11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236-8145 Fax: 262-242-9655 www.ci.mequon.wi.us Public Works Department PUBLIC WORKS COMMITTEE Tuesday, March 10, 2020 6:45 PM South Conference Room Agenda Dated: March 10, 2020 /s/ Glenn Bushee, Chair Notice is hereby given that a quorum of other governmental bodies may be present at this meeting to present, discuss and/or gather information about a subject over which they have decision-making responsibility, although they will not take formal action thereto at this meeting. Persons with disabilities requiring accommodations for attendance at this meeting should contact the City Clerk’s Office at 262-236-2914, twenty-four (24) hours in advance of the meeting. Any questions regarding this agenda may be directed to the Public Works Department at 262-236-2913, Monday through Friday, 7:00 AM 3:30 PM. 1) Call to Order, Roll Call 2) Approval of Minutes a. February 11, 2020 Minutes 3) Resolutions Action requested: review and recommend approval a. RESOLUTION 3698 A Resolution Awarding 2020 Construction Inspection Contracts to Ruekert-Mielke, Kapur and Associates, and R.A. Smith b. RESOLUTION 3707 A Resolution Awarding the 2020 Flex Patch Contract to Fahrner Asphalt Sealers, Waunakee, Wisconsin in an Amount Not-to-Exceed $20,000 c. RESOLUTION 3708 A Resolution Rejecting All Bids for the City of Mequon's 2020 Crack Sealing Contract d. RESOLUTION 3709 A Resolution Awarding the 2020 GSB-88 Bituminous Seal Contract to Fahrner Asphalt Sealers of Waunakee, Wisconsin, in an Amount Not-to-Exceed $250,000 e. RESOLUTION 3710 A Resolution Authorizing a Memorandum of Understanding Between the City of Mequon and the Mequon Nature Preserve for the Completion of Parking Lot Maintenance Work in 2020 4) Discussion Items a. 2020 Annual Road Program Update b. 2020 Work Plan (3.10.20) 5) Adjourn

Upload: others

Post on 24-Mar-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092 Phone: 262-236-8145

Fax: 262-242-9655

www.ci.mequon.wi.us Public Works Department

PUBLIC WORKS COMMITTEE

Tuesday, March 10, 2020

6:45 PM

South Conference Room

Agenda

Dated: March 10, 2020 /s/ Glenn Bushee, Chair

Notice is hereby given that a quorum of other governmental bodies may be present at this meeting to present, discuss

and/or gather information about a subject over which they have decision-making responsibility, although they will not

take formal action thereto at this meeting.

Persons with disabilities requiring accommodations for attendance at this meeting should contact the City Clerk’s

Office at 262-236-2914, twenty-four (24) hours in advance of the meeting.

Any questions regarding this agenda may be directed to the Public Works Department at 262-236-2913, Monday

through Friday, 7:00 AM – 3:30 PM.

1) Call to Order, Roll Call

2) Approval of Minutes

a. February 11, 2020 Minutes

3) Resolutions

Action requested: review and recommend approval

a. RESOLUTION 3698 A Resolution Awarding 2020 Construction Inspection Contracts to

Ruekert-Mielke, Kapur and Associates, and R.A. Smith

b. RESOLUTION 3707 A Resolution Awarding the 2020 Flex Patch Contract to Fahrner Asphalt

Sealers, Waunakee, Wisconsin in an Amount Not-to-Exceed $20,000

c. RESOLUTION 3708 A Resolution Rejecting All Bids for the City of Mequon's 2020 Crack

Sealing Contract

d. RESOLUTION 3709 A Resolution Awarding the 2020 GSB-88 Bituminous Seal Contract to

Fahrner Asphalt Sealers of Waunakee, Wisconsin, in an Amount Not-to-Exceed $250,000

e. RESOLUTION 3710 A Resolution Authorizing a Memorandum of Understanding Between the

City of Mequon and the Mequon Nature Preserve for the Completion of Parking Lot Maintenance

Work in 2020

4) Discussion Items

a. 2020 Annual Road Program Update

b. 2020 Work Plan (3.10.20)

5) Adjourn

Page 2: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092 Phone: 262-236-8145

Fax: 262-242-9655

www.ci.mequon.wi.us Public Works Department

PUBLIC WORKS COMMITTEE

Tuesday, February 11, 2020

6:45 PM

South Conference Room

Minutes

1) Call to Order, Roll Call

Alderman Bushee called the meeting to order at 6:45 PM.

Present:

Chairman Glenn Bushee

Alderman Jeffrey Hansher

Alderman Dale Mayr

Also present were Director of Public Works/City Engineer Lundeen, Deputy Director of

Public Works Weyker, Assistant City Administrator Schoenemann, Parks and Forestry

Superintendent Gies, Engineering Technician Dandy, and Administrative Assistant Deuster.

2) Approval of Minutes

a. January 14, 2020 Minutes

RESULT: Approved [Unanimous]

MOVED BY: Alderman Hansher

SECONDED BY: Alderman Mayr

AYES: Bushee, Hansher, Mayr

3) Ordinances

Action requested: review and recommend approval

a. ORDINANCE 2020-1566 An Ordinance Amending Chapters 14 and 54 of the Mequon

Municipal Code in Connection with the Licensing and Permitting of Special Events, and

Requiring a Template Special Event Agreement

Director of Public Works/City Engineer Lundeen provided the committee with verbiage

corrections from the Mayor on the Ordinance.

Alderman Bushee questioned the status of persons staying overnight in the park and where

that stood in the agreement. He also stated his preference that the only people permitted to

stay the night would be security.

2.a.a

Packet Pg. 2

Att

ach

men

t: 0

2-11

-202

0 M

ins_

Pu

blic

Wo

rks

(49

82 :

Feb

ruar

y 11

, 202

0 M

inu

tes)

Page 3: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

PUBLIC WORKS COMMITTEE MINUTES – February 11, 2020 Page 2 of 4

Director of Public Works/City Engineer Lundeen stated that the template agreement does not

include any waivers to the ordinance. Requested exceptions would require an agreement

approved by Park and Open Space Board, Public Works, and Common Council as an

amendment to the agreement template for consideration.

Alderman Bushee wanted to have clarification on the statement of no smoking in a park

facility, he felt it would be point to the City ordinance because the smoking includes e-

cigarettes and vaping. It is clear of what the definition of what smoking means in the

ordinance.

Director of Public Works/City Engineer Lundeen stated that there needs to be a good way to

incorporate standard language with respect to any escalation in cost, whether that is a 2%

increase on an annual basis so that doesn't have to come back through for approval and

addressing increased costs over time.

RESULT: Approved by Voice Acclamation [Unanimous]

MOVED BY: Alderman Bushee

SECONDED BY: Alderman Hansher

AYES: Bushee, Hansher, Mayr

4) Resolutions

Action requested: review and recommend approval

a. RESOLUTION 3681 A Resolution Approving a Second Amendment to the Cell Tower

License Agreement with Cellco Partnership d/b/a Verizon Wireless, Extending the

License Term and Expanding the Licensed Area for the Tower Located at 11800 N. Port

Washington Road

Assistant City Administrator Schoenemann provided an overview on the existing cell tower

location at the Fire Station on Port Washington Road. This contract would extend the lease

for another 25 years. If the lease amendment is approved the City would realize a significant

increase in revenue over the life of the 25 year lease as there is a 5% acceleration rate applied

to the base rent annually. The lease includes two proposed easement amendments.

RESULT: Approved [Unanimous]

MOVED BY: Alderman Mayr

SECONDED BY: Alderman Bushee

AYES: Bushee, Hansher, Mayr

b. RESOLUTION 3697 A Resolution Approving the Purchase of a John Deere 6120E Cab

Tractor and Diamond Side & Rear Flail Mower Attachments from Mid-State Equipment,

Jackson, Wisconsin for a Total Cost of $102,265

Alderman Mayr inquired regarding the number of proposals. He questioned why other makes

and models were not considered.

2.a.a

Packet Pg. 3

Att

ach

men

t: 0

2-11

-202

0 M

ins_

Pu

blic

Wo

rks

(49

82 :

Feb

ruar

y 11

, 202

0 M

inu

tes)

Page 4: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

PUBLIC WORKS COMMITTEE MINUTES – February 11, 2020 Page 3 of 4

Deputy Director of Public Works Weyker stated staff utilized the state contract for this

purchase. The City fleet currently includes a John Deere with a good performance record and

which is compatible with City operational needs.

Alderman Mayr inquired regarding the life expectancy of the current tractor. Also stating in

the future staff should look at other quotes aside from the state contract.

RESULT: Approved [Unanimous]

MOVED BY: Alderman Hansher

SECONDED BY: Alderman Mayr

AYES: Bushee, Hansher, Mayr

c. RESOLUTION 3699: A Resolution: A) Reaffirming the Award of a Contract for the

Mequon Road: Traffic Signal and Ozaukee Interurban Trail Crossing Design to Traffic

Analysis & Design, Inc. of Cedarburg, Wisconsin in an Amount Not-to-Exceed $68,000;

B) Terminating the Previous Contract Award to Traffic Analysis & Design, Inc. and

Approving the Subject Contract Award to Traffic Engineering Services of Elm Grove,

Wisconsin in an Amount Not-to-Exceed $31,000

Director of Public Works/City Engineer Lundeen presented the proposal which was omitted

from the January award and stated if staff had been aware of the proposal at the time of the

original resolution, it would have been included for consideration. Staff is looking for a

recommendation for approval of Resolution 3699A or 3699B.

Alderman Bushee stated the initial contract with TADI and the contingency was not to

exceed $68,000. The TES propsoal would have come out to $31,000. TADI has already

started on the project. Alderman Bushee stated he had reached out to TES for more

documentation and provided a sample of work that was previously done to promote bike and

pedestrian safety. He stated they do have a good background in what they are implementing.

Alderman Hanser inquired why there is such a price difference.

Director of Public Works/City Engineer Lundeen stated since TES did not provide a detailed

breakdown of their proposal she could not speak to the price difference.

Alderman Mayr made a motion to accept Resolution 3699A.

RESULT: Approved [2 to 1]

MOVED BY: Alderman Mayr

SECONDED BY: Alderman Hansher

AYES: Hansher, Mayr

NAYS: Bushee

5) Discussion Items

a. 2020 Annual Road Program

2.a.a

Packet Pg. 4

Att

ach

men

t: 0

2-11

-202

0 M

ins_

Pu

blic

Wo

rks

(49

82 :

Feb

ruar

y 11

, 202

0 M

inu

tes)

Page 5: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

PUBLIC WORKS COMMITTEE MINUTES – February 11, 2020 Page 4 of 4

Director of Public Works/City Engineer Lundeen stated Staff is looking to release the

maintenance contracts for award in March. Maintenance contracts include the crack sealing,

GSB-88, and flex patching. Staff will bring back the road rating map at the same time so the

Committee can see both.

b. 2020 Work Plan (2.11.20)

Director of Public Works/City Engineer Lundeen provided the committee with an update of

the work plan.

6) Motion to Adjourn at 7:23 PM.

RESULT: Approved by Voice Acclamation [Unanimous]

MOVED BY: Alderman Hansher

SECONDED BY: Alderman Mayr

AYES: Bushee, Hansher, Mayr

Respectfully Submitted,

Casey Deuster

2.a.a

Packet Pg. 5

Att

ach

men

t: 0

2-11

-202

0 M

ins_

Pu

blic

Wo

rks

(49

82 :

Feb

ruar

y 11

, 202

0 M

inu

tes)

Page 6: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Public Works Committee

TO: Public Works Committee

FROM: Bridget Henk, Assistant City Engineer

DATE: March 10, 2020

SUBJECT: RESOLUTION 3698 A Resolution Awarding 2020 Construction Inspection

Contracts to Ruekert-Mielke, Kapur and Associates, and R.A. Smith

Background

Several developments are planning for public infrastructure work in the 2020 construction

season. There are potential overlapping construction timelines that may require inspection

services beyond the availability of City staff. There are two projects remaining from 2019 that

require construction inspection and there are two potential projects slated for 2020 construction:

Foxtown Site D and the Enclave Phase IV. The specific construction schedules have not been

determined for either of the proposed projects.

Analysis

City staff requested three firms provide construction service rates for the 2020 construction

season: Ruekert-Mielke, Kapur and Associates, and R.A. Smith. All three firms have provided

services to the City of Mequon in the past and are qualified to perform inspection services. The

construction service rates were used to compare the cost of inspection services between each of

the three firms. Ruekert-Mielke has the lowest rates of the three firms, followed by Kapur and

Associates and R.A. Smith.

As developments request inspection services, City staff will contact the firms on a case by case

basis for inspections services if the services cannot be provided by City staff. Ruekert-Mielke

would be contacted first, followed by Kapur and Associates and then R.A.Smith.

The two continuing projects from 2019 will continue to be inspected by R.A.Smith. Continuity

of the inspection team reduces the need for redoing work and bringing a new consultant up to

speed.

Fiscal Impact

The inspection services are a pass-through cost to developers. With a potential that the contracts

may total more than $25,000, staff is seeking Common Council approval. There is no fiscal

impact to the City of Mequon.

3.a

Packet Pg. 6

Page 7: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Recommendation

Staff recommends that the Public Works Committee and Common Council authorize staff to

negotiate contracts with Ruekert-Mielke, Kapur and Associates or R.A. Smith as needed to

facilitate inspection services for the City of Mequon.

Attachments:

Ruekert-Mielke Fee Schedule (PDF)

Kapur and Associates Fess Schedule (PDF)

R.A.Smith Fee Schedule (PDF)

3.a

Packet Pg. 7

Page 8: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

COMMON COUNCIL

OF THE

CITY OF MEQUON

RESOLUTION 3698

A Resolution Awarding 2020 Construction Inspection Contracts to Ruekert-Mielke, Kapur and

Associates, and R.A. Smith

A. Private developments in the City of Mequon are required to have construction

inspections related to public infrastructure and erosion control.

B. There are potential overlapping construction timelines that may require inspection

services beyond the availability of City staff.

C. The City of Mequon Engineering Division received three construction service

rates from three qualified firms.

D. Staff has reviewed the construction service rates and found all firms to be

qualified to perform the inspection services.

E. The total expenditure of construction inspection fees incurred by the City for any

one firm and/or a combination of firms may exceed $25,000 requiring Common Council

approval.

F. The inspection fees are billed to the developer.

G. R.A.Smith will continue to inspect projects that began in 2019.

H. Based upon inspection rates, Ruekert-Mielke will be contacted first, followed by

Kapur and Associates and then R.A. Smith.

NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of

Mequon, that:

1. The above proposals, as recommended by the Public Works Committee, be

accepted and that the proper City officials be authorized to sign the appropriate contract

documents.

2. The Finance Department authorized to process all invoices under these contract

documents that may exceed $25,000 in total to any one firm or combination of firms without

further Common Council approval.

Approved by: John Wirth, Mayor

3.a

Packet Pg. 8

Page 9: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Date Approved: March 10, 2020

I certify that the foregoing Resolution was adopted by the Common Council of the City

of Mequon, Wisconsin, at a meeting held on March 10, 2020.

Caroline Fochs, City Clerk

3.a

Packet Pg. 9

Page 10: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

~48-00000 Miscellaneous Project Files > 2020 Misc Engineering > Daniel-20200106-2020 Inspection Rate Proposal.docx~

Your Infrastructure Ally ruekertmielke.com

W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020 262-542-5733

January 6, 2020 Mr. Scott Daniel Engineering Field Coordinator City of Mequon 11333 North Cedarburg Road Mequon, WI 53092-1930 Re: 2020 Inspection Rates

Dear Mr. Daniel:

Per your request in your January 3, 2020 email, please see Ruekert & Mielke’s proposed 2020 inspection charge out rates listed below. Mileage is .62 cents per mile.

Title 2020 Proposed Rates

Construction Review Technician 1

$78/hour

Construction Review Technician 2

$89/hour

Senior Construction Review Technician

$102/hour

Erosion Control Specialist $102/hour

Feel free to contact me with any questions at 414.881.4296. Thank you for allowing us to submit these rates. Let me know what you come up with.

Respectfully, RUEKERT & MIELKE, INC. Arlyn A. Kurth Construction Services Team Leader [email protected] AAK:tmg cc: Jerad J. Wegner, P.E., Ruekert & Mielke, Inc. Kenneth H. Williams, CPA, Ruekert & Mielke, Inc.

3.a.a

Packet Pg. 10

Att

ach

men

t: R

uek

ert-

Mie

lke

Fee

Sch

edu

le (

RE

SO

LU

TIO

N 3

698

: 20

20 In

spec

tio

n S

ervi

ces

Co

ntr

act)

Page 11: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

kapurinc.com

7711 N. Port Washington Road Milwaukee, WI 53217

T: 414.751.7200 • F: 414.351.4117

 

 

CONSTRUCTION MANGEMENT SERVICES 2020 FEE SCHEDULE City of Mequon

Project Manager $159 per hour Construction Project Engineer II $112 per hour Construction Project Engineer I $101 per hour Inspector $82 per hour Mileage $0.575 per mile (or current federal rate)

3.a.b

Packet Pg. 11

Att

ach

men

t: K

apu

r an

d A

sso

ciat

es F

ess

Sch

edu

le (

RE

SO

LU

TIO

N 3

698

: 20

20 In

spec

tio

n S

ervi

ces

Co

ntr

act)

Page 12: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

3.a.c

Packet Pg. 12

Att

ach

men

t: R

.A.S

mit

h F

ee S

ched

ule

(R

ES

OL

UT

ION

369

8 :

2020

Insp

ecti

on

Ser

vice

s C

on

trac

t)

Page 13: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

3.a.c

Packet Pg. 13

Att

ach

men

t: R

.A.S

mit

h F

ee S

ched

ule

(R

ES

OL

UT

ION

369

8 :

2020

Insp

ecti

on

Ser

vice

s C

on

trac

t)

Page 14: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Public Works Committee

TO: Public Works Committee

FROM: Jeremy Dandy, Engineering Technician

DATE: March 10, 2020

SUBJECT: RESOLUTION 3707 A Resolution Awarding the 2020 Flex Patch Contract to

Fahrner Asphalt Sealers, Waunakee, Wisconsin in an Amount Not-to-Exceed

$20,000

Background

At its February meeting, the Public Works Committee authorized staff to advertise the 2020

Annual Road Program. For the Flex Patch Contract, staff advertised for 6.63 miles of Flex Patch

Sealing at an estimated cost of $15,160. A flex patch is used to fill “u” shaped cracks in the

roadway. These cracks are too large for traditional crack filling.

Please see the attached location map and street list for roads included in the base bid.

Analysis

The City received 2 bids for the 2020 Flex Patch Seal Contract, with a low base bid of $16,890

from Fahrner Asphalt Sealers of Waunakee, WI. The low bid is approximately 11% higher than

the original estimate. The estimate was based on the volume of cracks and the width of the road.

Thunder Road, LLC $27,362.00

Fahrner Asphalt Sealers $16,890.00

As a result of several recent contract awards, the Public Works Committee and Common Council

have requested consideration of adding a contingency to the award amounts. Therefore, staff is

recommending that the resolution approve an amount not to exceed $20,000, which includes a

contingency of approximately 18% for additionally authorized efforts. The contingency provides

for additional services that may result from the spring thaw. Additive bid items would not be

added to the award to utilize the contingency.

Work on this contract can start as soon as the contract is fully executed. The completion date for

this work is July 31, 2020. The base bid summary is attached.

Fiscal Impact

There is adequate funding available in the Annual Road Program account to award this project.

Recommendation

Staff recommends awarding the 5.52 miles of base bid streets for this contract. It is staff’s

recommendation that the Public Works Committee favorably endorse, and the Common Council

3.b

Packet Pg. 14

Page 15: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

approve the attached resolution awarding the 2020 Flex Patch Seal Contract to Fahrner Asphalt

Sealers, Waunakee, WI, in an amount not to exceed $20,000.

Attachments:

2020 FLEX PATCH Area Map (PDF)

Flex Patch Streets list (PDF)

Flex Patch Bid Opening Sheet (PDF)

3.b

Packet Pg. 15

Page 16: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

COMMON COUNCIL

OF THE

CITY OF MEQUON

RESOLUTION 3707

A Resolution Awarding the 2020 Flex Patch Contract to Fahrner Asphalt Sealers, Waunakee,

Wisconsin in an Amount Not-to-Exceed $20,000

A. The City of Mequon Engineering Division has advertised and received bids for

the 2020 Flex Patch Seal Contract.

B. Staff has reviewed the various bids and contractor qualifications for the contracts.

C. Staff has determined that the bids received are in accord with the estimates and

that adequate funds are available to accomplish the work and on that basis has made a

recommendation to the Public Works Committee.

D. To provide for additional services that may result from the spring thaw, the

contract award amount shall be affirmed with a contingency, for a total not-to-exceed cost of

$20,000.

E. Adequate funds for this contract are available from the Capital Project - 0410,

Project: Local Road Program - 10001 account.

F. The Committee on Public Works at its meeting on March 10, 2020, approved

staff's recommendation.

NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of

Mequon that:

Staff is authorized to award and sign the appropriate contract agreement to Fahrner

Asphalt Sealers, Waunakee, WI for the total cost not to exceed $20,000.

Approved by: John Wirth, Mayor

Date Approved: March 10, 2020

I certify that the foregoing Resolution was adopted by the Common Council of the City

of Mequon, Wisconsin, at a meeting held on March 10, 2020.

Caroline Fochs, City Clerk

3.b

Packet Pg. 16

Page 17: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

LAKE

MIC

HIGA

NLA

KE M

ICHI

GAN

CITY OF MEQUONCITY OF MEQUONFLEX PATCH

3.b.a

Packet Pg. 17

Att

ach

men

t: 2

020

FL

EX

PA

TC

H A

rea

Map

(R

ES

OL

UT

ION

370

7 :

2020

Fle

x P

atch

Co

ntr

act

Aw

ard

)

Page 18: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

PRICE SCHEDULE – 2020 FLEX PATCH SEALING * - Curb & gutter joint to be routed & sealed

Number

of Cracks

ITEM NO. STREET

LOCATION L(mi.)

W (ft.)

PRICE/STREET FROM TO

MAIN ROADS (North/South Roads from West to East)

1 Wauwatosa Road Bonniwell Road Pioneer Road 1.00 34 3

SUBDIVISION ROADS (West of River – working South to North)

2 Mequon Square Drive Wauwatosa Road Around Circle 0.47 22 10

3 Ashbury Woods Drive Mequon Road Cul-de-sac 0.59 20 1

4 Madero Drive Village of Thiensville River Road 0.49 22 20

5 Century Court Madero Drive Cul-de-sac 0.14 22 13

6 Cobblestone Court Highland Road Cul-de-sac 0.44 20 20

SUBDIVISION ROADS (East of River – working South to North)

7 Squire Road Country View Drive Surface Change 0.08 22 2

8 Country View Drive Mequon Road Surface Change 0.58 24 16

9 Glenbrook Lane Chestnut Road Lilac Lane 0.39 22 2

10 Chestnut Road Arbor Lane St James Lane 0.43 21 10

11 Ranch Road Country Lane End 0.32 21 6

12 Sandhill Circle Glen Oaks Lane Cul-de-sac 0.26 22 4

13 Willow Glen Court Glen Oaks Lane Cul-de-sac 0.33 22 11

TOTAL BID:

PRICE SCHEDULE – ADDITIVE BID ITEMS * - Curb & gutter joint to be routed & sealed

Number of Cracks

ITEM NO. STREET

LOCATION L(mi.)

W (ft.)

PRICE/STREET FROM TO

MAIN ROADS (North/South Roads from West to East)

A1 River Road Freistadt Road Heidel Road 0.20 27 3

A2 River Road Heidel Road Highland Road 0.80 32 10

SUBDIVISIONS (West of the Milwaukee River – working from South to North)

A3 Maryhill Court River Road Cul-de-sac 0.11 25 1

3.b.b

Packet Pg. 18

Att

ach

men

t: F

lex

Pat

ch S

tree

ts li

st (

RE

SO

LU

TIO

N 3

707

: 20

20 F

lex

Pat

ch C

on

trac

t A

war

d)

Page 19: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

BID OPENING:2/27/2020 2:00 PM

DATE TIME

TOTAL BID

$27,362.00

BIDDER

Thunder Road, LLC

CITY OF MEQUON

WISCONSIN

BIDS RECEIVED FOR: 2020 FLEX PATCH SEALING FILE #3825-20

$16,890.00Fahrner Asphalt Sealers

G:\Project Folders\Digital Project Files\3825-20_Flex Patch Seal\2020 Bid Opening Sheet FP 1 of 1

3.b.c

Packet Pg. 19

Att

ach

men

t: F

lex

Pat

ch B

id O

pen

ing

Sh

eet

(R

ES

OL

UT

ION

370

7 :

2020

Fle

x P

atch

Co

ntr

act

Aw

ard

)

Page 20: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Public Works Committee

TO: Public Works Committee

FROM: Jeremy Dandy, Engineering Technician

DATE: March 10, 2020

SUBJECT: RESOLUTION 3708 A Resolution Rejecting All Bids for the City of

Mequon's 2020 Crack Sealing Contract

Background

At its February meeting, the Public Works Committee authorized staff to advertise the 2020

Annual Road Program. For the Crack Seal contract base bid, staff advertised for 51.84 miles of

Crack Sealing at an estimated cost of $173,200.

Analysis

Staff held a pre-bid conference on February 18, 2020 which was attended by only one potential

bidder, Fahrner Asphalt Sealers of Waunakee, WI.

A bid opening was conducted on February 27, 2020 and staff received two bids, one from

Fahrner Asphalt Sealers of Waunakee, WI and one from Thunder Road of Waukesha, WI. The

low base bid was $117,592 from Thunder Road of Waukesha, WI. The low bid is approximately

32% less than the original estimate. The estimate was based on the volume of cracks and the

length of the road.

The low bid total was determined to not include one full page of bid items on the bid list. An

approximate amount of $85,000 was not included in the low bid amount. The City Attorney

reviewed the contract language and has determined that the contract requires that the contract

award be based on the total base bid as written. Thunder Road has indicated that they would

retract the bid if it was awarded in the amount of $117,592. If Thunder Road retracted the bid,

the award would need to be either made to Fahrner Asphalt Sealers or rebid.

Staff recommends rebidding the contract in March and awarding the contract in April. The

rebidding the contract could bring in two equitable bids at a contract less than the current high

bidder. There is a chance that the rebidding efforts could result in a higher bid. Some streets

included in the base bid will be moved to the alternate bid to account for the possibility of an

increase in bid amounts.

Fiscal Impact

The next lowest bid amount of $257,331 is approximately 48% more than City’s estimate.

Recommendation

Staff recommends that the Public Works Committee favorably endorse, and the Common

Council approve the resolution rejecting the bid for the 2020 Crack Seal contract. Subsequently,

3.c

Packet Pg. 20

Page 21: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

staff will re-advertise the project allowing more competitive bids. Pending adoption of the

proposed resolution, staff intends to bring back additional project bids for consideration and/or

award in April 2020.

3.c

Packet Pg. 21

Page 22: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

COMMON COUNCIL

OF THE

CITY OF MEQUON

RESOLUTION 3708

A Resolution Rejecting All Bids for the City of Mequon's 2020 Crack Sealing Contract

A. The City of Mequon Engineering Division has advertised and received bids for

the 2020 Crack Seal contract.

B. Staff has reviewed the various bids and contractor qualifications for the contracts.

C. Since the lowest bid amount had missing amounts of approximately $85,000, staff

has been notified that the bid is withdrawn, and on that basis, has made a recommendation to

reject the bid to the Public Works Committee.

D. The Committee on Public Works at its meeting on March 10, 2020, agreed with

staff's recommendation.

NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of

Mequon that:

1. The bid for the City of Mequon’s 2020 Crack Sealing Contract is rejected.

2. Staff is authorized to re-advertise to solicit bids for the project with a potential

award in April 2020.

Approved by: John Wirth, Mayor

Date Approved: March 10, 2020

I certify that the foregoing Resolution was adopted by the Common Council of the City

of Mequon, Wisconsin, at a meeting held on March 10, 2020.

Caroline Fochs, City Clerk

3.c

Packet Pg. 22

Page 23: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Public Works Committee

TO: Public Works Committee

FROM: Jeremy Dandy, Engineering Technician

DATE: March 10, 2020

SUBJECT: RESOLUTION 3709 A Resolution Awarding the 2020 GSB-88 Bituminous

Seal Contract to Fahrner Asphalt Sealers of Waunakee, Wisconsin, in an

Amount Not-to-Exceed $250,000

Background

At its February meeting, the Public Works Committee authorized staff to advertise the 2020

Annual Road Program. For the GSB-88 Bituminous Seal contract base bid, staff advertised for

9.88 miles of GSB-88 Bituminous Pavement Sealing at an estimated cost of $149,363.

Additive bids included 2.49 miles of additional GSB-88 Bituminous Sealing. The total estimate

for the additional streets is $36,633. However, the additive bids are per street so that any number

of streets may be added. These additive bids were included to allow more work to be completed

within budget depending on bid prices received for the entire 2020 Annual Road Program.

Please see the attached location map and street list for roads included in the bid.

Analysis

The City received one bid for the 2020 GSB-88 Bituminous Seal contract with the low base bid

of $184,357.00 from Fahrner Asphalt Sealers, of Waunakee, WI. It is common that only one bid

is received for the GSB-88 sealing contract. In the past, there has been only one other company

that provides the sealing service.

The low bid is approximately 23% more than the original estimate. Asphalt prices and asphalt

based product prices have increased in the last year, resulting in an increased cost for the GSB-

88 sealant. Staff recommends awarding the 9.88 miles of base bid streets, additive item A5 for

the Mequon DPW Combined Facility Lot and additive item A6 for the Mequon Nature Preserve

Parking Lot for this contract.

The Department of Public Works Parking Lot was included in the bid as an alternate bid item.

The prices are favorable for sealing the parking lot. The sealing will utilize the funds earmarked

for parking lots in the 2019 road program borrowing.

The Mequon Nature Preserve has also requested that asphalt treatment of the parking lot be

included in the City's contract. Upon approval from the Mequon Nature Preserve, the treatment

will be added and paid for by using the Mequon Nature Preserve fund. A Memorandum of

Understanding (MOU) will be executed prior to any work being completed at the Mequon

Nature Preserve.

3.d

Packet Pg. 23

Page 24: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Proposed Work Total

Base Bid $184,357

Additive Bid A5 - DPW lot $ 22,130

Additive Bid A6 - Mequon Nature Preserve lot $ 7,899

Total $214,386

As a result of several recent contract awards, the Public Works Committee and Common Council

have requested consideration of adding a contingency to the award amounts. Therefore, staff is

recommending that the resolution approve an amount not to exceed $250,000, which includes a

contingency of approximately 17% for additionally authorized efforts. The contingency will not

be used for additive bid items, it is intended for additional work needed as a result of spring

thaw.

Fahrner Asphalt Sealers has applied GSB-88 bituminous sealer in Mequon in the past and has

provided a quality work product.

Work on this contract can start as soon as the contract is fully executed. The completion date for

this work is August 31, 2020. The bid opening sheet is attached.

Fiscal Impact

There is adequate funding available in the Annual Road Program account to award this project.

Recommendation

It is staff’s recommendation that the Public Works Committee favorably endorse, and the

Common Council approve the attached resolution awarding the 2020 GSB-88 Bituminous Seal

contract to Fahrner Asphalt Sealers, of Waunakee, WI, for an amount not-to-exceed $250,000.

Attachments:

2020 GSB-88 Area Map (PDF)

GSB-88 Street List (PDF)

GSB88 Bid Opening Sheet (PDF)

3.d

Packet Pg. 24

Page 25: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

COMMON COUNCIL

OF THE

CITY OF MEQUON

RESOLUTION 3709

A Resolution Awarding the 2020 GSB-88 Bituminous Seal Contract to Fahrner Asphalt Sealers

of Waunakee, Wisconsin, in an Amount Not-to-Exceed $250,000

A. The City of Mequon Engineering Division has advertised and received bids for

the 2020 GSB-88 Bituminous Seal contract.

B. Staff has reviewed the various bids and contractor qualifications for the contracts.

C. Staff has determined that the bids received are reasonable considering the

increased costs of asphalt-based material prices and that adequate funds are available to

accomplish the work and on that basis has made a recommendation to the Public Works

Committee.

D. The Mequon Nature Preserve will reimburse the Road Program $7,899 for the sealing

of the parking lot at 8200 W. County Line Road through a memorandum of understanding.

E. Adequate funds for this contract are available from the Capital Project - 0410,

Project: Local Road Program - 10001 account.

F. To provide for additional services that may result from the spring thaw, the

contract award amount shall be affirmed with a contingency, for a total not-to-exceed cost of

$250,000.

G. The Committee on Public Works at its meeting on March 10, 2020, approved

staff's recommendation.

NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of

Mequon that:

Staff is authorized to award and sign the appropriate contract agreement to Fahrner

Asphalt Sealers of Waunakee, WI, in the Amount not to exceed $250,000.

Approved by: John Wirth, Mayor

Date Approved: March 10, 2020

I certify that the foregoing Resolution was adopted by the Common Council of the City

of Mequon, Wisconsin, at a meeting held on March 10, 2020.

3.d

Packet Pg. 25

Page 26: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Caroline Fochs, City Clerk

3.d

Packet Pg. 26

Page 27: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

LAKE

MIC

HIGA

NLA

KE M

ICHI

GAN

CITY OF MEQUONCITY OF MEQUONBASE BID - GSB-88

3.d.a

Packet Pg. 27

Att

ach

men

t: 2

020

GS

B-8

8 A

rea

Map

(R

ES

OL

UT

ION

370

9 :

2020

GS

B-8

8 B

itu

min

ou

s S

eal C

on

trac

t A

war

d)

Page 28: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

BID PRICE SCHEDULE – 2020 GSB-88 BITUMINOUS SEAL

ITEM

NO. STREET LOCATION

L(mi.)

C/L W(ft.) PRICE/STREET

FROM TO

MAIN ROADS (North/South Roads from west to east)

1 Green Bay Road Village of Thiensville Highland Road 0.51 30

2 Green Bay Road Bonniwell Road Highland Road 1.07 23

3 Green Bay Road Pioneer Road Bonniwell Road 1.03 23

4 Oriole Lane Highland Road Bonniwell Road 0.99 20

SUBDIVISIONS (West of Milwaukee River, south to north)

5 Enterprise Drive Donges Bay Road Cul-de-sac 0.21 26

6 Marseilles Drive Meadow Circle W River Road 0.16 22

7 Marseilles Court Meadow Circle W Cul-de-sac 0.05 22

8 Meadow Circle W Meadow Circle E End 0.26 22

9 Meadow Circle E Marseilles Drive Highland Drive 0.25 22

10 Madero Drive Village of Thiensville River Road 0.49 22

11 Century Court Madero Drive Cul-de-sac 0.14 22

12 Oak Shore Lane Freistadt Road dead end south 0.22 13

13 Woodfield Court Woodfield Drive Cul-de-sac 0.13 22

14 Woodfield Drive Fieldwood Road Cul-de-sac 0.18 22

15 Lake Isle Drive Fieldwood Road Fieldwood Road 0.23 22

16 Golf Drive Ville Du Parc Drive End divided 0.05 31

17 Golf Drive End Divided Around Loop 0.21 22

18 Golf Circle Golf Drive Around circle 0.16 24

SUBDIVISIONS (East of Milwaukee River, south to north)

19 Tarrytown Lane River Road Sleepy Hollow Lane 0.20 22

20 Sleepy Hollow Lane River Valley Drive Tarrytown Lane 0.10 22

21 River Hollow Court Sleepy Hollow Lane Cul-de-sac 0.13 22

22 River Valley Drive Sleepy Hollow Lane Sunnydale Lane 0.15 22

23 Glen Cove Court River Valley Drive Cul-de-sac 0.05 22

24 Sunnydale Lane River Valley Drive Tarrytown Lane 0.20 22

3.d.b

Packet Pg. 28

Att

ach

men

t: G

SB

-88

Str

eet

Lis

t (

RE

SO

LU

TIO

N 3

709

: 20

20 G

SB

-88

Bit

um

ino

us

Sea

l Co

ntr

act

Aw

ard

)

Page 29: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

25 River Trail Road Mequon Road End of Curb 0.06 24

26 River Trail Road End of Curb River Trail 0.44 22

27 River Trail Court River Trail Cul-de-sac 0.05 24

28 Stratford Place Donges Bay Road Cul-de-sac 0.25 22

29 Sunnydale Lane Range Line Road End 0.70 22

30 Fairview Drive Valley Drive Linnwood Lane 0.10 21

31 Linnwood Lane Fairview Drive Cul-de-sac 0.15 21

32 Mequon Square Drive Wauwatosa Road Around Circle 0.47 22

TOTAL BASE BID - BID ITEMS 1 THROUGH 32:

BID PRICE SCHEDULE – ADDITIVE BID ITEMS

ITEM NO. STREET

LOCATION L(mi.) C/L

W(ft.) PRICE/STREET FROM TO

MAIN ROADS (North/South Roads from west to east)

A1 Davis Road Bonniwell Road Pioneer Road 0.95 21

A2 Buntrock Avenue Mequon Road Village of Thiensville 0.64 22

SUBDIVISIONS (West of Milwaukee River, south to north)

A3 Spring Street Village of Thiensville Buntrock Avenue 0.04 20

A2 Spring Avenue Division Street West Street 0.25 18

A3 Division Street Village of Thiensville Spring Avenue 0.10 20

A4 West Street Spring Avenue Village of Thiensville 0.10 18

PARKING LOTS (West of Milwaukee River, south to north)

A5 Mequon DPW Combined Facility

Industrial Drive Industrial Drive 14,753 SY

A6 Mequon Nature Preserve

County Line Road County Line Road 5,000 SY

PARKING LOTS (East of Milwaukee River, south to north)

A7 River Barn Park Cedarburg Road Around Parking Lot 9,400 SY

3.d.b

Packet Pg. 29

Att

ach

men

t: G

SB

-88

Str

eet

Lis

t (

RE

SO

LU

TIO

N 3

709

: 20

20 G

SB

-88

Bit

um

ino

us

Sea

l Co

ntr

act

Aw

ard

)

Page 30: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

BID OPENING:2/27/2020 1:00 PM

DATE TIME

BIDDER

Fahrner Asphalt

TOTAL BASE BID

CITY OF MEQUON

WISCONSIN

BIDS RECEIVED FOR: 2020 GSB-88 BITUMINOUS SEAL FILE #3762-20

$184,357.00

G:\Project Folders\Digital Project Files\3762-20 2020 GSB-88 Seal\2020 Bid Opening Sheet GSB88 1 of 1

3.d.c

Packet Pg. 30

Att

ach

men

t: G

SB

88 B

id O

pen

ing

Sh

eet

(R

ES

OL

UT

ION

370

9 :

2020

GS

B-8

8 B

itu

min

ou

s S

eal C

on

trac

t A

war

d)

Page 31: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Engineering

TO: Public Works Committee

FROM: Kristen Lundeen, Director of Public Works/City Engineer

DATE: March 10, 2020

SUBJECT: RESOLUTION 3710 A Resolution Authorizing a Memorandum of

Understanding Between the City of Mequon and the Mequon Nature

Preserve for the Completion of Parking Lot Maintenance Work in 2020

Background

Mequon Nature Preserve, LLC (MNP, LLC) leases and manages the Mequon Nature Preserve.

Recently, MNP, LLC identified various parking lot maintenance needs and requested that the

City bid the work as a part of its annual road program contracts. The City holds funds for MNP,

LLC, which is requesting that the funds be utilized for the project. The terms of this maintenance

work to be performed in 2020 are summarized in the attached Memorandum of Understanding

(MOU).

Analysis

City staff coordinated with MNP, LLC staff to outline the pavement maintenance work as a part

of its contracts. The proposed Memorandum of Understanding (MOU) confirms the bid amount

and outlines the funding terms.

Please note that while the City is considering rebidding one of the maintenance contracts, the

MOU would still be valid for any remaining work and for the rebid.

Fiscal Impact

The MOU is fiscally neutral for the City.

Recommendation

Staff recommends that the Public Works Committee favorably endorse and the Common Council

approve the resolution authorizing a memorandum of understanding with the Mequon Nature

Preserve for parking lot maintenance projects to be completed during the 2020 road maintenance

and construction season.

Attachments:

MNP MOU (PDF)

3.e

Packet Pg. 31

Page 32: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

COMMON COUNCIL

OF THE

CITY OF MEQUON

RESOLUTION 3710

A Resolution Authorizing a Memorandum of Understanding Between the City of Mequon and

the Mequon Nature Preserve for the Completion of Parking Lot Maintenance Work in 2020

A. The City of Mequon administers annual contracts for parking lot and roadway

maintenance.

B. Mequon Nature Preserve, LLC requested that programmed parking lot

maintenance for the Mequon Nature Preserve be included in the City’s annual contracts.

C. The City of Mequon holds sufficient funds in a dedicated account for Mequon

Nature Preserve to adequately cover the bid costs.

D. The Public Works Committee favorably recommended authorization of the

Memorandum of Understanding between the Mequon Nature Preserve, LLC and the City of

Mequon.

NOW, THEREFORE, BE IT RESOLVED by the Mayor and the Common Council of the

City of Mequon that:

City officials are authorized to execute a memorandum of understanding with the

Mequon Nature Preserve for parking lot maintenance.

Approved by: John Wirth, Mayor

Date Approved: March 10, 2020

I certify that the foregoing Resolution was adopted by the Common Council of the City

of Mequon, Wisconsin, at a meeting held on March 10, 2020.

Caroline Fochs, City Clerk

3.e

Packet Pg. 32

Page 33: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF MEQUON AND

MEQUON NATURE PRESERVE, INC.

Articles of agreement made and entered into this _____ day of ___________, 20__, by and between

Mequon Nature Preserve, Inc., hereinafter called MNP Inc., and the City of Mequon, a municipal

corporation of Ozaukee County, Wisconsin, hereinafter called the City and collectively called the Parties.

RECITALS

1. The City has a lease with MNP Inc. which governs the relationship between the two Parties.

2. The PieperPower Education Center (PPEC) parking lot needs to be repaired. MNP Inc. requested

that the City’s Public Works Committee place PPEC parking lot maintenance project on its agenda

for inclusion in the 2020 road and parking lot maintenance program.

3. MNP Inc. further requested that this project be funded using the City’s Mequon Nature Preserve

Fund whose current balance is $46,535. To defer the needed maintenance will result in additional

costs for even more substantial future repairs if parking lot maintenance is not addressed soon.

4. Both Parties have a vested interest in the infrastructure investment and proper protection thereof.

NOW, THEREFORE, in consideration of these Recitals, the mutual agreements, benefits and

responsibilities outlined herein, and other good and valuable consideration, receipt or sufficiency of which

is hereby acknowledged, the Parties agree:

1. The City will complete the bidding, contract administration and inspection of the parking lot

maintenance project as a part of its annual road program.

2. Bids for the PPEC parking lot maintenance project will be presented to MNP Inc. for consideration

and approval prior to awarding the contract.

3. There are sufficient funds in the City’s Mequon Nature Preserve Fund to pay for MNP Inc.’s share

of the maintenance contract.

4. Upon approval of this agreement, as indicated by the signatures below, City staff will begin the

procurement of bids for the Crack Seal, GSB-88 and Asphalt Patch. It is the intent of the City to

have the Crack Seal, GSB-88 and Asphalt Patch completed before the deadline for each contract.

CITY OF MEQUON OWNER

By____________________________ By_________________________________ John Wirth, Mayor NAME, TITLE

By____________________________ Caroline Fochs, City Clerk

3.e.a

Packet Pg. 33

Att

ach

men

t: M

NP

MO

U (

RE

SO

LU

TIO

N 3

710

: M

NP

MO

U P

arki

ng

Lo

t M

ain

ten

ance

)

Page 34: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

STATE OF WISCONSIN )

)SS

OZAUKEE COUNTY )

Personally came before me, this _____ day of _________________, 20___, the above named John

Wirth, Mayor and Caroline Fochs, City Clerk, to me known to be the persons who executed the foregoing

instrument and acknowledged the same.

______________________________________

______________________________________

Notary Public, Ozaukee County, Wisconsin

My Commission (expires) (is)______________

STATE OF WISCONSIN )

)SS

OZAUKEE COUNTY )

Personally came before me, this _____ day of _________________, 20__, the above named

______________________________, to me known to be the person who executed the foregoing instrument

and acknowledged the same.

______________________________________

______________________________________

Notary Public, Ozaukee County, Wisconsin

My Commission (expires) (is)______________

Approved by: __________________________

Brian Sajdak, City Attorney

3.e.a

Packet Pg. 34

Att

ach

men

t: M

NP

MO

U (

RE

SO

LU

TIO

N 3

710

: M

NP

MO

U P

arki

ng

Lo

t M

ain

ten

ance

)

Page 35: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092-1930

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Public Works Committee

TO: Public Works Committee

FROM: Jeremy Dandy, Engineering Technician

DATE: March 10, 2020

SUBJECT: 2020 Annual Road Program Update

Background

The Annual Road Program addresses both road reconstruction/rehabilitation and road

maintenance. This memo provides an overview of the status of the 2020 Annual Road Program

and the current estimates.

At the last meeting there was a request for the current SCR for the City streets. The 2019-2020

SCR Map is attached. There was also a request to provide the current 5-year Road Plan. The

plan years are approximate and are used as a general guidance for the selection of the roadways

in any given year.

Analysis

Business Park –

Phase 1 of the Business Park was built in the late 1980s. With the roadway construction a

lighting system, irrigation system, curb and gutter, catch basins, storm sewer and pavement were

installed. City staff has been working through the various components of the Business Park and

have determined that separating the Business Park into a two year project allow for the best final

product. The lighting, irrigation, catch basin repair and curb repair would be in Year 1 and the

pavement repair in Year 2. This would allow for the coordination of the various items to take

place ahead of the road surface. Each of the repairs is described below.

Lighting

When the Business Park was constructed the lighting was installed by the City and maintained

by the City. When phase 2 of the business park was completed, WE Energies owned the lights.

Currently, the lighting in the Business Park is in poor condition, it does not match the second

phase, and is becoming increasingly difficult to repair.

City staff has prepared the following costs relating to the lighting replacement:

Estimate of Cost to Demolish $30,000

Estimate of Cost to Install by WE Energies $223,800*

Estimate of Cost to Install Independently $206,100*

*The WE Energies estimate includes fiberglass poles, the City installation quote includes

Aluminum poles.

While the estimate to install the lighting independently is lower than the cost for WE energies

installation, The City would need to maintain the lights and poles. The maintenance would well

exceed the differences in the installation costs. The fiberglass poles included in the WE Energies

estimate are also preferred and would match phase 2 of the Business Park.

4.a

Packet Pg. 35

Page 36: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

City staff is currently working with WE Energies on the installation of new lighting in the

business park. The removal of the existing lighting and conduit are included as alternative bids

in the Road Improvements Contract. The demolition is included as an alternate bid since the

timing will need to coincide with the installation by WE Energies. This would be consistent with

Phase 2 of the Business Park.

If WE Energies declines the application for service, the demolition and installation of street

lighting will be combined and issued under a separate contract. Both options allow for the

coordination between contractors and reduces the risk of road cuts in a fresh pavement surface.

Irrigation

Irrigation lines were installed in the Business Park in 1993. City staff have reviewed the

landscaping plans and the approval by common council for the system and have found that the

irrigation system is no longer needed. The irrigation has not been used in the last 15 years and

likely has several areas of failure. The age of the system and the limited use would likely require

extensive repairs of the overall system. The cost to find and repair the failures would be

significantly higher than replacement. An irrigation contractor confirmed that repair cost are

generally higher than the replacement costs. Two other contractors have not responded to the

inquiries on repair costs.

Estimate of Cost to Abandon the Existing System $25,000

Estimate of Costs to Replace the System $59,000

The connections for the irrigation system are within the roadway and would need to be dug up to

be abandoned properly. City staff has prepared the estimates of the costs to abandon, or replace

the existing system.

Catch Basins, Storm Sewer, and Curb and Gutter

The catch basin and curb and gutter repairs can be completed independently of the pavement

replacement. The volume of catch basin, storm sewer and curb and gutter repairs are significant

enough that they are going to be released in a separate contract. Separating the repairs into a

separate contract allows for specialty contractors to bid on the work. Typically this leads to a

more competitive bid. The contract is proposed to be advertised in March with award in April.

Estimate of Catch Basin Repair $186,000

Estimate of Cost for Storm Sewer Repair $3,500

Estimated Cost of Curb and Gutter Repair $107,500

Total Cost $297,000

Revised Road Program –

With the removal of the streets in the Business Park in the Road Improvements contract, there is

opportunity to move other projects into the base bid. Staff is proposing to include the following

streets in the Road Program: Range Line Court (stand alone contract), Wauwatosa Road,

Eastbrook Drive, Woodberry Drive, Range Line Terrace, Essex Court and Essex Drive.

River Lake Subdivision was removed to allow for further review of the policies and procedures

relating to subdivisions with private water trusts.

Westchester Lakes is on the 5-year road program and will include catch basin repairs. Staff is

proposing to include the Westchester lakes catch basin repair in the 2020 Catch Basin, Storm

Sewer and Curb Repair contact. The pavement repair and replacement will follow in future

4.a

Packet Pg. 36

Page 37: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

years.

The Mequon Nature Preserve requested that the parking area be part of the bidding for Crack

Seal, GSB-88 and Asphalt Patching. If approved, these additive items would be funding using

the Mequon Nature Preserve account and a Memorandum of Understanding (MOU) would be

executed before beginning any work.

The maintenance contracts for GSB-88 and Flex Patch are recommended for award March 10.

The Crack Filling, Range Line Road Improvements, 2020 Road Improvements and 2020 Catch

Basin, Storm Sewer and Curb and Gutter contracts will be bid in March with award in April.

City staff is also planning to issue a sidewalk repair contract and a parking lot repair contract

within the next 3 months. The sidewalk repair contract

Fiscal Impact

The City of Mequon has applied for Local Roads Improvement Program Entitlement Project

(LRIP) funding for the reconstruction of the Mequon Business Park. The construction costs are

estimated at $833,788 which includes improvements to street lighting and storm sewer repairs.

The LRIP reimbursement amount is approximated to be $85,746.64 which equates to 10.3% of

the total estimated cost. The approval of the LRIP funding was approved in March 2020 and is

required to be utilized by June 30, 2025. The LRIP application is available by request from the

Engineering Division.

On February 12, 2019, common council approved a $5.1 million bond issuance for a 3-year

borrowing for the road program. This is the second year of the aforementioned three-year

program funded by long term bonding. Below are the costs associated with the 2019 Road

Program.

The net total expenditures for 2019 were under the overall budget for the road program. The

budget allocations will be utilized over the 3 year borrowing cycle. Additive bidding will be

utilized when possible to maximize the yearly expenditures.

The program shown on the chart below is the anticipated costs for 2020:

Miles Cost Rehabilitation – Cedarburg Road and Freistadt Road 3.08 $1,548,588

Crack Seal 52.02 $149,850

GSB-88 Seal 14.14 $265,499

Total Contract Costs 69.24 $1,963,937

Anticipated 2019 LRIP Reimbursement $469,965

Net Cost $1,493,972

4.a

Packet Pg. 37

Page 38: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Miles Cost Estimate

Rehabilitation – Range Line Court 0.51 $162,743

Rehabilitation – Wauwatosa Road 0.12 $65,720

Rehabilitation –Eastbrook Drive 0.38 $86,562

Rehabilitation – Woodberry Drive 0.18 $40,768

Rehabilitation – Range Line Terrace 0.26 $83,302

Rehabilitation – Essex Drive 0.36 $88,185

Rehabilitation – Essex Court 0.2 $51,011

Catch Basins - Business Park $111,600

Catch Basins - Westchester Subdivision $69,000

Catch Basins - Woodberry Drive $5,400

Curb and Gutter - Business Park $54,598

Curb and Gutter - WestChester Subdivision $29,400

Curb and Gutter - Woodberry Drive $23,480

Maintenance (Crack Seal) 51.84 $173,200

Maintenance (GSB-88) 9.88 $250,000

Maintenance (Flex Patch) 6.63 $20,000

WE Energies Lighting Installation $223,800

Irrigation Abandonment $25,000

City Totals 70.36 $1,563,927

Anticipated 2020 LRIP Reimbursement $85,746

Sub Total $1,478,181

Approximate Sidewalk Contract total $15,000

Approximate Parking Lot Repair total

(maximum) $600,000

Grand Total $2,093,181

Recommendation

Staff is providing the road program descriptions for information and discussion. Authorization

and approval of each of the contracts will come back before the Public Works Committee for

recommendation following each bidding cycle. Additive bids will be included with the Road

Improvements contract and Crack Seal contract that can be added at the time of award if funding

allows.

Attachments:

2019_2020 SCR Map (PDF)

2020 Five Year Plan-Model (PDF)

4.a

Packet Pg. 38

Page 39: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

LAKE

MIC

HIGA

NLA

KE M

ICHI

GAN

CITY OF MEQUONCITY OF MEQUON4.a.a

Packet Pg. 39

Att

ach

men

t: 2

019_

2020

SC

R M

ap (

4954

: 2

020

An

nu

al R

oad

Pro

gra

m U

pd

ate)

Page 40: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

LAKE

MIC

HIGA

NLA

KE M

ICHI

GAN

CITY OF MEQUONCITY OF MEQUON20202021202220232024

4.a.b

Packet Pg. 40

Att

ach

men

t: 2

020

Fiv

e Y

ear

Pla

n-M

od

el (

4954

: 2

020

An

nu

al R

oad

Pro

gra

m U

pd

ate)

Page 41: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

11333 N. Cedarburg Road

Mequon, WI 53092-1930

Phone: 262-236-2913

Fax: 262-242-9655

www.ci.mequon.wi.us Office of Engineering

TO: Public Works Committee

FROM: Kristen Lundeen, Director of Public Works/City Engineer

DATE: January 14, 2020

SUBJECT: 2020 Work Plan (3.10.20)

Attached for the Board’s review is a copy of the proposed work plan for 2020.

Attachments:

2020 Work Plan (3.10.20) (PDF)

4.b

Packet Pg. 41

Page 42: 11333 N. Cedarburg Road Mequon, WI 53092 Phone: 262-236

Public Works Committee 2020 Work Plan (March 10, 2020)

Month Agenda Topics April • Standard Specifications Update for Figure 5 and Exhibit G: Template DA

• Parks Naming Rights Future Agenda Topics

• Prairieview Lane Drainage Issue Update (April/May)

• 2020 Pool Vehicle Purchase

• 2020 Road Program and Associated Contract Awards (April)

• Prioritization of Drainage CIP (typically June)

• Review of Private Water Trust Maintenance and Coordination with Road Program Projects

2020 Completed Items

• Reapproval of Permits to Ozaukee County for the Little Menomonee River Corridor Ecosystem Restoration Project

• Contract Award for 2020 Cleaning Services • Contract Award for Pedestrian Crossing & Traffic

Signal Design Improvements Along Mequon Road from Buntrock Avenue East Towards Cedarburg Road

• Contract Award for Repair of the Mequon Public Safety Building Foot Bridge

• Approval of a Cost Share Agreement Between the City of Mequon and the Cedar Ridge Condominium Homeowners Association for Limited Storm Water Facility Improvements

• Approval of an Amendment to Chapters 14 and 54 for Special Events, and Adopting a Template Special Event Agreement

• Approval of a Second Amendment to the Cell Tower License at ESFS

• Approval of the purchase of a John Deere 6120E Cab Tractor and Mower Attachments

• Reaffirmation the Award of a Contract for the Mequon Road: Traffic Signal and Ozaukee Interurban Trail Crossing Design to TADI

• 2020 Annual Road Program Overview

4.b.a

Packet Pg. 42

Att

ach

men

t: 2

020

Wo

rk P

lan

(3.

10.2

0) (

4974

: 2

020

Wo

rk P

lan

(3.

10.2

0))