11kw grid tie solar plant simulation report. heliscope
TRANSCRIPT
![Page 1: 11kW Grid Tie Solar Plant Simulation report. Heliscope](https://reader034.vdocuments.net/reader034/viewer/2022042506/589e4d8f1a28ab1c7f8b5add/html5/thumbnails/1.jpg)
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 1/3 March15,2016
kWh
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0
500
1000
1500
2000
Shading:6.8%
Reflection:3.2%
Soiling:2.0%
Irradiance:1.0%
Temperature :8.0%
Mismatch:10.3%
Wiring:0.2%
Clipping:0.0%
Inverters:2.8%
ACSystem:0.0%
![Page 2: 11kW Grid Tie Solar Plant Simulation report. Heliscope](https://reader034.vdocuments.net/reader034/viewer/2022042506/589e4d8f1a28ab1c7f8b5add/html5/thumbnails/2.jpg)
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 2/3 March15,2016
![Page 3: 11kW Grid Tie Solar Plant Simulation report. Heliscope](https://reader034.vdocuments.net/reader034/viewer/2022042506/589e4d8f1a28ab1c7f8b5add/html5/thumbnails/3.jpg)
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 3/3 March15,2016