12000 30° - democracy.bcpcouncil.gov.uk

9
1M IN 6.8M RAMP DOWN TO BASEMENT PARKING 1M IN 12M RAMP DOWN TO BASEMENT PARKING NO CYCLING CYCLING STNBBS3 34.91 35.12 35.37 35.70 36.03 36.29 36.56 36.58 36.52 34.98 35.20 35.46 35.78 36.13 36.31 36.56 36.55 36.55 34.67 34.58 Gate W W BT G G 36.54 36.55 36.41 36.35 MH 36.32 MH 36.39 36.70 36.58 36.74 36.80 36.84 36.88 36.85 36.88 36.81 36.74 36.58 MH 35.96 36.07 36.29 35.37 35.31 35.31 35.27 35.26 36.15 BT FFL=38.29m 36.71 36.77 36.83 36.87 GAS 36.69 36.83 36.89 36.78 36.80 36.80 Wall Height=38.17m 36.27 36.20 36.14 FFL=35.20m 36.38 36.01 35.71 35.43 35.20 34.88 34.98 36.27 35.85 35.60 35.34 35.11 35.03 35.04 35.11 SP 35.08 35.14 35.01 34.95 34.94 34.92 34.82 35.40 35.48 35.40 34.76 34.57 34.67 34.76 34.71 35.19 35.28 35.29 35.63 35.75 35.78 35.86 36.53 35.31 35.34 35.28 35.26 35.20 35.18 35.14 35.12 35.10 35.06 35.08 35.10 35.10 35.18 MH 35.25 35.54 35.57 35.19 35.20 35.21 35.17 35.12 35.13 35.16 35.20 35.21 35.22 35.24 35.24 35.22 35.23 35.27 35.23 35.24 35.23 35.17 35.20 35.32 35.45 35.16 35.25 35.42 35.64 35.64 35.66 35.07 35.13 35.22 35.21 35.45 35.44 35.41 35.43 35.46 35.50 35.52 35.51 35.50 35.51 35.45 35.40 35.30 34.88 34.80 Wall Height=37.15m Flat Roof=38.33m 35.36 35.51 35.35 35.47 35.45 35.32 34.84 34.86 34.82 34.64 34.66 34.76 34.83 35.14 35.09 35.28 34.96 34.75 34.70 34.84 34.97 35.53 35.30 35.31 34.99 Gate 34.74 34.57 35.12 35.16 35.18 35.18 35.14 35.20 35.23 35.29 35.27 MH 35.22 35.41 35.32 35.24 35.22 35.18 35.19 35.24 FFL=35.29m Wall Height=37.49m 35.31 35.26 MH G G G 35.23 35.30 35.25 SP SP SP SP 35.64 35.66 35.66 Hoarding Asphalt Footpath Asphalt Footpath Asphalt Footpath Hoarding Br Wall Hotel Parking Bushes Bushes Bushes NO STNBBS4 STNBBS5 36.58 36.52 36.50 36.49 36.49 36.46 36.46 36.48 36.48 36.54 36.51 36.49 36.45 36.51 36.61 36.52 36.52 36.57 36.58 36.57 36.58 36.49 36.62 36.62 36.57 36.56 36.61 36.63 34.62 34.63 34.57 34.56 34.54 34.35 34.43 35.06 35.63 34.47 34.37 34.39 36.59 34.76 34.87 34.69 34.62 36.25 36.17 36.22 35.86 35.66 35.36 35.10 34.94 34.60 34.45 34.48 34.70 34.64 34.71 34.74 36.62 36.60 36.58 36.56 Gate MH 36.51 W W 36.69 36.62 36.59 36.60 36.55 36.55 36.55 36.60 36.59 36.67 36.70 36.71 G G 36.48 36.51 MH 36.65 LP4 G G 36.48 36.48 36.58 34.86 34.32 34.88 34.82 LP27 34.47 34.28 34.25 34.26 34.30 34.30 34.30 34.32 34.33 34.50 34.55 34.34 34.43 34.29 34.30 34.19 34.06 33.87 33.56 34.73 34.67 34.32 34.32 34.27 34.81 34.81 34.40 33.72 33.75 33.92 34.02 34.08 34.20 34.18 34.67 34.79 35.23 34.83 34.31 34.25 34.76 34.68 34.63 34.59 34.60 Apartments Br Wall Br Wall Asphalt Footpath Asphalt Footpath Br Wall Top Batter Bottom Batter Derelict Building Site Hoarding Br Wall Hoarding Top Batter Bottom Batter Grass Grass Grass Grass Grass Grass Asphalt Footpath 30° 30° 36.66 36.69 36.67 36.68 36.71 36.75 36.72 G 36.63 MH 36.78 36.75 36.85 W 36.59 Wall Height=38.18m 34.07 33.98 SP 34.13 9 34.16 34.14 34.09 3 FH Br Wall Asphalt Footpath Grass Asphalt Footpath 12000 35.91 35.91 35.91 35.91 BIN COLLECTION AREA ESCAPE STAIRS FROM BASEMENT PARKING 9097/300 AS SHOWN @ A1 JANUARY 2021 Revision. No. by date date scale drawn checked WD SITE, BLOCK & LOCATION PLANS SITE BOUNDARY // ARC Architecture ltd. Chapel Studios, 14 Purewell, Tel: +44 (0 )1202 479919 Christchurch, Dorset, BH23 1EP E-mail: [email protected] Web: www.andersrobertscheer.co.uk BLOCK PLAN: BASED ON ORDNANCE SURVEY EXTRACT O.S LICENSE NO. - 100007080 SCALE 1:500 LOCATION PLAN: BASED ON ORDNANCE SURVEY EXTRACT O.S LICENSE NO. - 100007080 SCALE 1:1250 EXISTING TO BE DEMOLISHED SITE PLAN: BASED ON TOPOGRAPHICAL SURVEY INFORMATION SCALE 1:200 TREES TO BE REMOVED 10m @ 1:100 TREES TO BE RETAINED PROPOSED DEVELOPMENT RIVIERA HOTEL 5 WEST CLIFF GARDENS BOURNEMOUTH BH2 5HL IMPLEMENTED APPROVED SCHEME @ 5 STOREY'S INDICATIVE PLANTING OUTLINE OF REFUSED APPLICATION OUTLINE OF UNDERGROUND BASEMENT 1. The contents of this drawing are copyright. 2. Do not scale. Figured dimensions only to be used. 3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings. 4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved. 5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areas of the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report - to be instructed by client or contractor to cover all aspects of Fire Safety / Part B 6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations). 7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication. 8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way. 9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letter from ARC to confirm compliance with our plans on site. 10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction. 11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliance from the clients chosen inspector (LA or Private alternative) 12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged. 13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project. 14. At planning stage planning drawings are to only to used for planning purposes. 15. All Cladding & building attachments to be all A1 fire rated. 16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feel the our plans do not accurately depict their ownership or area of control. Note: Any design or details relating to Fire Safety, including under Part B of the Building Regulations is shown for indicative/information purposes only and is subject to appropriate external professional input. No assumption of any responsibility is accepted. LEGEND INFORMATION CDM - PRE-CONSTRUCTION INFO FROM CLIENT CDM Information requested from client: 1) Topographical Survey Outstanding CDM information remains as residual risk, please request ARC appendix B for full list requested. CONSTRUCTION RISKS MAINTENANCE RISKS DEMOLITION RISKS DESIGNERS RISK ASSESSMENT GENERAL NOTES: · Principal Contractor to provide method statements for the safe working practice for: demolition, excavations, cutting of materials, support of adjacent structures, protecting personnel, neighbours & the public,working at height including crash bags & fall restraint systems. · Principal Contractor to ensure Temporary Works Designer and Coordinator appointed for all propping works for structural alterations of existing building, including temporary guardrail and edge protection around voids and stairwells. · This Designers Risk Assessment should be passed on to the Appointed Principal Designers and or Principal Contractor carrying out the next phase of works on this site. Building Products and Construction Execution Hazards The design team have highlighted unusual and significant risks only that may not be obvious to a competent contractor. They are to assist with risk reduction only and are not necessarily comprehensive. It is assumed that all works will be carried out by a competent contractor following good site management, site practice procedures, to an approved method statement (where appropriate) and in accordance with HSE guidance. The proposed works are designed on a well established method of construction which can be carried out by a competent contractor. However, should the contractor find any area of concern he must inform the designer in order that appropriate action can be taken. For significant hazards specific to this project see the following: DESIGN INFORMATION Further design info to be provided at subsequent stages of design / building regulations process CLEANING WINDOWS CLEANING GUTTERS STAINING TIMBERS REFURBISHMENT AND DEMOLITION SURVEY Gutters to be cleaned from ground level by specialist using specialist equipment. e.g. long reach and clean systems where possible. Parapets and valleys to be accessed when required via scaffolding - to be assembled by a specialist. Low maintenance imitation cladding to be specified to avoid high level maintenance. Hazardous material survey to undertaken prior to any on site works commencing - including stripping out. Windows and balcony glass above ground floor level to be cleaned from ground level by specialist using specialist equipment. e.g. long reach and clean systems. IN - USE RISKS FLOOD RISK SUDS plan to be designed at building regulations phase to provide excess surface water drainage TREE REMOVAL Tree removal/ trimming works to undertaken prior to any on building works commencing by approved arboricultural surgeon. Waste to be removed from site responsibly. SLIPPERY FLOORS (swimming pools / roof terraces) Non slip floors to be specified BASEMENTS Mains Fire alarm system to have siren within basement to alert persons of potential fire in the house above. ROOF TERRACE Mains Fire alarm system to have siren at roof terrace level to alert persons of potential fire in the building below. BASEMENTS Basement design fire engineering strategy to be provided by qualified fire engineer with a view to compliance with part B. e.g. - Mains Fire alarm system to have siren within basement to alert persons of potential fire in the house above. Sprinkler system may be required. etc. MEANS OF ESCAPE To be reviewed by specialist with a view towards protected staircase. e.g.is the first floor an acceptable exit, if not, glass wall to swimming pool may need to be fireproof. FLAT ROOF ACCESS Plant or apparatus on the roof to be kept to a minimum and positioned away from edges/ potential falls. Roof access for maintenance to be undertaken by specialist using specialist equipment. e.g. permanent 950mm guarding / scaffolding / appropriately designed and installed man safe system by specialist designer. ** MAINTAINING STRUCTURAL SUPPORT TO BOUNDARIES WHERE LEVELS DIFFER WITHIN ADJACENT OWNERSHIP / PUBLIC LAND / HIGHWAYS Mitigation / Diversion to be considered by Principal Contractor within Construction Phase Plan, pre-construction works starting on site. Solar panels to be positioned as far from edges of flat roof as feasibly possible. To be designed by specialist supplier to be structurally sound (where roof access is required), and to incorporate self cleaning glass When positioning heavy machinery - The layout of the proposed SUDS plan should be considered by the Principal Contractor during the construction phase plan Roof access for construction to be undertaken by specialist using specialist equipment. e.g. scaffolding, appropriately designed and installed man safe system by specialist designer. Self cleaning glass to be specified where possible Positioning of roof features to be as remote from edge of building as possible To be installed during construction to prevent falling on existing uneven and stepped terrain TEMPORARY GUARDING ROOFLIGHT SPECIFICATION PROXIMITY TO OVERHEAD SERVICES ** MAINTAINING STRUCTURAL SUPPORT FOR ADJACENT STRUCTURES SOLAR PANELS PLACEMENT OF SUDS FLAT ROOF ACCESS GLAZING IN CLOSE PROXIMITY TO BOUNDARY PLACEMENT OF ROOF FEATURES (SOLAR PANELS / AOV'S / PLANT ETC) Underground bin section added. A. WD 17.03.21 A. Scheme reduced following comments. B. WD 14.06.21 B. Further reductions to scheme following comments. C. WD 01.07.21 C. Bay windows amended, basement entrance added to elevations, cycle ramp added to escape stairs for cycles, ramp moved 5m from footpath & parking spaces for electric cars highlighted. D. WD 13.07.21 SITE AREA: 0.095 HECTARES / 0.234 ACRES 14 X PARKING SPACES 30 X CYCLE SPACES PROPOSED GIA - 1,750.0 SQM / 18,837 SQFT EXISTING GIA - 1,243.5 SQM / 13,385 SQFT D. Path added from basement stairs to public footpath. E. WD 15.07.21 E.

Upload: others

Post on 11-Jan-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 12000 30° - democracy.bcpcouncil.gov.uk

1M IN

6.8

M R

AM

P

DO

WN

TO

BA

SE

ME

NT

PA

RK

ING

1M IN

12M

RA

MP

DO

WN

TO

BA

SE

ME

NT

PA

RK

ING

N

O

C

YC

LIN

G

CY

CLIN

G

STNBBS3

34.9

1

35.1

2

35.3

7

35.7

0

36.0

3

36.2

9

36.56

3

6

.5

8

3

6

.

5

2

34.98

35.20

35.46

35.78

36.13

36.31

36.56

36.55

36.55

34.67

34.58

Gate

W

W

BT

G

G

36.54

36.55

36.41

36.35

MH

36.32

MH

36.39

36.7

0

36.5

8

36.7

4

36.8

0

36.8

4

3

6

.

8

8

36.85

36.88

36.8

1

36.7

4

36.5

8

MH

35.96

36.07

3

6

.

2

9

3

5

.

3

7

3

5

.

3

1

3

5

.

3

1

35.27

35.26

3

6

.

1

5

BT

FFL=38.29m

36.71

36.7

7

36.8

3

3

6

.

8

7

GAS

3

6

.

6

9

36.8

3

36.8

9

36.7

8

36.80

36.80

Wall

Heig

ht=

38.1

7m

36.2

7

36.20

36.14

FFL=35.20m

3

6

.

3

8

36.01

35.71

35.43

35.20

3

4

.

8

8

34.98

36.27

35.85

35.60

35.34

35.11

3

5

.0

3

3

5

.0

435.1

1

SP

35.08

35.14

3

5

.

0

1

3

4

.

9

5

3

4

.9

4

3

4

.

9

2

3

4

.

8

2

35.40

35.48

35.40

34.76

34.57

3

4

.6

7

3

4

.7

6

34.71

35.19

35.28

35.29

35.63

3

5

.7

5

3

5

.7

8

35.86

36.5

3

3

5

.

3

1

35.34

3

5

.2

8

35.26

3

5

.

2

0

3

5

.

1

8

3

5

.

1

4

3

5

.

1

2

35.1

0

3

5

.

0

6

35.08

3

5

.

1

0

35.10

3

5

.1

8

MH

35.25

3

5

.

5

4

3

5

.

5

7

3

5

.

1

9

35.2

0

3

5

.2

1

3

5

.

1

7

3

5

.1

2

3

5

.1

3

35.16

3

5

.

2

0

3

5

.

2

1

3

5

.

2

2

3

5

.

2

4

3

5

.2

4

3

5

.

2

2

35.23

35.27

35.23

3

5

.

2

4

3

5

.

2

3

35.17

35.2

0

35.32

35.45

35.16

3

5

.

2

5

35.42

35.64

35.64

35.66

35.07

35.1

3

3

5

.

2

2

3

5

.

2

1

35.45

35.44

3

5

.4

1

3

5

.4

3

3

5

.

4

6

35.50

35.5

2

35.5

1

3

5

.5

0

35.51

35.45

35.40

3

5

.

3

0

3

4

.

8

8

3

4

.

8

0

W

all H

eight=

37.15m

Flat Roof=

38.33m

3

5

.

3

6

3

5

.

5

1

3

5

.

3

5

3

5

.

4

7

3

5

.

4

5

35.32

3

4

.

8

4

3

4

.8

6

34.82

3

4

.

6

4

3

4

.6

6

3

4

.

7

6

3

4

.

8

3

3

5

.

1

4

3

5

.0

9

3

5

.

2

8

3

4

.

9

6

3

4

.

7

5

3

4

.7

0

3

4

.

8

4

34.97

35.53

35.30

35.31

34.99

Gate

34.74

34.57

3

5

.

1

2

3

5

.

1

6

3

5

.1

8

3

5

.

1

8

3

5

.

1

4

3

5

.

2

0

3

5

.

2

3

35.29

35.27

MH

35.22

3

5

.

4

1

3

5

.

3

2

3

5

.

2

4

3

5

.

2

2

3

5

.1

8

3

5

.

1

9

35.2

4

FFL=35.29m

Wall H

eight=

37.49m

3

5

.

3

1

35.26

MH

G

G

G

35.23

35.30

35.25

SP

SP

SP

SP

3

5

.

6

4

35.66

35.66

Hoarding

Asphalt F

ootpath

Asphalt F

ootpath

Asphalt F

ootpath

Hoarding

Br

Wall

Hotel P

arking

Bush

es

Bushes

Bush

es

NO

STNBBS4

STNBBS5

36.5

8

3

6

.

5

2

3

6

.

5

0

3

6

.4

9

36.49

36.46

36.46

36.48

36.48

36.54

3

6

.

5

1

36.49

36.45

36.51

36.61

3

6

.

5

2

3

6

.5

2

36.57

36.58

36.57

36.58

36.49

36.62

3

6

.

6

2

36.57

36.56

36.61

36.63

34.62

34.63

34.57

34.56

34.54

34.35

34.43

35.06

35.63

34.4734.37

34.39

36.59

34.76

34.87

34.69

34.62

36.25

36.17

3

6

.2

2

3

5

.

8

6

35.66

35.36

35.10

34.94

3

4

.

6

0

3

4

.

4

5

34.48

3

4

.

7

0

3

4

.6

4

34.7

1

34.74

3

6

.

6

2

36.60

36.58

36.56

Gate

MH

36.51

W

W

36.69

3

6

.6

2

3

6

.

5

9

3

6

.

6

0

36.55

36.55

36.55

36.60

36.59

36.67

3

6

.

7

0

36.71

G

G

36.48 36.51

MH

36.65

LP4

G

G

36.48

36.48

36.58

34.86

34.32

3

4

.

8

8

34.8

2

LP27

34.47

3

4

.2

8

34.25

34.26

34.30

34.30

34.30

3

4

.

3

2

3

4

.

3

3

3

4

.

5

0

34.55

3

4

.3

4

3

4

.

4

3

3

4

.

2

9

34.30

34.19

34.06

33.87

33.56

3

4

.

7

3

34.6

7

34.3

2

3

4

.3

2

3

4

.

2

7

34.81

3

4

.

8

1

34.40

3

3

.

7

2

3

3

.

7

5

3

3

.

9

2

3

4

.

0

2

34.08

34.20

34.18

3

4

.

6

7

3

4

.

7

9

3

5

.

2

3

3

4

.8

3

34.31

34.2

5

3

4

.7

6

34.6

8

3

4

.6

3

3

4

.

5

9

3

4

.

6

0

Apartments

Br Wall

Br Wall

Asphalt Footpath

Asphalt Footpath

Br W

all

Top Batter

Botto

m B

atte

r

Derelict Building Site

Hoard

ing

Br W

all

Hoard

ing

Top Batter

Bottom

Batter

Grass

Grass

Grass

Grass

Grass

Grass

Asphalt Footpath

3

0

Â

°

30°

36.6

6

36.6

9

36.6

7

36.68

36.71

36.75

36.72

G

36.63

MH

36.78

36.75

36.8

5

W

36.59

Wall H

eight=

38.18m

34.07

33.98

SP

34.13

3

4

.

0

9

3

4

.1

6

34.14

34.09

36.53

FH

Br W

all

Asphalt F

ootpath

Grass

Asphalt Footpath

12000

35.91

35.91

35.91

35.91

BINCOLLECTION

AREA

ESCAPE STAIRS FROMBASEMENT PARKING

9097/300

AS SHOWN @ A1

JANUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

SITE, BLOCK & LOCATION PLANS

SITE BOUNDARY

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

BLOCK PLAN: BASED ON ORDNANCE SURVEY EXTRACTO.S LICENSE NO. - 100007080SCALE 1:500

LOCATION PLAN: BASED ON ORDNANCE SURVEY EXTRACTO.S LICENSE NO. - 100007080SCALE 1:1250

EXISTING TO BE DEMOLISHED

SITE PLAN: BASED ON TOPOGRAPHICAL SURVEY INFORMATIONSCALE 1:200

TREES TO BE REMOVED

10m @ 1:100

TREES TO BE RETAINED

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

IMPLEMENTEDAPPROVED SCHEME

@ 5 STOREY'S

INDICATIVE PLANTING

OUTLINE OF REFUSED APPLICATION

OUTLINE OF UNDERGROUND BASEMENT

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

LEGEND

INFORMATIONCDM - PRE-CONSTRUCTION INFO

FROM CLIENT

CDM Information requested from client:

1) Topographical Survey

Outstanding CDM information remains

as residual risk, please request ARC

appendix B for full list requested.

CONSTRUCTION RISKS MAINTENANCE RISKS

DEMOLITION RISKS

DESIGNERS RISK ASSESSMENT GENERAL NOTES:

· Principal Contractor to provide method

statements for the safe working practice for:

demolition, excavations, cutting of materials,

support of adjacent structures, protecting

personnel, neighbours & the public,working at

height including crash bags & fall restraint

systems.

· Principal Contractor to ensure Temporary Works

Designer and Coordinator appointed for all

propping works for structural alterations of

existing building, including temporary guardrail

and edge protection around voids and stairwells.

· This Designers Risk Assessment should be

passed on to the Appointed Principal Designers

and or Principal Contractor carrying out the next

phase of works on this site.

Building Products and Construction Execution Hazards

The design team have highlighted unusual and significant risks only that

may not be obvious to a competent contractor. They are to assist with risk

reduction only and are not necessarily comprehensive. It is assumed that

all works will be carried out by a competent contractor following good site

management, site practice procedures, to an approved method statement

(where appropriate) and in accordance with HSE guidance.

The proposed works are designed on a well established method of

construction which can be carried out by a competent contractor.

However, should the contractor find any area of concern he must inform

the designer in order that appropriate action can be taken.

For significant hazards specific to this project see the following:

DESIGN INFORMATION

Further design info to be provided

at subsequent stages of design /

building regulations process

CLEANING WINDOWS

CLEANING GUTTERS

STAINING TIMBERS

REFURBISHMENT AND

DEMOLITION SURVEY

Gutters to be cleaned from ground level by specialist

using specialist equipment. e.g. long reach and clean

systems where possible. Parapets and valleys to be

accessed when required via scaffolding - to be

assembled by a specialist.

Low maintenance imitation cladding to be specified

to avoid high level maintenance.

Hazardous material survey to

undertaken prior to any on site works

commencing - including stripping out.

Windows and balcony glass above ground floor level to

be cleaned from ground level by specialist using

specialist equipment. e.g. long reach and clean systems.

IN - USE RISKS

FLOOD RISK

SUDS plan to be designed at building

regulations phase to provide excess

surface water drainage

TREE REMOVAL

Tree removal/ trimming works to undertaken prior to any on

building works commencing by approved arboricultural

surgeon. Waste to be removed from site responsibly.

SLIPPERY FLOORS (swimming

pools / roof terraces)

Non slip floors to be specified

BASEMENTS

Mains Fire alarm system to have

siren within basement to alert

persons of potential fire in the house

above.

ROOF TERRACE

Mains Fire alarm system to have

siren at roof terrace level to alert

persons of potential fire in the

building below.

BASEMENTS

Basement design fire engineering

strategy to be provided by qualified fire

engineer with a view to compliance with

part B. e.g. - Mains Fire alarm system to

have siren within basement to alert

persons of potential fire in the house

above.

Sprinkler system may be required. etc.

MEANS OF ESCAPE

To be reviewed by specialist with

a view towards protected

staircase. e.g.is the first floor an

acceptable exit, if not, glass wall

to swimming pool may need to be

fireproof.

FLAT ROOF ACCESS

Plant or apparatus on the roof to be kept to a minimum

and positioned away from edges/ potential falls.

Roof access for maintenance to be undertaken by

specialist using specialist equipment. e.g. permanent

950mm guarding / scaffolding / appropriately designed

and installed man safe system by specialist designer.

** MAINTAINING STRUCTURAL SUPPORT

TO BOUNDARIES WHERE LEVELS

DIFFER WITHIN ADJACENT

OWNERSHIP / PUBLIC LAND /

HIGHWAYS

Mitigation / Diversion to be considered

by Principal Contractor within

Construction Phase Plan,

pre-construction works starting on site.

Solar panels to be positioned as far from

edges of flat roof as feasibly possible.

To be designed by specialist supplier

to be structurally sound (where roof

access is required), and to

incorporate self cleaning glass

When positioning heavy machinery - The layout

of the proposed SUDS plan should be

considered by the Principal Contractor during the

construction phase plan

Roof access for construction to be

undertaken by specialist using specialist

equipment. e.g. scaffolding, appropriately

designed and installed man safe system

by specialist designer.

Self cleaning glass to be specified where possible

Positioning of roof features to be as remote

from edge of building as possible

To be installed during

construction to prevent falling on

existing uneven and stepped

terrain

TEMPORARY GUARDING

ROOFLIGHT SPECIFICATION

PROXIMITY TO OVERHEAD

SERVICES

** MAINTAINING STRUCTURAL SUPPORT

FOR ADJACENT STRUCTURES

SOLAR PANELS

PLACEMENT OF SUDS

FLAT ROOF ACCESS

GLAZING IN CLOSE PROXIMITY TO BOUNDARY

PLACEMENT OF ROOF FEATURES

(SOLAR PANELS / AOV'S / PLANT ETC)

Underground bin section added.A. WD17.03.21

A.

Scheme reduced following comments.B. WD14.06.21

B.

Further reductions to scheme followingcomments.

C. WD01.07.21

C.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs for cycles,ramp moved 5m from footpath & parkingspaces for electric cars highlighted.

D. WD13.07.21

SITE AREA: 0.095 HECTARES / 0.234 ACRES

14 X PARKING SPACES

30 X CYCLE SPACES

PROPOSED GIA - 1,750.0 SQM / 18,837 SQFT

EXISTING GIA - 1,243.5 SQM / 13,385 SQFT

D.

Path added from basement stairs topublic footpath.

E. WD15.07.21

E.

AutoCAD SHX Text
HOTEL
AutoCAD SHX Text
ST GEORGE
AutoCAD SHX Text
WEST CLIFF GARDENS
AutoCAD SHX Text
Tower
AutoCAD SHX Text
House
AutoCAD SHX Text
8
AutoCAD SHX Text
Hotel
AutoCAD SHX Text
1 to 4
AutoCAD SHX Text
5 to 8
AutoCAD SHX Text
WEST CLIFF GARDENS
AutoCAD SHX Text
Sunnington
AutoCAD SHX Text
Tower
AutoCAD SHX Text
House
AutoCAD SHX Text
Cumberland
AutoCAD SHX Text
Court
AutoCAD SHX Text
Rothbury
AutoCAD SHX Text
Fair Lea
AutoCAD SHX Text
1 to 9
AutoCAD SHX Text
PCs
AutoCAD SHX Text
8
AutoCAD SHX Text
Hotel
AutoCAD SHX Text
The
AutoCAD SHX Text
Lindens
AutoCAD SHX Text
Bayview
AutoCAD SHX Text
1 to 12
AutoCAD SHX Text
1 to 4
AutoCAD SHX Text
5 to 8
AutoCAD SHX Text
Bayview
AutoCAD SHX Text
Gardens
AutoCAD SHX Text
33.8m
AutoCAD SHX Text
BM 34.04m
AutoCAD SHX Text
33.2m
AutoCAD SHX Text
West Cliff Zig-Zag
AutoCAD SHX Text
Tumulus
AutoCAD SHX Text
(site of)
Page 2: 12000 30° - democracy.bcpcouncil.gov.uk

DINING

BED

BED

KITCHEN

BOILER

STAFF FLAT

STAFF FLAT

BATH

BATH

ST

ST

DRYING ROOM

GARAGE

BED

BED

BED

BED

BED

BED

BATH

BATH

LOUNGE

LOUNGE BAR

OFFICE

BED

BED

BED

BED

BED

BED

BED

BED

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

WC

ST

WC

ST

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATH

BATHBATH

BATH

BATH

BATH

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED BED

BED

BED

BED

BED

LAUNDRY

ST

ST

ST

RIVIERA

9097/208

AS SHOWN @ A1

MAY 2019

Revision.No. bydate

date

scale

drawn

checked

WD

EXISTING FLOOR PLANS & ELEVATIONS

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

LOWER GROUND FLOOR PLANSCALE 1:200

EXISTING AREA - 1,243.5 SQM / 13,385 SQFT

GROUND FLOOR PLANSCALE 1:200

FIRST FLOOR PLANSCALE 1:200

SECOND FLOOR PLANSCALE 1:200

THIRD FLOOR PLANSCALE 1:200

FRONT SOUTH ELEVATIONSCALE 1:200

SIDE EAST ELEVATIONSCALE 1:200

REAR NORTH ELEVATIONSCALE 1:200

SIDE WEST ELEVATIONSCALE 1:200

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

Page 3: 12000 30° - democracy.bcpcouncil.gov.uk

123456

MECHANICAL VENTILATION IN ADDITION TO NATURAL VENTILATIONINDICATED, MAY BE REQUIRED SUBJECT TO SPECIALIST DESIGN

LIFT

1M IN 6.8M RAMP

DOWN TO BASEMENT

PARKING

1M IN 12M RAMP

DOWN TO BASEMENT

PARKING

CYCLE STORE

78

14

13

12

9

10

11

BIN STORE

1280L

RECYCLING

1280L

RECYCLING

780L

RECYCLING

1100L

REFUSE

1100L

REFUSE

BINS TO BE PRIVATE COLLECTION

BED 1

KITCHEN

KITCHEN

LIVING

DINING

BATH

BED 1

EN-SUITE

BATH

LIFT

BED 2

ST

AC

KITCHEN

LIVING

ST

AC

BED 2

EN-SUITE

BED 1

BED 2

ST

AC

DINING

BATH

LIVING

DINING

EN-SUITE

SR

O.G O.GO.G

O.G

O.G

O.G

O.G

O.G O.GO.G

1M IN 7.5M RAMP

DOWN TO BASEMENT

PARKING

1

2

3

1M IN 12M RAMP

DOWN TO BASEMENT

PARKING

1M IN 12M RAMP

DOWN TO BASEMENT

PARKING

9097/301

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

FLOOR PLANS 1 OF 3

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

BASEMENT FLOOR PLANSCALE 1:100

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

GROUND FLOOR PLANSCALE 1:100

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

SCHEDULE OF ACCOMMODATION

UNIT NO. BEDS SQM SQFT

2

1

2

3

1,100.1 11,841TOTAL AREA

4

5

6

7

8

9

10

11

12

13

2

2

76.6 824

14

2

2

2

2

2

2

3

90.8 977

90.9 978

2

2

3

2

76.4 822

76.6 824

Scheme reduced following comments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

76.4 822

76.4 822

76.4 822

CYCLE RAMP SECTIONSCALE 1:50https://www.falco.co.uk/products/cycle-parking/advanced-cycle-products/velocomfort%C2%AE-automated-cycle-wheel-ramp.html

CYCLE RAMP PLANSCALE 1:50

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

PARKING SPACES TO BE ELECTRICCHARGING PORT

Page 4: 12000 30° - democracy.bcpcouncil.gov.uk

BED 1

KITCHEN

KITCHEN

LIVING

DINING

BATH

BED 1

EN-SUITE

BATH

LIFT

BED 2

ST

AC

KITCHEN

LIVING

ST

AC

BED 2

EN-SUITE

BED 1

BED 2

ST

AC

DINING

BATH

LIVING

DINING

EN-SUITE

SR

O.G O.GO.G

O.G

O.G

O.G

O.G

O.G O.GO.G

7

8

9

BED 1

KITCHEN

KITCHEN

LIVING

DINING

BATH

BED 1

EN-SUITE

BATH

LIFT

BED 2

ST

AC

KITCHEN

LIVING

ST

AC

BED 2

EN-SUITE

BED 1

BED 2

ST

AC

DINING

BATH

LIVING

DINING

EN-SUITE

SR

O.G O.GO.G

O.G

O.G

O.G

O.G

O.G O.GO.G

4

5

6

9097/302

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

FLOOR PLANS 2 OF 3

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

FIRST FLOOR PLANSCALE 1:100

SECOND FLOOR PLANSCALE 1:100

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

LEGEND

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

SCHEDULE OF ACCOMMODATION

UNIT NO. BEDS SQM SQFT

2

1

2

3

1,100.1 11,841TOTAL AREA

4

5

6

7

8

9

10

11

12

13

2

2

76.6 824

14

2

2

2

2

2

2

3

90.8 977

90.9 978

2

2

3

2

76.4 822

76.6 824

76.4 822

76.4 822

76.4 822

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

Page 5: 12000 30° - democracy.bcpcouncil.gov.uk

UTILITY

BED 1

BED 2

KITCHEN

BATH

KITCHEN

BED 1

LIFT

LIVING

EN-SUITE

EN-SUITE

AC

BATH

BED 3

BED 2

BED 3

ST

LIVING

DINING

UTILITY

DINING

AC

ST

SR

2M HEADROOM LINE

14

13

BED 1

KITCHEN

KITCHEN

LIVING

DINING

BATH

BED 1

EN-SUITE

BATH

LIFT

BED 2

ST

AC

KITCHEN

LIVING

ST

AC

BED 2

EN-SUITE

BED 1

BED 2

ST

AC

DINING

BATH

LIVING

DINING

EN-SUITE

SR

O.G O.GO.G

O.G

O.G

O.G

O.G

O.G O.GO.G

10

11

12

1M IN 6.8M RAMP

DOWN TO BASEMENT

PARKING

1M IN 12M RAMP

DOWN TO BASEMENT

PARKING

9097/303

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

FLOOR PLANS 3 OF 3

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

UPPER FLOOR PLANSCALE 1:100

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

THIRD FLOOR PLANSCALE 1:100

ROOF PLANSCALE 1:100

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

LEGEND

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

SCHEDULE OF ACCOMMODATION

UNIT NO. BEDS SQM SQFT

2

1

2

3

1,100.1 11,841TOTAL AREA

4

5

6

7

8

9

10

11

12

13

2

2

76.6 824

14

2

2

2

2

2

2

3

90.8 977

90.9 978

2

2

3

2

76.4 822

76.6 824

76.4 822

76.4 822

76.4 822

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

76.6 824

Page 6: 12000 30° - democracy.bcpcouncil.gov.uk

9097/304

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

ELEVATIONS 1 OF 2

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

REAR SOUTH ELEVATIONSCALE 1:100

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

SIDE EAST ELEVATIONSCALE 1:100

RUBBED BRICK WINDOW HEADS WITH STONE KEY STONES

WHITE SLIDING SASH UPVC

BLACK WROUGHT IRON RAILS

WHITE TIMBER

RED CLAY BRICK

PLAIN CLAY TILES WITH BONNETTS

RENDER BEAM FEATURES - PAINTED GREY

EXPOSED RAFTER FEET

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

EXISTING TO BE DEMOLISHED

OUTLINE OF REFUSED APPLICATION

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

Page 7: 12000 30° - democracy.bcpcouncil.gov.uk

9097/305

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

ELEVATIONS 2 OF 2

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

FRONT NORTH ELEVATIONSCALE 1:100

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

SIDE WEST ELEVATIONSCALE 1:100

OUTLINE OF REFUSED APPLICATION

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

Page 8: 12000 30° - democracy.bcpcouncil.gov.uk

FFL: 35.91

FFL: 32.91

36.41

1 IN 6.8M RAMP1 IN 12M RAMP 1 IN 12M RAMP 9097/307

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

STREET SCENE & SITE SECTION

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

STREET SCENE: ( FOR INDICATIVE PURPOSES ONLY )SCALE 1:100

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

EXISTING TO BE DEMOLISHED

SITE SECTION:SCALE 1:100

OUTLINE OF REFUSED APPLICATION

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

Page 9: 12000 30° - democracy.bcpcouncil.gov.uk

1M IN

6.8

M R

AM

P

DO

WN

TO

BA

SE

ME

NT

PA

RK

ING

1M IN

12M

RA

MP

DO

WN

TO

BA

SE

ME

NT

PA

RK

ING

N

O

C

YC

LIN

G

CY

CLIN

G

STNBBS3

34.9

1

35.1

2

35.3

7

35.7

0

36.0

3

36.2

9

36.56

3

6

.5

8

3

6

.

5

2

34.98

35.20

35.46

35.78

36.13

36.31

36.56

36.55

36.55

34.67

34.58

Gate

W

W

BT

G

G

36.54

36.55

36.41

36.35

MH

36.32

MH

36.39

36.7

0

36.5

8

36.7

4

36.8

0

36.8

4

3

6

.

8

8

36.85

36.88

36.81

36.7

4

36.5

8

MH

35.96

36.07

3

6

.

2

9

3

5

.

3

7

3

5

.

3

1

3

5

.

3

1

35.27

35.26

3

6

.

1

5

BT

FFL=38.29m

36.7

1

36.7

7

36.83

3

6

.

8

7

GAS

3

6

.

6

9

36.8

3

36.8

9

36.7

8

36.80

36.80

Wall

Heig

ht=

38.1

7m

36.2

7

36.20

36.14

FFL=35.20m

3

6

.

3

8

36.01

35.71

35.43

35.20

3

4

.

8

8

34.98

36.27

35.85

35.60

35.34

35.11

3

5

.0

3

3

5

.0

435.1

1

SP

35.08

35.14

3

5

.

0

1

3

4

.

9

5

3

4

.9

4

3

4

.

9

2

3

4

.

8

2

35.40

35.48

35.40

34.76

34.57

3

4

.6

7

3

4

.7

6

34.71

35.19

35.28

35.29

35.63

3

5

.7

5

3

5

.7

8

35.86

36.53

3

5

.

3

1

35.34

3

5

.2

8

35.26

3

5

.

2

0

3

5

.

1

8

3

5

.

1

4

3

5

.

1

2

35.1

0

3

5

.

0

6

35.08

3

5

.

1

0

35.10

3

5

.1

8

MH

35.25

3

5

.

5

4

3

5

.

5

7

3

5

.

1

9

35.2

0

3

5

.2

1

3

5

.

1

7

3

5

.1

2

3

5

.1

3

35.16

3

5

.

2

0

3

5

.

2

1

3

5

.

2

2

3

5

.

2

4

3

5

.2

4

3

5

.

2

2

35.2335.27

35.23

3

5

.

2

4

3

5

.

2

3

35.17

35.20

35.32

35.45

35.16

3

5

.

2

5

35.42

35.64

35.64

35.66

35.07

35.1

3

3

5

.

2

2

3

5

.

2

1

35.45

35.44

3

5

.4

1

3

5

.4

3

3

5

.

4

6

35.50

35.5

2

35.5

1

3

5

.5

0

35.51

35.45

35.40

3

5

.

3

0

3

4

.

8

8

3

4

.

8

0

W

all H

eight=

37.15m

Flat Roof=

38.33m

3

5

.

3

6

3

5

.

5

1

3

5

.

3

5

3

5

.

4

7

3

5

.

4

5

35.32

3

4

.

8

4

3

4

.8

6

34.82

3

4

.

6

4

3

4

.6

6

3

4

.

7

6

3

4

.

8

3

3

5

.

1

4

3

5

.0

9

3

5

.

2

8

3

4

.

9

6

3

4

.

7

5

3

4

.7

0

3

4

.

8

4

34.97

35.53

35.30

35.31

34.99

Gate

34.74

34.57

3

5

.

1

2

3

5

.

1

6

3

5

.1

8

3

5

.

1

8

3

5

.

1

4

3

5

.

2

0

3

5

.

2

3

35.29

35.27

MH

35.22

3

5

.

4

1

3

5

.

3

2

3

5

.

2

4

3

5

.

2

2

3

5

.1

8

3

5

.

1

9

35.2

4

FFL=35.29m

Wall H

eight=

37.49m

3

5

.

3

1

35.26

MH

G

G

G

35.23

35.30

35.25

SP

SP

SP

SP

3

5

.

6

4

35.66

35.66

Hoarding

Asphalt F

ootpath

Asphalt F

ootpath

Asphalt F

ootpath

Hoarding

Br

Wall

Hotel P

arking

Bush

es

Bushes

Bush

es

NO

STNBBS4

STNBBS5

36.5

8

3

6

.

5

2

3

6

.

5

0

3

6

.4

9

36.49

36.46

36.46

36.48

36.48

36.54

3

6

.

5

1

36.49

36.45

36.51

36.61

3

6

.

5

2

3

6

.5

2

36.57

36.58

36.57

36.58

36.49

36.62

3

6

.

6

2

36.5

7

36.56

36.61

36.63

34.62

34.63

34.57

34.56

34.54

34.35

34.43

35.06

35.63

34.4734.37

34.39

36.59

34.76

34.87

34.69

34.62

36.25

36.17

3

6

.2

2

3

5

.

8

6

35.66

35.36

35.10

34.94

3

4

.

6

0

3

4

.

4

5

34.48

3

4

.

7

0

3

4

.6

4

34.7

1

34.74

3

6

.

6

2

36.60

36.58

36.56

Gate

MH

36.51

W

W

36.69

3

6

.6

2

3

6

.

5

9

3

6

.

6

0

36.55

36.55

36.55

36.60

36.59

36.67

3

6

.

7

0

36.71

G

G

36.48 36.51

MH

36.65

LP4

G

G

36.48

36.48

36.58

34.86

34.32

3

4

.

8

8

34.8

2

LP27

34.47

3

4

.2

8

34.25

34.26

34.30

34.30

34.30

3

4

.

3

2

3

4

.

3

3

3

4

.

5

0

34.55

3

4

.3

4

3

4

.

4

3

3

4

.

2

9

34.30

34.19

34.06

33.87

33.56

3

4

.

7

3

34.6

7

34.3

2

3

4

.3

2

3

4

.

2

7

34.81

3

4

.

8

1

34.40

3

3

.

7

2

3

3

.

7

5

3

3

.

9

2

3

4

.

0

2

34.08

34.20

34.18

3

4

.

6

7

3

4

.

7

9

3

5

.

2

3

3

4

.8

3

34.31

34.2

5

3

4

.7

6

34.6

8

3

4

.6

3

3

4

.

5

9

3

4

.

6

0

Apartments

Br Wall

Br Wall

Asphalt Footpath

Asphalt Footpath

Br W

all

Top Batter

Botto

m B

atte

r

Derelict Building Site

Hoard

ing

Br W

all

Hoard

ing

Top Batter

Bottom

Batter

Grass

Grass

Grass

Grass

Grass

Grass

Asphalt Footpath

3

0

Â

°

30°

34.7

1

36.6

6

36.6

9

36.6

7

36.68

36.71

36.75

36.72

G

36.63

MH

36.78

36.75

36.8

5

W

36.59

Wall H

eight=

38.18m

34.07

33.98

SP

34.13

3

4

.

0

1

3

4

.

0

9

3

4

.1

6

34.14

34.09

34.09

34.23

W

36.53

Gate

FH

Br W

all

Asphalt F

ootpath

Fence P

/W

Grass

Asphalt Footpath

CONNECTION TO EXISTING DRAINAGESERVICES TO BE NEGOTIATED WITHWESSEX WATER PRIOR TOCONSTRUCTION.

INDICATIVE ATTENUATIONTANK LOCATION.

(FINAL DESIGN & SIZE TO BECONFIRMED BYDRAINAGE ENGINEER &LOCAL AUTHORITY.)

12000

35.91

35.91

35.91

35.91

BINCOLLECTION

AREA

ESCAPE STAIRS FROMBASEMENT PARKING

9097/306

AS SHOWN @ A1

FEBRUARY 2021

Revision.No. bydate

date

scale

drawn

checked

WD

INDICATIVE DRAINAGE PLAN

SITE AREA: 0.095 HECTARES / 0.234 ACRES

SITE BOUNDARY

//

ARC Architecture ltd.

Chapel Studios, 14 Purewell,

Tel: +44 (0 )1202 479919

Christchurch, Dorset, BH23 1EP

E-mail: [email protected]

Web: www.andersrobertscheer.co.uk

DRAINAGE

INDICATIVE DRAINAGE PLAN: BASED ON TOPOGRAPHICAL SURVEY INFORMATIONSCALE 1:200

10m @ 1:100

PROPOSED DEVELOPMENTRIVIERA HOTEL5 WEST CLIFF GARDENSBOURNEMOUTHBH2 5HL

RECENTLYAPPROVED SCHEME

SUDS STRATEGIES, METHOD STATEMENTS AND MAINTENANCEPROGRAMME TO BE APPROVEDBY LOCAL AUTHORITY SUDS APPROVAL BODY(SAB) PRIOR TO ANY DEMOLITION ORCONSTRUCTION ON SITE.MAINTENANCE WHEN TO BE CARRIED OUT

TYPICAL MAINTENANCE PLAN

· INSPECTION OF INLETS & OUTLETS· REMOVAL OF LITTER· GRASS CUTTING

· REMOVAL OF SILT AROUND COMPONENTS· REMOVAL OF VEGETATION AROUND COMPONENTS

MONTHLY

ANNUALLY

1. The contents of this drawing are copyright.2. Do not scale. Figured dimensions only to be used.     3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings.4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved.5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areasof the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report -to be instructed by client or contractor to cover all aspects of Fire Safety / Part B6. Fixed shut fire safety glass windows may be required where windows are in close proximity to boundaries (subject to building regulations).7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication.8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way.9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letterfrom ARC to confirm compliance with our plans on site.10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction.11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliancefrom the clients chosen inspector (LA or Private alternative)12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project can be mortgaged.13. A design and risk assessment should form part of our drawing package, if you have not received this from us by post, email or collection please contact us for a copy before moving forward with the project.14. At planning stage planning drawings are to only to used for planning purposes.15. All Cladding & building attachments to be all A1 fire rated.16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feelthe our plans do not accurately depict their ownership or area of control.

Note: Any design or details relating to Fire Safety, including under Part B of theBuilding Regulations is shown for indicative/information purposes only and issubject to appropriate external professional input. No assumption of anyresponsibility is accepted.

NOTES

LEGEND

Scheme reduced following coments.A. WD14.06.21

A.

Further reductions to scheme followingcomments.

B. WD01.07.21

B.

Bay windows amended, basemententrance added to elevations, cycleramp added to escape stairs forcycles, ramp moved 5m from footpath& parking spaces for electric carshighlighted.

C. WD13.07.21

C.

AutoCAD SHX Text
HOTEL
AutoCAD SHX Text
ST GEORGE
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC