REPORT NO.: PAGE: 1 OF 2 11kV MV SWGR TEST REPORT DATE: _________________ Ref No.: ________________ LOCATION / AREA : DRAWING NO : KKS NO : MAKER: TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER Meg Ohm Meter Digital Micro Ohm meter Circuit Breaker Analizer 11kV SWGR VACUUM CIRCUIT BREAKER TEST 1. General Data Type Rated Voltage Rated Current Rated Breaking Capacity Duty Cycle Serial No. Aux. Voltage Motor Voltage 2. Visual Check Description OK Visual Check for External Damage Visual Check of operation mechanism components: operation mechanis 3. Insulation Resistance Test Breaker Closed Breaker Open R-E R-R S-E S-S T-E T-T COMMENTS: Accepted by Name Signature Date HHI DOOSAN FICHTNER DEWA DUBAI ELECTRICITY & WATER AUTHORITY JEBEL ALI POWER AND DESALINATION STATION 'M' Contract No. : CNE/001/2006 CALIBRATION DATE Not Accepted Visual Check of operation mechanism components: control switch, position indicator

Upload: mohammed-samee

Post on 22-Nov-2014

728 views

Category:

Documents


33 download

TRANSCRIPT

Page 1: 11KV Test Report

REPORT NO.:

PAGE: 1 OF 2

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Digital Micro Ohm meter

Circuit Breaker Analizer

11kV SWGR VACUUM CIRCUIT BREAKER TEST

1. General Data

Type

Rated Voltage

Rated Current

Rated Breaking Capacity

Duty Cycle

Serial No.

Aux. Voltage

Motor Voltage

2. Visual Check

Description OK

Visual Check for External Damage

Visual Check of operation mechanism components: operation mechanism

3. Insulation Resistance Test

Breaker Closed Breaker Open

R-E R-R

S-E S-S

T-E T-T

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Not Accepted

Visual Check of operation mechanism components: control switch, position indicator

Page 2: 11KV Test Report

REPORT NO.:

PAGE: 2 OF 2

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Digital Micro Ohm meter

Circuit Breaker Analizer

11kV SWGR VACUUM CIRCUIT BREAKER TEST

4. CB Close / Open Timing Test

Phase Main Contacts

Closing Time msec Opening Time msec

R

S

T

5. Contact Resistance Measurement

Phase Current injected A Contact Resistance µΩ

R

S

T

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 3: 11KV Test Report

REPORT NO.:

PAGE: 1 OF 5

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST

1. Data

Phase R S T

Serial No.

CT No. Purpose Ratio Class

T2-1

5P20

CL PX

T2-2

2. Insulation Resistance Test: 500V DC for 1 min

CTSec to all other core & Primary Earth Primary to Sec. Earth

R S T R S T

3. Polarity Test:

CT No.S1-S2

R S T

T2-1

5P20

CL PX

T2-2

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Winding Resistance @ 75 °C

Page 4: 11KV Test Report

REPORT NO.:

PAGE: 2 OF 5

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST

4. Winding Resistance in ohms @ 75 °C (room temperature °C)

CTS1-S2 Ohms S1-S2 @ 75 °C

R S T R S T

T2-1

5P20

CL PX

T2-2

ZCT

5. Magnetizing Curve Test

T2-1

R S T

Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 5: 11KV Test Report

REPORT NO.:

PAGE: 3 OF 5

11kV MV SWGR TEST REPORT

DATE:

Ref No.: _____________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

MAKE / MODEL

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST5P20

R S T

Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

CL PX

R S T

Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

T2-2

R S T

Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

COMMENTS:

Accepted by Name Signature Date

HHIDOOSANFICHTNERDEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

SERIAL NUMBER

CALIBRATION DATE

Page 6: 11KV Test Report

REPORT NO.:

PAGE: 4 OF 5

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST

6. Ratio Test

PhaseCurrent Measured at Secondary A

T2-1 5P20 CL PX

R

S

T

PhaseCurrent Measured at Secondary A

T2-2

R

S

T

COMMENTS:

Accepted by Name Signature DateHHIDOOSANFICHTNERDEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Current Inejcted In Primary A

Current Inejcted In Primary A

Page 7: 11KV Test Report

REPORT NO.:

PAGE: 5 OF 5

11kV SWGR MV TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER: HHI

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV CT CIRCUIT LOOP RESISTANCE MEASUREMENT

7. Bus Bar Protection CT Circuit Loop Resistance (RL)

Phase Calculated RL at 75°C

R

S

T

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Measured RL at Room Temp.( 24°C)

Page 8: 11KV Test Report

REPORT NO.:

PAGE: 1 OF 3

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV SGWR POTENTIAL TRANSFORMER TEST

1. Data

Phase R S T

Serial No.

Ratio

Class

Burden (VA)

2. Insulation Resistance Test: 500V DC (Result in Giga Ohm) for: 1 min. room temp. °C

Winding ConnectionsIR Value (Giga Ohms)

RemarksR S T

Primay - Ground

Secondary - Ground

Primary - Secondary

3. Polarity Test

PhasePolarity

Core-1

R

S

T

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 9: 11KV Test Report
Page 10: 11KV Test Report

REPORT NO.:

PAGE: 2 OF 3

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV SWGR POTENTIAL TRANSFORMER TEST

4. Winding Resistance Measurement

Phase Primary Winding (KΩ)Secondary Winding

Core-1 (Ohm)

R

S

T

5. Voltage Ratio Test: Primary Injected Voltage : VAC 1 -Phase

VT Ratio=11,000/1.73/110/1.73

a-n Standard Ratio Measured Ratio Remarks

R 100

S 100

T 100

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Applied Volt 1 - phase

Sec. Measured Voltage

Page 11: 11KV Test Report

REPORT NO.:

PAGE: 3 OF 3

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: SERIAL NUMBER

Meg Ohm Meter

DC mA Ammeter

Single Phase Variac

CT Injection kit

11kV SWGR POTENTIAL TRANSFORMER TEST

6. Magnetization current Measurement

Phase Magnetizing current in Primary Secondary Voltage

R

S

T

7. Zero sequence voltage measurement

Phase Magnetizing current

RS

ST

TR

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Voltage Applied in Primary

Voltage Applied in Primary

Secondary Zero sequence Voltage (open delta)

Page 12: 11KV Test Report

REPORT NO.:

PAGE: 1 OF 11

11kV SWGR MV TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

11kV SWGR MULTIFUNCTION RELAY

REF543 PROTECTION RELAY

SERIAL No. :

1. Visual checks

Conditions of Relay

Installation and wiring checking

Relay connected to local earth bar

Status Input

Relay Auxiliary supply

2.Insulation Resistance measurement on Control & Aux. circuits

IR value (500 V DC for 1 min ):

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 13: 11KV Test Report

REPORT NO.:

PAGE: 2 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

3.PROTECTION FUNCTIONS

1. DATA

1.1 REF543-Inputs

Input - Analog Type Ratio

CT

2. OVERCURRENT IDMT CHARACTERISTICS (51)

2.1 Settings

Main Setting Second Setting Setting Range

Iset / In 0.05….40.00 In

K 0.05….1.50

Curve Type NI,VI,EI,LI

Used Sensors 1….6

2.2. Check on Overcurrent IDMT Characteristic: Curve VI

Sl.No.Operating Time

2*Is 5*Is

1

2

3

3. EARTH FAULT IDMT CHARACTERISTIC (51N)

2.1 Settings

Main Setting Second Setting Setting Range

Iset / In 0.05….40.00 In

K 0.05….1.50

Curve Type NI,VI,EI,LI

Used Sensors 1….6

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Pick up Current A

Drop off Current A

TMS Setting

Page 14: 11KV Test Report
Page 15: 11KV Test Report

REPORT NO.:

PAGE: 3 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

b. Check on Earthfault IDMT Characteristic: Curve NI

Sl.No.Operating Time

2*Is 5*Is

1

4. CB TRIP, SIGNALING

CB Trip OK: Signaling OK

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Pick up Current A

Drop off Current A

TMS Setting

Page 16: 11KV Test Report
Page 17: 11KV Test Report

REPORT NO.:

PAGE: 4 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

3.PROTECTION FUNCTIONS

SERIAL No.

1. DATA

1.1 SPAU 140C

Input - Analog Type Ratio

2. RESTRICTED EARTH-FAULT CURRENT (87B-R)

2.1 Settings

Main Setting Second Setting Setting Range

Iset / In 0.5 … 5 % In

Time 35 msec

2.2. Measurement

Pick up Current Drop Off Tripping Time

1

3. RESTRICTED EARTH-FAULT CURRENT (87B-S)

3.1 Settings

Main Setting Second Setting Setting Range

Iset / In 0.5….5% In

Time 35 msec

3.2 Measurement

Pick up Current Drop Off Tripping Time

1 0.042

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 18: 11KV Test Report

REPORT NO.:

PAGE: 5 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

4. RESTRICTED EARTH-FAULT CURRENT (87B-T)

4.1 Settings

Main Setting Second Setting Setting Range

Iset/ In 0.5…5% In

Time 35 msec

4.2 Measurement

Pick up Current Drop Off Tripping Time

5. UNDER VOLTAGE LOW SET PROTECTION U< (27)

5.1 Settings

Main Setting Second Setting Setting Range

Start Value 0.1 …. 1.2 Un

Time 40 …..300000 msec

5.2. Measurements

Pick up Voltage V Drop Off Voltage V

1

6. CB TRIP, SIGNALING

CB TRIP OK SIGNALING OK

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Time at rated Voltage (msec)

Page 19: 11KV Test Report
Page 20: 11KV Test Report

REPORT NO.:

PAGE: 6 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER CALIBRATION DATE

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

4.Mechanical Functional Test

Earth Switch Circuit Breaker Lock Lever KeyResults Status

Closed Open Closed Open Open Close

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1 CB Insertion Possible

1 1 1 1

1 1 1 1

1 1 1 1

1 intermediate 1

1 1 1 1

1 1 1 1

1 _ _ _ _ _ _

1 _ _ _ _ _ _

Note: Everytime CB is moved to rack in or rack out position, rack in / out key turn and hold to Anticlockwise (30 deg)

COMMENTS:

Accepted by Name Signature Date

DOOSAN

EMPLOYER/ENGINEER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

Service Position

Test Position

CB Insertion not Possible

CB Insertion not Possible

CB Insertion not Possible

CB Disconnection not Possible

CB Disconnection not Possible

CB Disconnection Possible

CB Closing Not Possible

CB Door Not Posible Open

CB Door Not Posible Open

Cable comp Door not posible to close

Cable comp Door not posible to open

Page 21: 11KV Test Report
Page 22: 11KV Test Report

REPORT NO.:

PAGE: 7 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

5.Electrical Functional Test

(i) SS1 Local/ Remote Control Key in Remote

Circuit BreakerAction Results Status

Closed Open

1 1 Local Closing CB Not Closed

1 1 Local Closing CB Opened

1 1 Remote Closing CB Closed

1 1 Remote Opening CB Opened

1 1 Local Closing CB Not Closed

1 1 Local Opening CB Opened

1 1 CB Opened

1 1 Remote Closing CB Closed

1 1 Remote Opening CB Opened

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Service Position

Test Position

Emergency Opening

Page 23: 11KV Test Report
Page 24: 11KV Test Report

REPORT NO.:

PAGE: 8 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

(ii) SS1 Local/ Remote Control Key in Local (A Type)

Circuit BreakerAction Result Status

Test Service Closed Opened

1 1 Local Closing CB Closed

1 1 Local Opening CB Opened

1 1 Remote Closing CB Not Closed

1 1 Remote Opening CB Opened

1 1 Local Closing CB Closed

1 1 Local Opening CB Opened

1 1 CB Opened

1 1 Remote Closing CB Not Closed

1 1 Remote Opening CB Opened

Note: REF Key in No Control mode bay control no action

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Emergency Opening

Page 25: 11KV Test Report
Page 26: 11KV Test Report

REPORT NO.:

PAGE: 9 OF 11

11kV MV SWGR TEST REPORTDATE: ______________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

6. LED Checking

FUNCTION OF SIGNALLING LEDs

NR DESCRIPTION OFF GREEN YELLOW RED STATUS

READY Internal self test FAULT NORM _ _

ALARM LOCK ( 86 ) NORM _ _ TRIP

INTERLOCKS ERROR

1 ARC FAULT CABLE ZONE _ NORM _ TRIP

2 ARC FAULT C.B ZONE _ NORM _ TRIP

3 ARC FAULT BUS ZONE _ NORM _ TRIP

4 C.B SPRING CHARGED _ CHARGED DISCHAR _

5 C.B TRIP COIL _ NORM FAULT _

6 REF 543 PROT _ OK OFF

7 87B/ ARC NORM TRIP

8 Alarm page 1 of 3/see > page2 _

page 3

1 51 NORM _ _ TRIP

2 51N NORM _ _ TRIP

3 27 NORM _ _ TRIP

4 VT fuse

5 MCB

6 VENT

7 87B A /ARC

8 Alarm page 2 of 3/see > page1

page 3

1 PROT. GTG TR

3 Alarm page 3 of 3 /see page 1

page 2

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

SERIAL NUMBER

CALIBRATION DATE

Page 27: 11KV Test Report

DEWA

Page 28: 11KV Test Report

REPORT NO.:

PAGE: 10 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

7. Binary Input

Binary Input Initiating Device Result

BI01 CB On

BI02 CB Off

BI03 CB test Position

BI04 CB service Position

BI05 Earting Switch off

BI06 Earting Switch On

BI07 Trip Coil Supervision Alarm

BI08 Watchdog

BI09 Arc Fault

BI10 Protection Trip

BI11 Selector switch remote

BI12 CB tripped Arc F50/51,F87B & CB Open

BI13 Spare

BI14 Protection Activated (F50/51,F87B& Arc)

BI15 ARC fault Control Compartment

BI16 ARC fault Main Bus Compartment

BI17 ARC fault C.B. Compartment

BI18 ARC fault Cable Compartment

BI19 F27/59 Protection Trip

BI20 F87B Protection Trip

BI21 Protection Activated

BI22 MCB Trip & No Control Voltage

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 29: 11KV Test Report
Page 30: 11KV Test Report

REPORT NO.:

PAGE: 11 OF 11

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER

Meg Ohm Meter

Relay Test Unit

Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

8. Binary Output (A Type)

Binary Output Initiating Device Result

BO01 Closing QC

BO02 Opening QO

BO03 Prot trip (86)

BO04 Cubicle remote position

BO05 Spare

BO06 CB Tripped

BO07 Group alarm control MCB trip

BO08 Aux. Supply On

BO09 ARC Fault

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

CALIBRATION DATE

Page 31: 11KV Test Report
Page 32: 11KV Test Report

REPORT NO.:

PAGE : 1 OF 1

11kV MV SWGR TEST REPORT

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE/MODEL

Relay Test Unit

11kV SWGR SYNCHRO CHECK RELAY

SYNCHRO CHECK RELAY SPAU140 C

SERIAL No. :

1. Visual checks

Conditions of Relay

Installation and wiring checking

Status Input

Relay Auxiliary supply

2.Relay Test

Voltage applied in terminal Voltage applied in terminal Close Permissive

Voltage Degree Hz Voltage Degree Hz Ok Not Ok

High

Low

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN

FICHTNER

DEWA

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

SERIAL NUMBER

CALIBRATION DATE

Relay Test connected to local earth bar

Relay check at extreme limit of voltage

Page 33: 11KV Test Report
Page 34: 11KV Test Report

REPORT NO.:

PAGE : 1 OF 4

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE/MODEL

Digital Multimeter

Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS

CT Ratio: Input:

Aux. Supply: Range:

1. Calibration of Ammeter

Data of Ammeter:

Sl.No. Phase % Error

1 R

2 R

3 R

4 R

5 S

6 S

7 S

8 S

9 T

10 T

11 T

12 T

COMMENTS:

Accepted by Name Signature Date

DOOSAN

EMPLOYER/ENGINEER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

11kV MV SWGR TEST REPORT

SERIAL NUMBER

CALIBRATION DATE

Current injected A

Ammeter reading

Calculated AMP

Page 35: 11KV Test Report

REPORT NO.:

PAGE : 2 OF 4

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE/MODEL

Digital Multimeter

Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS

2.Calibration of Voltmeter

VT Ratio: Input:

Aux.Supply: Output range:

Data:

Sl.No. Phase Voltage applied V % Error

1 R

2 R

3 R

4 R

5 S

6 S

7 S

8 S

9 T

10 T

11 T

12 T

3. Calibration of Energymeter Input: Aux. Supply:

CT Ratio: VT Ratio: Output:

Sl.No. PF Calculated KWH % Error

1

2

3

COMMENTS:

Accepted by Name Signature Date

DOOSAN

EMPLOYER/ENGINEER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

11kV MV SWGR TEST REPORT

SERIAL NUMBER

CALIBRATION DATE

Voltmeter reading

Calculated voltage

Voltage applied

V

Current injected

A

Test Duration

Registered KWH

Page 36: 11KV Test Report
Page 37: 11KV Test Report

REPORT NO.:

PAGE : 3 OF 4

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE/MODEL

Digital Multimeter

Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS

1. Calibration of Ammeter Transducer

DATA:

CT Ratio: Input:

Aux. Supply: Output:

Sl.No. Phase % Error

1 R

2 R

3 R

4 R

5 S

6 S

7 S

8 S

9 T

10 T

11 T

12 T

COMMENTS:

Accepted by Name Signature Date

DOOSAN

EMPLOYER/ENGINEER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

11kV MV SWGR TEST REPORT

SERIAL NUMBER

CALIBRATION DATE

Current injected A

Transducer output mA

Calculated output mA

Page 38: 11KV Test Report

REPORT NO.:

PAGE : 4 OF 4

DATE: ___________________

Ref No.: __________________

LOCATION / AREA : DRAWING NO :

KKS NO : MAKER:

TEST INSTRUMENT: MAKE/MODEL

Digital Multimeter

Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS

2.Calibration of Voltmeter Transducer

DATA:

VT RatioInput: Aux. Power supply:Output:

Sl.No. Phase % Error

1 R

2 R

3 R

4 R

5 S

6 S

7 S

8 S

9 T

10 T

11 T

12 T

3. Calibration of Watt Transducer

DATA: INPUT: Volts (V): OUTPUT: VT Ratio

Ampere (I): CT Ratio: Aux. Supply

Sl.No. PF % Error

1

2

3

COMMENTS:

Accepted by Name Signature Date

DOOSAN

EMPLOYER/ENGINEER

DUBAI ELECTRICITY & WATER AUTHORITYJEBEL ALI POWER AND DESALINATION STATION 'M'

Contract No. : CNE/001/2006

11kV MV SWGR TEST REPORT

SERIAL NUMBER

CALIBRATION DATE

Voltage applied V

Transducer output mA

Calculated output mA

Voltage applied V

Current injected

A

Transducer output mA

Calculated output mA