SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted 1. 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi Data Sheets GCAN Notes: 1. See engineer’s comments. END OF REVIEW

Upload: phambao

Post on 07-Jun-2018

230 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete

SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner

This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following:

NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted

1. 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi Data Sheets GCAN

Notes: 1. See engineer’s comments.

END OF REVIEW

Page 2: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete

EMAIL TRANSMITTAL

PROJECT: DATE:

JOB#

SUBMITTAL#

TO: Comma-Q ArchitectureADDRESS:

ATTENTION:

PHONE:

FAX:

TRANSMITTED:

ITEM DATE COPIES1 1

TRANSMITVia:

No. Page: 1

REMARKS:

COPY TO:

Bozeman, MT. 59715

PDF - 3500 psi concrete mix design

Matt Miller

Mix Design

Laura Landon

6/6/2012

11011

NM06062012-2

109 N. Rouse Ave., #1

New Belgrade Elementary School

(406) 585-1112

DESCRIPTION

(406) 585-5518

TRANSMITTED BY:

108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992

Prints

Proposal OtherShop Drawings

RFI Response

Field Report

Specifications

CalculationsLetter Sketches

No Exceptions Taken

These are Transmitted as Checked Below:

For Your File

For Your Use

Revise As Noted And Resubmit

Make Corrections Noted

Rejected/Resubmit As Specified

Reviewed For Load To Structure Only

As Requested

Email

Submitted Previously

Page 3: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete

TRANSMITTAL

May 29, 2012

To: Nishkian Monks Attention: Matt Miller From: Laura Landon Project: BPS – Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03

Copy to: File

we are sending you : Attached

Under separate cover

the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other:

these are transmitted as checked below:

Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment:

date qty description

5/25/2012 1 (elec) Submittal 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi

Remarks:

Matt, please review the attached submittal, please return an electronic version to our office with your comments. Thanks

Page 4: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete

MARTEL CONSTRUCTION, INC. LETTER OF TRANSMITTAL1203 South Church Avenue

Bozeman, MT 59715-5801

Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/25/12 JOB NO. 12-001

TRANSMITTAL/SUBMITTAL NO. 13.00

TO: Comma Q Architects RE: Line Pump Concrete Mix Designs

109 North Rouse Ave #1

Bozeman, MT 59715

ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL

We are hand delivering

We are sending via Email

ATTACHED UNDER SEPARATE COVER TheThe following items:

Shop drawings Prints Plans Samples Specifications

Copy of letter Change order X Product Data

COPIES DATE DWG NO. DESCRIPTION

1 Section 03 3000 2.11 Line Pump Concrete Mix Design 3500 psi Slabs5/24/12

THESE ARE TRANSMITTED as checked below:X For approval Approved as Submitted Resubmit Copies for Approval

For your use Approved as Noted Submit Copies for Distribution

As requested Returned for Corrections Return Corrected Prints

For review and comment

FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US

REMARKS:

COPY TO File

Matt -Nishkian SIGNED: Mike Wilkinson - Project Engineer

If enclosures are not as noted, kindly notify us at once.

Page 5: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete
laura
New Stamp
laura
Typewritten Text
laura
Typewritten Text
laura
Text Box
X
laura
Text Box
Laura Landon 6/6/2012
Page 6: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete
Page 7: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete
Page 8: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete
Page 9: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete
Page 10: 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi ...commaq.com/cq/wp-content/uploads/2012/04/BPS-BES... · SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete