127th hsjv weekly meeting
TRANSCRIPT
-
7/29/2019 127th HSJV Weekly Meeting
1/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
-
7/29/2019 127th HSJV Weekly Meeting
2/27
7/14/20
SCREEN
Dont Panic11
Switch Off All Electrical Equipment22
BARAKAH NUCLEAR POWER PLANT PROJECT
Dont Run, Walk Fast!33
Go to the Assembly Point44
Wait for the Final Instruction55
1. Safety Moment
2. Previous Meeting
1. Safety Moment
2. Previous Meeting
7. Weekly Inspection
Committee Inspection
Weekly Inspection
7. Weekly Inspection
Committee Inspection
Weekly Inspection
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
8. Incident Reports
9. Medical Cases
10.Environmental Issues
11.Action Plans
Ujin
8. Incident Reports
9. Medical Cases
10.Environmental Issues
11.Action Plans
Ujin
BARAKAH NUCLEAR POWER PLANT PROJECT
va ua on y n ngs core6. Findings Analysis per Discipline
va ua on y n ngs core6. Findings Analysis per Discipline
Seoyong (Infra)
Hilalco
Seoyong (Infra)
Hilalco
-
7/29/2019 127th HSJV Weekly Meeting
3/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
4/27
7/14/20
NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE
DATEDATESTATUSSTATUS
A comparison was made on number of findings
reported by every Subcontractor and findings raised by
HS V KEPCO. Both Seo on and Hilalco failed to Hilalco Next
Findings
.
exceed number of HSE findings. Both companies are
requested to prepare action plans and report on next
meeting.
Seoyong
MeetingDone
2InjuryCases
Preventive
Actions
Medical cases reported by subcontractors should
include preventive actions to be taken by immediate
supervisor.
HSJVNext
MeetingDone
A letter should be issued to UJ IN requesting
BARAKAH NUCLEAR POWER PLANT PROJECT
3Attendance
explanation on their absent from HSE meeting. Medical
case from UJ IN will be reported again on next meeting.
UJIN
MeetingDone
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
5/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion
Al l vehic les leavi ng Gate 3 should tak e roundab out at wes t par t of BNPPAl l vehic les leavi ng Gate 3 should tak e roundab out at wes t par t of BNPP
before proceeding to Gate 1. Speed l imit at service r oad is set at maximumbefore proceeding to Gate 1. Speed l imit at service r oad is set at maximum
of 60of 60 kphkph, and overtaking is prohib ited on this road., and overtaking is proh ibited on this ro ad.
ConstructionTeam
prepareswork
plan,includes
PlanforTomorroworHolidaywork
TodaysNightwork
Managersignsthe
WorkPlan
before4:30PMdailyat
HSJVHSE
HSJVHSEManagerConstructionTeamHSJVHSETeam
BARAKAH NUCLEAR POWER PLANT PROJECT
s gns
t e
or
an
Planto
Site.
WorkPlan
Descript ionDescript ion
As par t of work prep ar at ion ev er y Su bcontrac tor must prep ar e an d submitAs par t of work prep ar at ion ev er y Su bcontrac tor must prep ar e an d submit
dai ly wor k plan to HSE Department. Night w ork and hol i day shal l bedai ly wor k plan to HSE Department. Night w ork and hol i day shal l be
includ ed on this form. This wi l l ease monitoring act iv i t ies at s i te.includ ed on this form. This wi l l ease monitoring act iv i t ies at s i te.
-
7/29/2019 127th HSJV Weekly Meeting
6/27
7/14/20
Descript ionDescript ion
n c u s ve a es : ~ u g.n c u s ve a es : ~ u g.
Training Provider : TAPROOT, U.S.ATraining Provider : TAPROOT, U.S.A
Training Part ic ipants :Training Part ic ipants :
HSJVHSJV, KEPCO,, KEPCO, SubcontractorsSubcontractors
Benefi ts :Benef i ts :
BARAKAH NUCLEAR POWER PLANT PROJECT
incident and prevent ingincident and prevent ing
recurrence of such case.recurrence of such case.
Incident from safety or q ual i ty.Incident from safety or q ual i ty.
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
7/27
7/14/20
ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 0 18 0 0 0 0 0 20
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1
(This Week From July 6 July 12, 2013)
First Aid Cases (FA) 0 4 0 0 3 10 0 45 0 7 0 3 3 68
Medical TreatmentCases (MTC) 0 3 0 1 0 5 0 12 0 0 0 1 0 22
Restricted Work
Cases (RWC) 0 3 0 1 0 0 0 4 0 0 0 0 0 8
LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3
Property/Vehicle
Accid ents 0 4 0 1 0 4 0 7 0 2 0 1 0 19
Environmental
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 27 (2013)
Release
Forthisweek Cumulative
OneStrike Policy 2 133*
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
8/27
7/14/20
(This Week From July 6 July 12, 2013)
Issued
NearMissNearMiss
CARCAR
0 0 1 1
12 15 164 191
Findings TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 0 1
12 5 0 0 10 164
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC&WFOC&WF 0 56 266 322
12 71 431 514
0 0 0 0 56 266
12 5 0 0 66 431
3131
3334
35
Access&Egress
ElectricalSafety
Health&Welfare
Plant&Equipment
Scaffolding
(This Week From July 6 July 12, 2013)
1112
1313
151919
2122
2626
2730
Environmental
WorkingatHeight
PoorIllumination
HotWorks
Signs,Barriers&barricades
MaterialManagement
Lifting
WasteManagement
Hand&PowerTools
FirePrevention
PPE
FallProtection
ColorCoding
BARAKAH NUCLEAR POWER PLANT PROJECT
00
12
67
88
0 5 10 15 20 25 30 35 40
SteelErection
LOTO
RoadSafety
ConfinedSpace
Documents
PTW
Training
Supervision
Source: CAR, Near Miss, Walkthrough and Observation Card
-
7/29/2019 127th HSJV Weekly Meeting
9/27
7/14/20
Ensure continuous supply of
water in the workplace.
Ensure scaffold have guard
rail, supervisor to check
com leteness
Banks men should control
ground personnel movement
1 32
(RCB,(RCB, SamjinSamjin))
Sufficient amount of ORSshould be on hand for heat
stress prevention (Power(Power
Block,Block, AdvanAdvan))
Maintain minimum stock of
medical items in the first aid
ki t (TGB1, D&I)(TGB1, D&I)
(CWDC,(CWDC, GusanGusan))
Clear scaffold pl atform of
unnecessary materials
(ADB,(ADB, SeobonSeobon))
Scaffold inspectors to
thoroughly check for
damaged section(STC, Hanlim E&C)(STC, Hanlim E&C)
(Office Area,(Office Area, JonghapJonghap))
Install operational reverse
alarm for tanker
(CWDC, WBG)(CWDC, WBG)
Ensure motor chain are
installed with safety guards
(Batch Plant, Eugene)(Batch Plant, Eugene)
BARAKAH NUCLEAR POWER PLANT PROJECT
Ensure condition of water is
cold and drinkable
(STC, Hyundai C&I)(STC, Hyundai C&I)
Use of standard scaffold
materials in railings and
platform (CWIS,(CWIS, Hilalc oHilalco))
ns a w p c ec arres o r
and fire extinguisher
available in air compressor.
(CWIC, Hilalco )
Scaffolding Health and WelfarePlant and Equipment
BARAKAHNUCLEARPOWERPLANTPROJECT
-
7/29/2019 127th HSJV Weekly Meeting
10/27
7/14/20
AncillaryAreaVillage1
48
FindingsperArea
(This Week From July 6 July 12, 2013)
Arch(I)Mech
Piping
21
FindingsperDiscipline
65
13%CampArea
2
0%
OfficeArea
93
19%
10%96
19%
Elec
61
12%
42
9%
4
BARAKAH NUCLEAR POWER PLANT PROJECT
PowerBlock
288
58%
Arch(PB)
132
27%
Civil
14429%
(This Week From July 6 July 12, 2013)
4046
149
2120
30
40
50
FindingsperCompany(ArchPB)
41
55
Signs,Barriers&Barricades
Training
WasteManagement
WorkingatHeight
FindingsperCause(ArchPB)
1 2
0
10
Advan D&I DOW Isam
Kabbani
Seobon Seoyong
(PB)
Ujin
2
22
52
15
1 16
1
139
3 4
34
71 1
6
05
10152025303540
FindingsperArea(ArchPB)
29
111
45
166
144
57
17
38
Documents
ElectricalSafety
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
PTW
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
78
0 5 10 15 20
Access&
Egress
ColorCoding
Corrective Action
Ensure that toilets have continuous supply of water. Completion of basic supplies inside the first aid kit. Proper arrangement of cables be maintained at all times.
-
7/29/2019 127th HSJV Weekly Meeting
11/27
7/14/20
(This Week From July 6 July 12, 2013)
38
2017 1820
30
40
FindingsperCompany(ArchInfra)
6
2
7
2
Signs,Barriers&Barricades
Supervision
WasteManagement
WorkingatHeight
FindingsperCause(ArchInfra)
2
0
10
Hanlim Seobon Towerstech Uwell YooA
18
45
31
20
30
40
50
FindingsperArea(ArchInfra)
7
3
5
10
5
4
6
4
10
4
3
1
8
ElectricalSafety
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
Housekeeping
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
PTW
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
1
0
AncillaryArea CampArea OfficeArea Village1
5
3
0 2 4 6 8 10 12
Access&Egress
ColorCoding
Corrective Action
Repair air compressor and prevent equipment from oil leakage. Use of gas cylinders will be supported by fire extinguishers.Air compressor must be kept in drip tray to contain possible leaks.
(This Week From July 6 July 12, 2013)
104
80
100
120
FindingsperCompany(Civil)
43
42
Supervision
Training
WasteManagement
WorkingatHeight
FindingsperCause(Civil)
7 1 315 14
0
20
40
AlRaeel Athena Eugene Gusan Hilalco WBG
4
90
6 5 417
7 1 3 3 4
0
20
40
60
80
100
FindingsperArea(Civil)
244
26
42
43
1410
611
54
113
4
Documents
ElectricalSafety
Environmental
Excavation
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
RoadSafety
Scaffolding
Signs,Barriers&Barricades
BARAKAH NUCLEAR POWER PLANT PROJECT
16142
0 5 10 15 20
Access&Egress
ColorCoding
ConfinedSpace
Corrective Action
Removal of unnecessary materials at the scaffold platform.
Install safe access for rebar works. Conduct inspection on grinder and sling belt and have items properly attached with color code.
-
7/29/2019 127th HSJV Weekly Meeting
12/27
7/14/20
(This Week From July 6 July 12, 2013)
10
16
9710
15
20
FindingsperCompany(Mech)
1
1
2
PPE
Scaffolding
Training
WasteManagement
FindingsperCause(Mech)
0
5
Hwachon Samjin Seil YounChang
19
7
35
7
5
10
15
20
FindingsperArea(Mech)
4
2
5
2
2
1
2
3
1
3
2
Color Codin
ElectricalSafety
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
MaterialManagement
Plant&Equipment
PoorIllumination
BARAKAH NUCLEAR POWER PLANT PROJECT
1
0
Ancillary
Area
OfficeArea PBCLP PBLaydown PBRCBUnit
1
PBWorkshop
1
0 2 4 6 8 1 0
Access&Egress
l
Corrective Action
Use of suitable hand protection during hot works activities. Replace damage fitting of oxy-acetylene tanks.
Arrangement of argon hose line to avoid possible hazards.
(This Week From July 6 July 12, 2013)
8
11
6
8
10
12
FindingsperCompany(Piping)
4
3
Scaffolding
WasteManagement
FindingsperCause(Piping)
2
0
2
4
Hwachon SungChang YounChang
13
46
8
10
12
14
FindingsperArea(Piping)
2
1
2
1
1
2
2
1
2
Color Codin
Excavation
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
PPE
BARAKAH NUCLEAR POWER PLANT PROJECT
2 1 1
0
2
AncillaryArea Offic eArea PBABUnit1 PBLay down Village1
0 1 2 3 4 5
l
Corrective Action
Ensure toe board and guard rails are complete while scaffold is put into use.
Observe proper segregation of waste- paper, and plastic segregated.
-
7/29/2019 127th HSJV Weekly Meeting
13/27
7/14/20
(This Week From July 6 July 12, 2013)
15
37
20
30
40
FindingsperCompany(Elec)
1
2
3
3
l
Signs,Barriers&Barricades
Supervision
Training
WorkingatHeight
FindingsperCause(Elec)
36
0
10
D ae my un g H yu nd aiC&I Jonghap JongHap(PB)
39
20
25
30
35
40
45
FindingsperArea(Elec)
3
6
3
1
7
6
1
3
2
3
3
1
2
2
Environmental
Excavation
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
PTW
ca old ng
BARAKAH NUCLEAR POWER PLANT PROJECT
9
1
0
5
10
15
AncillaryArea Camp
Area Office
Area Village
1
2
1
1
4
0 1 2 3 4 5 6 7 8
Access&Egress
ColorCoding
Documents
ElectricalSafety
Corrective Action
Replace appropriate machine guards of power tools. Maintain quality of drinking water ensuring cold water are distributed on site.
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
14/27
7/14/20
91
80
90100
26
37
15 1819
20
30
40
50
60
70
BARAKAH NUCLEAR POWER PLANT PROJECT
15 4 1
5 6 6 4 6 7 7
0
10
80
90
100 RoadSafetyExcavation
ConfinedSpace
PTW
Environmental
Documents
13,Housekeeping
20
30
40
50
60
70Supervision
PoorIllumination
WorkingatHeight
Hand&PowerTools
HotWorks
Signs,Barriers&Barricades
WasteManagement
MaterialManagement
FirePrevention
ElectricalSafety
PPE
8,Housekeeping
2,Plant&Equipment
2,ElectricalSafety
6,Health&Welfare
6,Health&
Welfare
3,Housekeeping
BARAKAH NUCLEAR POWER PLANT PROJECT
0
10
Lifting
Plant&Equipment
FallProtection
ColorCoding
Health&Welfare
Access&Egress
Scaffolding
Housekeeping
3,Scaffolding
-
7/29/2019 127th HSJV Weekly Meeting
15/27
7/14/20
700
80090
100KEPCO/HSJV
SUBCON
(This Week From July 6 July 12, 2013)
100
200
300
400
500
600
203040506070 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
Seoyo
ng
Seoyong(PB)
TowersTech
Gusan
Jongh
ap
Jonghap(PB)
YounChang
YounChang(PB)
Hwach
on
W
BG
Hila
lco
Advan
Hanlim
Uw
ell
YooA
HyundaiC
&I
Sam
jin
Euge
ne
Daemyu
ng
Seob
on
D
&I
AlRa
eel
DO
W
Sam
ho
Geumh
wa
Sungcha
ng
Seil
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
16/27
7/14/20
25.023.2
FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)
Source: CAR, Near Miss, Walkthrough and
Observation Card reported by KEPCO & HSJV
0.0
5.0
10.0
15.0
20.0
0.2 0.2
3.4 3.0 3.01.7
4.2
0.51.7 1.9 1.0 1.0
BARAKAH NUCLEAR POWER PLANT PROJECT
ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem
1.JointInspection willbecarriedoutbyAreaManagementTeam.
2.SpotTrainingwillbegiven toworkersaboutmajorfindings
3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby GUSAN
Legend : (I) Infra, (PB) Power Block
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
17/27
7/14/20
Top Hazards
Cause Nos
Color Coding 12
Total No. of Findings : 104ColorCoding,12
PPE,3HotWorks,2
Training,2Supervision,2
Housekeeping 12
Control Measure Due Date
Observeregular
housekeepingatsite,
organizeteamstocarryout
thetask
Continuous
Housekeeping,12Material
Management,6
FallProtection,4
BARAKAH NUCLEAR POWER PLANT PROJECT
,
andliftingapparatuswith
colorcodemarking.
Done
Access&Egress,11
Scaffolding,10Lifting,8
Source: CAR, Near Miss, Walkthrough and Observation Card
Top Hazards
Total No. of Findings: 38
Hand&PowerTools,5
FallProtection,4Waste
Signs,Barriers&Barricades,2
HandandPowerTools 5
Fall Protection 4
Control Measure Due Date
Prohibituseofimprovised
tools,andrepairof
damagedtools
Done
FirePrevention,2
Housekeeping,2Management,2
BARAKAH NUCLEAR POWER PLANT PROJECT
Useof
safe working
platformandprovisionof
guardrailsystematedgesof
building
DonePoor
Illumination,3Scaffolding,3
Health&Welfare,2
ElectricalSafety,2
Source: CAR, Near Miss, Walkthrough and Observation Card
-
7/29/2019 127th HSJV Weekly Meeting
18/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate AttendeesAtt endees RemarkRemark
Commi tt ee Ins pect ion 2013-07-09 HSJV, KEPCO, HSE Manag ement Team 4 Fi ndi ngs
Weekly Inspection 2013-07-10 HSJV HSE Team 10 Findings
-
7/29/2019 127th HSJV Weekly Meeting
19/27
7/14/20
3
4
5
FindingsperCompany
2
I
Plankswithgap
FindingsperCausal
2
4
1
2
1
0
1
2
D&I Gusan Hanlim Seobon Seoyong
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
1
1
2
0 0.5 1 1.5 2 2.5
UnsafeAccess
SubstandardScaffold
IncompleteBracing
Housekeeping
NotInspected
I
Key item : Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
20/27
7/14/20
No.Source of
InjuryArea Descr ip tion
ImmediateAct ion
PlannedSupervisor
Preventive Act ion
1
littlefingerof
lefthandafter
contactwith
hotobject
Geumhwa
TIGWelder
WeldingSchool
(Welding
TrainingCenter)
Accidentallytouchhottube
whilecheckingit.
AssessedbyDr.
Anand
Antibiotic
ointment
applied
Wound
Providewarning
signsonhot
surfaces
Awarenesstoall
workers
BARAKAH NUCLEAR POWER PLANT PROJECT
s er
09072013
10:30am
dressing
applied
seo appropr ate
PPE
No.Source of
InjuryArea Descr ip tion
Immediate
Act ion
Planned
Supervisor
Preventive Act ion
2
Leftchestwall
pain
secondaryto
theinjury
Geumhwa
Rigger
Powerblock
TGBarea
Hewasaccidentallyhitbya
scaffoldingmaterialonhischest
whileworking
AssessedbyDR
:Kim
Painonthe4th
ribcage
Salonpaspatch
applied
Advisedfor
Use oftagline
whileonlifting
process.
Riggertoattend
refreshertraining
BARAKAH NUCLEAR POWER PLANT PROJECT
1007
2013
10:00
chestxray
Referredto
Hospital
RiggingTechniques.
-
7/29/2019 127th HSJV Weekly Meeting
21/27
7/14/20
No.Source of
InjuryArea Descr iption
Immediate
Acti on
Planned
Supervisor
Preventive
Act ion
2 Syncope
Samjin
Construction
Engineer
PowerBlock
nearTower1
Hyungi Minaconstruction
engineermakeaninspectionat
RCBouterareaaround4:50PM,
when suddenl felt dizz
AssessedbyDr.
KIM
Vitalsignstaken
andmonitored
Restprovided
Awarenesstoall
personnelon
signsofheat
stress
Coordinate with
HSEonsite
conditionand
BARAKAH NUCLEAR POWER PLANT PROJECT
11072013
16:50
. Oralrehydration
solutiongiven
heatstressindex.
Newworkerto
undergo
acclimatization.
No.Source of
InjuryArea Descr iption
Immediate
Act ion
Planned
Supervisor
Preventive
Act ion
5Injuryright
ankle sprain
Ujin
CommonLabour
PowerBlock
(RCB)
Whilecleaningtheareahe
slippedonthefloorthat
causesprain.
AssessedbyDr.
Kim
Analgesicspray
applied
Elasticbandage
Implement
regular
housekeeping
onsite
Define
BARAKAH NUCLEAR POWER PLANT PROJECT
0207
2013
17:38
applied wa ways or
workers
-
7/29/2019 127th HSJV Weekly Meeting
22/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Schedule & Planning
Control Manager
Housekeeping & Site Workplace Cleanness Organization
D. Manager
Subcon Site
Manager
D. Manager
Subcon Site
Manager
D. Manager
Subcon Site
Manager
D. Manager
Subcon Site
Manager
D. Manager
Subcon Site
Manager
D. Manager
Subcon Site
Manager
D. Manager
O&M Team
Housekeeping CoordinatorHousekeeping
team
BARAKAH NUCLEAR POWER PLANT PROJECT
Housekeeping
Manpower
Housekeeping
Team
Housekeeping
Manpower
Housekeeping
Manpower
Housekeeping
Manpower
Housekeeping
Manpower
Housekeeping
Manpower
Descript ionDescript ion
Site Housekeeping team has been organized to keepSite Housekeeping team has been organized to keep w orkplace clean.workp lace clean.
KEPCO and HSJV is maintaining andKEPCO and HSJV is maintaining and managingmanaging the t eam.the team.
-
7/29/2019 127th HSJV Weekly Meeting
23/27
7/14/20
Responsible disciplines and subcontractors by area
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion
As s igned res ponsible per son for each locat ion each levelAs s igned res ponsible per son for each locat ion each lev el of bui ld ing.of bui ld ing.
PPE Standard for housekeeping team
Blue color safety helmet
Purple color safety vest
Yellow color coverall
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
24/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Marine Works Wharf Phase 2
Description Crawler Crane on barge observed disch arging heavy black smoke whil e dredging works.
Act ion taken Ensure to conduct preventive maintenance according to manufacturers specification
Status OPEN
No.0 DateActio n by
CompanyS ta tu s C lo s in g D ate
Expiration
Date
Ref. No.
CARM ai n Area Sub -A re a Issu ed By
Issuer
Company
1
11 July
2013 Athena
Crawler Crane on barge with body
number LIMA 2400-B observed
discharging heavy black smoke from
the exhaust system while dredging
works in progress which contributes
to degradation of ambient air quality.
OPEN
16 July
2013
16 June
2013 1621 Wharf Phase 2
Renato
Ponce HSJV
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
25/27
7/14/20
WASTEMANAGEMENT
UPDATE
Week=04/07/2013 10/07/2013
WASTETYPEThisweek Lastweek
Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)
Paper 56 0 45 80 0 0
Metal 32 0 45 64 0 45
Construction 112 495 0 128 675 0
Concrete 0 0 0 0 0 0
Wood(Good) 0 0 0 0 0 45
Wood(Bad) 240 45 0 216 270 0
Plastic 144 0 45 144 0 0
Municipal 0 296 0 0 328 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea
Recycle Treatedwaste(GMET)toRecyclingPlants
Hazardous 32 32 0 24 24 0
TotalSolidWaste 616 868 135 21.96% 656 1297 90 13.72%
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
26/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 127th HSJV Weekly Meeting
27/27
7/14/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT