20.00 $2,000.00 $100.00 EA

772 3150 REMOVE FLASHING BEACON SYSTEM 5.00 $4,599.00 $919.80 EA

772 3180 REMOVE WOOD POLE 4.00 $1,200.00 $300.00 EA

772 9010 AUTOMATIC TRAFFIC RECORDER SYSTEM 5.00 $793,000.00 $158,600.00 EA

772 9012 REVISE AUTOMATIC TRAFFIC RECORDER SYSTEM 2.00 $94,000.00 $47,000.00 EA

772 9110 VIRTUAL WEIGH IN MOTION SYSTEM 1.00 $228,000.00 $228,000.00 EA

772 9151 INSTALL ESS STATION/RWIS 4.00 $484,000.00 $121,000.00 EA

772 9200 IT SYSTEM 4.00 $464,875.68 $116,218.92 EA

772 9230 IT FIBEROPTIC CABLE 24,236.00 $57,681.68 $2.38 LF

772 9240 FIBER OPTIC TRAFFIC MONITORING SYSTEM 3.00 $446,345.00 $148,781.67 EA

772 9250 FIBER OPTIC SPLICE 5.00 $8,875.00 $1,775.00 EA

772 9300 SURVEILLANCE CAMERA SYSTEM 6.00 $66,000.00 $11,000.00 EA

772 9811 TRAFFIC SIGNAL SYSTEM - SITE 1 6.00 $1,387,019.50 $231,169.92 EA

772 9812 TRAFFIC SIGNAL SYSTEM - SITE 2 4.00 $1,074,704.00 $268,676.00 EA

806 300 GROUT 785.00 $18,840.00 $24.00 CF

900 500 CEMENT STABILIZED BASE COURSE 218,516.00 $360,630.20 $1.65 SY

900 1000 TEMPORARY STREAM DIVERSION 19.00 $535,261.20 $28,171.64 EA

900 1050 TEMPORARY DRAINAGE SYSTEM 1.00 $10,100.00 $10,100.00 L SUM

902 300 REMOVE TEMPORARY WIDENING 2.00 $497,900.00 $248,950.00 L SUM

902 400 MACHINE HYGIENE 3.00 $27,500.00 $9,166.67 L SUM

910 480 TRASH RACK 2.00 $1,316.00 $658.00 EA

Page 20: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 20 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

910 565 CONTROLLED DENSITY BACKFILL 17.00 $8,415.00 $495.00 CY

910 570 MODIFY MANHOLE 4.00 $8,690.00 $2,172.50 EA

910 695 SLUICE GATE 15IN 2.00 $4,480.00 $2,240.00 EA

910 702 SLUICE GATE 42IN 1.00 $7,000.00 $7,000.00 EA

910 810 REPAIR AND SEALING CULVERT JOINT 26.00 $25,220.00 $970.00 EA

920 100 PUMPING EQUIPMENT 1.00 $92,000.00 $92,000.00 L SUM

920 200 PUMP HOUSE 1.00 $15,845.00 $15,845.00 L SUM

920 1233 HEALTH AND SAFETY PLAN 1.00 $80,000.00 $80,000.00 L SUM

920 1237 STRUCTURAL ENGINEER 200.00 $40,000.00 $200.00 MHR

920 1240 ARCHEOLOGIST 1.00 $16,750.00 $16,750.00 L SUM

920 1241 BIOLOGIST 1.00 $36,000.00 $36,000.00 L SUM

920 1500 DUST PALLIATIVE MATERIAL 38,709.00 $46,450.80 $1.20 GAL

920 2102 RIPRAP USACE GRADATION IV 283.00 $10,754.00 $38.00 TON

930 3000 BRIDGE BENCH MARKS 2.00 $4,300.00 $2,150.00 SET

930 3040 BEARINGS (EXPANSION) 134.00 $286,900.00 $2,141.04 EA

930 3042 BEARINGS (FIXED) 13.00 $26,000.00 $2,000.00 EA

930 3631 POLYURETHANE FOAM 153,291.27 $1,013,298.10 $6.61 LBS

930 3639 POLYURETHANE FOAM - 90 LBS 312.00 $62,865.00 $201.49 GAL

930 3640 HIGH EXPANSION POLYURETHANE FOAM 160.30 $44,884.00 $280.00 GAL

930 7012 ROADWAY CANOPY 3.00 $237,352.00 $79,117.33 L SUM

930 7013 ROADWAY CANOPY-SITE 1 1.00 $30,000.00 $30,000.00 L SUM

930 7014 ROADWAY CANOPY-SITE 2 1.00 $30,000.00 $30,000.00 L SUM

930 8230 SHORING 8.00 $84,000.00 $10,500.00 EA

930 8600 ELASTOMERIC BEARING PAD 97.80 $4,890.00 $50.00 SF

930 8644 SILICONE SEALANT 137.00 $5,456.25 $39.83 LF

930 8670 CONCRETE SLEEPER SLAB 2.00 $23,000.00 $11,500.00 EA

930 8681 FINGER EXPANSION JOINT 214.00 $374,500.00 $1,750.00 LF

930 8700 3 IN EXPANSION JOINT 494.00 $27,664.00 $56.00 LF

930 9534 MODIFY DECK DRAIN 10.00 $5,724.10 $572.41 EA

930 9535 DECK DRAINAGE SYSTEM 1.00 $50,000.00 $50,000.00 L SUM

930 9537 ABUTMENT UNDERDRAIN SYSTEM 8.00 $110,000.00 $13,750.00 EA

930 9543 RETAINING WALL 189.00 $4,347.00 $23.00 SF

930 9550 MECHANICALLY STABILIZED EARTH WALL 611.00 $39,715.00 $65.00 SF

930 9610 DECK SPALL REPAIR 20.00 $6,000.00 $300.00 SF

930 9612 SPALL REPAIR 196.00 $20,288.50 $103.51 SF

930 9639 APPROACH SLAB LIP REPAIR 341.20 $115,186.00 $337.59 LF

930 9642 REHABILITATE HISTORIC STRUCTURE 1.00 $70,000.00 $70,000.00 L SUM

930 9647 BARRIER END MODIFICATION 4.00 $2,000.00 $500.00 EA

930 9667 CONCRETE POST REPAIR 1.00 $3,400.00 $3,400.00 EA

930 9671 BOX CULVERT JOINT REPAIR 6.00 $16,200.00 $2,700.00 EA

930 9694 GIRDER PATCHING 2.00 $41,371.20 $20,685.60 L SUM

930 9952 PIER MEDALLION 4.00 $40,000.00 $10,000.00 EA

950 8673 EXPANSION JOINT MODIFICATION 522.00 $31,950.00 $61.21 LF

950 9694 PAVEMENT REINFORCING FABRIC 18,585.00 $38,384.00 $2.07 SY

950 9712 JOINT TREATMENT 147.00 $18,669.00 $127.00 LF

950 9713 ASPHALT JOINT TREATMENT 16.00 $47,200.00 $2,950.00 MILE

970 1 LANDSCAPING APPURTENANCES 1.00 $5,772.00 $5,772.00 L SUM

970 3 LANDSCAPE FABRIC 1,386.00 $2,772.00 $2.00 SY

970 8 LANDSCAPE PREPARATION 885.00 $15,454.70 $17.46 SY

970 25 LANDSCAPE ENHANCEMENT PROJECT 1.00 $5,300.00 $5,300.00 L SUM

970 75 WOOD MULCH 211.00 $232.10 $1.10 SF

970 80 LANDSCAPE BOULDERS 270.00 $18,900.00 $70.00 TON

Page 21: 1/12/2017 North Dakota Department of Transportation Page 1 ...201 300 clearing & grubbing 41.00 $4,018.00 $98.00 acre 201 330 clearing & grubbing 23.00 $132,315.78 $5,752.86 l sum

North Dakota Department of Transportation1/12/2017 Page 21 of 2101/12/2017Price Sheet List For 2016 , Totals Last Calculated

EnglishSpec Code Item Description Total Quantity Total Cost Ave. Price Unit

970 300 BENCH 4.00 $5,000.00 $1,250.00 EA

970 601 TREE GRATE 9.00 $15,768.00 $1,752.00 EA

970 1000 TREES 22.00 $11,280.00 $512.73 EA

970 1011 LANDSCAPE PLANTINGS 2.00 $5,416.00 $2,708.00 L SUM

970 1025 REPLANT TREES 30.00 $13,470.00 $449.00 EA

970 2011 AMUR MAPLE 2.00 $840.00 $420.00 EA

970 2029 OHIO BUCKEYE 3.00 $1,410.00 $470.00 EA

970 2032 AUTUMN SPLENDOR BUCKEYE 8.00 $2,712.00 $339.00 EA

970 2050 COMMON HACKBERRY 3.00 $1,410.00 $470.00 EA

970 2055 SNOW BIRD HAWTHORN 4.00 $1,680.00 $420.00 EA

970 2083 EUROPEAN MOUNTAIN ASH 2.00 $840.00 $420.00 EA

970 2150 NORTHERN ACCLAIM HONEYLOCUST 3.00 $1,410.00 $470.00 EA

970 2202 SPRING SNOW CRABAPPLE 12.00 $5,085.60 $423.80 EA

970 2203 GLADIATOR CRABAPPLE 19.00 $8,052.20 $423.80 EA

970 2220 CANADA RED CHERRY 4.00 $1,680.00 $420.00 EA

970 2290 MAYDAY 23.00 $8,316.80 $361.60 EA

970 2330 BUR OAK 11.00 $5,062.00 $460.18 EA

970 2405 JAPANESE TREE LILAC 27.00 $10,373.40 $384.20 EA

970 2436 HARVEST GOLD LINDEN 3.00 $1,410.00 $470.00 EA

970 2470 DISCOVERY ELM 8.00 $3,932.80 $491.60 EA

970 3590 DWARF ALBERTA SPRUCE 2.00 $840.00 $420.00 EA

970 3600 BLACK HILLS SPRUCE 39.00 $20,055.00 $514.23 EA

980 170 CATTLE GUARD RESET 19.00 $32,444.00 $1,707.58 EA

980 171 REMOVE CATTLE GUARD 1.00 $1,000.00 $1,000.00 EA

980 510 RAILROAD SUB-BALLAST 9,353.00 $147,777.40 $15.80 TON

980 806 VERTICAL ROAD CLOSURE GATE-18FT 1.00 $22,277.50 $22,277.50 EA

980 811 VERTICAL ROAD CLOSURE GATE-28FT 2.00 $45,331.20 $22,665.60 EA

980 820 REMOVE ROAD CLOSURE GATE 3.00 $3,562.74 $1,187.58 EA

990 220 GUARD POST-PERMANENT 10.00 $7,500.00 $750.00 EA

990 221 GUARD POST-REMOVABLE 4.00 $7,960.00 $1,990.00 EA

990 230 TEMPORARY ACCESS 2.00 $24,490.00 $12,245.00 L SUM

990 400 PIPE CLEANOUT 62.00 $113,050.00 $1,823.39 EA

990 1934 STONE SIGN 2.00 $136,000.00 $68,000.00 EA