1/30/2019 alabama department of...
TRANSCRIPT
Route I -10 ProjectDescription
SOUTHWEST REGION, MOBILE AREA SIGN REPLACEMENT ON I-10, I-65 AND I-165
Type of Work SIGN REHABILITATION
Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055398 IM MR15 (901) CONSTRUCTION
SIGN REHABILITATION
2021 $5,601 $622 $6,224
TOTAL COST: $5,601 $622 $6,224
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 9 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-65 FROM FINLEY BLVD N. TO FIELDSTOWN RD, AND US-78 FROM I-59 NORTH/WEST TO GRAYSVILLE.
Type of Work UNCLASSIFIED
Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029543 CMAQ 9802 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $460 $115 $575
TOTAL COST: $460 $115 $575
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
1 of 305
HIGHWAY PROJECTS - AREAWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3A ELECTRONICS AND EQUIPMENT TO BE INSTALLED IN THE TMC.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032142 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $2,117 $529 $2,647
TOTAL COST: $2,117 $529 $2,647
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 9 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-65 FROM FINLEY BLVD N. TO FIELDSTOWN RD, AND US-78 FROM I-59 NORTH/WEST TO GRAYSVILLE.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032145 CMAQ 9802 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $465 $116 $581
100032143 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $4,948 $1,237 $6,185
TOTAL COST: $5,413 $1,353 $6,766
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
2 of 305
HIGHWAY PROJECTS - AREAWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 8 CAMERAS, FIBER OPTIC CABLE, MESSAGE SIGNS, AND VEHICLE DETECTION DEVICES. I-20/59 FR ARKADELPHIA RD SOUTHWEST TO SOUTH OF I-459.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032146 CMAQ 9802 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $460 $115 $575
100032144 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $5,466 $1,366 $6,832
TOTAL COST: $5,926 $1,482 $7,408
Route NA- ProjectDescription
ALDOT CMS / IMS MARKETING ACTIVITY, PHASE 2 PROJECT IS IN TIP / STIP BREAKOUT OF PROJECT 8C-009-802-PX0-UNC.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029548 CMAQ 9802 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $230 $58 $288
TOTAL COST: $230 $58 $288
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
3 of 305
HIGHWAY PROJECTS - AREAWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MANAGEMENT DIVERSION ROUTE, SPONSOR: ALDOT.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029530 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,277 $319 $1,597
TOTAL COST: $1,277 $319 $1,597
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
4 of 305
HIGHWAY PROJECTS - AREAWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-75 ProjectDescription
WIDEN AND RESURFACE CR-75 (MCQUEEN SMITH RD) FROM SR-3 (US-31, S MEMORIAL DR) TO CR-2 (COBBS FORD RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050962 STPMN 7812 (600) UTILITIES
ADDITIONAL ROADWAY LANES
2020 $51 $13 $64
100050963 STPMN 7812 (600) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $8,388 $2,097 $10,485
TOTAL COST: $8,439 $2,110 $10,549
Route CR-85 ProjectDescription
WIDEN AND RESURFACE CR-85 FROM SR-3 (US-31) TO CR-40
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 4.245 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064374 STPAA 0118 (253) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $806 $202 $1,008
TOTAL COST: $806 $202 $1,008
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
5 of 305
HIGHWAY PROJECTS - AUTAUGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
DRAINAGE IMPROVEMENTS ON SOUTH NORTHINGTON ST. (LINK # 5162) , FROM DOSTER STREET TO NORTH OF THIRD STREET SOUTH OF PRATTVILLE
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.100 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039970 STPMN 7809 (600) CONSTRUCTION
DRAINAGE CORRECTION
2020 $1,331 $333 $1,664
TOTAL COST: $1,331 $333 $1,664
Route CR-NA ProjectDescription
RESURFACING ON MARTIN LUTHER KING JR DRIVE FROM 6TH STREET TO THE PRATTVILLE CITY LIMITS AND ON UPPER KINGSTON ROAD FROM 6TH STREET TO THE PRATTVILLE CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057524 STPAA 0118 () CONSTRUCTION
RESURFACING
2019 $346 $87 $433
TOTAL COST: $346 $87 $433
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
6 of 305
HIGHWAY PROJECTS - AUTAUGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON UPPER KINGSTON ROAD FROM WEST 6TH STREET NORTH TO MOSES ROAD (SITE 1) AND ON GARDNER ROAD FROM UPPER KINGSTON ROAD TO MARTIN LUTHER KING JR DRIVE (SITE 2)
Type of Work RESURFACING
Project Length in Miles 2.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063684 STPMN 0115 () PRELIMINARY ENGINEERING
RESURFACING
2019 $36 $9 $45
100063685 STPMN 0115 () CONSTRUCTION
RESURFACING
2020 $320 $80 $400
TOTAL COST: $356 $89 $445
Route CR-NA ProjectDescription
ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068602 STPMN 0115 () PRELIMINARY ENGINEERING
TURN LANES 2020 $196 $49 $245
100063689 STPMN 0115 () CONSTRUCTION
TURN LANES 2021 $2,400 $600 $3,000
TOTAL COST: $2,596 $649 $3,245
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
7 of 305
HIGHWAY PROJECTS - AUTAUGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
RESURFACE AND SAFETY SIDE SLOPE IMPROVEMENTS ON I-65 FROM 1 MILE SOUTH CR-61 OVERPASS TO CHILTON COUNTY LINE
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 8.020 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055206 IM-HSIP I065 (472) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $15,570 $1,730 $17,300
TOTAL COST: $15,570 $1,730 $17,300
Route SR-3 ProjectDescription
ADD TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063687 STPMN 0115 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $2,000 $500 $2,500
TOTAL COST: $2,000 $500 $2,500
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
8 of 305
HIGHWAY PROJECTS - AUTAUGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-6 ProjectDescription
US-82 FROM SR-14 TO US-31 IN PRATTVILLE - ADDITIONAL LANES
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.740 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004463 NH 0006 (504) UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2023 $1,733 $433 $2,166
100004425 NHF 0006 (504) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2023 $13,417 $3,354 $16,772
TOTAL COST: $15,150 $3,787 $18,937
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
9 of 305
HIGHWAY PROJECTS - AUTAUGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-99 ProjectDescription
ADD PAVED SHOULDERS ON CR-99 FROM CARRIER DRIVE TO SPANISH COVE DRIVE
Type of Work SHOULDER WIDENING
Project Length in Miles 1.640 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063404 STPLL 0219 () CONSTRUCTION
SHOULDER WIDENING
2023 $408 $102 $510
TOTAL COST: $408 $102 $510
Route CR-99 ProjectDescription
ADD PAVED SHOULDERS ON CR-99 FROM CR-91 TO CARRIER DRIVE
Type of Work SHOULDER PAVING
Project Length in Miles 0.000 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063634 STPLL 0215 () PRELIMINARY ENGINEERING
SHOULDER PAVING
2020 $20 $5 $25
TOTAL COST: $20 $5 $25
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
10 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -10 ProjectDescription
I-10 BAYWAY WIDENING FROM MOBILE COUNTY LINE TO EAST OF SR-16 (US-90) AT SPANISH FORT
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 7.591 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062415 NHP3 I010 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $874 $218 $1,092
100062416 NHP3 I010 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $651,248 $162,812
$814,060
TOTAL COST: $652,122 $163,030
$815,152
Route I -10 ProjectDescription
I-10 INTERCHANGE AT CR-68 WITH CONNECTOR TO (983) BALDWIN BEACH EXPRESS
Type of Work LIGHTING
Project Length in Miles 2.000 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055054 IM I010 () CONSTRUCTION
LIGHTING 2021 $931 $103 $1,034
TOTAL COST: $931 $103 $1,034
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
11 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -10 ProjectDescription
WIDEN I-10 FROM EAST END OF BAYWAY BRIDGE TO 0.5 MILE EAST OF SR-181
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.072 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055816 NHP3 I010 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $13,882 $3,470 $17,352
TOTAL COST: $13,882 $3,470 $17,352
Route I -10 ProjectDescription
RESURFACING ON I-10 FROM SR-59 TO 0.3 MILE EAST OF CR-64 (WILCOX ROAD)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 9.461 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067472 IM I010 (343) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $3,218 $358 $3,576
TOTAL COST: $3,218 $358 $3,576
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
12 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-180 ProjectDescription
SR-180 NEW LOCATION AND WIDENING FROM SR-59 IN GULF SHORES TO FOLEY BEACH EXPRESS
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 4.740 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040566 STPAA 0180 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2021 $3,358 $839 $4,197
100040567 STPAA 0180 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2021 $1,096 $274 $1,370
TOTAL COST: $4,453 $1,113 $5,567
Route SR-180 ProjectDescription
SR-180 WIDENING FR FOLEY BEACH EXPRESS TO SR-161 IN ORANGE BEACH
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.869 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040588 STPAA 0180 (501) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $1,014 $253 $1,267
TOTAL COST: $1,014 $253 $1,267
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
13 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-181 ProjectDescription
SR-181, ADDITIONAL LANES FROM SR-42 (US-98) TO CR-32
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 3.630 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044781 STPAA 0181 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2023 $4,174 $1,044 $5,218
100044782 STPAA 0181 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2023 $2,722 $680 $3,402
TOTAL COST: $6,896 $1,724 $8,620
Route SR-181 ProjectDescription
SR-181, ADDITIONAL LANES FROM CR-32 TO SR-104
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 5.030 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044786 STPAA 0181 (503) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2023 $1,297 $324 $1,622
TOTAL COST: $1,297 $324 $1,622
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
14 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-181 ProjectDescription
HYDRAULIC REVIEW AND DRAINAGE IMPROVEMENTS ALONG SR-181 FROM CR-64 TO SOUTH OF SR-16 (US-90)
Type of Work DRAINAGE CORRECTION
Project Length in Miles 3.160 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062477 STPAA 0181 (507) CONSTRUCTION
DRAINAGE CORRECTION
2020 $656 $164 $820
TOTAL COST: $656 $164 $820
Route SR-42 ProjectDescription
ADD PAVED SHOULDERS ON SR-42 (US-98) FROM BARCLAY AVENUE TO ALABAMA STATE LINE
Type of Work SHOULDER PAVING
Project Length in Miles 1.348 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060029 STPLL 0042 () CONSTRUCTION
SHOULDER PAVING
2020 $265 $66 $331
TOTAL COST: $265 $66 $331
Route SR-42 ProjectDescription
ADD PAVED SHOULDERS ON SR-42 (US-98) FROM HILLCREST RD TO BARCLAY AVE
Type of Work SHOULDER PAVING
Project Length in Miles 0.000 Urban Area LILLIAN(PENSACOLA) COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063635 STPLL 0215 () PRELIMINARY ENGINEERING
SHOULDER PAVING
2021 $20 $5 $25
TOTAL COST: $20 $5 $25
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
15 of 305
HIGHWAY PROJECTS - BALDWIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-1 ProjectDescription
REMOVE (BIN 007606), (BIN 007607) AND PEDESTRIAN (BIN 011380) ON SR-1 (US-431) OVER ABANDONED GEORGIA SOUTHWESTERN RAILROAD. REMOVE AND REPLACE (BIN 007604) AND (BIN 007605) AND REMOVE PEDESTRIAN (BIN 011379) ON SR-1 (US-431) OVER CHEWALLA CREEK
Type of Work OVERPASS REMOVAL
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040558 BR 0001 () RIGHT OF WAY
OVERPASS REMOVAL
2021 $88 $22 $109
100040559 BR 0001 () UTILITIES
OVERPASS REMOVAL
2022 $118 $29 $147
100040561 BR 0001 () CONSTRUCTION
OVERPASS REMOVAL
2022 $4,867 $1,217 $6,084
TOTAL COST: $5,073 $1,268 $6,341
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
16 of 305
HIGHWAY PROJECTS - BARBOUR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-58 ProjectDescription
SLOPE FAILURE REPAIRS ON CR-58 (UNIVERSITY WAY) APPROXIMATELY 0.5 MILE SOUTHEAST OF SR-6 (US-82) AND EXTENDING FOR APPROXIMATELY 100 FT, FHWA DISASTER #AL 2017-01 (DDIR REPORT #BIBB-1)
Type of Work SLIDE CORRECTION
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068471 ER 9020 (907) CONSTRUCTION
SLIDE CORRECTION
2017 $30 $0 $30
TOTAL COST: $30 $0 $30
Route SR-5 ProjectDescription
REPLACE BRIDGE ON SR-5 OVER BLUE GIRTH CREEK (BIN# 002651) AND RELIEF (BIN# 002650)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.555 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049167 BR 0005 (556) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $8,776 $2,194 $10,970
TOTAL COST: $8,776 $2,194 $10,970
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
17 of 305
HIGHWAY PROJECTS - BIBB
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-6 ProjectDescription
BRIDGE REPLACEMENT ON SR-6 (US-82) OVER SANDY CREEK (BIN 1189)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.826 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066953 BR 0006 (573) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $122 $31 $153
100066954 BR 0006 (573) UTILITIES
BRIDGE REPLACEMENT
2020 $165 $41 $206
100066955 BR 0006 (573) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,978 $495 $2,473
TOTAL COST: $2,265 $566 $2,832
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
18 of 305
HIGHWAY PROJECTS - BIBB
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN BLOUNT / ST CLAIR COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061456 STPAA NR13 (934) CONSTRUCTION
SIDEWALK 2019 $103 $26 $129
TOTAL COST: $103 $26 $129
Route SR-53 ProjectDescription
REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038326 BR 0053 (559) RIGHT OF WAY
BRIDGES AND APPROACHES
2020 $23 $6 $29
100003356 BR 0053 () CONSTRUCTION
BRIDGES AND APPROACHES
2022 $210 $53 $263
TOTAL COST: $233 $58 $292
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
19 of 305
HIGHWAY PROJECTS - BLOUNT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-74 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 1.136 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067595 BR 0074 (537) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $868 $217 $1,085
100003565 BR 0074 (537) CONSTRUCTION
BRIDGES AND APPROACHES
2019 $2,897 $724 $3,622
TOTAL COST: $3,766 $941 $4,707
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
20 of 305
HIGHWAY PROJECTS - BLOUNT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-79 ProjectDescription
REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044645 BR 0079 (500) UTILITIES
BRIDGE REPLACEMENT
2023 $296 $74 $370
100003396 BR 0079 (500) CONSTRUCTION
BRIDGE REPLACEMENT
2023 $8,335 $2,084 $10,419
TOTAL COST: $8,631 $2,158 $10,789
Route SR-79 ProjectDescription
SR-79ATSR-160 IN CLEVELAND, TRAFFIC CONTROL SIGNAL, SIGNS, CHANNELIZE BUS DR.,WIDEN FOR LEFT TURN LANES
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.105 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048708 NH 0079 () RIGHT OF WAY
SAFETY IMPROVEMENTS
2021 $171 $43 $213
100040214 NH 0079 (502) CONSTRUCTION
SAFETY IMPROVEMENTS
2021 $1,072 $268 $1,340
TOTAL COST: $1,242 $311 $1,553
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
21 of 305
HIGHWAY PROJECTS - BLOUNT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
REST AREA REPLACEMENT NB AND SB I-65 NEAR GREENVILLE BLDG AND PK
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.041 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100001665 IM I065 (423) CONSTRUCTION
REST AREA REHABILITATION
2020 $9,090 $1,010 $10,100
TOTAL COST: $9,090 $1,010 $10,100
Route I -65 ProjectDescription
SIGN REHABILITATION ALONG I-65 FROM CONECUH CL THROUGH BUTLER, LOWNDES, MONTGOMERY, ELMORE, AND AUTAUGA TO CHILTON CL.
Type of Work SIGN REHABILITATION
Project Length in Miles 92.467 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054300 IM I065 (407) CONSTRUCTION
SIGN REHABILITATION
2020 $3,573 $397 $3,969
TOTAL COST: $3,573 $397 $3,969
Route SR-185 ProjectDescription
ROADWAY IMPROVEMENTS SR-185, INCLUDING ROADWAY WIDENING, SIGNALS AND TURN LANE FROM CR-42 (MANNINGHAM ROAD) TO 0.2 MILE NORTH CR-73 (CAHABA RD)
Type of Work ROADWAY WIDENING
Project Length in Miles 0.670 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056506 STPAA 0185 (501) CONSTRUCTION
ROADWAY WIDENING
2020 $1,401 $350 $1,751
TOTAL COST: $1,401 $350 $1,751
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
22 of 305
HIGHWAY PROJECTS - BUTLER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-440 ProjectDescription
CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054937 STPOA 7448 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $29 $7 $36
100054938 STPOA 7448 () UTILITIES
BRIDGE REPLACEMENT
2021 $19 $5 $24
100054939 STPOA 7448 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $382 $96 $478
TOTAL COST: $430 $107 $537
Route CR-NA ProjectDescription
RESURFACING ALEXANDRIA/JACKSONVILLE HIGHWAY FROM JACKSONVILLE CITY LIMITS TO MCCLELLAN ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064930 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $1,143 $286 $1,428
TOTAL COST: $1,143 $286 $1,428
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
23 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063208 STPOA 0815 (255) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $206 $52 $258
TOTAL COST: $206 $52 $258
Route CR-NA ProjectDescription
RESURFACING, STRIPING, AND DRAINAGE IMPROVEMENTS ON MOUNTAIN STREET NE FROM SR-21 TO 8TH AVENUE NE CITY OF JACKSONVILLE
Type of Work RESURFACING
Project Length in Miles 0.587 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064884 STPOA 0815 (258) CONSTRUCTION
RESURFACING
2019 $377 $94 $472
TOTAL COST: $377 $94 $472
Route CR-NA ProjectDescription
RESURFACING CHURCH AVENUE FROM 11TH STREET TO SR-21
Type of Work RESURFACING
Project Length in Miles 3.350 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064886 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $893 $223 $1,116
TOTAL COST: $893 $223 $1,116
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
24 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064888 STPOA 0815 (260) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $8 $2 $10
100064889 STPOA 0815 (260) UTILITIES
BRIDGE REPLACEMENT
2020 $62 $15 $77
100064890 STPOA 0815 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $734 $184 $918
TOTAL COST: $804 $201 $1,006
Route CR-NA ProjectDescription
RESURFACE WEST 9TH STREET AND CAFFEY DRIVE FROM SR-78 TO BARRY STREET CITY OF OXFORD
Type of Work RESURFACING
Project Length in Miles 2.180 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064892 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $323 $81 $404
TOTAL COST: $323 $81 $404
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
25 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064897 STPOA 0815 () CONSTRUCTION
SIGNALIZATION 2020 $727 $182 $909
TOTAL COST: $727 $182 $909
Route CR-NA ProjectDescription
RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER
Type of Work RESURFACING
Project Length in Miles 0.660 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064899 STPOA 0818 () CONSTRUCTION
RESURFACING
2020 $327 $82 $409
TOTAL COST: $327 $82 $409
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
26 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-204 ProjectDescription
BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049969 BR 0204 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $280 $70 $349
100049971 BR 0204 () CONSTRUCTION
BRIDGE REPLACEMENT
2025 $3,430 $857 $4,287
TOTAL COST: $3,709 $927 $4,637
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
27 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-21 ProjectDescription
SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD
Type of Work SIGNALIZATION
Project Length in Miles 0.015 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047014 STPOA 0021 (516) CONSTRUCTION
SIGNALIZATION 2019 $107 $27 $133
TOTAL COST: $107 $27 $133
Route SR-21 ProjectDescription
TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF LENLOCK LANE AND SR-21 IN THE CITY OF ANNISTON
Type of Work SIGNALIZATION
Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047016 STPOA 0021 (543) CONSTRUCTION
SIGNALIZATION 2019 $170 $42 $212
TOTAL COST: $170 $42 $212
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
28 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-4 ProjectDescription
RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057405 STPOA 0004 (536) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $791 $198 $989
100057406 STPOA 0004 (536) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $94 $23 $117
100057407 STPOA 0004 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $529 $132 $661
TOTAL COST: $1,414 $353 $1,767
Route SR-9 ProjectDescription
REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061463 BR 0009 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $131 $33 $164
100041404 BR 0009 () CONSTRUCTION
BRIDGE REPLACEMENT
2025 $2,996 $749 $3,745
TOTAL COST: $3,127 $782 $3,909
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
29 of 305
HIGHWAY PROJECTS - CALHOUN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -85 ProjectDescription
REPLACEMENT OF WELCOME CENTER ON I-85ATGEORGIA LINE SMALL URBAN LANETT. REST AREA
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054187 IMF I085 (317) CONSTRUCTION
REST AREA REHABILITATION
2019 $11,811 $1,312 $13,123
TOTAL COST: $11,811 $1,312 $13,123
Route I -85 ProjectDescription
PAVEMENT REHABILITATION ON I-85 FROM THE LEE COUNTY LINE (MP 69.068) TO 1.5 MILES NORTH OF CR-388 (MP 71.964)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.896 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066477 IM I085 (360) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $1,880 $209 $2,088
100067306 IM I085 (363) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $8,759 $973 $9,732
TOTAL COST: $10,639 $1,182 $11,821
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
30 of 305
HIGHWAY PROJECTS - CHAMBERS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-77 ProjectDescription
BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF US-431 BIN 2600
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003702 BR 0077 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,204 $551 $2,755
TOTAL COST: $2,204 $551 $2,755
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
31 of 305
HIGHWAY PROJECTS - CHAMBERS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-68 ProjectDescription
BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)
Type of Work BRIDGE REMOVAL
Project Length in Miles 0.266 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049710 BR 0068 (505) UTILITIES
BRIDGE REMOVAL
2019 $17 $4 $21
100049707 BR 0068 (505) CONSTRUCTION
BRIDGE REMOVAL
2020 $3,082 $770 $3,852
TOTAL COST: $3,099 $775 $3,874
Route SR-9 ProjectDescription
BIN #003411 BR REPL AND APP ON SR-9 OVER TERRAPIN CR #9-10-7.4
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003725 BR 0009 (508) CONSTRUCTION
BRIDGES AND APPROACHES
2019 $7,746 $1,936 $9,682
TOTAL COST: $7,746 $1,936 $9,682
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
32 of 305
HIGHWAY PROJECTS - CHEROKEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-145 ProjectDescription
REPLACE BRIDGE ON SR-145 OVER WAXAHATCHEE CREEK, BIN 005318
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.454 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049163 BR 0145 (504) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $6,613 $1,653 $8,266
TOTAL COST: $6,613 $1,653 $8,266
Route SR-3 ProjectDescription
BRIDGE WIDENING BIN# 006916 ON SR-3 (US-31) AT I-65 IN CLANTON (EXIT 205)
Type of Work BRIDGE WIDENING
Project Length in Miles 0.190 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065815 BR 0003 (607) CONSTRUCTION
BRIDGE WIDENING
2019 $1,525 $381 $1,906
TOTAL COST: $1,525 $381 $1,906
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
33 of 305
HIGHWAY PROJECTS - CHILTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-10 ProjectDescription
REPLACE BRIDGE, BIN 003199, SR-10 OVER TUCKABUM CREEK (SUFF=54.2, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049161 BR 0010 (515) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $3,015 $754 $3,769
TOTAL COST: $3,015 $754 $3,769
Route SR-12 ProjectDescription
BRIDGE REPLACEMENT ON SR-12 (US-84) OVER TOMBIGBEE RIVER AND RELIEF BRIDGES BIN # 006199, 006200, 006201 (SUFF = 46.2, STA = 2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 4.225 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040182 BRF 0101 (559) UTILITIES
BRIDGE REPLACEMENT
2022 $479 $120 $599
100038706 BRF 0101 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $20,482 $5,121 $25,603
TOTAL COST: $20,961 $5,240 $26,201
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
34 of 305
HIGHWAY PROJECTS - CHOCTAW
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-39 ProjectDescription
RESURFACE CR-39 (11 MILE POST ROAD) FROM SILVER CREEK ACCESS RD SOUTH 1.050 MILES
Type of Work RESURFACING
Project Length in Miles 1.050 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063538 FLAP-STPNU FLAP (026)
CONSTRUCTION
RESURFACING
2019 $31 $8 $39
TOTAL COST: $31 $8 $39
Route CR-NA ProjectDescription
RESURFACE OLD LOCK 1 ROAD FROM THE PAVEMENT JOINT AT THE OLD LOCK 1 PARK ENTRANCE EAST FOR 1.204 MILES
Type of Work RESURFACING
Project Length in Miles 1.204 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063540 FLAP FLAP (025) CONSTRUCTION
RESURFACING
2018 $165 $94 $259
TOTAL COST: $165 $94 $259
Route SR-13 ProjectDescription
RELOCATE INTERSECTION SR-13 (US-43)ATCR-3 (MCVAY RD) FROM 0.1 MILE N OF CR-484 (TELLIE TRAIL) TO 0.4 MILE NORTH OF CR-3 (MCVAY RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.670 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054558 NH 0013 (564) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $420 $105 $526
TOTAL COST: $420 $105 $526
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
35 of 305
HIGHWAY PROJECTS - CLARKE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-18 ProjectDescription
CR-18 BRIDGE REPLACEMENT OVER TALLAPOOSA RIVER BIN # 12270 (R.A.M.P.)
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060386 ACBRZ60386 ATRP (013)
CONSTRUCTION
BRIDGE 2019 $2,104 $526 $2,630
TOTAL COST: $2,104 $526 $2,630
Route SR-46 ProjectDescription
SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN# 2108) NORTH OF I-20
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.070 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049186 BR 0046 (503) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,943 $736 $3,679
TOTAL COST: $2,943 $736 $3,679
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
36 of 305
HIGHWAY PROJECTS - CLEBURNE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-167 ProjectDescription
BRIDGE REPLACEMENT AND NEW ALIGNMENT ON SR-167 OVER PEA RIVER WITH RELIEF BRIDGES (BINS # 006033, 006034 AND 006035)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.183 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061396 BRF 0167 (508) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $10,874 $2,719 $13,593
TOTAL COST: $10,874 $2,719 $13,593
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
37 of 305
HIGHWAY PROJECTS - COFFEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
IMPROV TO RIVER RD FR BRICK HATTON TO SR-184, FRANKFORD RD FR LITTLE BEAR CR TO TUSCUMBIA CL, WOODMONT DR FR PONDEROSA DR TO TUSCUMBIA CL, RIVER RD FROM SR-133 TO FORD RD, LIME KILN RD, CO LN RD FR SR-20 TO OLD HWY 20, SOCKWELL LN FR SR-157 TO SR-20
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065034 STPOA 1716 () CONSTRUCTION
RESURFACING
2022 $2,409 $602 $3,011
TOTAL COST: $2,409 $602 $3,011
Route CR-NA ProjectDescription
RESURFACING, LEVELING, AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET INCLUDING NORFOLK-SOUTHERN RAILROAD CROSSING
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056076 STPOA 8822 (601) RIGHT OF WAY
RESURFACING
2019 $495 $124 $619
100056077 STPOA 8822 (601) UTILITIES
RESURFACING
2020 $91 $23 $114
100056078 STPOA 8822 (601) CONSTRUCTION
RESURFACING
2020 $1,856 $464 $2,320
TOTAL COST: $2,442 $611 $3,053
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
38 of 305
HIGHWAY PROJECTS - COLBERT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
VARIOUS STREET IMPROVEMENTS ON N COMMONS ST W, N COMMONS ST E, KING ST, 6TH ST, E COMMONS ST N, E COMMONS ST S, JOE WHEELER DR, N DICKSON ST, E 5TH ST, HOOK ST
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065036 STPOA 1716 (250) CONSTRUCTION
RESURFACING
2019 $1,771 $443 $2,214
TOTAL COST: $1,771 $443 $2,214
Route CR-NA ProjectDescription
NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067955 FLAP FLAP () CONSTRUCTION
RESURFACING
2019 $4,170 $1,042 $5,212
TOTAL COST: $4,170 $1,042 $5,212
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
39 of 305
HIGHWAY PROJECTS - COLBERT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-2 ProjectDescription
REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055932 BRF 0002 (529) UTILITIES
BRIDGES AND APPROACHES
2019 $273 $68 $342
100049340 BRF 0002 (529) CONSTRUCTION
BRIDGES AND APPROACHES
2019 $4,246 $1,061 $5,307
TOTAL COST: $4,519 $1,130 $5,649
Route SR-20 ProjectDescription
SAFETY IMPROVEMENTS TO INTERSECTION OF SR-20 AND SR-157
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056500 NH 0020 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $767 $192 $959
TOTAL COST: $767 $192 $959
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
40 of 305
HIGHWAY PROJECTS - COLBERT
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.277 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057625 IM I065 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $22,743 $2,527 $25,270
TOTAL COST: $22,743 $2,527 $25,270
Route SR-12 ProjectDescription
SR-12 (US-84) ADDITIONAL LANES FROM MP 96.3 TO I-65
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.860 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064652 HPPF A107 (900) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2019 $333 $83 $416
100064653 HPPF-NHF A107 (900) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $4,789 $1,197 $5,986
TOTAL COST: $5,122 $1,281 $6,403
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
41 of 305
HIGHWAY PROJECTS - CONECUH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
CULVERT REPLACEMENT ON SANDERS ROAD OVER AN UNNAMED TRIBUTARY TO THE YELLOW RIVER - CCP 20-365-17
Type of Work DRAINAGE CORRECTION
Project Length in Miles 1.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068177 FLAP FLAP (020) CONSTRUCTION
DRAINAGE CORRECTION
2019 $120 $30 $150
TOTAL COST: $120 $30 $150
Route SR-12 ProjectDescription
RESURFACE AND 2' SAFETY WIDENING, FLATTEN SLOPES, EXTEND DRAINAGE STRUCTURES, ACQUIRE RIGHT OF WAY AND BRIDGE RAIL RETROFITS ON SR-12 (US-84) FROM CONECUH COUNTY TO WEST END OF ARROW LOOP RD.
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 4.024 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058169 NH-HSIP 0012 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $222 $52 $275
100058171 NH-HSIP 0012 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $3,317 $778 $4,094
TOTAL COST: $3,539 $830 $4,369
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
42 of 305
HIGHWAY PROJECTS - COVINGTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-9 ProjectDescription
BRIDGE REPLACEMENT (BIN 002285) ON SR-9 (US-331) OVER LIGHTWOOD KNOT CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.380 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033503 BR 0009 (573) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $288 $72 $360
100038583 BR 0009 (573) UTILITIES
BRIDGE REPLACEMENT
2021 $292 $73 $365
100033501 BR 0009 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,891 $723 $3,613
TOTAL COST: $3,470 $868 $4,338
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
43 of 305
HIGHWAY PROJECTS - COVINGTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-9 ProjectDescription
US-331, ADL LNS FR CR-17 AT SARDIS TO CR-5 N OF HIGHLAND HOME
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 6.682 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004066 NH 0009 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2024 $2,787 $697 $3,483
100038584 NH 0009 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2025 $2,828 $707 $3,535
100004061 NH 0009 () CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2026 $22,313 $5,578 $27,892
TOTAL COST: $27,928 $6,982 $34,910
Route SR-9 ProjectDescription
REPLACE BRIDGE, BIN 003021, SR-9 (US-331) OVER PATSALIGA CREEK (SUFF=57.9, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.400 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068211 BR 0009 (541) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $485 $121 $606
100049232 BR 0009 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $7,324 $1,831 $9,155
TOTAL COST: $7,809 $1,952 $9,761
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
44 of 305
HIGHWAY PROJECTS - CRENSHAW
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON CONVENT ROAD NORTH EAST OVER EIGHTMILE CREEK BIN# 6659
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061111 ACBR61111 ATRP (013) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,390 $348 $1,738
TOTAL COST: $1,390 $348 $1,738
Route I -65 ProjectDescription
I-65 RECONSTRUCT NORTH AND SOUTH BOUND LANES AND ADDITIONAL LANES AND WIDEN OVERPASS SR-91
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 5.960 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063586 NH I065 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2023 $1,733 $433 $2,166
TOTAL COST: $1,733 $433 $2,166
Route I -65 ProjectDescription
NEW LIGHTING SYSTEM FOR REST AREA ON I-65 IN CULLMAN COUNTY
Type of Work LIGHTING
Project Length in Miles 1.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057470 IM I065 (481) CONSTRUCTION
LIGHTING 2019 $1,530 $170 $1,700
TOTAL COST: $1,530 $170 $1,700
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
45 of 305
HIGHWAY PROJECTS - CULLMAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON I-65 FROM SOUTH OF CR-222 (MP 304.100) TO SR-74 (US-278) AT MP 307.500
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 3.400 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067549 IM I065 (495) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $4,350 $483 $4,833
100066223 IM I065 (482) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $14,973 $1,664 $16,636
TOTAL COST: $19,322 $2,147 $21,469
Route I -65 ProjectDescription
RESURFACE I-65 FROM HURRICANE CREEK (MP 315.665) TO SOUTH OF THE CSX RAILROAD BRIDGE (MP 319.055)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.393 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066225 IM I065 (490) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $1,783 $198 $1,981
TOTAL COST: $1,783 $198 $1,981
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
46 of 305
HIGHWAY PROJECTS - CULLMAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-157 ProjectDescription
SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 4.417 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038840 NH 0157 (506) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $230 $58 $288
100038842 NH 0157 (506) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $19,935 $4,984 $24,919
TOTAL COST: $20,165 $5,041 $25,207
Route SR-69 ProjectDescription
ADDITIONAL LANES ON SR-69 FROM 4TH AVE. WEST OF EIGHT MILE CREEK TO EASTPOINT (INT. OF SR-69 AND US-278)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.810 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043195 NH A103 (900) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2023 $4,841 $1,210 $6,051
TOTAL COST: $4,841 $1,210 $6,051
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
47 of 305
HIGHWAY PROJECTS - CULLMAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-74 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON SR-74 (US-278) OVER CROOKED CREEK, BIN 001617
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 1.610 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068184 BR 0074 () RIGHT OF WAY
BRIDGES AND APPROACHES
2021 $82 $21 $103
100068185 BR 0074 () UTILITIES
BRIDGES AND APPROACHES
2023 $84 $21 $105
100068183 BR 0074 () CONSTRUCTION
BRIDGES AND APPROACHES
2023 $7,567 $1,892 $9,459
TOTAL COST: $7,734 $1,933 $9,667
Route SR-91 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068171 BR 0091 () RIGHT OF WAY
BRIDGES AND APPROACHES
2021 $82 $21 $103
100068172 BR 0091 () UTILITIES
BRIDGES AND APPROACHES
2022 $83 $21 $104
100068170 BR 0091 () CONSTRUCTION
BRIDGES AND APPROACHES
2022 $4,579 $1,145 $5,723
TOTAL COST: $4,744 $1,186 $5,930
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
48 of 305
HIGHWAY PROJECTS - CULLMAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-47 ProjectDescription
RESURFACE CR-47 FROM DALE/HOUSTON COUNTY LINE TO SR-134 (GISSENDANNER ROAD)
Type of Work RESURFACING
Project Length in Miles 5.180 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065700 STPOA 2316 () CONSTRUCTION
RESURFACING
2020 $729 $182 $912
TOTAL COST: $729 $182 $912
Route CR-47 ProjectDescription
RESURFACING CR-47 FROM SR-134 TO THE HOUSTON COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 1.020 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062463 STPOA 2314 () CONSTRUCTION
RESURFACING
2020 $722 $181 $903
TOTAL COST: $722 $181 $903
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
49 of 305
HIGHWAY PROJECTS - DALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICT 5) PHASE 3
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060243 STPAA NR13 () CONSTRUCTION
SIDEWALK 2020 $185 $46 $231
TOTAL COST: $185 $46 $231
Route SR-14 ProjectDescription
BRIDGE REPLACEMENT ON SR-14 AT BLUE GIRTH SWAMP (BIN 1556 AND 1557)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.261 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061670 BR 0014 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $3,215 $804 $4,018
TOTAL COST: $3,215 $804 $4,018
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
50 of 305
HIGHWAY PROJECTS - DALLAS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-22 ProjectDescription
REPL BIN 008103 ON SR-22 OVER SOUTHERN RR NEAR SAFFORD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002696 BR 0201 (513) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2022 $141 $35 $176
TOTAL COST: $141 $35 $176
Route SR-22 ProjectDescription
SR-22 FR END OF EXISTING 4-LN TO CR-63
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 5.436 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008928 STPAA 0022 (504) UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $2,149 $537 $2,686
100008924 STPAA 0022 (504) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $20,977 $5,244 $26,221
TOTAL COST: $23,125 $5,781 $28,907
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
51 of 305
HIGHWAY PROJECTS - DALLAS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 7.750 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066508 IM I059 () CONSTRUCTION
PAVEMENT REHABILITATION
2020 $32,133 $3,570 $35,704
TOTAL COST: $32,133 $3,570 $35,704
Route NA- ProjectDescription
WELCOME CENTER REHABILITATION ALONG I-59 NEAR GEORGIA STATE LINE
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047076 IM I059 (334) CONSTRUCTION
REST AREA REHABILITATION
2022 $9,273 $1,030 $10,303
TOTAL COST: $9,273 $1,030 $10,303
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN DEKALB AND JACKSON COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060151 STPAA NR13 () CONSTRUCTION
SIDEWALK 2020 $156 $39 $195
TOTAL COST: $156 $39 $195
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
52 of 305
HIGHWAY PROJECTS - DEKALB
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-7 ProjectDescription
REPL BR, BIN 000481, SR-7 (US-11) OVER DRY CREEK (SUFF=66.9, STAT=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.021 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100041641 BR 0007 (529) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,807 $452 $2,259
TOTAL COST: $1,807 $452 $2,259
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
53 of 305
HIGHWAY PROJECTS - DEKALB
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-59 ProjectDescription
INSTALL MICRO-SURFACING PAVEMENT AND TRAFFIC STRIPE ON CR-59 (FIRETOWER ROAD) FROM CR-8 (REDLAND ROAD) NORTH TO SR-14
Type of Work RESURFACING
Project Length in Miles 3.900 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067724 STPMN 2618 () CONSTRUCTION
RESURFACING
2019 $143 $36 $179
TOTAL COST: $143 $36 $179
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
54 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-8 ProjectDescription
WIDENING ON CR-8 (REDLAND ROAD) FROM SR-9 (US-231) TO CR-4 (RIFLE RANGE ROAD) AND BRIDGE REPLACEMENT AT HARWELL MILL CREEK (BIN #10936) AND INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.480 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063232 STPAA 2615 (250) UTILITIES
WIDENING AND RESURFACING (RDWY)
2019 $400 $100 $500
100063233 STPMN 2615 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,200 $300 $1,500
100067261 STPMN 2615 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $1,520 $380 $1,900
TOTAL COST: $3,120 $780 $3,900
Route CR-8 ProjectDescription
INSTALL MICRO-SURFACING PAVEMENT AND TRAFFIC STRIPE ON CR-8 (REDLAND ROAD) FROM THE INTERSECTION OF CR-4 (RIFLE RANGE ROAD) TO CR-116 (MARSHELL ROAD)
Type of Work RESURFACING
Project Length in Miles 7.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067722 STPMN 2618 () CONSTRUCTION
RESURFACING
2019 $276 $69 $345
TOTAL COST: $276 $69 $345
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
55 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN TO ACCOMMODATE A CENTER TURN LANE ON RIFLE RANGE RD FROM DOZIER RD TO TOLL BRIDGE RD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063705 STPMN 2615 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2021 $480 $120 $600
TOTAL COST: $480 $120 $600
Route CR-NA ProjectDescription
RESURFACE, SIDEWALK IMPROVEMENTS, LANDSCAPING AND PEDESTRIAN LIGHTING FIXTURES ON SOUTH MAIN ST FROM EAST BRIDGE ST TO US-231 (SR-9)
Type of Work RESURFACING
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056090 STPMN CN11 () CONSTRUCTION
RESURFACING
2020 $640 $160 $800
TOTAL COST: $640 $160 $800
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
56 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON COMPANY STREET, HILL STREET AND ORLINE STREET; RESURFACING, LANDSCAPING AND DECORATIVE LIGHTING FIXTURES ON COURT STREET, EAST BRIDGE FROM SOUTH MAIN STREET TO HILL STREET IN THE CITY OF WETUMPKA
Type of Work RESURFACING
Project Length in Miles 0.300 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063025 STPAA 2615 (252) CONSTRUCTION
RESURFACING
2019 $386 $96 $482
TOTAL COST: $386 $96 $482
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT COOSADA PARKWAY AND COOSADA ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063710 STPMN 2615 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100063711 STPMN 2619 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2023 $160 $40 $200
TOTAL COST: $200 $50 $250
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
57 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT COOSADA PARKWAY AND ALABAMA RIVER PARKWAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063712 STPMN 2615 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100063713 STPMN 2615 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $160 $40 $200
TOTAL COST: $200 $50 $250
Route CR-NA ProjectDescription
RESURFACE POSSOM TROT ROAD FROM COOSA RIVER ROAD TO LIGHTWOOD ROAD
Type of Work RESURFACING
Project Length in Miles 1.800 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063716 STPMN 2615 () PRELIMINARY ENGINEERING
RESURFACING
2020 $4 $1 $5
100063717 STPMN 2615 () CONSTRUCTION
RESURFACING
2020 $252 $63 $315
TOTAL COST: $256 $64 $320
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
58 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE, DRAINAGE IMPROVEMENTS AND BIKE LANES ON BROWNS ROAD FROM SR-143 (MAIN STREET) TO SR-14
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064614 STPAA 2615 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $304 $76 $380
TOTAL COST: $304 $76 $380
Route I -65 ProjectDescription
INTERCHANGE LIGHTING ON I-65 AT SR-14 (EXIT 181) - PRATTVILLE / MILLBROOK
Type of Work LIGHTING
Project Length in Miles 1.200 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055339 IM I065 (418) CONSTRUCTION
LIGHTING 2020 $1,636 $182 $1,818
TOTAL COST: $1,636 $182 $1,818
Route NA- ProjectDescription
ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICTS 1 AND 3)
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060170 STPAA NR13 (925) CONSTRUCTION
SIDEWALK 2020 $168 $42 $210
TOTAL COST: $168 $42 $210
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
59 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-14 ProjectDescription
ADD LANE SR-14 FROM 0.5 MILE WEST CR-3 (INGRAM RD) TO CR-153 (COOSADA PKWY)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.870 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064189 STPAA 0014 (541) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2025 $3,774 $943 $4,717
100064194 STPAA 0014 (541) UTILITIES
ADDITIONAL ROADWAY LANES
2026 $803 $201 $1,004
100054496 STPAA 0014 (541) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2026 $10,264 $2,566 $12,830
TOTAL COST: $14,841 $3,710 $18,552
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
60 of 305
HIGHWAY PROJECTS - ELMORE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
RESURFACING ON I-65 FROM SR-21 TO 0.4 MILE NORTH OF CR-40
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 12.280 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066470 IM I065 (491) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $20,044 $2,227 $22,271
TOTAL COST: $20,044 $2,227 $22,271
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
61 of 305
HIGHWAY PROJECTS - ESCAMBIA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR- NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM SR-25 (US-411/RAINBOW DRIVE) TO SR-1 (US-278 WEST MEIGHAN BLVD) IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064628 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2020 $45 $11 $56
TOTAL COST: $45 $11 $56
Route CR-290 ProjectDescription
WIDENING, RESURFACING AND TRAFFIC STRIPE ON LAY SPRINGS ROAD AND MOON ROAD FROM GADSDEN CITY LIMITS TO TABOR ROAD (CR-291)
Type of Work RESURFACING
Project Length in Miles 6.700 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056668 STPOA 2814 (252) CONSTRUCTION
RESURFACING
2019 $2,175 $544 $2,719
TOTAL COST: $2,175 $544 $2,719
Route CR-330 ProjectDescription
RESURFACE CR-330 (TIDMORE BEND ROAD) FROM CR-345 (WHITE CHAPEL RD) TO COOSA RIVER
Type of Work RESURFACING
Project Length in Miles 4.170 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050715 STPOA 2814 () CONSTRUCTION
RESURFACING
2020 $633 $158 $791
TOTAL COST: $633 $158 $791
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
62 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE SOUTH 11TH STREET FROM CR-203 (BLACK CREEK PARKWAY) TO NEAR PIEDMONT AVENUE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.560 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048747 STPOA 8121 (601) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,830 $492 $2,322
TOTAL COST: $1,830 $492 $2,322
Route CR-NA ProjectDescription
ADDITIONAL LANES ON LUMLEY ROAD FROM STEELE STATION ROAD TO SR-25 (US-411)IN RAINBOW CITY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.400 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063550 STPOA 2815 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2020 $158 $158 $315
100063551 STPOA 2815 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2020 $1,064 $266 $1,330
100063552 STPOA 2815 () UTILITIES
ADDITIONAL ROADWAY LANES
2021 $1,055 $264 $1,318
100063553 STPOA 2815 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2022 $2,739 $685 $3,423
TOTAL COST: $5,015 $1,372 $6,387
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
63 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING CHURCH STREET FROM SR-77 TO SR-25 (US-411)IN RAINBOW CITY
Type of Work RESURFACING
Project Length in Miles 0.250 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063621 STPOA 2815 () CONSTRUCTION
RESURFACING
2019 $104 $26 $130
TOTAL COST: $104 $26 $130
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON NORTH COLLEGE STREET FROM RAILROAD AVENUE TO RABBITTOWN ROAD
Type of Work RESURFACING
Project Length in Miles 2.385 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064395 STPOA 2818 (250) CONSTRUCTION
RESURFACING
2019 $438 $110 $548
TOTAL COST: $438 $110 $548
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
64 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING MAIN STREET FROM SR-1 (US-431) TO NORTH OF HATLEY AVENUE IN THE CITY OF GLENCOE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064389 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2020 $29 $7 $36
100064392 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $282 $70 $352
TOTAL COST: $310 $78 $388
Route CR-NA ProjectDescription
RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064394 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $306 $77 $383
TOTAL COST: $306 $77 $383
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
65 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064625 STPOA 2815 (252) CONSTRUCTION
PAVEMENT REHABILITATION
2020 $374 $94 $468
TOTAL COST: $374 $94 $468
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM SR-25 (US-411/RAINBOW DRIVE) TO SR-1 (US-278 WEST MEIGHAN BLVD) IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064629 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $255 $64 $318
TOTAL COST: $255 $64 $318
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064638 STPOA 2815 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,429 $357 $1,787
TOTAL COST: $1,429 $357 $1,787
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
66 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CHESTNUT STREET FROM 5TH STREET TO BLACK CREEK IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064640 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $290 $73 $363
TOTAL COST: $290 $73 $363
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064641 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2019 $42 $11 $53
100064642 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $243 $61 $304
TOTAL COST: $285 $71 $357
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
67 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON RANDALL STREET FROM 6TH STREET TO 11TH STREET IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064643 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2020 $25 $6 $31
100064644 STPOA 2815 () CONSTRUCTION
RESURFACING
2020 $140 $35 $174
TOTAL COST: $164 $41 $205
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON FORREST AVENUE OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 000741
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064645 STPOA 2815 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $187 $47 $234
100064646 STPOA 2815 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,072 $268 $1,340
TOTAL COST: $1,259 $315 $1,574
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
68 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON GEORGE WALLACE DRIVE OVER NOWLIN BRANCH IN THE CITY OF GADSDEN BIN# 011233
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064650 STPOA 2815 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $126 $32 $158
100064651 STPOA 2815 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $715 $179 $893
TOTAL COST: $841 $210 $1,051
Route CR-NA ProjectDescription
PARTIAL REALIGNMENT AND RESURFACING OF SOUTH 11TH STREET FROM THE BRIDGE OVER BLACK CREEK TO RANDALL STREET IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064654 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2020 $68 $17 $85
100064655 STPOA 2815 () CONSTRUCTION
RESURFACING
2021 $390 $97 $487
TOTAL COST: $458 $114 $572
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
69 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN ETOWAH COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061454 STPAA NR13 () CONSTRUCTION
SIDEWALK 2020 $36 $9 $45
TOTAL COST: $36 $9 $45
Route SR-205 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON SR 205 OVER ATN RAILROAD (BIN 000438) (SUFF = 47.4)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.380 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064725 BR 0205 (507) RIGHT OF WAY
BRIDGES AND APPROACHES
2020 $84 $21 $105
100064724 BR 0205 (507) UTILITIES
BRIDGES AND APPROACHES
2020 $63 $16 $79
100064723 BR 0205 () CONSTRUCTION
BRIDGES AND APPROACHES
2021 $2,403 $601 $3,004
TOTAL COST: $2,550 $638 $3,188
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
70 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-211 ProjectDescription
WIDENING AND RESURFACING OF SR-211 (NOCCALULA ROAD) FROM TABOR ROAD TO SCENIC DRIVE IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 1.210 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064657 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2020 $89 $22 $111
100064658 STPOA 2815 () CONSTRUCTION
RESURFACING
2021 $1,494 $374 $1,868
TOTAL COST: $1,583 $396 $1,978
Route SR-77 ProjectDescription
SR-77 FROM SR-7 (US-11) TO SR-1 (US-431) (ADDITIONAL LANES)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 3.212 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004854 NH 0077 () PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2021 $1,334 $333 $1,667
TOTAL COST: $1,334 $333 $1,667
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
71 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-77 ProjectDescription
SR-77 FR I-59 RAMP(WEST SIDE) TO US-11 IN ATTALLA
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.800 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064756 NH 0077 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2021 $425 $106 $531
100054836 NH 0077 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2021 $1,198 $299 $1,497
100049111 NH 0077 () UTILITIES
ADDITIONAL ROADWAY LANES
2024 $924 $231 $1,155
100004852 NH 0077 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2024 $6,439 $1,610 $8,049
TOTAL COST: $8,985 $2,246 $11,231
Route SR-77 ProjectDescription
REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.600 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050052 BR A181 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $16,741 $4,185 $20,926
TOTAL COST: $16,741 $4,185 $20,926
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
72 of 305
HIGHWAY PROJECTS - ETOWAH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-433 ProjectDescription
BRIDGE REPLACEMENT CR-433 (SELMAN ROAD) OVER BOXES CREEK BIN # 11440 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060329 ACBRZ60329 ATRP () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $686 $171 $857
TOTAL COST: $686 $171 $857
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ON SR-18 AND SR-171 IN FAYETTE COUNTY AND SR-17, SR-18, SR-96 AND SR-118 IN LAMAR COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061462 STPAA NR13 (944) CONSTRUCTION
SIDEWALK 2019 $162 $41 $203
TOTAL COST: $162 $41 $203
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
73 of 305
HIGHWAY PROJECTS - FAYETTE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-13 ProjectDescription
SR-13 BRIDGE REPLACEMENT OVER CLEAR CREEK (BIN 005845) AND BRIDGE REMOVAL OVER SOUTHERN RR (ABAND) (BIN 005846)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.450 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038407 BR 0013 (513) RIGHT OF WAY
BRIDGE REPLACEMENT
2022 $24 $6 $30
100038406 BR 0013 (513) CONSTRUCTION
BRIDGE REPLACEMENT
2024 $5,236 $1,309 $6,545
TOTAL COST: $5,260 $1,315 $6,574
Route SR-18 ProjectDescription
BRIDGE REPLACEMENT SR-18 (US-43) OVER DEADWATER CREEK WEST OF BANKSTON, BIN 000278
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.570 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061122 RP-BR 0018 (505) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,997 $749 $3,746
TOTAL COST: $2,997 $749 $3,746
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
74 of 305
HIGHWAY PROJECTS - FAYETTE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-19 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-19 AND SR-172 AND SR-172 AND SR-187
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063461 STPAA 0019 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2021 $64 $16 $80
100063462 STPAA 0019 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2021 $149 $37 $186
100063463 STPAA 0019 () UTILITIES
INTERSECTION IMPROVEMENTS
2022 $249 $62 $311
100063464 STPAA 0019 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2022 $343 $86 $429
TOTAL COST: $804 $201 $1,005
Route SR-24 ProjectDescription
INTERCHANGE LIGHTING AT SR-24 (CORR V) AND SR-19
Type of Work LIGHTING
Project Length in Miles 0.760 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060599 NH 0024 () CONSTRUCTION
LIGHTING 2020 $841 $210 $1,051
TOTAL COST: $841 $210 $1,051
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
75 of 305
HIGHWAY PROJECTS - FRANKLIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-243 ProjectDescription
BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.025 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049146 BR 0243 (504) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $285 $71 $357
100049147 BR 0243 (504) UTILITIES
BRIDGE REPLACEMENT
2020 $115 $29 $144
100040791 BR 0243 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $1,734 $434 $2,168
TOTAL COST: $2,135 $534 $2,669
Route SR-247 ProjectDescription
REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049911 BR 0247 (501) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
100049912 BR 0247 (501) UTILITIES
BRIDGE REPLACEMENT
2020 $57 $14 $72
100049913 BR 0247 (501) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $4,255 $1,064 $5,318
TOTAL COST: $4,369 $1,092 $5,461
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
76 of 305
HIGHWAY PROJECTS - FRANKLIN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CURB RAMP INSTALLATIONS AND MODIFICATIONS ON STATE ROUTES AT VARIOUS LOCATIONS IN GENEVA AND HOUSTON COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060276 STPAA NR13 () CONSTRUCTION
SIDEWALK 2020 $589 $147 $736
TOTAL COST: $589 $147 $736
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
77 of 305
HIGHWAY PROJECTS - GENEVA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
NORTHBOUND AND SOUTHBOUND REST AREA RENOVATIONS ALONG I-59 AT EUTAW
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049320 IM I059 () CONSTRUCTION
REST AREA REHABILITATION
2023 $670 $74 $744
TOTAL COST: $670 $74 $744
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN GREENE AND PICKENS COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060103 STPAA NR13 (926) CONSTRUCTION
SIDEWALK 2020 $236 $59 $295
TOTAL COST: $236 $59 $295
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
78 of 305
HIGHWAY PROJECTS - GREENE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-103 ProjectDescription
BRIDGE REPLACEMENT CR-103 (ERIE ROAD) OVER TRIBUTARY TO WRIGHTS CREEK BIN # 5036 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060342 ACBRZ60342 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $241 $60 $301
TOTAL COST: $241 $60 $301
Route CR-103 ProjectDescription
BRIDGE REPLACEMENT CR-103 (ERIE ROAD) OVER BAPTIZING BRANCH BIN # 5035 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060346 ACBRZ60346 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $267 $67 $333
TOTAL COST: $267 $67 $333
Route CR-12 ProjectDescription
RESURFACE CR-12 FROM SR-25 TO SR-61 (R.A.M.P.)
Type of Work RESURFACING
Project Length in Miles 4.010 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060354 ACNU60354 ATRP (012) CONSTRUCTION
RESURFACING
2018 $1,084 $271 $1,355
TOTAL COST: $1,084 $271 $1,355
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
79 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-16 ProjectDescription
BRIDGE REPLACEMENT CR-16 OVER BIG GERMAN CREEK BIN # 8278
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060350 ACBRZ60350 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $126 $32 $158
TOTAL COST: $126 $32 $158
Route CR-16 ProjectDescription
BRIDGE REPLACEMENT (RELIEF) CR-16 OVER BIG GERMAN CREEK BIN # 7946
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060351 ACBRZ60351 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $342 $85 $427
TOTAL COST: $342 $85 $427
Route CR-16 ProjectDescription
RESURFACE CR-16 FROM SR-25 TO SR-61 (R.A.M.P.)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060355 ACNU60355 ATRP (012) CONSTRUCTION
RESURFACING
2018 $991 $248 $1,239
TOTAL COST: $991 $248 $1,239
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
80 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-192 ProjectDescription
BRIDGE REPLACEMENT CR-192 (DUNKIN LOOP ROAD) OVER HARDIN CREEK BIN # 3708 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060336 ACBRZ60336 ATRP (006)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $406 $101 $507
TOTAL COST: $406 $101 $507
Route CR-198 ProjectDescription
BRIDGE REPLACEMENT CR-198 (DAVID CAMPBELL ROAD) OVER GILE CREEK BIN # 12515 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060344 ACBRZ60344 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $404 $101 $504
TOTAL COST: $404 $101 $504
Route CR-2 ProjectDescription
REPLACE BRIDGE CR-2 OVER YELLOW CREEK TRIBUTARY BIN # 15728
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060353 ACBRZ60353 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $90 $22 $112
TOTAL COST: $90 $22 $112
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
81 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-21 ProjectDescription
REPLACE BRIDGE (CR-21) SOUTH BYPASS BIN # 7050 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060356 ACBRZ60356 ATRP (014)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $306 $76 $382
TOTAL COST: $306 $76 $382
Route CR-28 ProjectDescription
REPLACE BRIDGE CR-28 OVER BIG GERMAN CREEK TRIBUTARY BIN # 2825
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060352 ACBRZ60352 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $90 $22 $112
TOTAL COST: $90 $22 $112
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
82 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-40 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK AND TRIBUTARY TO GREER CREEK BIN # 5029 AND 6854 BIN# 5030 (R.A.M.P.)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060338 ACBRZ60338 ATRP (006)
CONSTRUCTION
BRIDGES AND APPROACHES
2019 $698 $174 $872
TOTAL COST: $698 $174 $872
Route CR-50 ProjectDescription
BRIDGE REPLACEMENT CR-50 OVER ELLIOT'S CREEK BIN # 9729
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060348 ACBR60348 ATRP (012) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $360 $90 $450
TOTAL COST: $360 $90 $450
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
83 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-51 ProjectDescription
BRIDE REPLACEMENT (RELIEF) OVER BIG BRUSH CREEK ON CR-51 BIN # 10051
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060349 ACBRZ60349 ATRP (012)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $358 $89 $447
TOTAL COST: $358 $89 $447
Route NA- ProjectDescription
WETLAND MITIGATION AREA AT PRAIRIE CREEK
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064688 STPAA 3315 () CONSTRUCTION
UNCLASSIFIED 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN PERRY AND HALE COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060105 STPAA NR13 () CONSTRUCTION
SIDEWALK 2020 $276 $69 $345
TOTAL COST: $276 $69 $345
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
84 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-25 ProjectDescription
RESURFACING AND LIME STABILIZATION ON SR-25 FROM 1.7 MILES SOUTH CR-10 (MP-41.180) TO PICKS CREEK (MP-48.026).
Type of Work RESURFACING
Project Length in Miles 6.846 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057824 STPAA 0025 (535) CONSTRUCTION
RESURFACING
2021 $2,436 $609 $3,045
TOTAL COST: $2,436 $609 $3,045
Route SR-25 ProjectDescription
RESURFACING AND LIME STABILIZATION ON SR-25 FROM MARENGO COUNTY LINE (MP 37.007) TO .35 MILE SOUTH OF CR-57 (MP 41.153) AND FROM .65 MILE SOUTH OF CR-54 (MP 48.180) TO INTERSECTION OF SR-69 IN GREENSBORO.
Type of Work RESURFACING
Project Length in Miles 7.580 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057826 STPAA 0025 (536) CONSTRUCTION
RESURFACING
2021 $876 $219 $1,095
TOTAL COST: $876 $219 $1,095
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
85 of 305
HIGHWAY PROJECTS - HALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-10 ProjectDescription
REPLACE BRIDGE, BIN 002543, SR-10 OVER MCRAE MILL CREEK (SUFF=55.2, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.086 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049234 BR 0010 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $4,040 $1,010 $5,050
TOTAL COST: $4,040 $1,010 $5,050
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
86 of 305
HIGHWAY PROJECTS - HENRY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-25 ProjectDescription
CR-25 (DENTON RD) ADD LANES FROM SR-210 (ROSS CLARK CIRCLE) TO WESTGATE PARKWAY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.203 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008618 STPOA 9450 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $4,331 $2,231 $6,561
TOTAL COST: $4,331 $2,231 $6,561
Route CR-33 ProjectDescription
RESURFACE CR-33 FROM THE SOUTH CITY LIMIT OF ASHFORD TO OLD US HIGHWAY 84
Type of Work RESURFACING
Project Length in Miles 1.290 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065701 STPOA 3516 () CONSTRUCTION
RESURFACING
2021 $193 $48 $241
TOTAL COST: $193 $48 $241
Route CR-41 ProjectDescription
RESURFACE CR-41 (WALDEN DRIVE) FROM KINSEY ROAD TO BROAD STREET
Type of Work RESURFACING
Project Length in Miles 1.770 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065702 STPOA 3516 () CONSTRUCTION
RESURFACING
2021 $326 $82 $408
TOTAL COST: $326 $82 $408
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
87 of 305
HIGHWAY PROJECTS - HOUSTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-51 ProjectDescription
RESURFACE CR-51 (BETHEL ROAD) FROM CR-41 (BROAD STREET) TO SR-1 (US-431)
Type of Work RESURFACING
Project Length in Miles 0.890 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065705 STPOA 3516 () CONSTRUCTION
RESURFACING
2022 $148 $37 $185
TOTAL COST: $148 $37 $185
Route CR-55 ProjectDescription
RESURFACE CR-55 (BROADWAY STREET) FROM THE SOUTH CITY LIMIT OF ASHFORD TO OLD US HIGHWAY 84
Type of Work RESURFACING
Project Length in Miles 0.830 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065706 STPOA 3516 () CONSTRUCTION
RESURFACING
2023 $172 $43 $215
TOTAL COST: $172 $43 $215
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
88 of 305
HIGHWAY PROJECTS - HOUSTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-65 ProjectDescription
RESURFACE CR-65 (COWARTS CREEK RD/SOUTH BROAD STREET) FROM CR-24 (LUCY GRADE ROAD) TO SR-12 (US-84)
Type of Work RESURFACING
Project Length in Miles 2.767 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065697 STPOA 3516 () CONSTRUCTION
RESURFACING
2023 $364 $91 $455
TOTAL COST: $364 $91 $455
Route CR-65 ProjectDescription
RESURFACE CR-65 (N BROAD STREET) AND CR-41 (OMUSSEE ROAD) FROM SR-12 (US-84) TO SR-52 ( COLUMBIA HIGHWAY)
Type of Work RESURFACING
Project Length in Miles 3.320 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065698 STPOA 3516 () CONSTRUCTION
RESURFACING
2020 $464 $116 $580
TOTAL COST: $464 $116 $580
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
89 of 305
HIGHWAY PROJECTS - HOUSTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE SUGGS ROAD FROM HEADLAND AVENUE TO THE HOUSTON/HENRY COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 0.970 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065703 STPOA 3516 () CONSTRUCTION
RESURFACING
2021 $198 $50 $248
TOTAL COST: $198 $50 $248
Route CR-NA ProjectDescription
RESURFACE HOSEA ROAD FROM THE GENEVA / HOUSTON COUNTY LINE TO SR-605 (BRANNON STAND ROAD)
Type of Work RESURFACING
Project Length in Miles 0.970 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065704 STPOA 3516 () CONSTRUCTION
RESURFACING
2022 $146 $37 $183
TOTAL COST: $146 $37 $183
Route SR-210 ProjectDescription
ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM US-231 SOUTH TO BAUMAN DRIVE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.700 Urban Area DOTHAN COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062175 NHF 0210 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2023 $4,087 $1,022 $5,109
TOTAL COST: $4,087 $1,022 $5,109
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
90 of 305
HIGHWAY PROJECTS - HOUSTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-117 ProjectDescription
REHABILITATE BIN #006378 OVER TENNESSE RIVER AND BIN #006377 OVER TENNESSEE RIVER RELIEF
Type of Work BRIDGE REHABILITATION
Project Length in Miles 1.200 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002736 BR 0117 (506) RIGHT OF WAY
BRIDGE REHABILITATION
2020 $300 $75 $374
100002735 BR 0117 () CONSTRUCTION
BRIDGE REHABILITATION
2021 $11,678 $2,920 $14,598
TOTAL COST: $11,978 $2,994 $14,972
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
91 of 305
HIGHWAY PROJECTS - JACKSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-35 ProjectDescription
SR-35 ADDITIONAL LANES FROM CR-62 (WILLIAM ST) TO NORTH OF CR-124 (SCENIC DR)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.136 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053776 NH 0035 () UTILITIES
ADDITIONAL ROADWAY LANES
2025 $2,101 $525 $2,626
100053774 NH 0035 (523) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2025 $5,580 $1,395 $6,976
TOTAL COST: $7,681 $1,920 $9,601
Route SR-35 ProjectDescription
SR-35 ADDITIONAL LANES FROM CR-124(SCENIC DR) TO THE TENNESSEE RIVER
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.314 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049112 NHF 0035 (507) UTILITIES
ADDITIONAL ROADWAY LANES
2025 $2,764 $691 $3,455
100038314 NHF 0035 (507) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2025 $25,198 $6,299 $31,497
TOTAL COST: $27,962 $6,990 $34,952
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
92 of 305
HIGHWAY PROJECTS - JACKSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-18 ProjectDescription
EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064232 STPBH 3715 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2020 $1,600 $400 $2,000
100064233 STPBH 3715 () UTILITIES
ADDITIONAL ROADWAY LANES
2020 $1,360 $340 $1,700
100064234 STPBH 3715 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $5,045 $1,261 $6,306
TOTAL COST: $8,005 $2,001 $10,006
Route CR-2303 ProjectDescription
CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.
Type of Work RAMP REVISIONS
Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040771 STPBHF 7026 (601) CONSTRUCTION
RAMP REVISIONS
2020 $10,723 $2,681 $13,403
TOTAL COST: $10,723 $2,681 $13,403
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
93 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-30 ProjectDescription
CR-30 (OLD SPRINGVILLE RD) IMPROVEMENTS TO VARIOUS INTERSECTIONS FROM CARDINAL DRIVE TO CR-153 (CLAY/TRUSSVILLE RD) CITY OF CLAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056273 STPBH 7245 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $2,040 $510 $2,550
100056275 STPBH 7245 () UTILITIES
INTERSECTION IMPROVEMENTS
2022 $1,128 $282 $1,410
TOTAL COST: $3,168 $792 $3,960
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
94 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-337 ProjectDescription
RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059497 ACAA59497 ATRP (007) CONSTRUCTION
RESURFACING
2020 $1,257 $314 $1,571
TOTAL COST: $1,257 $314 $1,571
Route CR-337 ProjectDescription
RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)
Type of Work TURN LANES
Project Length in Miles 0.960 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060502 STPBH 3713 () RIGHT OF WAY
TURN LANES 2019 $1,572 $393 $1,965
100060504 STPBH 3713 () UTILITIES
TURN LANES 2019 $560 $140 $700
TOTAL COST: $2,132 $533 $2,665
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
95 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-46 ProjectDescription
CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056290 STPBH 7021 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,200 $300 $1,500
TOTAL COST: $1,200 $300 $1,500
Route CR-52 ProjectDescription
CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 2.470 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007542 STPBH 7002 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $9,907 $2,477 $12,383
TOTAL COST: $9,907 $2,477 $12,383
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
96 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-6 ProjectDescription
>PARKWOOD RD IMPROVEMENTS - PHASE 3 PARKWOOD ROADATPINELANE SE AND HILLTOP ROAD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007636 STPBH 9802 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $9 $2 $11
100007630 STPBH 9802 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $709 $177 $886
TOTAL COST: $718 $179 $897
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
97 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-65 ProjectDescription
BRIDGES ON CR-65 MINOR RD TO BIRMINGPORT RD (ENS ADM)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007588 STPBH 7147 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,710 $427 $2,137
TOTAL COST: $1,710 $427 $2,137
Route CR-65 ProjectDescription
CR-65 (HILLCREST RD) FROM SR-5(US-78) TO CORRIDOR X (PRELIMINARY ENGINEERING-DESIGN)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040404 STPBH 7174 (600) PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $487 $122 $608
100038801 STPBH 7174 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $6,650 $1,663 $8,313
100040405 STPBH 7174 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $158 $39 $197
100038803 STPBH 7174 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $8,800 $2,200 $11,000
TOTAL COST: $16,095 $4,024 $20,118
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
98 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-94 ProjectDescription
CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)
Type of Work TURN LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042371 STPBH 3716 () RIGHT OF WAY
TURN LANES 2020 $45 $11 $56
100042372 STPBH 3716 () UTILITIES
TURN LANES 2020 $146 $36 $182
100042373 STPBH 3716 () CONSTRUCTION
TURN LANES 2020 $1,947 $487 $2,433
TOTAL COST: $2,138 $534 $2,672
Route CR-NA ProjectDescription
FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059888 STPBH 7173 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $3,041 $760 $3,801
100046959 STPBH 7173 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $19,882 $4,971 $24,853
TOTAL COST: $22,924 $5,731 $28,655
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
99 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060490 STPBH 9802 (904) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $80 $20 $100
100007628 STPBH 9802 (904) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $5,245 $1,311 $6,556
TOTAL COST: $5,325 $1,331 $6,656
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD RD. AND MONTEVALLO RD., SITE 3. CROSSHAVEN DR. AND GREEN VALLEY DR.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007629 STPBH 9802 (924) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $2,655 $664 $3,318
TOTAL COST: $2,655 $664 $3,318
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
100 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056488 STPBH 3715 (255) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $400 $100 $500
100056489 STPBH 3715 (255) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $3,200 $800 $4,000
TOTAL COST: $3,600 $900 $4,500
Route CR-NA ProjectDescription
HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.
Type of Work TURN LANES
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007555 STPBH 7020 (601) CONSTRUCTION
TURN LANES 2019 $2,017 $504 $2,521
TOTAL COST: $2,017 $504 $2,521
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
101 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
>GARDENDALE - MAIN STREET FR TARRANT DR. TO REDMAYNE RD. PROJECT SPONSOR: JEFFERSON COUNTY.
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007597 STPBH 7164 (600) RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2020 $275 $69 $343
100007595 STPBH 7164 (600) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2021 $1,638 $409 $2,047
TOTAL COST: $1,912 $478 $2,390
Route CR-NA ProjectDescription
EAST LAKE BLVD FROM 39TH ST TO 40TH ST N, ADD TURN LANES ; WEST OF B'HAM INTERNATIONAL AIRPORT (PHASE 2)
Type of Work TURN LANES
Project Length in Miles 0.170 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053046 STPBH 7173 () CONSTRUCTION
TURN LANES 2020 $240 $60 $300
TOTAL COST: $240 $60 $300
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
102 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
JEFFERSON COUNTY TOPICS (PHASE 9) TARRANT HUFFMAN ROAD FROM SR-79 (OLD PINSON HIGHWAY) TO TREADWELL ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007609 STPBH 7229 (602) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $3,691 $923 $4,614
TOTAL COST: $3,691 $923 $4,614
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059460 STPBH 3717 (250) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,644 $411 $2,055
TOTAL COST: $1,644 $411 $2,055
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
103 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029563 STPBH 9802 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $243 $61 $304
100029566 STPBH 9802 () UTILITIES
UTILITY ADJUSTMENT
2020 $658 $164 $822
100029510 STPBH 9802 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $3,597 $899 $4,496
TOTAL COST: $4,498 $1,125 $5,623
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION, SYSTEM WIDE TIMING PLAN AND PHASE 1 EQUIPMENT UPGRADE PLAN FOR TRAFFIC SIGNAL SYSTEM AT 100 INTERSECTIONS
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039866 CMAQ NR01 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $747 $187 $933
100039867 CMAQ NR01 () CONSTRUCTION
SIGNALIZATION 2020 $1,352 $338 $1,691
TOTAL COST: $2,099 $525 $2,624
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
104 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 2
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039868 CMAQ NR04 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $575 $144 $719
100039869 CMAQ NR04 () CONSTRUCTION
SIGNALIZATION 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 3
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039870 CMAQ NR06 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $575 $144 $719
100039871 CMAQ NR06 () CONSTRUCTION
SIGNALIZATION 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
105 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059893 HPP-STPBH 1602 (519) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $876 $219 $1,095
100033434 HPP-STPBH 1602 (519) UTILITIES
BRIDGE REPLACEMENT
2019 $424 $106 $530
100059894 STPBH 1602 (519) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,680 $420 $2,100
TOTAL COST: $2,980 $745 $3,725
Route CR-NA ProjectDescription
RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD
Type of Work RESURFACING
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059488 ACAA59488 ATRP (006) CONSTRUCTION
RESURFACING
2019 $674 $169 $843
TOTAL COST: $674 $169 $843
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
106 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANE AT CALDWELL MILL ROAD AND JAGUAR DRIVE IN THE CITY OF HOOVER
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062345 CMAQ 3714 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100062346 CMAQ 3714 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100062347 CMAQ 3714 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $90 $22 $112
100062348 CMAQ 3714 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $692 $173 $865
TOTAL COST: $862 $216 $1,078
Route CR-NA ProjectDescription
ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 3.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063245 STPBH 3716 (252) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $800 $200 $1,000
100063246 STPBH 3716 (252) UTILITIES
INTERSECTION IMPROVEMENTS
2021 $1,000 $250 $1,250
100063247 STPBH 3716 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $4,150 $1,037 $5,187
TOTAL COST: $5,950 $1,487 $7,437
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
107 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064200 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $300 $75 $375
100064201 CMAQ 3715 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $420 $105 $526
100064202 CMAQ 3715 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,779 $445 $2,224
TOTAL COST: $2,499 $625 $3,124
Route CR-NA ProjectDescription
UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064216 STPBH 3716 () CONSTRUCTION
LIGHTING 2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
108 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM VENICE ROAD TO LEAF LAKE DRIVE
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064225 STPBH 3715 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064311 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $160 $40 $200
100064312 CMAQ 3715 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $160 $40 $200
100064313 CMAQ 3715 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $480 $120 $600
TOTAL COST: $800 $200 $1,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
109 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK
Type of Work BRIDGE REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066111 STPBH 3716 (256) RIGHT OF WAY
BRIDGE REHABILITATION
2020 $80 $20 $100
100066112 STPBH 3716 (256) UTILITIES
BRIDGE REHABILITATION
2020 $80 $20 $100
100066113 STPBH 3716 () CONSTRUCTION
BRIDGE REHABILITATION
2020 $880 $220 $1,100
TOTAL COST: $1,040 $260 $1,300
Route CR-NA ProjectDescription
13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068127 CMAQ 3718 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $299 $75 $374
100068128 CMAQ 3718 () UTILITIES
STREETSCAPE
2021 $82 $21 $103
100068129 CMAQ 3718 () CONSTRUCTION
STREETSCAPE
2021 $1,714 $429 $2,143
TOTAL COST: $2,096 $524 $2,620
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
110 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -20 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FR DMS #5 (3/4 MI WEST OF ENSLEY AVE (EXIT120)) TO I-65 (EXIT 124) AND ALONG US-280 FR SR-119 TO I-20/I-59 (EXIT 126), INCLUDES CCTV, RADAR, ETC. ELECTRONIC DEVICES AND EQUIPMENT
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046084 CMAQ NR05 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $52 $13 $66
100046086 CMAQ NR05 () CONSTRUCTION
UNCLASSIFIED 2020 $1,049 $262 $1,312
100046085 CMAQ NR05 () SPECIAL
UNCLASSIFIED 2020 $193 $48 $242
TOTAL COST: $1,295 $324 $1,619
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068066 IM I020 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,300 $700 $7,000
TOTAL COST: $6,300 $700 $7,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
111 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -459 ProjectDescription
INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)
Type of Work LIGHTING
Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100005120 IM I459 () CONSTRUCTION
LIGHTING 2020 $1,617 $180 $1,797
TOTAL COST: $1,617 $180 $1,797
Route I -459 ProjectDescription
COLONNADE DRIVE RELOCATION (GRADE, DRAIN, BASE, PAVE, AND RETAINING WALL)
Type of Work RAMP REVISIONS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038955 IM I459 (306) CONSTRUCTION
RAMP REVISIONS
2021 $1,854 $206 $2,059
TOTAL COST: $1,854 $206 $2,059
Route I -459 ProjectDescription
I-459, RAMP MODIFICATIONS AT THE SR-38 (US-280) INTERCHANGE (PHASE 3)
Type of Work RAMP REVISIONS
Project Length in Miles 0.080 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063754 IM I459 () CONSTRUCTION
RAMP REVISIONS
2022 $26,250 $2,917 $29,167
TOTAL COST: $26,250 $2,917 $29,167
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
112 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -459 ProjectDescription
INTERCHANGE AT I-459 AND CR-2 (SOUTH SHADES CREST ROAD) INCLUDES BRIDGE OVER INTERSTATE AND RAMP BRIDGE OVER RAILROAD, CITY OF HOOVER
Type of Work INTERCHANGE
Project Length in Miles 0.002 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062062 STPBHF I459 (310) PRELIMINARY ENGINEERING
INTERCHANGE
2020 $1,200 $300 $1,500
100056292 STPBHF I459 (310) RIGHT OF WAY
INTERCHANGE
2021 $1,600 $400 $2,000
TOTAL COST: $2,800 $700 $3,500
Route I -59 ProjectDescription
PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1ST AVENUE NORTH TO 16TH STREET NORTH
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063656 IM I059 (410) CONSTRUCTION
PAVEMENT REHABILITATION
2020 $14,048 $1,561 $15,609
TOTAL COST: $14,048 $1,561 $15,609
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
113 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE
Type of Work RESURFACING
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062068 IM I059 () CONSTRUCTION
RESURFACING
2020 $12,593 $1,399 $13,993
TOTAL COST: $12,593 $1,399 $13,993
Route I -59 ProjectDescription
ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT112) TO VALLEY ROAD (EXIT 118)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056495 NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2024 $300 $75 $375
100039736 IM-NH I059 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2026 $352 $43 $395
TOTAL COST: $652 $118 $770
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
114 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)
Type of Work SIGN REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042475 IM I059 () CONSTRUCTION
SIGN REHABILITATION
2019 $3,766 $418 $4,184
TOTAL COST: $3,766 $418 $4,184
Route I -59 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FROM 0.75 MILE WEST OF ENSLEY AVE (EXIT 120) TO I-65 (EXIT 124) AND ALONG SR-38 (US-280) FROM SR-119 TO I-59 (EXIT 126), INCLUDES FIBER, POLES, ECT, NONE ELECTRONICS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046082 CMAQ NR05 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $89 $22 $111
100046083 CMAQ NR05 () CONSTRUCTION
UNCLASSIFIED 2020 $1,181 $295 $1,477
TOTAL COST: $1,270 $317 $1,587
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
115 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
I-59 FR MP 132.16AT1ST AV N TO MP 137.19ATI-459 6 LANES
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064120 NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2024 $1,750 $437 $2,187
100045051 NH I059 () UTILITIES
ADDITIONAL ROADWAY LANES
2026 $122 $30 $152
100004982 NH I059 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2027 $39,061 $9,765 $48,826
TOTAL COST: $40,932 $10,233
$51,166
Route I -59 ProjectDescription
RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064600 IM-NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2025 $469 $83 $552
100064602 IM-NH I059 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2028 $20,315 $3,585 $23,900
TOTAL COST: $20,784 $3,668 $24,452
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
116 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
ROADWAY LIGHTING I-65 FROM 5100' SOUTH OF ALFORD AVENUE TO 6TH AVENUE NORTH
Type of Work LIGHTING
Project Length in Miles 7.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048475 STPBH I065 (445) CONSTRUCTION
LIGHTING 2021 $5,556 $1,389 $6,945
TOTAL COST: $5,556 $1,389 $6,945
Route I -65 ProjectDescription
CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM US-31 TO RALEIGH AVENUE. OVERPASS (PRIORITY #35)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055415 IM I065 () CONSTRUCTION
PAVEMENT REHABILITATION
2020 $9,414 $1,046 $10,460
TOTAL COST: $9,414 $1,046 $10,460
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
117 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 13.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060142 IM-HSIP I065 (484) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $20,036 $2,226 $22,262
TOTAL COST: $20,036 $2,226 $22,262
Route NA- ProjectDescription
OXMOOR VALLEY GREENWAY-BIKE TRAIL PROJECT SPONSOR:CITY OF BIRMINGHAM (1.) FROM SAND RIDGE/LITTLE SHADES CREEK TO OXMOOR VILLAGE CENTER.
Type of Work UNCLASSIFIED
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029522 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,450 $363 $1,813
TOTAL COST: $1,450 $363 $1,813
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
118 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
HOOVER-TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029518 STPBH 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $198 $49 $247
TOTAL COST: $198 $49 $247
Route NA- ProjectDescription
SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY
Type of Work UNCLASSIFIED
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029525 CMAQ 9802 (911) CONSTRUCTION
UNCLASSIFIED 2019 $2,945 $736 $3,682
100029526 CMAQ 9802 (912) CONSTRUCTION
UNCLASSIFIED 2021 $4,735 $1,184 $5,919
TOTAL COST: $7,680 $1,920 $9,600
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
119 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BESSEMER RAIL TO TRAIL CONVERSION PROJECT FROM THE HOOVER CITY LIMITS NEAR PARKWOOD TO SR-150 AT LAKESHORE PARKWAY CONNECTION -CITY OF BESSEMER PROJECT SPONSOR
Type of Work UNCLASSIFIED
Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029565 CMAQ 9802 () RIGHT OF WAY
UNCLASSIFIED 2020 $633 $158 $791
100029524 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,114 $278 $1,392
TOTAL COST: $1,746 $437 $2,183
Route NA- ProjectDescription
"CBD INCIDENT AND CONGESTION MANAGMENT PROGRAM"
Type of Work UNCLASSIFIED
Project Length in Miles 0.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029534 CMAQ 9802 (926) CONSTRUCTION
UNCLASSIFIED 2020 $1,367 $342 $1,709
TOTAL COST: $1,367 $342 $1,709
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
120 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT TRAFFIC SYSTEM (PHASE 7) FIBER OPTIC CABLE MESSAGE SIGNS AND VEHICLE DETECTION DEVICES, SR-3 FR UNIV. BLVD TO SR-38 THEN SR-38 FR SR-3 TO SR-119
Type of Work UNCLASSIFIED
Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029515 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $4,603 $1,151 $5,754
TOTAL COST: $4,603 $1,151 $5,754
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3 AND 3A PROJECT SPONSOR: ALDOT, TRANSPORTATION MANAGEMENT CENTER TO BE BUILT AT 3RD DIVISION COMPLEX
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040855 CMAQ 9802 () UTILITIES
UTILITY ADJUSTMENT
2020 $12 $3 $14
100029517 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2021 $4,881 $1,220 $6,102
TOTAL COST: $4,893 $1,223 $6,116
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
121 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM (PHASE 4) PROJECT SPONSOR:ALDOT,REGIONAL HIGHWAY RADIO: TO BE BUILTATCORNER 26TH ST AND 12 AVE N
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029519 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $575 $144 $719
TOTAL COST: $575 $144 $719
Route NA- ProjectDescription
TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)
Type of Work UNCLASSIFIED
Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052630 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,151 $288 $1,439
TOTAL COST: $1,151 $288 $1,439
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
122 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
OLD LEEDS ROAD BICYCLE LANES FROM IRONDALE CITY LIMITS/ BERMUDA DR TO GRANTS MILL. WIDEN TO 31 FT TO ACCOMMODATE TWO 14-FOOT WIDE TRAVEL LANES WITH THE REMAINDER AS PAVED SHOULDER. PROJECT SPONSOR: IRONDALE
Type of Work UNCLASSIFIED
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032371 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $600 $150 $750
TOTAL COST: $600 $150 $750
Route NA- ProjectDescription
>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD
Type of Work UNCLASSIFIED
Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032397 CMAQ 9802 () RIGHT OF WAY
UNCLASSIFIED 2019 $63 $16 $78
TOTAL COST: $63 $16 $78
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
123 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CITY OF BIRMINGHAM ARTERIAL CCTV 41 INTERSECTIONS WITH FIBER OPTIC CABLE INSTALLED, PHASE 2.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033183 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $426 $106 $532
TOTAL COST: $426 $106 $532
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039850 CMAQ NR03 () RIGHT OF WAY
UNCLASSIFIED 2021 $174 $44 $218
100039851 CMAQ NR03 () CONSTRUCTION
UNCLASSIFIED 2022 $1,763 $441 $2,204
TOTAL COST: $1,938 $484 $2,422
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
124 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039846 CMAQ NR02 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $513 $128 $641
100039847 CMAQ NR02 () RIGHT OF WAY
UNCLASSIFIED 2020 $259 $65 $324
100039848 CMAQ NR02 () CONSTRUCTION
UNCLASSIFIED 2021 $2,619 $655 $3,273
TOTAL COST: $3,390 $848 $4,238
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039849 CMAQ NR03 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $345 $86 $432
TOTAL COST: $345 $86 $432
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
125 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VALLEY CREEK GREENWAY FROM 12TH STREET AT RICKWOOD FIELD TO AVENUE W AT FIVE POINTS WEST
Type of Work UNCLASSIFIED
Project Length in Miles 1.950 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039852 CMAQ NR06 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $460 $115 $575
100039853 CMAQ NR06 () RIGHT OF WAY
UNCLASSIFIED 2020 $138 $35 $173
100039854 CMAQ NR06 () CONSTRUCTION
UNCLASSIFIED 2020 $460 $115 $575
TOTAL COST: $1,059 $265 $1,323
Route NA- ProjectDescription
ITS FIBER OPTIC PLAN, CITY WIDE FOR ITS ARTERIAL INCIDENT MGT.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039861 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $135 $34 $169
TOTAL COST: $135 $34 $169
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
126 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERA, 7 LOCATIONS. EMERGENGY RESPONSE ROUTING
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039864 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $19 $5 $23
100039865 STPBH NR01 () CONSTRUCTION
UNCLASSIFIED 2020 $187 $47 $234
TOTAL COST: $206 $51 $257
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERAS NSRR, 41ST ST NORTH TO BRUSSELS CIRCLE ( RAILROAD CROSSING)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039872 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $140 $35 $175
100039873 STPBH NR01 () CONSTRUCTION
UNCLASSIFIED 2020 $234 $58 $292
TOTAL COST: $374 $94 $468
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
127 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CAHABA RIVER EAST GREENWAY; OFF CR-115-1 (OLD ROCKY RIDGE RD) NEAR CHESTNUT RIDGE (SUB-DIVISION) AND CAHABA RIVER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039922 CMAQ CN07 (911) CONSTRUCTION
UNCLASSIFIED 2020 $449 $112 $561
TOTAL COST: $449 $112 $561
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 3 (TRUSSVILLE) CORRIDOR STUDY FOR A PEDESTRIAN BRIDGE OVER THE CAHABA RIVER, SOUTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048496 CMAQ PE07 (912) PRELIMINARY ENGINEERING
CORRIDOR STUDY
2020 $41 $10 $52
TOTAL COST: $41 $10 $52
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
128 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 4 (TRUSSVILLE) CORRIDOR STUDY FOR WALKWAY AND TRAILHEAD CONNECTING CONNECTING SENIOR CENTER TO THE CAHABA RIVER GREENWAY, NORTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048497 CMAQ PE07 (911) PRELIMINARY ENGINEERING
CORRIDOR STUDY
2020 $41 $10 $52
TOTAL COST: $41 $10 $52
Route NA- ProjectDescription
RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE
Type of Work UNCLASSIFIED
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054521 STPBH 3716 (250) CONSTRUCTION
UNCLASSIFIED 2019 $2,724 $681 $3,405
TOTAL COST: $2,724 $681 $3,405
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
129 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work STREETSCAPE
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056316 STPBH 7117 () CONSTRUCTION
STREETSCAPE
2020 $2,613 $653 $3,266
TOTAL COST: $2,613 $653 $3,266
Route NA- ProjectDescription
SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056510 CMAQ NR13 (954) CONSTRUCTION
SIDEWALK 2019 $546 $137 $683
TOTAL COST: $546 $137 $683
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
130 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS ALONG CR-99 (COLUMBIANA RD) FROM SR-3 (US-31,MONTGOMERY HIGHWAY) TO SHADES CREST RD IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 1.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056515 CMAQ NR13 () PRELIMINARY ENGINEERING
SIDEWALK 2020 $189 $47 $236
100056516 CMAQ NR13 () RIGHT OF WAY
SIDEWALK 2021 $92 $23 $115
100056517 CMAQ NR13 () UTILITIES
SIDEWALK 2022 $90 $22 $112
TOTAL COST: $371 $93 $463
Route NA- ProjectDescription
REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK
Type of Work UNCLASSIFIED
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056520 CMAQ RW13 () RIGHT OF WAY
UNCLASSIFIED 2019 $90 $23 $113
100056521 CMAQ UT14 () UTILITIES
UNCLASSIFIED 2019 $87 $22 $108
100056522 CMAQ CN14 () CONSTRUCTION
UNCLASSIFIED 2019 $568 $142 $710
TOTAL COST: $745 $186 $931
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
131 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056541 CMAQ 7282 (600) CONSTRUCTION
SIDEWALK 2019 $824 $206 $1,030
TOTAL COST: $824 $206 $1,030
Route NA- ProjectDescription
SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK
Type of Work SIDEWALK
Project Length in Miles 1.420 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056547 CMAQ 3715 (254) CONSTRUCTION
SIDEWALK 2019 $742 $185 $927
TOTAL COST: $742 $185 $927
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
132 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER
Type of Work SIDEWALK
Project Length in Miles 1.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056557 CMAQ NR13 (961) RIGHT OF WAY
SIDEWALK 2020 $109 $27 $137
100056558 CMAQ NR13 (961) UTILITIES
SIDEWALK 2021 $102 $26 $128
100056559 CMAQ NR13 () CONSTRUCTION
SIDEWALK 2021 $2,830 $708 $3,538
TOTAL COST: $3,042 $760 $3,802
Route NA- ProjectDescription
SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 0.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057172 CMAQ 7030 (600) RIGHT OF WAY
SIDEWALK 2019 $72 $18 $90
100057173 CMAQ 7030 (600) UTILITIES
UTILITY ADJUSTMENT
2020 $73 $18 $91
100057174 CMAQ 7030 (600) CONSTRUCTION
SIDEWALK 2020 $2,116 $529 $2,645
TOTAL COST: $2,261 $565 $2,826
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
133 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE
Type of Work STREETSCAPE
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033432 STPBH 3716 (251) CONSTRUCTION
STREETSCAPE
2019 $661 $165 $827
TOTAL COST: $661 $165 $827
Route NA- ProjectDescription
BIRMINGHAM SAFE ROUTES TO SCHOOL, SIDEWALKS ON TARRANT-HUFFMAN ROAD FROM WILLIAMSBURG TO ROEBUCK DR, AND WALKWAY TO CONNECT ROSE DR TO GASTON MIDDLE AND NORTH ROEBUCK ELEMENTARY SCHOOLS
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048384 STPBH CN07 (906) CONSTRUCTION
SIDEWALK 2020 $253 $63 $316
TOTAL COST: $253 $63 $316
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
134 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BUILDING COMMUNITIES PROGRAMS FY 2019-2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062376 STPBH NR19 () SPECIAL
UNCLASSIFIED 2019 $550 $138 $688
TOTAL COST: $550 $138 $688
Route NA- ProjectDescription
NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH
Type of Work STREETSCAPE
Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059190 CMAQ 3715 (257) CONSTRUCTION
STREETSCAPE
2020 $520 $130 $650
TOTAL COST: $520 $130 $650
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICE FOR SUBRECIPIENT (FY 2014 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062364 STPBH TR16 () TRANSIT
UNCLASSIFIED 2020 $1,018 $255 $1,273
TOTAL COST: $1,018 $255 $1,273
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
135 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY
Type of Work UNCLASSIFIED
Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064288 CMAQ 3715 (267) RIGHT OF WAY
UNCLASSIFIED 2019 $40 $10 $50
100064289 CMAQ 3715 (267) UTILITIES
UNCLASSIFIED 2020 $40 $10 $50
100064290 CMAQ 3715 () CONSTRUCTION
UNCLASSIFIED 2020 $320 $80 $400
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE
Type of Work UNCLASSIFIED
Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064292 CMAQ 3715 (262) RIGHT OF WAY
UNCLASSIFIED 2019 $75 $19 $94
100064293 CMAQ 3715 (262) UTILITIES
UNCLASSIFIED 2020 $83 $21 $104
100064294 CMAQ 3715 () CONSTRUCTION
UNCLASSIFIED 2020 $600 $150 $750
TOTAL COST: $758 $190 $948
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
136 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064297 CMAQ 3715 () CONSTRUCTION
STREETSCAPE
2019 $816 $204 $1,020
TOTAL COST: $816 $204 $1,020
Route NA- ProjectDescription
ZOO SIDEWALK CONNECTOR FROM POINCIANA DRIVE TO 20TH PLACE SOUTH, ALONG 20TH PLACE SOUTH TO CAHABA ROAD
Type of Work SIDEWALK
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064299 CMAQ 3715 (268) CONSTRUCTION
SIDEWALK 2019 $496 $124 $619
TOTAL COST: $496 $124 $619
Route NA- ProjectDescription
SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH STREET SOUTH
Type of Work SIDEWALK
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064303 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2019 $1,600 $400 $2,000
TOTAL COST: $1,600 $400 $2,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
137 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD
Type of Work SIDEWALK
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064315 CMAQ 3715 (263) RIGHT OF WAY
SIDEWALK 2019 $40 $10 $50
100064316 CMAQ 3715 (263) UTILITIES
SIDEWALK 2020 $40 $10 $50
100064317 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2020 $960 $240 $1,200
TOTAL COST: $1,040 $260 $1,300
Route NA- ProjectDescription
OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2019 AND FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064488 CMAQ NR19 (900) SPECIAL
UNCLASSIFIED 2018 $400 $100 $500
TOTAL COST: $400 $100 $500
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
138 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2015 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065085 STPBH TR17 () TRANSIT
UNCLASSIFIED 2020 $2,000 $500 $2,500
TOTAL COST: $2,000 $500 $2,500
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2014 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065086 STPBH TR16 () TRANSIT
UNCLASSIFIED 2020 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT ( FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065087 STPBH TR18 () TRANSIT
UNCLASSIFIED 2020 $1,818 $455 $2,273
TOTAL COST: $1,818 $455 $2,273
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
139 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2015 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065088 STPBH TR17 () TRANSIT
UNCLASSIFIED 2020 $1,080 $270 $1,350
TOTAL COST: $1,080 $270 $1,350
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065089 STPBH TR18 () TRANSIT
UNCLASSIFIED 2020 $950 $237 $1,187
TOTAL COST: $950 $237 $1,187
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2017 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065090 STPBH TR19 () TRANSIT
UNCLASSIFIED 2020 $1,826 $456 $2,282
TOTAL COST: $1,826 $456 $2,282
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
140 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2017 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065091 STPBH TR19 () TRANSIT
UNCLASSIFIED 2020 $953 $238 $1,191
TOTAL COST: $953 $238 $1,191
Route NA- ProjectDescription
18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065219 CMAQ TA15 (903) RIGHT OF WAY
STREETSCAPE
2019 $82 $21 $103
100065220 CMAQ TA15 (903) UTILITIES
STREETSCAPE
2019 $82 $21 $103
100064505 TAPAA-CMAQ TA15 (903)
CONSTRUCTION
STREETSCAPE
2019 $1,200 $300 $1,500
TOTAL COST: $1,365 $341 $1,706
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
141 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065503 CMAQ TA14 (930) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065504 CMAQ TA14 (930) UTILITIES
SIDEWALK 2019 $82 $21 $103
100062999 TAPAA-CMAQ TA14 (930)
CONSTRUCTION
SIDEWALK 2019 $899 $225 $1,123
TOTAL COST: $1,063 $266 $1,329
Route NA- ProjectDescription
PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065615 ACIM-ACCMAQ-CMAQ 3716 ()
CONSTRUCTION
STREETSCAPE
2020 $32,675 $4,787 $37,462
TOTAL COST: $32,675 $4,787 $37,462
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
142 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066622 CMAQ 3717 () CONSTRUCTION
UNCLASSIFIED 2019 $1,120 $280 $1,400
TOTAL COST: $1,120 $280 $1,400
Route NA- ProjectDescription
WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066709 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $1,224 $306 $1,530
TOTAL COST: $1,224 $306 $1,530
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
143 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067027 CMAQ 3717 () UTILITIES
STREETSCAPE
2019 $122 $31 $153
100067028 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $408 $102 $510
TOTAL COST: $530 $133 $663
Route NA- ProjectDescription
SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068125 CMAQ 3718 () RIGHT OF WAY
SIDEWALK 2020 $41 $10 $51
100068124 CMAQ 3718 () UTILITIES
SIDEWALK 2020 $82 $20 $102
100068126 CMAQ 3718 () CONSTRUCTION
SIDEWALK 2020 $1,906 $476 $2,382
TOTAL COST: $2,028 $507 $2,535
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
144 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068135 STPBH TR18 () SPECIAL
UNCLASSIFIED 2019 $1,300 $0 $1,300
TOTAL COST: $1,300 $0 $1,300
Route SR-119 ProjectDescription
REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049954 BR 0119 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $228 $57 $285
100049986 BR 0119 () RIGHT OF WAY
BRIDGE REPLACEMENT
2022 $59 $15 $73
100049987 BR 0119 () UTILITIES
BRIDGE REPLACEMENT
2022 $35 $9 $44
100049955 BR 0119 () CONSTRUCTION
BRIDGE REPLACEMENT
2023 $2,362 $591 $2,953
TOTAL COST: $2,684 $671 $3,355
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
145 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-150 ProjectDescription
PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064228 CMAQ 3715 () RIGHT OF WAY
PEDESTRIAN OVERPASS
2020 $84 $21 $105
100064229 CMAQ 3715 () UTILITIES
PEDESTRIAN OVERPASS
2020 $84 $21 $105
100064230 CMAQ 3715 () CONSTRUCTION
PEDESTRIAN OVERPASS
2020 $841 $210 $1,051
TOTAL COST: $1,009 $252 $1,261
Route SR-150 ProjectDescription
BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066943 BR 0150 (505) UTILITIES
BRIDGE REPLACEMENT
2020 $247 $62 $309
100066944 BR 0150 (505) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,236 $309 $1,545
TOTAL COST: $1,484 $371 $1,855
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
146 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003818 BR 7044 (600) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2023 $126 $31 $157
TOTAL COST: $126 $31 $157
Route SR-3 ProjectDescription
SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM
Type of Work UNCLASSIFIED
Project Length in Miles 3.265 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039842 CMAQ 003 () CONSTRUCTION
UNCLASSIFIED 2019 $636 $159 $796
TOTAL COST: $636 $159 $796
Route SR-3 ProjectDescription
SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE
Type of Work SLIDE CORRECTION
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056427 NH 0003 () CONSTRUCTION
SLIDE CORRECTION
2020 $91 $23 $114
TOTAL COST: $91 $23 $114
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
147 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064209 STPBH 0003 () CONSTRUCTION
LIGHTING 2020 $1,600 $400 $2,000
TOTAL COST: $1,600 $400 $2,000
Route SR-3 ProjectDescription
AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.
Type of Work STREETSCAPE
Project Length in Miles 1.598 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064507 CMAQ 0003 () CONSTRUCTION
STREETSCAPE
2019 $2,602 $650 $3,252
TOTAL COST: $2,602 $650 $3,252
Route SR-38 ProjectDescription
BRIDGE WIDENING ON SR-38 (US-280) OVER I-459 FROM SUMMIT BOULEVARD TO BLUE LAKE DRIVE
Type of Work BRIDGE WIDENING
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060860 BR 0038 () CONSTRUCTION
BRIDGE WIDENING
2022 $267 $67 $334
TOTAL COST: $267 $67 $334
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
148 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-4 ProjectDescription
REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049988 BR 0004 () RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $58 $14 $72
100049989 BR 0004 () UTILITIES
BRIDGE REPLACEMENT
2022 $35 $9 $44
100049957 BR 0004 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $2,639 $660 $3,299
TOTAL COST: $2,732 $683 $3,415
Route SR-4 ProjectDescription
INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.260 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065396 STPAA 0004 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $412 $103 $515
100065397 STPAA 0004 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $416 $104 $520
100063799 STPAA 0004 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $2,522 $631 $3,153
TOTAL COST: $3,351 $838 $4,188
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
149 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-5 ProjectDescription
BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.681 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002809 BR 0005 (517) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $5,135 $1,284 $6,418
TOTAL COST: $5,135 $1,284 $6,418
Route SR-5 ProjectDescription
SR-5 (US-78) ADD LANES FROM FINLEY BLVD. TO PRATT HWY (2ND ST) (PHASE 2)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063746 NH 0005 (510) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2023 $217 $54 $271
TOTAL COST: $217 $54 $271
Route SR-7 ProjectDescription
WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039839 STPBH 7073 (602) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $2,049 $512 $2,562
TOTAL COST: $2,049 $512 $2,562
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
150 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD). INCLUDES SINGLE BRIDGES ON BROOKWOOD ROAD AT STATIONS 8+01 TO 11+31 AND STATIONS 21+70 TO 22+28. GRADE, DRAIN, PARTIAL BASE AND PAVE, AND BRIDGE.
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058452 ACNHF 1602 (556) RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2044 $5,285 $1,321 $6,606
TOTAL COST: $5,285 $1,321 $6,606
Route SR-959 ProjectDescription
(BNB) DUAL MAINLINE BRGS OVER CR-129 (GLENWOOD RD), TURKEY CREEK, CR-131 (MAJESTIC RD) / CSX RR, CR-121 (BRADFORD ROAD), CR-141 (OLD DIXIANA RD), SR-79, AND SELF CREEK STATIONS 2149+00 TO 2158+00. ALSO INCLUDES RAMP C BRIDGE AT SR-79.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058465 ACNHF 1602 (553) CONSTRUCTION
BRIDGE 2042 $31,413 $7,853 $39,266
TOTAL COST: $31,413 $7,853 $39,266
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
151 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047841 ACNHF 1602 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2025 $15,330 $3,832 $19,162
TOTAL COST: $15,330 $3,832 $19,162
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE INCLUDES DUAL MAINLINE BRIDGES OVER US-31, RAMP A AND B, BRIDGES AT US-31 AND RAMP 3 AND 4, BRIDGES AT I-65
Type of Work BRIDGE
Project Length in Miles 0.970 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047834 ACNHF 1602 () CONSTRUCTION
BRIDGE 2024 $59,136 $14,784
$73,920
TOTAL COST: $59,136 $14,784
$73,920
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
152 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047848 ACNHF 1602 () RIGHT OF WAY
GRADE, DRAIN AND BRIDGE
2034 $8,028 $2,007 $10,035
TOTAL COST: $8,028 $2,007 $10,035
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CUNNINGHAM CREEK.
Type of Work BRIDGE
Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047854 ACNHF 1602 () CONSTRUCTION
BRIDGE 2040 $59,832 $14,958
$74,789
TOTAL COST: $59,832 $14,958
$74,789
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
153 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM CUNNINGHAM CREEK TO 0.39 MI EAST OF SR-79. GRADE, DRAIN, PARTIAL BASE AND PAVE.
Type of Work GRADE AND DRAIN
Project Length in Miles 6.840 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058461 ACNHF 1602 (555) RIGHT OF WAY
GRADE AND DRAIN
2038 $20,892 $5,223 $26,116
TOTAL COST: $20,892 $5,223 $26,116
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.
Type of Work BRIDGE
Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048413 APDF 1602 (550) CONSTRUCTION
BRIDGE 2023 $42,174 $10,544
$52,718
TOTAL COST: $42,174 $10,544
$52,718
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
154 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SR-75, CR-159 (CEDAR MT. ROAD), CR-2186 (CAVERN RD / BUD ALISON RD), AND CR-30 (OLD SPRINGVILLE ROAD). ALSO INCLUDES SINGLE RAMP H AND I BRIDGES AT SR-75.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056652 ACNHF 1602 (561) CONSTRUCTION
BRIDGE 2048 $376,303 $94,076
$470,378
TOTAL COST: $376,303 $94,076
$470,378
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE RD) TO I-59. INCLUDES ACCEL/DECEL LANES ON I-59 BETWEEN CR-2133 (DEERFOOT PKWY) AND CR-2145 (HONOR KEITH RD / LILES LN) AND BRIDGE OVER I-59 ON CR-2137 (ADVENT CIRCLE)
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058456 ACNHF 1602 (557) RIGHT OF WAY
GRADE, DRAIN AND BRIDGE
2027 $1,873 $468 $2,341
TOTAL COST: $1,873 $468 $2,341
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
155 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CR-2137 (ADVENT CIRCLE) AND SINGLE BRIDGES ON RAMP O AND RAMP Q OVER I-59.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056660 ACNHF 1602 (554) CONSTRUCTION
BRIDGE 2030 $38,174 $9,543 $47,717
TOTAL COST: $38,174 $9,543 $47,717
Route SR-959 ProjectDescription
FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063385 APDF 1602 () SPECIAL
UNCLASSIFIED 2020 $2,353 $0 $2,353
TOTAL COST: $2,353 $0 $2,353
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
156 of 305
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-17 ProjectDescription
BIN # 002561 OVER BUTAHATCHEE RIVER ON SR-17
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.700 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064122 BR 0174 (534) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $294 $74 $368
100002717 BR 0174 (534) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $53 $13 $67
100045191 BR 0174 (534) UTILITIES
BRIDGE REPLACEMENT
2022 $117 $29 $147
100002715 BR 0174 (534) CONSTRUCTION
BRIDGE REPLACEMENT
2027 $19,496 $4,874 $24,370
TOTAL COST: $19,961 $4,990 $24,951
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
157 of 305
HIGHWAY PROJECTS - LAMAR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-16 ProjectDescription
CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059049 STPOA 3914 (251) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $40 $10 $50
100059050 STPOA 3914 (251) UTILITIES
BRIDGE REPLACEMENT
2020 $39 $10 $49
100059051 STPOA 3914 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,213 $303 $1,516
TOTAL COST: $1,292 $323 $1,615
Route CR-NA ProjectDescription
WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063588 STPOA 3915 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $60 $15 $75
100063589 STPOA 3915 () UTILITIES
ADDITIONAL ROADWAY LANES
2020 $320 $80 $400
100063590 STPOA 3915 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $1,280 $320 $1,600
TOTAL COST: $1,660 $415 $2,075
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
158 of 305
HIGHWAY PROJECTS - LAUDERDALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-2 ProjectDescription
BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038052 BR 0002 (579) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $2,279 $570 $2,848
100038505 BR 0002 (579) UTILITIES
BRIDGES AND APPROACHES
2020 $691 $173 $864
100002587 BR 0002 () CONSTRUCTION
BRIDGES AND APPROACHES
2020 $4,737 $1,184 $5,921
TOTAL COST: $7,707 $1,927 $9,634
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
159 of 305
HIGHWAY PROJECTS - LAUDERDALE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-270 ProjectDescription
BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060555 ACBRZ60555 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $910 $227 $1,137
TOTAL COST: $910 $227 $1,137
Route CR-270 ProjectDescription
BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER NORFOLK SOUTHERN RAILROAD IN THE CITY OF COURTLAND (BIN 397)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060567 ACBRZ60567 ATRP (014)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $432 $108 $540
TOTAL COST: $432 $108 $540
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
160 of 305
HIGHWAY PROJECTS - LAWRENCE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-101 ProjectDescription
REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049906 BR 0101 (570) RIGHT OF WAY
BRIDGES AND APPROACHES
2020 $58 $14 $72
100049907 BR 0101 (570) UTILITIES
BRIDGES AND APPROACHES
2021 $58 $15 $73
100049908 BR 0101 () CONSTRUCTION
BRIDGES AND APPROACHES
2021 $2,895 $724 $3,618
TOTAL COST: $3,010 $753 $3,763
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
161 of 305
HIGHWAY PROJECTS - LAWRENCE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-197 ProjectDescription
FULL DEPTH RECLAMATION, SEAL, AND RESURFACE CR-197 FROM CR-208 TO CR-240
Type of Work RESURFACING
Project Length in Miles 2.400 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062982 STPPC 4118 () CONSTRUCTION
RESURFACING
2019 $672 $168 $840
TOTAL COST: $672 $168 $840
Route CR-243 ProjectDescription
RESURFACING ON CR-243 FROM CR-223 TO CR-298 IN SMITHS STATION
Type of Work RESURFACING
Project Length in Miles 3.200 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067543 STPPC 4117 () CONSTRUCTION
RESURFACING
2020 $704 $176 $880
TOTAL COST: $704 $176 $880
Route CR-249 ProjectDescription
RESURFACING ON CR-249 FROM CR-379 TO CR-318 IN SMITHS STATION
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067545 STPPC 4117 () CONSTRUCTION
RESURFACING
2020 $442 $111 $553
TOTAL COST: $442 $111 $553
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
162 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-318 ProjectDescription
RESURFACING ON CR-318 FROM CR-248 (SUMMERVILLE ROAD) TO CR-249 IN SMITHS STATION
Type of Work RESURFACING
Project Length in Miles 4.800 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067544 STPPC 4117 () CONSTRUCTION
RESURFACING
2020 $1,056 $264 $1,320
TOTAL COST: $1,056 $264 $1,320
Route CR-379 ProjectDescription
RESURFACING ON CR-379 FROM SR-1 (US-280) TO THE BRIDGE OVER HARDING LAKE IN SMITHS STATION
Type of Work RESURFACING
Project Length in Miles 9.700 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067546 STPPC 4117 () CONSTRUCTION
RESURFACING
2021 $1,300 $325 $1,625
TOTAL COST: $1,300 $325 $1,625
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
163 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-40 ProjectDescription
RESURFACING,WIDENING,TRAFFIC SIGNALS AND DRAINAGE IMPROVEMENTS ON SOUTH COLLEGE STREET,SAMFORD AVENUE, GAY STREET, AND REESE AVENUE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.968 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065891 STPOA 4116 (250) RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $663 $166 $828
100065892 STPOA 4116 (250) UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $271 $68 $338
100061106 STPOA 4116 (250) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $3,591 $898 $4,488
TOTAL COST: $4,524 $1,131 $5,655
Route CR-63 ProjectDescription
BRIDGE REPLACEMENT ON (CR-63) NORTH UNIROYAL ROAD BIN # 3663
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061109 ACBR61109 ATRP (015) CONSTRUCTION
BRIDGE 2020 $722 $180 $902
TOTAL COST: $722 $180 $902
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
164 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
ADD TURN LANE ON DONAHUE DRIVE FROM NORTH OF BRAGG AVENUE TO CARY DRIVE
Type of Work TURN LANES
Project Length in Miles 0.470 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008577 STPOA 4116 () RIGHT OF WAY
TURN LANES 2020 $408 $102 $510
100033351 STPOA 4116 () UTILITIES
TURN LANES 2020 $522 $131 $653
100008575 STPOA 4116 () CONSTRUCTION
TURN LANES 2020 $2,246 $562 $2,808
TOTAL COST: $3,176 $794 $3,971
Route CR-NA ProjectDescription
SEPARATE TRUCK ENTRANCES AND EXITS ON NORTHPARK DRIVE TO BENEFIT PROJECT THUNDER IN THE CITY OF OPELIKA
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060172 IAR-041-000-015 () CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2019 $0 $1,481 $1,481
TOTAL COST: $0 $1,481 $1,481
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
165 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON MELANIE LANE FROM SUMMERVILLE ROAD TO RIVERCHASE DRIVE IN PHENIX CITY
Type of Work RESURFACING
Project Length in Miles 0.751 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067423 STPPC 4117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $58 $15 $73
100067424 STPPC 4117 () CONSTRUCTION
RESURFACING
2020 $367 $92 $459
TOTAL COST: $426 $106 $532
Route CR-NA ProjectDescription
RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM LOWNDES STREET TO GATEWAY DRIVE (SR-38/US-280)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068462 STPOA 4118 () CONSTRUCTION
RESURFACING
2020 $1,371 $343 $1,714
TOTAL COST: $1,371 $343 $1,714
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
166 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM WESTEND COURT (FIVE POINTS) TO GATEWAY DRIVE (SR-38/US-280)
Type of Work RESURFACING
Project Length in Miles 0.592 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068463 STPOA 4118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $56 $14 $69
100068464 STPOA 4118 () RIGHT OF WAY
RESURFACING
2019 $20 $5 $25
100068465 STPOA 4118 () UTILITIES
RESURFACING
2020 $51 $13 $64
100068466 STPOA 4118 () CONSTRUCTION
RESURFACING
2021 $1,072 $268 $1,339
TOTAL COST: $1,198 $300 $1,498
Route I -85 ProjectDescription
BRIDGE WIDENING - BRIDGES BIN 008593 AND 008594 OVER CHOCTAFAULA CREEK ; BRIDGES BIN 007262 AND BIN 007263 OVER HALAWAKEE CREEK
Type of Work BRIDGE WIDENING
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066325 IM I085 (331) PRELIMINARY ENGINEERING
BRIDGE WIDENING
2019 $250 $28 $278
100051084 IM I085 () CONSTRUCTION
BRIDGE WIDENING
2022 $3,254 $362 $3,615
TOTAL COST: $3,504 $389 $3,894
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
167 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -85 ProjectDescription
I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL EXTENSIONS NB OFF RAMP AND SB ON RAMP
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.800 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067237 IM I085 (362) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $92 $10 $102
100067238 IM I085 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $16,495 $1,833 $18,328
TOTAL COST: $16,587 $1,843 $18,430
Route I -85 ProjectDescription
RESURFACE I-85 FROM 1.340 MILES SOUTH OF ANDREWS ROAD (EXIT 66) TO THE CHAMBERS COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.775 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067348 IM I085 (361) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $1,631 $181 $1,812
TOTAL COST: $1,631 $181 $1,812
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
168 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-51 ProjectDescription
REPLACE BRIDGE BIN 002013, SR-51 OVER ROBINSON CREEK (SUFF=44.1, STATUS = SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.150 Urban Area AUBURN-OPELIKA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067706 BR 0051 (512) UTILITIES
BRIDGE REPLACEMENT
2019 $8 $2 $10
100003743 BR 0051 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,171 $293 $1,464
TOTAL COST: $1,180 $295 $1,475
Route SR-51 ProjectDescription
BRIDGE REPLACEMENT ON SR-51 OVER WATULA CREEK BIN 002012
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066232 BR 0051 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $41 $10 $52
100012530 BR 0051 () CONSTRUCTION
BRIDGE REPLACEMENT
2023 $629 $157 $786
TOTAL COST: $670 $168 $838
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
169 of 305
HIGHWAY PROJECTS - LEE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON THACH ROAD OVER AN UNAMED CREEK (BIN # 4132)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061859 ACBRZ61859 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $282 $70 $352
TOTAL COST: $282 $70 $352
Route CR-NA ProjectDescription
REHABILITATE ROCKHOUSE ROAD (ROUTE 15) AT WHEELER NATIONAL WILDLIFE REFUGE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 4.370 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066414 PFH 4217 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,236 $0 $1,236
TOTAL COST: $1,236 $0 $1,236
Route I -565 ProjectDescription
RESURFACING I-565 FROM I-65 (MP 0.00) TO MP 5.63
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 5.630 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066497 IM I565 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2020 $5,600 $622 $6,223
TOTAL COST: $5,600 $622 $6,223
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
170 of 305
HIGHWAY PROJECTS - LIMESTONE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
CLEAR ZONE SAFETY IMPROVEMENTS ON I-65 FROM MP 339.40 TO MP 351.25
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 11.850 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040334 IM I065 () CONSTRUCTION
SAFETY IMPROVEMENTS
2020 $1,618 $180 $1,798
TOTAL COST: $1,618 $180 $1,798
Route I -65 ProjectDescription
WELCOME CENTER REHABILITATION NEAR I-65 NORTH OF ATHENS
Type of Work REST AREA COMPLETE
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045459 IMF I065 () CONSTRUCTION
REST AREA COMPLETE
2021 $9,181 $1,020 $10,201
TOTAL COST: $9,181 $1,020 $10,201
Route I -65 ProjectDescription
RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 0.1 MILE SOUTH OF CSXT OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 7.750 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065908 IM I065 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $9,817 $1,091 $10,908
TOTAL COST: $9,817 $1,091 $10,908
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
171 of 305
HIGHWAY PROJECTS - LIMESTONE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-2 ProjectDescription
WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.059 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067910 DEF-NHF A205 (937) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $212 $15 $227
100067911 DEF-NHF A205 (937) UTILITIES
ADDITIONAL ROADWAY LANES
2020 $122 $31 $153
100055214 DEF-NHF A205 (937) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $1,410 $352 $1,762
TOTAL COST: $1,744 $398 $2,142
Route SR-2 ProjectDescription
INTERSECTION IMPROVEMENTS TO INTERSECTION OF SR-2 (US-72) AND CR-71 (MOORESVILLE RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058225 NH 0002 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2021 $69 $17 $86
100058226 NH 0002 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $688 $172 $861
TOTAL COST: $757 $189 $947
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
172 of 305
HIGHWAY PROJECTS - LIMESTONE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.006 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100037845 BR 0003 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $4,945 $1,236 $6,182
TOTAL COST: $4,945 $1,236 $6,182
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
173 of 305
HIGHWAY PROJECTS - LIMESTONE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
I-65 DISTRICT WIDE GUARDRAIL REPLACEMENT FROM THE CONECUH COUNTY LINE TO THE MONTGOMERY COUNTY LINE
Type of Work GUARDRAIL
Project Length in Miles 53.172 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066450 IM I065 () PRELIMINARY ENGINEERING
GUARDRAIL 2019 $138 $15 $153
100066451 IM I065 () CONSTRUCTION
GUARDRAIL 2019 $3,063 $340 $3,403
TOTAL COST: $3,201 $356 $3,556
Route SR-8 ProjectDescription
REPLACE BRIDGE, BIN 002917, SR-8 (US-80) OVER BIG SWAMP CREEK. (SUFF=63.0, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 2.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050031 BRF 0008 (581) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $3,661 $915 $4,576
TOTAL COST: $3,661 $915 $4,576
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
174 of 305
HIGHWAY PROJECTS - LOWNDES
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-81 ProjectDescription
BRIDGE REPLACEMENT ON SR-81 OVER UPHAPEE CREEK BIN # 2853
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.160 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061664 BR 0081 () CONSTRUCTION
BRIDGES AND APPROACHES
2023 $6,631 $1,658 $8,288
TOTAL COST: $6,631 $1,658 $8,288
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
175 of 305
HIGHWAY PROJECTS - MACON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-17 ProjectDescription
2 FT SAFETY WIDENING AND RESURFACING OF CR-17(BALCH ROAD)FROM .53 MILE SOUTH OF CR-21(BROWNS FERRY ROAD)TO NORTH OF CR-27(GOOCH LANE)IN THE CITY OF MADISON
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.450 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046745 DE-STPAA-STPHV AL81 (940)
CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,486 $195 $1,681
TOTAL COST: $1,486 $195 $1,681
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
176 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-19 ProjectDescription
ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.800 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061458 ACAA61458 ATRP (015) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $9,045 $4,455 $13,500
TOTAL COST: $9,045 $4,455 $13,500
Route CR-19 ProjectDescription
ADDITIONAL LANES ON JEFF ROAD (CR-19) FROM DOUGLASS ROAD TO SR-53
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062241 STPHV 4514 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2020 $800 $200 $1,000
100062256 STPHV 4514 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2022 $1,800 $450 $2,250
TOTAL COST: $2,600 $650 $3,250
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
177 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-242 ProjectDescription
CR-242 (OLD HIGHWAY 431) FOUR (4) BRIDGE REPLACEMENTS. BIN NUMBERS 313, 558, 559, AND 314
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062252 STPHV 4514 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $6,792 $1,698 $8,490
TOTAL COST: $6,792 $1,698 $8,490
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.300 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061222 ACAA61222 ATRP (010) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $10,385 $5,115 $15,500
TOTAL COST: $10,385 $5,115 $15,500
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061457 ACAA61457 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $6,536 $1,634 $8,170
TOTAL COST: $6,536 $1,634 $8,170
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
178 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051833 DEF A179 (922) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $40 $0 $40
100051834 DEF A179 (922) UTILITIES
BRIDGES AND APPROACHES
2020 $277 $0 $277
100051835 DEF-STPHVF A179 (922)
CONSTRUCTION
BRIDGES AND APPROACHES
2020 $4,072 $718 $4,790
TOTAL COST: $4,389 $718 $5,107
Route CR-NA ProjectDescription
HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 4.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061851 NHF-STPAAF 4514 (252)
CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $18,951 $4,738 $23,688
TOTAL COST: $18,951 $4,738 $23,688
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
179 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 6.060 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062236 STPHV 4514 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2021 $1,520 $380 $1,900
100062237 STPHV 4514 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2022 $1,506 $376 $1,882
100062238 STPHV 4514 () CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2022 $20,000 $5,000 $25,000
TOTAL COST: $23,026 $5,756 $28,782
Route CR-NA ProjectDescription
KELLNER ROAD EXTENSION FROM WALL TRIANA HWY TO SOUTH OF BUSINESS PARK BLVD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061239 ACAA61239 ATRP (010) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $8,040 $3,960 $12,000
TOTAL COST: $8,040 $3,960 $12,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
180 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WHEELER NATIONAL WILDLIFE REFUGE REHABILITATE ROCKHOUSE ROAD (ROUTE 15)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067956 FLAP FLAP () CONSTRUCTION
PAVEMENT REHABILITATION
2020 $960 $240 $1,200
TOTAL COST: $960 $240 $1,200
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
181 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
IMPROVE PEDESTRIAN FACILITIESATFIVE POINTS ; PROJECT LOCATED NEAR HOLMES AV, PRATT AV, AND ANDREW JACKSON AV. IN HUNTSVILLE
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045139 STPAA AL61 (900) CONSTRUCTION
STREETSCAPE
2019 $474 $119 $593
TOTAL COST: $474 $119 $593
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MADISON COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060145 STPAA NR13 (945) CONSTRUCTION
SIDEWALK 2019 $390 $98 $488
TOTAL COST: $390 $98 $488
Route NA- ProjectDescription
DRY CREEK GREENWAY FROM INDIAN CREEK GREENWAY/GATES MILL ROAD TO THE INTERSECTION OF ARCH STREET AND BILTMORE DRIVE IN NORTHWEST HUNTSVILLE
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067267 TAPHV TA17 (946) CONSTRUCTION
UNCLASSIFIED 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
182 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-1 ProjectDescription
SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.629 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004926 NHF 8510 (009) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $33,413 $8,353 $41,766
TOTAL COST: $33,413 $8,353 $41,766
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
183 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-2 ProjectDescription
ADDITIONAL LANES SR-2 (US-72) FROM BALCH ROAD TO HUGHES ROAD IN THE CITY LIMITS OF MADISON
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.552 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061224 ACAA61224 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2022 $4,400 $2,167 $6,567
TOTAL COST: $4,400 $2,167 $6,567
Route SR-2 ProjectDescription
ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 5.440 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061845 NHF 0002 (566) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2020 $6,182 $1,545 $7,727
100061846 NHF 0002 (566) UTILITIES
ADDITIONAL ROADWAY LANES
2021 $2,458 $614 $3,072
100061847 NH 0002 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2022 $24,000 $6,000 $30,000
TOTAL COST: $32,639 $8,160 $40,799
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
184 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-53 ProjectDescription
ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM HOBBS ISLAND ROAD TO SOUTH OF WEATHERLY ROAD
Type of Work UNCLASSIFIED
Project Length in Miles 4.194 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061839 NH 0053 (571) RIGHT OF WAY
UNCLASSIFIED 2020 $323 $81 $404
100061838 NH 0053 (571) UTILITIES
UNCLASSIFIED 2020 $1,246 $311 $1,557
100061840 RP-NH 0053 () CONSTRUCTION
UNCLASSIFIED 2020 $9,302 $2,326 $11,628
TOTAL COST: $10,871 $2,718 $13,589
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
185 of 305
HIGHWAY PROJECTS - MADISON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-38 ProjectDescription
BRIDGE REPLACEMENT ON CR-38 OVER ELAM BRANCH BIN#7404 (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060438 ACBRZ60438 ATRP () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $290 $72 $362
TOTAL COST: $290 $72 $362
Route CR-44 ProjectDescription
BRIDGE REPLACEMENT ON CR-44 OVER DRY CREEK BIN # 13020 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060439 ACBRZ60439 ATRP (009)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $398 $99 $497
TOTAL COST: $398 $99 $497
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
186 of 305
HIGHWAY PROJECTS - MARENGO
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-13 ProjectDescription
REPL BIN 002547, SR-13 (US-43) OVER AGR RR, SOUTHEAST OF DEMOPOLIS (SUFF=44.5, STAT=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100041301 BRF 0013 (501) UTILITIES
BRIDGE REPLACEMENT
2019 $2,571 $643 $3,214
100041302 BRF 0013 (501) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $3,985 $996 $4,981
TOTAL COST: $6,556 $1,639 $8,195
Route SR-69 ProjectDescription
BRIDGE REPLACEMENT ON SR-69 OVER WHIRL CREEK BIN# 5977
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060178 BR 0069 (544) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,400 $600 $3,000
TOTAL COST: $2,400 $600 $3,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
187 of 305
HIGHWAY PROJECTS - MARENGO
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-8 ProjectDescription
REPL BRIDGE AND RELIEF SR-8 (US-80) BIN 003018 AND BIN # 003017 OVER COTTONWOOD CREEK, EAST OF FAUNSDALE
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.603 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043730 BRF 0008 (542) UTILITIES
BRIDGE REPLACEMENT
2020 $92 $23 $116
100043731 BRF 0008 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $3,057 $764 $3,821
TOTAL COST: $3,150 $787 $3,937
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
188 of 305
HIGHWAY PROJECTS - MARENGO
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-9 ProjectDescription
BRIDGE REPLACEMENT ON CR-9 OVER BARNSVILLE CK (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060456 ACBRZ60456 ATRP (008)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $521 $130 $652
TOTAL COST: $521 $130 $652
Route I -22 ProjectDescription
PLANING AND RESURFACING ON I-22 FROM SR-129 INTERCHANGE AT MP 29.950 TO EAST OF THE SR-233 OVERPASS AT MP 34.460
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 4.510 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064936 IM I022 (305) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $11,524 $1,280 $12,805
TOTAL COST: $11,524 $1,280 $12,805
Route I -22 ProjectDescription
RESURFACING ON I-22 FROM MP 0.00 AT THE MISSISSIPPI STATE LINE TO MP 6.00 JUST WEST OF REESE ROAD OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 6.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068043 IM I022 (310) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2020 $2,164 $240 $2,404
TOTAL COST: $2,164 $240 $2,404
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
189 of 305
HIGHWAY PROJECTS - MARION
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -22 ProjectDescription
RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.8 AT EXIT 16
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 10.800 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068045 IM I022 (309) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2020 $3,958 $440 $4,398
TOTAL COST: $3,958 $440 $4,398
Route I -22 ProjectDescription
RESURFACING ON I-22 FROM EXIT 16 (MP 16.800) TO EXIT 22 (MP 22.600)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 5.800 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068047 IM I022 (308) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2020 $2,613 $290 $2,903
TOTAL COST: $2,613 $290 $2,903
Route I -22 ProjectDescription
RESURFACING ON I-22 FROM EXIT 22 (MP 22.600) TO EXIT 30 (MP 29.950)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 7.350 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068048 IM I022 (311) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $227 $25 $253
TOTAL COST: $227 $25 $253
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
190 of 305
HIGHWAY PROJECTS - MARION
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT AT VARIOUS LOCATIONS (DISTRICT 3)
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061282 STPAA NR13 (931) CONSTRUCTION
SIDEWALK 2019 $335 $84 $418
TOTAL COST: $335 $84 $418
Route SR-118 ProjectDescription
REPLACE BRIDGE, BIN 009166, SR-118 OVER LITTLE NEW RIVER. (SUFF=19.0, STATUS=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.600 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049902 BR 0118 (512) RIGHT OF WAY
BRIDGE REPLACEMENT
2021 $58 $15 $73
100049903 BR 0118 (512) UTILITIES
BRIDGE REPLACEMENT
2021 $58 $15 $73
100049904 BR 0118 (512) CONSTRUCTION
BRIDGE REPLACEMENT
2022 $3,275 $819 $4,093
TOTAL COST: $3,391 $848 $4,238
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
191 of 305
HIGHWAY PROJECTS - MARION
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-17 ProjectDescription
INTERSECTION IMPROVEMENT ON SR-17 AT SR-74 IN CITY OF HAMILTON
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063748 STPAA 0017 (539) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2023 $65 $16 $81
TOTAL COST: $65 $16 $81
Route SR-17 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-17 (US-43) AND SR-172 AND SR-17 (US-43) AND SR-187
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.150 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063612 STPAA 0017 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2020 $84 $21 $105
100058750 STPAA 0017 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2021 $184 $46 $229
100058751 STPAA 0017 () UTILITIES
INTERSECTION IMPROVEMENTS
2021 $459 $115 $574
100058752 STPAA 0017 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2022 $555 $139 $693
TOTAL COST: $1,281 $320 $1,601
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
192 of 305
HIGHWAY PROJECTS - MARION
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-168 ProjectDescription
REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049732 BR 0168 (501) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $85 $21 $107
100049733 BR 0168 (501) UTILITIES
BRIDGE REPLACEMENT
2020 $40 $10 $50
100049734 BR 0168 (501) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $2,751 $688 $3,439
TOTAL COST: $2,877 $719 $3,597
Route SR-69 ProjectDescription
SR-69 REL FR US-231 INT TO MAIN ST IN ARAB SURVEY AND PLAN PREPARATION SMALL URBAN ARAB
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.811 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008848 STPAA 0069 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2021 $6,842 $1,710 $8,552
100033082 STPAA 0069 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2022 $292 $73 $365
100008845 STPAA 0069 (519) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2023 $4,623 $1,156 $5,778
TOTAL COST: $11,757 $2,939 $14,696
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
193 of 305
HIGHWAY PROJECTS - MARSHALL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-75R ProjectDescription
RELOCATION OF SR-75 AROUND THE ALBERTVILLE AIRPORT EXPANSION (HORTON ROAD) FROM CR-152 SOUTH (ONEONTA CUT-OFF ROAD) TO CR-325 NORTH (TURNPIKE ROAD).
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.990 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060124 STPAA 0075 (529) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2023 $2,252 $563 $2,815
TOTAL COST: $2,252 $563 $2,815
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
194 of 305
HIGHWAY PROJECTS - MARSHALL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-25 ProjectDescription
NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 4.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059789 STPMB 4918 (250) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2020 $4,800 $1,200 $6,000
100059790 STPMB 4918 (250) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2021 $1,920 $480 $2,400
100059791 STPMB 4918 () CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2022 $10,480 $2,620 $13,100
TOTAL COST: $17,200 $4,300 $21,500
Route CR-32 ProjectDescription
THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052462 STPMB 4919 (250) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2021 $732 $183 $915
100052463 STPMB 4919 (250) UTILITIES
ADDITIONAL ROADWAY LANES
2022 $360 $90 $450
100052464 STPMB 4919 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2023 $3,600 $900 $4,499
TOTAL COST: $4,691 $1,173 $5,864
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
195 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-32 ProjectDescription
CR-32 (THREE NOTCH RD) ADDITIONAL LANES FROM CR-25 (BEN HAMILTON RD) TO CR-39 (MCDONALD RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052465 STPMB 7502 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2020 $262 $66 $328
100052594 STPMB 7502 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2021 $796 $199 $994
100052595 STPMB 7502 () UTILITIES
ADDITIONAL ROADWAY LANES
2021 $389 $97 $487
100052596 STPMB 7502 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $3,893 $973 $4,867
TOTAL COST: $5,340 $1,335 $6,675
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
196 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-32 ProjectDescription
CR-32 (THREE NOTCH RD) ADDITIONAL LANES FROM CR-33 (DAWES RD.) TO CR-25 (BEN HAMILTON RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052466 STPMB 7502 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2020 $262 $66 $328
100052597 STPMB 7502 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2021 $796 $199 $994
100052598 STPMB 7502 () UTILITIES
ADDITIONAL ROADWAY LANES
2021 $389 $97 $487
100052599 STPMB 7502 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $3,893 $973 $4,867
TOTAL COST: $5,340 $1,335 $6,675
Route CR-39 ProjectDescription
MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.500 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052449 STPMB 7612 (600) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $560 $140 $700
100052450 STPMB 7612 (600) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $3,840 $960 $4,800
TOTAL COST: $4,400 $1,100 $5,500
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
197 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-56 ProjectDescription
ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.460 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068532 STPMB 4918 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $1,040 $260 $1,300
100068533 STPMB 4918 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2021 $1,200 $300 $1,500
100068534 STPMB 4918 () UTILITIES
UNCLASSIFIED 2022 $800 $200 $1,000
100068535 STPMB 4918 () CONSTRUCTION
UNCLASSIFIED 2023 $7,920 $1,980 $9,900
TOTAL COST: $10,960 $2,740 $13,700
Route CR-656 ProjectDescription
ZEIGLER BLVD ADDITIONAL LANES FROM ATHEY RD TO FOREST HILL DR
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.410 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100037215 DBMB-STPMB 7550 (600)
CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $14,120 $3,530 $17,650
TOTAL COST: $14,120 $3,530 $17,650
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
198 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-656 ProjectDescription
CR-656 (ZEIGLER BLVD) ADD LANES FROM CR-372 (SCHILLINGER RD) TO CR-429 (CODY RD)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.200 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046895 STPMB 7550 (601) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2019 $7,520 $1,880 $9,400
TOTAL COST: $7,520 $1,880 $9,400
Route CR-656 ProjectDescription
ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.400 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055881 STPMB 7550 (602) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2019 $1,504 $376 $1,880
100055882 STPMB 7550 (602) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $896 $224 $1,120
100055883 STPMB 7550 (602) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $4,000 $1,000 $5,000
TOTAL COST: $6,400 $1,600 $8,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
199 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
FLORIDA ST, GOVERNMENT BLVD TO AIRPORT BLVD (MOBILE)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.640 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007699 STPMB 7522 () PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2022 $36 $9 $45
TOTAL COST: $36 $9 $45
Route CR-NA ProjectDescription
FLORIDA ST, AIRPORT BLVD TO SPRINGHILL AVE (MOBILE)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.390 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007700 STPMB 7522 () PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2022 $36 $9 $45
TOTAL COST: $36 $9 $45
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
200 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 1.100 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052458 STPMB 7533 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $216 $54 $270
100052459 STPMB 7533 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $225 $56 $281
100052460 STPMB 7533 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $5,656 $1,414 $7,070
TOTAL COST: $6,097 $1,524 $7,621
Route CR-NA ProjectDescription
MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.490 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052601 STPMBF 7508 (600) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $1,200 $300 $1,500
100052602 STPMBF 7508 (600) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $2,706 $676 $3,382
TOTAL COST: $3,906 $976 $4,882
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
201 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066707 STPMB 4918 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $450 $113 $563
TOTAL COST: $450 $113 $563
Route I -10 ProjectDescription
I-10 MOBILE RIVER BRIDGE AND BAYWAY FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 4.409 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062411 NHP3 I010 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $8,080 $1,010 $9,090
100062412 NHP3 I010 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $890,416 $222,604
$1,113,020
TOTAL COST: $898,496 $223,614
$1,122,110
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
202 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -10 ProjectDescription
ADD LANES I-10 FR CR-39 TO CR-59 (CAROL PLANTATION RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.460 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064147 NH I010 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2025 $265 $66 $331
100033461 NH I010 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2027 $27,800 $6,950 $34,750
TOTAL COST: $28,065 $7,016 $35,081
Route I -10 ProjectDescription
I-10 ROADWAY LIGHTING REHAB FROM SR-16 (EXIT 27) TO SR-16 (EXIT 35) ALONG THE BAYWAY BRIDGE
Type of Work LIGHTING
Project Length in Miles 7.467 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055108 IM I010 (331) CONSTRUCTION
LIGHTING 2020 $1,561 $173 $1,734
TOTAL COST: $1,561 $173 $1,734
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
203 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -10 ProjectDescription
I-10 INTERCHANGE MODIFICATIONS FROM TEXAS STREET (EXIT: 25A) TO WEST TUNNEL ENTRANCE .
Type of Work INTERCHANGE
Project Length in Miles 1.080 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055752 IMF AL06 (900) UTILITIES
INTERCHANGE
2020 $450 $50 $500
100055753 IMP3F AL06 (900) CONSTRUCTION
INTERCHANGE
2020 $27,000 $3,000 $30,000
TOTAL COST: $27,450 $3,050 $30,500
Route I -10 ProjectDescription
DESIGN OF VARIOUS INTELLIGENT TRANSPORTATION SYSTEM DEVICES AND FIBER BACKBONE ALONG I-10, I-65, I-165, SR-16 (US-90), SR-42 (US-98), SR-59 WITHIN THE MOBILE AND BALDWIN URBAN AREA
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area EASTERN SHORE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057419 IM MR17 () CONSTRUCTION
UNCLASSIFIED 2019 $8,263 $918 $9,181
TOTAL COST: $8,263 $918 $9,181
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
204 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -165 ProjectDescription
RESURFACING I-165 SERVICE ROADS FROM .04 MILE SOUTH OF BAY BRIDGE ROAD TO .08 MILE NORTH OF WHISTLER STREET
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 1.700 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058195 IM I165 (303) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $2,137 $237 $2,375
TOTAL COST: $2,137 $237 $2,375
Route I -65 ProjectDescription
INTERCHANGE IMPROVEMENTS AT I-65 AND SR-13 (US-43), SOUTH OF CREOLA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050693 IM I065 (380) UTILITIES
INTERSECTION IMPROVEMENTS
2023 $134 $15 $149
TOTAL COST: $134 $15 $149
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MOBILE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060122 STPAA NR13 (910) CONSTRUCTION
SIDEWALK 2020 $653 $163 $817
TOTAL COST: $653 $163 $817
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
205 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-13 ProjectDescription
CULVERT REPLACMENT, BIN 5715, SR-13 (US-43) OVER STEELE CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061588 BR 0013 (601) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,560 $640 $3,200
TOTAL COST: $2,560 $640 $3,200
Route SR-158X ProjectDescription
SR-158 EXTENSION LOTT ROAD OVERPASS AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE, AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.770 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060154 NHF 0158 (505) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $16,000 $4,000 $20,000
100060155 NHF 0158 (503) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2023 $10,525 $2,631 $13,157
TOTAL COST: $26,525 $6,631 $33,157
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
206 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-16 ProjectDescription
REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER. (SUFF=49.7, STATUS=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.653 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056130 BRF 0016 (522) UTILITIES
BRIDGE REPLACEMENT
2019 $451 $113 $564
100049566 BRF 0016 (522) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $19,873 $4,968 $24,842
TOTAL COST: $20,324 $5,081 $25,405
Route SR-163 ProjectDescription
BRIDGE REPLACEMENT ON SR-163 OVER PERCH CREEK BIN 011865 FROM MP 3.931 TO MP 3.983
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.052 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067047 BR 0163 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $4,733 $1,183 $5,917
TOTAL COST: $4,733 $1,183 $5,917
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
207 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-17 ProjectDescription
BRIDGE REPL SR-17(US-45) (STR#17-49-35.7) OVER BENNETTS CK BIN 003218
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002812 BR 0017 (574) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $9 $2 $11
100043179 BR 0017 (574) UTILITIES
BRIDGE REPLACEMENT
2021 $117 $29 $146
100002811 BR 0017 (574) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,548 $637 $3,185
TOTAL COST: $2,673 $668 $3,342
Route SR-217 ProjectDescription
REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.111 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049586 BR 0217 (501) UTILITIES
BRIDGE REPLACEMENT
2022 $29 $7 $37
100049584 BR 0217 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $884 $221 $1,105
TOTAL COST: $913 $228 $1,142
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
208 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-42 ProjectDescription
EXTEND EASTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK EAST 1440'
Type of Work BRIDGE
Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054972 NHF 0042 (511) CONSTRUCTION
BRIDGE 2019 $8,130 $2,032 $10,162
TOTAL COST: $8,130 $2,032 $10,162
Route SR-42 ProjectDescription
US-98 EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. BASE AND PAVE
Type of Work BASE AND PAVE
Project Length in Miles 4.870 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040584 NH 0042 (509) CONSTRUCTION
BASE AND PAVE
2020 $14,560 $3,640 $18,200
TOTAL COST: $14,560 $3,640 $18,200
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
209 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-42R ProjectDescription
CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)
Type of Work BRIDGE
Project Length in Miles 0.010 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066917 BP-049-042-015 () RIGHT OF WAY
BRIDGE 2018 $0 $240 $240
100060480 NHF 0042 (535) CONSTRUCTION
BRIDGE 2020 $6,979 $1,745 $8,723
TOTAL COST: $6,979 $1,985 $8,963
Route SR-42R ProjectDescription
CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98)
Type of Work BRIDGE
Project Length in Miles 0.010 Urban Area MOBILE COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052812 NHF 0042 (517) CONSTRUCTION
BRIDGE 2020 $4,429 $1,107 $5,536
TOTAL COST: $4,429 $1,107 $5,536
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
210 of 305
HIGHWAY PROJECTS - MOBILE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
ADA REQUIRED SIDEWALK CURB RAMP INSTALLATIONS ON VARIOUS STATE ROUTES IN MONROE AND WILCOX COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060287 STPAA NR13 (957) CONSTRUCTION
SIDEWALK 2019 $361 $90 $451
TOTAL COST: $361 $90 $451
Route SR-12 ProjectDescription
BRIDGE RAIL RETROFIT (BIN 011202) AND GUARDRAIL ON SR-12 (US-84) FROM CLARKE COUNTY LINE TO 0.367 MILE EAST OF CR-1
Type of Work BRIDGE REHABILITATION
Project Length in Miles 2.700 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052611 NH 0012 (535) CONSTRUCTION
BRIDGE REHABILITATION
2020 $447 $112 $559
TOTAL COST: $447 $112 $559
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
211 of 305
HIGHWAY PROJECTS - MONROE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-18 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067620 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $4 $1 $5
100067621 STPMN 5118 () CONSTRUCTION
RESURFACING
2019 $751 $188 $939
TOTAL COST: $755 $189 $944
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
212 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-2120 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067622 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2020 $4 $1 $5
TOTAL COST: $4 $1 $5
Route CR-2120 ProjectDescription
RESURFACE AND TRAFFIC STRIPE ALABAMA RIVER PARKWAY (CR-2120) FROM END OF TOLL BRIDGE OVER THE ALABAMA RIVER TO THE MONTGOMERY CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 1.682 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067623 STPMN 5118 (252) CONSTRUCTION
RESURFACING
2019 $446 $111 $557
TOTAL COST: $446 $111 $557
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
213 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-234 ProjectDescription
RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064673 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $286 $71 $357
100064674 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $170 $42 $212
100064675 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $2,400 $600 $3,000
TOTAL COST: $2,855 $714 $3,569
Route CR-236 ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.
Type of Work RESURFACING
Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059831 STPMN 5116 () CONSTRUCTION
RESURFACING
2020 $2,400 $600 $3,000
TOTAL COST: $2,400 $600 $3,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
214 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-24 ProjectDescription
RESURFACE CR-24 (CLOVERFIELD/FEDERAL ROAD) FROM THE LOWNDES COUNTY LINE TO SR-3 (US-31) - MCP 51-82-17
Type of Work RESURFACING
Project Length in Miles 2.960 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067616 STPAA 5117 (252) CONSTRUCTION
RESURFACING
2019 $572 $143 $715
TOTAL COST: $572 $143 $715
Route CR-33 ProjectDescription
BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060092 STPMN 7702 (601) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $60 $15 $75
100060091 STPMN 7702 (601) UTILITIES
BRIDGE REPLACEMENT
2020 $160 $40 $200
100055807 STPMN 7702 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,600 $400 $2,000
TOTAL COST: $1,820 $455 $2,275
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
215 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-39 ProjectDescription
BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060096 STPAA 7701 (602) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $60 $15 $75
100060095 STPMN 7701 (602) UTILITIES
BRIDGE REPLACEMENT
2020 $160 $40 $200
100055809 STPMN 7701 (602) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,340 $585 $2,925
TOTAL COST: $2,560 $640 $3,200
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
216 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-42 ProjectDescription
RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION
Type of Work RESURFACING
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064378 STPMN 5118 (251) CONSTRUCTION
RESURFACING
2019 $1,279 $320 $1,599
TOTAL COST: $1,279 $320 $1,599
Route CR-42 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)
Type of Work RESURFACING
Project Length in Miles 2.737 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064377 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $4 $1 $5
TOTAL COST: $4 $1 $5
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
217 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-43 ProjectDescription
WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044515 STPMN 7707 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $888 $222 $1,110
TOTAL COST: $888 $222 $1,110
Route CR-54 ProjectDescription
RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)
Type of Work RESURFACING
Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067638 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2020 $64 $16 $80
100067639 STPMN 5118 () CONSTRUCTION
RESURFACING
2022 $2,800 $700 $3,500
TOTAL COST: $2,864 $716 $3,580
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
218 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-74 ProjectDescription
RESURFACING ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231)
Type of Work RESURFACING
Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064380 STPAA 5117 (253) CONSTRUCTION
RESURFACING
2019 $1,340 $335 $1,674
TOTAL COST: $1,340 $335 $1,674
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040822 STPMN 7771 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $692 $173 $865
TOTAL COST: $692 $173 $865
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
219 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044273 STPMN 7724 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $1,052 $263 $1,315
100044272 STPMN 7724 () UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $1,642 $411 $2,053
100007740 STPMN 7724 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $4,737 $1,184 $5,921
TOTAL COST: $7,431 $1,858 $9,289
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064161 STPMN 5115 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $800 $200 $1,000
100064162 STPMN 5115 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $5,600 $1,400 $7,000
TOTAL COST: $6,400 $1,600 $8,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
220 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053061 STPAA 7733 (602) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2019 $973 $243 $1,217
100045392 STPMN 7733 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,474 $368 $1,842
100053059 STPAA 7733 (601) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2021 $1,898 $474 $2,372
TOTAL COST: $4,345 $1,086 $5,431
Route CR-NA ProjectDescription
RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)
Type of Work RESURFACING
Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054277 STPAA 7729 (600) CONSTRUCTION
RESURFACING
2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
221 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET
Type of Work RESURFACING
Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054280 STPMN CN10 () CONSTRUCTION
RESURFACING
2020 $1,316 $329 $1,645
TOTAL COST: $1,316 $329 $1,645
Route CR-NA ProjectDescription
RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054282 STPMN 7716 () CONSTRUCTION
RESURFACING
2020 $1,125 $281 $1,406
TOTAL COST: $1,125 $281 $1,406
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
222 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054285 STPMN 7730 (600) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $3,360 $840 $4,200
TOTAL COST: $3,360 $840 $4,200
Route CR-NA ProjectDescription
BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)
Type of Work BRIDGE PAINTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060098 STPMN 5113 () CONSTRUCTION
BRIDGE PAINTING
2020 $200 $50 $250
TOTAL COST: $200 $50 $250
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
223 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040817 STPMN 5116 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,248 $312 $1,560
TOTAL COST: $1,248 $312 $1,560
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064606 STPAA 5116 (250) RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2020 $200 $50 $250
100064607 STPMN 5116 (250) UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $40 $10 $50
TOTAL COST: $240 $60 $300
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
224 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059726 STPMN 5115 (251) UTILITIES
RESURFACING
2020 $80 $20 $100
100063695 STPMN 5115 () CONSTRUCTION
RESURFACING
2020 $3,200 $800 $4,000
TOTAL COST: $3,280 $820 $4,100
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.
Type of Work RESURFACING
Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063696 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $87 $22 $108
100063697 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $997 $249 $1,247
TOTAL COST: $1,084 $271 $1,355
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
225 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.
Type of Work RESURFACING
Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063698 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $35 $9 $43
100063699 STPMN 5115 () CONSTRUCTION
RESURFACING
2022 $398 $99 $497
TOTAL COST: $433 $108 $541
Route CR-NA ProjectDescription
RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.
Type of Work RESURFACING
Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063731 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $342 $86 $428
100063732 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $3,939 $985 $4,923
TOTAL COST: $4,281 $1,070 $5,351
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
226 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB
Type of Work RESURFACING
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064163 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $232 $58 $290
100064164 STPMN 5115 () CONSTRUCTION
RESURFACING
2022 $2,085 $521 $2,606
TOTAL COST: $2,316 $579 $2,896
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064165 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $257 $64 $321
100064166 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $2,314 $579 $2,893
TOTAL COST: $2,571 $643 $3,214
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
227 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064167 STPMN 5115 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $824 $206 $1,030
100064168 STPMN 5115 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $7,416 $1,854 $9,270
TOTAL COST: $8,240 $2,060 $10,300
Route CR-NA ProjectDescription
WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064169 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $800 $200 $1,000
100064170 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $1,600 $400 $2,000
100064171 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $13,040 $3,260 $16,300
TOTAL COST: $15,440 $3,860 $19,300
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
228 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY
Type of Work RESURFACING
Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064180 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $8 $2 $10
100064156 STPMN 5115 () CONSTRUCTION
RESURFACING
2020 $1,680 $420 $2,100
TOTAL COST: $1,688 $422 $2,110
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066880 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $200 $50 $250
100066881 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $2,800 $700 $3,500
TOTAL COST: $3,000 $750 $3,750
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
229 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066882 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2020 $160 $40 $200
100066883 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $3,376 $844 $4,220
TOTAL COST: $3,536 $884 $4,420
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066884 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2020 $200 $50 $250
100066885 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $976 $244 $1,220
TOTAL COST: $1,176 $294 $1,470
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
230 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066886 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2020 $200 $50 $250
100066887 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $4,000 $1,000 $5,000
TOTAL COST: $4,200 $1,050 $5,250
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067611 STPAA 5117 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $32 $8 $40
100067613 STPAA 5117 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $80 $20 $100
100067614 STPMN 5117 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $400 $100 $500
TOTAL COST: $512 $128 $640
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
231 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067636 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2020 $80 $20 $100
100067637 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $2,400 $600 $3,000
TOTAL COST: $2,480 $620 $3,100
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
232 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.980 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066453 IM I065 (494) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $2,849 $317 $3,166
TOTAL COST: $2,849 $317 $3,166
Route I -65 ProjectDescription
RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066459 IM I065 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2020 $2,061 $229 $2,290
TOTAL COST: $2,061 $229 $2,290
Route I -85 ProjectDescription
SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE
Type of Work SIGN REHABILITATION
Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054302 IM I085 (333) CONSTRUCTION
SIGN REHABILITATION
2020 $2,535 $282 $2,817
TOTAL COST: $2,535 $282 $2,817
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
233 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -85 ProjectDescription
BRIDGE REPLACEMENT ON I-85 NB AND SB OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES) BIN # 7554, 7555, 7556, 7557, 7566, 7567
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059252 IM I085 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $2,430 $270 $2,700
100059253 IM I085 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $23,182 $2,576 $25,758
TOTAL COST: $25,612 $2,846 $28,458
Route I -85 ProjectDescription
PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062472 IM I085 (357) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $2,536 $282 $2,818
TOTAL COST: $2,536 $282 $2,818
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
234 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060100 STPMN 5113 () CONSTRUCTION
SIDEWALK 2020 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063693 STPMN 5115 () CONSTRUCTION
LIGHTING 2020 $1,653 $413 $2,066
TOTAL COST: $1,653 $413 $2,066
Route NA- ProjectDescription
DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063733 STPMN 5115 () SPECIAL
CORRIDOR STUDY
2020 $240 $60 $300
TOTAL COST: $240 $60 $300
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
235 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043877 STPAA 0110 (501) UTILITIES
ADDITIONAL ROADWAY LANES
2021 $714 $179 $893
100050187 STPAA 0110 (501) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $2,917 $729 $3,647
TOTAL COST: $3,631 $908 $4,539
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067733 STPAA 0110 (502) UTILITIES
ADDITIONAL ROADWAY LANES
2041 $498 $124 $622
TOTAL COST: $498 $124 $622
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
236 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-271 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067646 STPAA 0271 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $2,040 $510 $2,550
TOTAL COST: $2,040 $510 $2,550
Route SR-6 ProjectDescription
BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038170 BR 0006 (563) UTILITIES
BRIDGES AND APPROACHES
2019 $242 $61 $303
100004312 BR 0006 () CONSTRUCTION
BRIDGES AND APPROACHES
2020 $3,981 $995 $4,976
TOTAL COST: $4,223 $1,056 $5,279
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
237 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-8 ProjectDescription
WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064153 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $203 $51 $254
100064154 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2020 $160 $40 $200
100064155 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2021 $1,669 $417 $2,086
TOTAL COST: $2,032 $508 $2,540
Route SR-8 ProjectDescription
TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064157 STPMN 5115 () SPECIAL
CORRIDOR STUDY
2020 $96 $24 $120
TOTAL COST: $96 $24 $120
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
238 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-9 ProjectDescription
EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063744 NH 0009 (533) PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2023 $69 $17 $87
TOTAL COST: $69 $17 $87
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
239 of 305
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
CLEAR ZONE SAFETY IMPROVEMENTS ON I-65 FROM MP 319.710 TO MP 326.850
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 7.140 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100001761 IM I065 () CONSTRUCTION
SAFETY IMPROVEMENTS
2023 $4,510 $501 $5,011
TOTAL COST: $4,510 $501 $5,011
Route I -65 ProjectDescription
PAINT, RETROFIT BRIDGE RAILS AND REPLACE VARIOUS BEARING ASSEMBLIES ON I-65 BRIDGES OVER THE TENNESSEE RIVER, BIN# 010882 AND 010883
Type of Work BRIDGE REHABILITATION
Project Length in Miles 1.880 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042493 IM I065 () CONSTRUCTION
BRIDGE REHABILITATION
2021 $10,092 $1,121 $11,213
TOTAL COST: $10,092 $1,121 $11,213
Route SR-20 ProjectDescription
PAVEMENT REHABILITATION ON SR-20 (US-72) FROM MP 67.147 EAST OF RR SPUR TO MP 68.600 WEST OF BRIDGE OVER RR
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 1.453 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061923 NH 0020 () CONSTRUCTION
PAVEMENT REHABILITATION
2021 $2,548 $637 $3,185
TOTAL COST: $2,548 $637 $3,185
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
240 of 305
HIGHWAY PROJECTS - MORGAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049717 BR 0003 (591) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $58 $14 $72
100049718 BR 0003 (591) UTILITIES
BRIDGE REPLACEMENT
2019 $40 $10 $50
100049719 BR 0003 (591) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,040 $510 $2,550
TOTAL COST: $2,138 $534 $2,672
Route SR-36 ProjectDescription
BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.326 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066926 BR 0036 (503) UTILITIES
BRIDGE REPLACEMENT
2019 $163 $41 $204
100040782 BR 0036 (503) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,449 $612 $3,062
TOTAL COST: $2,613 $653 $3,266
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
241 of 305
HIGHWAY PROJECTS - MORGAN
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-14 ProjectDescription
REPLACE BRIDGE ON SR-14 OVER LUBBUB CREEK BIN # 002672
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.833 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060610 BR 0014 (521) UTILITIES
BRIDGE REPLACEMENT
2019 $188 $47 $235
100049165 BR 0014 (521) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,721 $680 $3,402
TOTAL COST: $2,909 $727 $3,637
Route SR-14 ProjectDescription
BRIDGE REPLACEMENT ON SR-14 OVER BLUBBER CREEK WEST OF ALICEVILLE, BIN # 003677
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.570 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061125 BR 0014 (536) UTILITIES
BRIDGE REPLACEMENT
2019 $75 $19 $94
100061126 BR 0014 (536) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,612 $653 $3,265
TOTAL COST: $2,687 $672 $3,358
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
242 of 305
HIGHWAY PROJECTS - PICKENS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-6 ProjectDescription
SR-6 (US-82) FROM WEST OF GORDO TO TUSCALOOSA COUNTY LINE
Type of Work BASE AND PAVE
Project Length in Miles 6.740 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032473 NHF 0006 (576) CONSTRUCTION
BASE AND PAVE
2020 $22,935 $5,734 $28,669
TOTAL COST: $22,935 $5,734 $28,669
Route SR-6 ProjectDescription
ADD CENTER TURN LANE ON SR-6 (US-82) FROM THE 4 LANES WEST OF REFORM TO 3RD AVENUE SOUTHEAST IN THE CITY OF REFORM
Type of Work TURN LANES
Project Length in Miles 1.600 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068073 NH 0006 () RIGHT OF WAY
TURN LANES 2019 $1,414 $354 $1,768
100068074 NH 0006 () UTILITIES
TURN LANES 2019 $2,020 $505 $2,525
100068075 NH 0006 () CONSTRUCTION
TURN LANES 2019 $5,656 $1,414 $7,070
TOTAL COST: $9,090 $2,273 $11,363
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
243 of 305
HIGHWAY PROJECTS - PICKENS
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-22 ProjectDescription
REPLACE BR #22-56-1.5A OVER TALLAPOOSA RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.900 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003447 BR 451 () RIGHT OF WAY
BRIDGE REPLACEMENT
2021 $24 $6 $29
100003442 BR 451 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $7,492 $1,873 $9,365
TOTAL COST: $7,516 $1,879 $9,395
Route SR-22 ProjectDescription
REPLACE BRIDGE, BIN 004332, SR-22 OVER WEHADKEE CREEK (SUFF=55.7, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.061 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049192 BR 0022 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $2,645 $661 $3,306
TOTAL COST: $2,645 $661 $3,306
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
244 of 305
HIGHWAY PROJECTS - RANDOLPH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-22R ProjectDescription
REALIGNMENT OF SR-22 FROM SR-22/MAINSTREET INTERSECTION TO US-431 IN ROANOKE
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.670 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004420 STPAA 0022 (505) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $7,847 $1,962 $9,809
TOTAL COST: $7,847 $1,962 $9,809
Route SR-48 ProjectDescription
REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047362 BR 0048 (502) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $3,368 $842 $4,210
TOTAL COST: $3,368 $842 $4,210
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
245 of 305
HIGHWAY PROJECTS - RANDOLPH
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-296 ProjectDescription
REPLACE BRIDGE ON CR-427 (OPELIKA ROAD) BIN # 1730 AND IMPROVEMENTS ON CR-296 (CUTRATE ROAD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059582 STPPC-ACAABRZ59582 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,395 $349 $1,743
TOTAL COST: $1,395 $349 $1,743
Route CR-NA ProjectDescription
RESURFACING AND WIDENING ON FREEMAN ROAD FROM SANDFORT ROAD TO SR-1 (US-431) IN PHENIX CITY
Type of Work RESURFACING
Project Length in Miles 2.300 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067563 STPPC 5717 () CONSTRUCTION
RESURFACING
2021 $322 $81 $403
TOTAL COST: $322 $81 $403
Route CR-NA ProjectDescription
WIDEN AND RESURFACE BRADLEY ROAD FROM NUCKOLS ROAD TO SR-165
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.940 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063092 STPPC 5714 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $412 $103 $515
TOTAL COST: $412 $103 $515
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
246 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE LATO ROAD FROM UCHEE HILL HIGHWAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.880 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063093 STPPC 5714 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $403 $101 $504
TOTAL COST: $403 $101 $504
Route CR-NA ProjectDescription
WIDEN AND RESURFACE TARVER ROAD FROM LATO ROAD TO NUCKOLS ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.240 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063094 STPPC 5714 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $314 $78 $392
TOTAL COST: $314 $78 $392
Route CR-NA ProjectDescription
RESURFACING AND WIDENING ON OWENS ROAD FROM MCCLENDON ROAD TO PATTERSON ROAD IN FORT MITCHELL
Type of Work RESURFACING
Project Length in Miles 0.496 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067564 STPPC 5717 () CONSTRUCTION
RESURFACING
2021 $69 $17 $87
TOTAL COST: $69 $17 $87
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
247 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING AND WIDENING ON OWENS ROAD FROM SR-165 TO MCCLENDON ROAD IN FORT MITCHELL
Type of Work RESURFACING
Project Length in Miles 1.200 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067565 STPPC 5717 () CONSTRUCTION
RESURFACING
2022 $168 $42 $210
TOTAL COST: $168 $42 $210
Route CR-NA ProjectDescription
RESURFACING AND WIDENING ON MCCLENDON ROAD FROM OWENS ROAD TO OWENS ROAD IN FORT MITCHELL
Type of Work RESURFACING
Project Length in Miles 1.884 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067566 STPPC 5717 () CONSTRUCTION
RESURFACING
2021 $264 $66 $330
TOTAL COST: $264 $66 $330
Route CR-NA ProjectDescription
BRICKYARD ROAD RESURFACING FROM DILLINGHAM STREET TO STATE DOCKS ROAD
Type of Work RESURFACING
Project Length in Miles 2.100 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063082 STPPC 5716 () CONSTRUCTION
RESURFACING
2019 $1,038 $260 $1,298
TOTAL COST: $1,038 $260 $1,298
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
248 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRICKYARD ROAD RESURFACING FROM STATE DOCKS ROAD TO CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 2.100 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063086 STPPC 5716 () CONSTRUCTION
RESURFACING
2019 $366 $92 $458
TOTAL COST: $366 $92 $458
Route CR-NA ProjectDescription
SOUTH RAILROAD STREET RESURFACING FROM BEGINNING OF SOUTH RAILROAD STREET TO STADIUM DRIVE
Type of Work RESURFACING
Project Length in Miles 1.360 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063088 STPPC 5716 () CONSTRUCTION
RESURFACING
2019 $791 $198 $989
TOTAL COST: $791 $198 $989
Route CR-NA ProjectDescription
SOUTH RAILROAD STREET RESURFACING FROM STADIUM DRIVE TO SUMMERVILLE DRIVE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063090 STPPC 5716 () CONSTRUCTION
RESURFACING
2019 $633 $158 $791
TOTAL COST: $633 $158 $791
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
249 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON SOUTH SEALE ROAD FROM SR-1 (US-431) TO THE BRIDGE AT SR-38 (US-280)
Type of Work RESURFACING
Project Length in Miles 4.111 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067443 STPPC 5717 () PRELIMINARY ENGINEERING
RESURFACING
2019 $45 $11 $56
100067444 STPPC 5717 () CONSTRUCTION
RESURFACING
2020 $287 $72 $359
TOTAL COST: $332 $83 $415
Route CR-NA ProjectDescription
RESURFACING ON 16TH AVENUE FROM SR-38 (US-280) TO INGERSOL COURT IN PHENIX CITY
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067445 STPPC 5717 () PRELIMINARY ENGINEERING
RESURFACING
2019 $72 $18 $90
100067446 STPPC 5717 () CONSTRUCTION
RESURFACING
2020 $458 $115 $573
TOTAL COST: $530 $133 $663
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
250 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SEALE ROAD OVER COCHGALECHEE CREEK BIN # 004291 IN PHENIX CITY
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area PHENIX CITY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067447 STPPC 5717 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $32 $8 $40
100067448 STPPC 5717 () UTILITIES
BRIDGE REPLACEMENT
2020 $32 $8 $40
100067449 STPPC 5717 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $352 $88 $440
TOTAL COST: $416 $104 $520
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
251 of 305
HIGHWAY PROJECTS - RUSSELL
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-11 ProjectDescription
SHELBY CR-11 (PHASE 2) GUARDRAIL AND RAILROAD CROSSING IMPROVMENTS: FROM SR-3 TO CR-68
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 1.580 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040846 STPBH 7118 () UTILITIES
SAFETY IMPROVEMENTS
2020 $10 $2 $12
100007571 STPBH 7118 () CONSTRUCTION
SAFETY IMPROVEMENTS
2020 $323 $81 $403
TOTAL COST: $332 $83 $415
Route CR-11 ProjectDescription
WIDEN AND RESURFACE CR-11 FROM SR-3 (US-31) TO CR-332 (WEATHERLY WAY)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 3.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007575 STPBH 7118 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $190 $48 $238
100007576 STPBH 7118 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $1,937 $484 $2,421
100007577 STPBH 7118 () UTILITIES
UTILITY ADJUSTMENT
2022 $963 $241 $1,204
100007572 STPBH 7118 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $3,078 $770 $3,848
TOTAL COST: $6,169 $1,542 $7,711
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
252 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-12 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064320 CMAQ 5915 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $200 $50 $250
100064321 CMAQ 5915 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $160 $40 $200
100064322 CMAQ 5915 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,600 $400 $2,000
TOTAL COST: $1,960 $490 $2,450
Route CR-1396 ProjectDescription
CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059534 ACAA59534 ATRP (015) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
253 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-17 ProjectDescription
ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046238 STPBH 7112 (602) UTILITIES
ADDITIONAL ROADWAY LANES
2020 $553 $138 $691
100046239 STPBH 7112 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $3,149 $787 $3,936
TOTAL COST: $3,702 $925 $4,627
Route CR-17 ProjectDescription
RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)
Type of Work RESURFACING
Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059513 ACAA59513 ATRP (010) CONSTRUCTION
RESURFACING
2018 $1,136 $284 $1,420
TOTAL COST: $1,136 $284 $1,420
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
254 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-17 ProjectDescription
RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067607 STPBH 5918 () CONSTRUCTION
RESURFACING
2020 $1,200 $300 $1,500
TOTAL COST: $1,200 $300 $1,500
Route CR-29 ProjectDescription
WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045964 STPBH 5939 (200) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $4,274 $1,069 $5,343
100007540 STPBH 5939 (200) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,589 $397 $1,986
TOTAL COST: $5,863 $1,466 $7,329
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
255 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-52 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059503 STPBH-ACBR59503 ATRP (012)
CONSTRUCTION
BRIDGES AND APPROACHES
2019 $3,702 $926 $4,628
TOTAL COST: $3,702 $926 $4,628
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059509 CMAQ 5918 (250) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $760 $190 $950
TOTAL COST: $760 $190 $950
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
256 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-55 ProjectDescription
BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056309 STPBH 5914 (250) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $772 $193 $965
100056310 STPBH 5914 (250) UTILITIES
UTILITY ADJUSTMENT
2019 $200 $50 $250
100056311 STPBH 5914 () CONSTRUCTION
BRIDGES AND APPROACHES
2020 $1,000 $250 $1,250
TOTAL COST: $1,972 $493 $2,465
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
257 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033064 STPBH 9802 (905) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $10,212 $2,553 $12,765
TOTAL COST: $10,212 $2,553 $12,765
Route CR-NA ProjectDescription
SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.853 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063242 STPBH-CMAQ 5915 (250)
UTILITIES
INTERSECTION IMPROVEMENTS
2019 $60 $15 $75
100063243 STPBH-CMAQ 5915 (250)
CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $1,359 $340 $1,699
TOTAL COST: $1,419 $355 $1,774
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
258 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
CONGESTION MGT. TRAFFIC SYSTEM, SUPP. ITS DEVICES ALONG I-65 FROM SR-119 (EXIT 246) TO NORTH OF I-20/I-59 (EXIT 261), INCLUDES CCTV AND RADAR
Type of Work UNCLASSIFIED
Project Length in Miles 15.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046079 CMAQ I065 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $213 $53 $266
100046081 CMAQ I065 () CONSTRUCTION
UNCLASSIFIED 2020 $2,817 $704 $3,521
100046080 CMAQ I065 () SPECIAL
UNCLASSIFIED 2020 $469 $117 $587
TOTAL COST: $3,499 $875 $4,374
Route I -65 ProjectDescription
BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833
Type of Work BRIDGE WIDENING
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055322 IMF I065 () PRELIMINARY ENGINEERING
BRIDGE WIDENING
2020 $746 $83 $829
100055323 IMF I065 () CONSTRUCTION
BRIDGE WIDENING
2022 $7,000 $778 $7,778
TOTAL COST: $7,746 $861 $8,607
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
259 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485
Type of Work BRIDGE WIDENING
Project Length in Miles 0.040 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055332 IMF I065 () PRELIMINARY ENGINEERING
BRIDGE WIDENING
2020 $368 $41 $409
100055333 IMF I065 () CONSTRUCTION
BRIDGE WIDENING
2022 $3,756 $417 $4,173
TOTAL COST: $4,125 $458 $4,583
Route I -65 ProjectDescription
BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87
Type of Work BRIDGE WIDENING
Project Length in Miles 0.540 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055334 IMF I065 () PRELIMINARY ENGINEERING
BRIDGE WIDENING
2020 $1,297 $144 $1,442
100055335 IMF I065 () CONSTRUCTION
BRIDGE WIDENING
2022 $12,212 $1,357 $13,569
TOTAL COST: $13,509 $1,501 $15,010
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
260 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .
Type of Work UNCLASSIFIED
Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032369 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $230 $58 $288
TOTAL COST: $230 $58 $288
Route NA- ProjectDescription
HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD
Type of Work UNCLASSIFIED
Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032383 CMAQ 9802 (925) CONSTRUCTION
UNCLASSIFIED 2019 $2,261 $565 $2,826
100032386 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $287 $72 $358
TOTAL COST: $2,547 $637 $3,184
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
261 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054519 CMAQ 5917 (904) CONSTRUCTION
UNCLASSIFIED 2019 $1,032 $258 $1,290
TOTAL COST: $1,032 $258 $1,290
Route NA- ProjectDescription
CALERA NORTHERN BYPASS FROM SR-25 WEST OF CALERA TO SR-3 (US-31) NORTH OF CALERA
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050235 HPP A152 (901) PRELIMINARY ENGINEERING
GRADE, DRAIN AND BRIDGE
2020 $299 $75 $374
100050243 HPP A152 () RIGHT OF WAY
GRADE, DRAIN AND BRIDGE
2021 $1,796 $449 $2,245
100050244 HPP A152 () UTILITIES
GRADE, DRAIN AND BRIDGE
2022 $292 $73 $365
100050239 HPP-STPBH A152 () CONSTRUCTION
GRADE, DRAIN AND BRIDGE
2022 $4,863 $1,216 $6,078
TOTAL COST: $7,250 $1,812 $9,062
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
262 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060174 STPAA NR13 (909) CONSTRUCTION
SIDEWALK 2019 $1,432 $358 $1,790
TOTAL COST: $1,432 $358 $1,790
Route NA- ProjectDescription
PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064282 CMAQ 5916 (252) CONSTRUCTION
UNCLASSIFIED 2018 $4,390 $1,097 $5,487
TOTAL COST: $4,390 $1,097 $5,487
Route NA- ProjectDescription
DOWNTOWN SIDEWALK IMPROVEMENT ALONG SR-25 (US-231) IN DOWNTOWN VINCENT.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064513 TAPNU TA15 (909) CONSTRUCTION
SIDEWALK 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
263 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065162 CMAQ 5916 (253) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065163 CMAQ 5916 (253) UTILITIES
SIDEWALK 2020 $83 $21 $104
TOTAL COST: $166 $41 $207
Route NA- ProjectDescription
MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067294 TAPAA-CMAQ TA17 (904)
CONSTRUCTION
UNCLASSIFIED 2019 $1,183 $296 $1,479
TOTAL COST: $1,183 $296 $1,479
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
264 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061118 ACAA61118 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $9,839 $2,460 $12,298
TOTAL COST: $9,839 $2,460 $12,298
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061286 STPBH 0119 (510) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $426 $106 $532
100063109 STPBH 0119 (510) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $600 $150 $750
TOTAL COST: $1,026 $256 $1,282
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
265 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-25 ProjectDescription
BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.011 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066556 BR 0025 (550) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $500 $500 $1,000
TOTAL COST: $500 $500 $1,000
Route SR-261 ProjectDescription
ADD LANES SR-261 FROM BEARDEN RD TO SR-3 (US-31)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046437 STPAA 7112 () UTILITIES
ADDITIONAL ROADWAY LANES
2020 $1,381 $345 $1,726
100009265 STPAA 7112 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $22,372 $5,593 $27,965
TOTAL COST: $23,753 $5,938 $29,691
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
266 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-261 ProjectDescription
HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 5.897 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049209 HPP A139 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $1,945 $486 $2,431
100049210 HPP A139 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $117 $29 $146
100049211 HPP-STPBH A139 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $20,826 $5,207 $26,033
TOTAL COST: $22,888 $5,722 $28,610
Route SR-261 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067712 CMAQ 0261 (501) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $326 $82 $408
100067713 CMAQ 0261 (501) UTILITIES
INTERSECTION IMPROVEMENTS
2021 $595 $149 $743
100067714 CMAQ 0261 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $1,210 $303 $1,513
TOTAL COST: $2,131 $533 $2,664
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
267 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039450 STPBH 7012 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $449 $112 $561
TOTAL COST: $449 $112 $561
Route SR-3 ProjectDescription
SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057649 BR 0003 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $437 $109 $546
100057650 BR 0003 () CONSTRUCTION
BRIDGE REPLACEMENT
2025 $4,585 $1,146 $5,732
TOTAL COST: $5,022 $1,255 $6,277
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
268 of 305
HIGHWAY PROJECTS - SHELBY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -20 ProjectDescription
BRIDGE ANDAPPROACHES (BIN 007850 AND 007851) ON I-20 OVER COOSA RIVER AT ST. CLAIR AND TALLADEGA CO LINE
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 1.500 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064150 BR I020 () PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2020 $704 $176 $880
100042214 BR I020 () CONSTRUCTION
BRIDGES AND APPROACHES
2025 $18,048 $4,512 $22,560
TOTAL COST: $18,752 $4,688 $23,441
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 4.983 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068218 IM I020 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,818 $758 $7,575
TOTAL COST: $6,818 $758 $7,575
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
269 of 305
HIGHWAY PROJECTS - ST. CLAIR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049965 BRF I059 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $285 $71 $357
100049999 BRF I059 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
100049998 BRF I059 () UTILITIES
BRIDGE REPLACEMENT
2023 $36 $9 $45
100049966 BRF I059 () CONSTRUCTION
BRIDGE REPLACEMENT
2023 $5,898 $1,474 $7,372
TOTAL COST: $6,276 $1,569 $7,844
Route I -59 ProjectDescription
CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 8.660 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066472 IM I059 () CONSTRUCTION
PAVEMENT REHABILITATION
2021 $14,454 $1,606 $16,060
TOTAL COST: $14,454 $1,606 $16,060
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
270 of 305
HIGHWAY PROJECTS - ST. CLAIR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-23 ProjectDescription
BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040861 BR 5815 (200) UTILITIES
BRIDGE REPLACEMENT
2020 $23 $6 $29
100013032 BR 5815 (200) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $946 $237 $1,183
TOTAL COST: $969 $242 $1,212
Route SR-25 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT PARK AVENUE AND AT CR-6 (SANIE ROAD/SIMPSON ROAD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064325 CMAQ 0025 (547) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,513 $378 $1,892
TOTAL COST: $1,513 $378 $1,892
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
271 of 305
HIGHWAY PROJECTS - ST. CLAIR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-34 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.002 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066390 STPAA-HSIP 0034 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $316 $45 $361
100066391 STPAA-HSIP 0034 () UTILITIES
INTERSECTION IMPROVEMENTS
2021 $455 $65 $520
100066392 STPAA-HSIP 0034 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $1,366 $195 $1,561
TOTAL COST: $2,137 $305 $2,442
Route SR-53 ProjectDescription
SR-53 (US-231) ADD LANES FROM CR-516 (CROPWELL DR) TO SR-34
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.590 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056633 STPAA 0053 () UTILITIES
ADDITIONAL ROADWAY LANES
2020 $15 $4 $19
100056635 STPAA 0053 (565) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $3,363 $841 $4,204
TOTAL COST: $3,379 $845 $4,223
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
272 of 305
HIGHWAY PROJECTS - ST. CLAIR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-7 ProjectDescription
ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052628 HPP A187 (900) CONSTRUCTION
DRAINAGE CORRECTION
2019 $640 $160 $800
TOTAL COST: $640 $160 $800
Route SR-7 ProjectDescription
DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.789 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055162 HPP 10AL (002) CONSTRUCTION
DRAINAGE CORRECTION
2019 $633 $158 $791
TOTAL COST: $633 $158 $791
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
273 of 305
HIGHWAY PROJECTS - ST. CLAIR
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
FY-2019 LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTHEAST REGION
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033116 STATE RESURFACING LVOE ()
SPECIAL
UNCLASSIFIED 2019 $46,592 $11,648
$58,240
TOTAL COST: $46,592 $11,648
$58,240
Route NA- ProjectDescription
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046551 TAP LVOE () SPECIAL
UNCLASSIFIED 2019 $52,730 $13,183
$65,913
TOTAL COST: $52,730 $13,183
$65,913
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
274 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
LEVEL OF EFFORT SAFETY PROGRAM FY-2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048788 SAFETY LVOE () SPECIAL
UNCLASSIFIED 2019 $61,306 $6,812 $68,118
TOTAL COST: $61,306 $6,812 $68,118
Route NA- ProjectDescription
LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056581 COUNTY LVOE () SPECIAL
UNCLASSIFIED 2019 $35,711 $8,928 $44,639
TOTAL COST: $35,711 $8,928 $44,639
Route NA- ProjectDescription
LEVEL OF EFFORT FEDERAL AID RESURFACING EAST CENTRAL REGION FOR FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057571 STATE RESURFACING LVOE ()
SPECIAL
UNCLASSIFIED 2019 $28,288 $7,072 $35,360
TOTAL COST: $28,288 $7,072 $35,360
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
275 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
LEVEL OF EFFORT FEDERAL AID RESURFACING NORTH REGION FOR FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063428 STATE RESURFACING LVOE ()
SPECIAL
UNCLASSIFIED 2019 $36,608 $9,152 $45,760
TOTAL COST: $36,608 $9,152 $45,760
Route NA- ProjectDescription
LEVEL OF EFFORT FEDERAL AID RESURFACING WEST CENTRAL REGION FOR FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063432 STATE RESURFACING LVOE ()
SPECIAL
UNCLASSIFIED 2019 $28,288 $7,072 $35,360
TOTAL COST: $28,288 $7,072 $35,360
Route NA- ProjectDescription
LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTH WEST REGION FOR FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063436 STATE RESURFACING LVOE ()
SPECIAL
UNCLASSIFIED 2019 $26,624 $6,656 $33,280
TOTAL COST: $26,624 $6,656 $33,280
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
276 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
LEVEL OF EFFORT SEC. 5307 SMALL URBAN TRANSIT - OPR, CAPITAL, JARC - (FY 2015 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063770 FTA9 TR19 () TRANSIT
UNCLASSIFIED 2019 $8,305 $2,076 $10,381
TOTAL COST: $8,305 $2,076 $10,381
Route NA- ProjectDescription
LEVEL OF EFFORT SEC. 5307 SMALL URBAN TRANSIT - OPR, CAPITAL, JARC - FY 2016
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063781 FTA9 TR20 () TRANSIT
UNCLASSIFIED 2020 $8,350 $2,088 $10,438
TOTAL COST: $8,350 $2,088 $10,438
Route NA- ProjectDescription
LEVEL OF EFFORT SEC. 5310 SMALL URBAN AND RURAL TRANSIT CAPITAL (FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063782 UMTA TR19 () TRANSIT
UNCLASSIFIED 2019 $2,756 $689 $3,445
TOTAL COST: $2,756 $689 $3,445
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
277 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
LEVEL OF EFFORT SEC. 5311 - OPR, ADMIN, CAPITAL, INTERCITY BUS, RTAP, APPALACHIAN DEV, (FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063783 RTAP TR19 () TRANSIT
UNCLASSIFIED 2019 $20,641 $5,160 $25,802
TOTAL COST: $20,641 $5,160 $25,802
Route NA- ProjectDescription
ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2022
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064438 FRT-STPAA-STPNU ATRP (999)
SPECIAL
UNCLASSIFIED 2022 $116,000 $25,460
$141,460
TOTAL COST: $116,000 $25,460
$141,460
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
278 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067513 RECREATIONAL TRAILS LVOE ()
SPECIAL
UNCLASSIFIED 2019 $1,732 $433 $2,165
TOTAL COST: $1,732 $433 $2,165
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
279 of 305
HIGHWAY PROJECTS - STATEWIDE
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON NAT JONES ROAD 0.5 MILES SOUTH OF WATSON ROAD BIN #12051
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061899 ACBRZ61899 ATRP (017)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $191 $48 $239
TOTAL COST: $191 $48 $239
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON WATSON ROAD OVER TIFALLILA CREEK 0.1 MILES SOUTH OF CR-30 BIN # 6027
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061901 ACBRZ61901 ATRP () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $127 $32 $159
TOTAL COST: $127 $32 $159
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT OVER TIFALLILA CREEK ON WATSON ROAD 2.0 MILES SOUTH OF CR-30 BIN # 6028
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062010 ACBRZ62010 ATRP (016)
CONSTRUCTION
BRIDGE REPLACEMENT
2020 $246 $62 $308
TOTAL COST: $246 $62 $308
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
280 of 305
HIGHWAY PROJECTS - SUMTER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-17 ProjectDescription
REPLACE BRIDGE, BIN 002307, SR-17 OVER SUCARNOOCHEE RIVER RELIEF (SUFF=11.6, STATUS=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.150 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049155 BR 0017 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $14 $3 $17
100049156 BR 0017 () UTILITIES
BRIDGE REPLACEMENT
2020 $42 $10 $52
100049157 BR 0017 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $4,386 $1,096 $5,482
TOTAL COST: $4,441 $1,110 $5,551
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
281 of 305
HIGHWAY PROJECTS - SUMTER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-7 ProjectDescription
BRIDGE REPLACEMENT ON SR-7(US-11) OVER TOOMSUBA CREEK BIN 002909 AND BIN 002908 RELIEF (SUFF=50.5, STATUS=2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.301 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042197 BR 0007 (502) UTILITIES
BRIDGE REPLACEMENT
2021 $144 $36 $181
100038699 BR 0007 (502) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $3,485 $871 $4,356
TOTAL COST: $3,629 $907 $4,537
Route SR-7 ProjectDescription
BRIDGE REPLACEMENT ON SR-7 (US-11) OVER PARKER CREEK. BIN #002884, STR # 7-60-13.153. (SUFF=45.2, STAT=2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040205 BR 0007 (503) UTILITIES
BRIDGE REPLACEMENT
2022 $171 $43 $214
100040203 BR 0007 (503) CONSTRUCTION
BRIDGE REPLACEMENT
2022 $1,285 $321 $1,606
TOTAL COST: $1,456 $364 $1,819
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
282 of 305
HIGHWAY PROJECTS - SUMTER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-47 ProjectDescription
EXTENSION OF CR-047 (PRIEBES MILL ROAD) FROM CR-058 (JENIFER ROAD) NEAR JENIFER TO SR-21
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059434 ACNU59434 ATRP (007) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $4,944 $1,236 $6,180
TOTAL COST: $4,944 $1,236 $6,180
Route CR-NA ProjectDescription
MAGNOLIA STREET IMPROVEMENTS FROM SR-77 TO SR-4 (US-78) IN LINCOLN
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.830 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062174 ACNU62174 ATRP (005) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,822 $455 $2,277
TOTAL COST: $1,822 $455 $2,277
Route I -20 ProjectDescription
INTERCHANGE LIGHTING ON I-20 AT CR-207 (EXIT 165)
Type of Work LIGHTING
Project Length in Miles 0.402 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004964 IM I020 (338) CONSTRUCTION
LIGHTING 2021 $656 $73 $729
TOTAL COST: $656 $73 $729
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
283 of 305
HIGHWAY PROJECTS - TALLADEGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-21 ProjectDescription
SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.700 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060130 BR 0021 (554) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $3,379 $845 $4,224
TOTAL COST: $3,379 $845 $4,224
Route SR-21 ProjectDescription
SR-21 REPLACE BRIDGE BIN #001441 NO. 21-61-27.1 OVER SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002467 BR 0021 () RIGHT OF WAY
BRIDGE REPLACEMENT
2021 $393 $98 $491
100002464 BR 0021 () CONSTRUCTION
BRIDGE REPLACEMENT
2024 $3,213 $803 $4,017
TOTAL COST: $3,606 $902 $4,508
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
284 of 305
HIGHWAY PROJECTS - TALLADEGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-34 ProjectDescription
REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, NEAR CR-366. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.013 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100041617 BR 0034 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,573 $393 $1,966
TOTAL COST: $1,573 $393 $1,966
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
285 of 305
HIGHWAY PROJECTS - TALLADEGA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-50 ProjectDescription
REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.003 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067062 BR 0050 (505) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $202 $51 $253
100049968 BR 0050 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,518 $630 $3,148
TOTAL COST: $2,720 $680 $3,400
Route SR-63 ProjectDescription
BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067663 BR 0063 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,224 $306 $1,530
TOTAL COST: $1,224 $306 $1,530
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
286 of 305
HIGHWAY PROJECTS - TALLAPOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-107 ProjectDescription
PATCHING, RESURFACING AND STRIPING ON CR-107 (FRANK LARY ROAD) FROM CR-54 (MITT LARY ROAD) TO CR-98 (LARY LAKE ROAD)
Type of Work RESURFACING
Project Length in Miles 1.945 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061864 ACOA61864 ATRP (017) CONSTRUCTION
RESURFACING
2020 $705 $176 $882
TOTAL COST: $705 $176 $882
Route CR-115 ProjectDescription
BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059617 ACBRZ59617 ATRP (007)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $938 $235 $1,173
TOTAL COST: $938 $235 $1,173
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
287 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059618 ACBRZ59618 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $383 $96 $479
TOTAL COST: $383 $96 $479
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059619 ACBRZ59619 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $241 $60 $302
TOTAL COST: $241 $60 $302
Route CR-1358 ProjectDescription
BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059621 ACBRZ59621 ATRP (007)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $694 $173 $867
TOTAL COST: $694 $173 $867
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
288 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-66 ProjectDescription
ADDITIONAL LANES ON BEAR CREEK ROAD AND BEAR CREEK CUTOFF ROAD FROM SR-69 TO SR-215
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066303 TRC-ST-063-999-024 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $0 $1,236 $1,236
100066304 TRC-ST-063-999-025 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $0 $412 $412
100066305 TRC-ST-063-999-026 () UTILITIES
ADDITIONAL ROADWAY LANES
2019 $0 $3,194 $3,194
100066306 TRC-ST-063-999-027 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $0 $6,244 $6,244
TOTAL COST: $0 $11,086
$11,086
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
289 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK
Type of Work TURN LANES
Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008464 STPOA 6317 (250) RIGHT OF WAY
TURN LANES 2019 $901 $225 $1,127
100043870 STPOA 6317 (250) UTILITIES
TURN LANES 2020 $455 $114 $569
100008460 STPOA 6317 () CONSTRUCTION
TURN LANES 2020 $5,463 $1,366 $6,829
TOTAL COST: $6,820 $1,705 $8,524
Route CR-NA ProjectDescription
RESURFACE VARIOUS ELIGIBLE STREETS IN THE CITY OF TUSCALOOSA FY10
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053859 STPAA 6314 () CONSTRUCTION
RESURFACING
2020 $246 $61 $307
TOTAL COST: $246 $61 $307
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
290 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING KENNEDY MILL ROAD FROM SR-216 TO HOLT-PETERSON ROAD
Type of Work RESURFACING
Project Length in Miles 0.760 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061867 ACOA61867 ATRP (017) CONSTRUCTION
RESURFACING
2020 $364 $91 $455
TOTAL COST: $364 $91 $455
Route CR-NA ProjectDescription
RESURFACING HOLT-PETERSON ROAD FROM KENNEDY MILL ROAD TO ALABAMA AVENUE
Type of Work RESURFACING
Project Length in Miles 2.020 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061868 ACOA61868 ATRP (017) CONSTRUCTION
RESURFACING
2020 $750 $188 $938
TOTAL COST: $750 $188 $938
Route CR-NA ProjectDescription
WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET
Type of Work RESURFACING
Project Length in Miles 1.365 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061873 ACOA61873 ATRP (017) CONSTRUCTION
RESURFACING
2019 $1,491 $373 $1,864
TOTAL COST: $1,491 $373 $1,864
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
291 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING SAND ROAD FROM ROMULUS ROAD TO FROG RIDGE ROAD.
Type of Work RESURFACING
Project Length in Miles 1.236 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061874 ACOA61874 ATRP (017) CONSTRUCTION
RESURFACING
2020 $378 $95 $473
TOTAL COST: $378 $95 $473
Route CR-NA ProjectDescription
WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008465 STPOA 6314 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $451 $113 $563
100043871 STPOA 6314 () UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $273 $68 $341
100008461 STPOA 6314 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $455 $114 $569
TOTAL COST: $1,179 $295 $1,474
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
292 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
RESURFACING ON I-59 (I-20) FROM SR-69 (I-359) TO EAST OF SR-6 (US-82) AND ADDITIONAL LANES BETWEEN SR-215 AND SR-6 (US-82), GRADE, DRAIN, BASE, PAVE, SIGNING, STRIPING, AND RESURFACING
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039473 IM-NH I059 (399) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2019 $3,858 $923 $4,780
TOTAL COST: $3,858 $923 $4,780
Route NA- ProjectDescription
CURB RAMP INSTALLATION ON STATE ROUTES AT VARIOUS LOCATIONS IN TUSCALOOSA COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068201 STPAA NR18 () CONSTRUCTION
SIDEWALK 2020 $224 $56 $281
TOTAL COST: $224 $56 $281
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
293 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-13 ProjectDescription
BR #13-63-46.4A ROCKY CREEK RELIEF BR ON US-43
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003223 BR 0354 () RIGHT OF WAY
BRIDGE REPLACEMENT
2022 $12 $3 $15
100003222 BR 0354 () CONSTRUCTION
BRIDGE REPLACEMENT
2023 $413 $103 $517
TOTAL COST: $425 $106 $531
Route SR-215 ProjectDescription
ADD LANES ON SR-215 FROM SR-216 TO SR-7 (US-11) AND REALIGN INTERSECTION WITH SR-7 (US-11)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.400 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066568 NH 0215 (504) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2024 $962 $241 $1,203
100066569 NH 0215 (504) UTILITIES
ADDITIONAL ROADWAY LANES
2024 $945 $236 $1,181
100066570 NH 0215 (504) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2025 $5,784 $1,446 $7,230
TOTAL COST: $7,691 $1,923 $9,614
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
294 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-5 ProjectDescription
SR-5 BRG REMOVAL 5-63-2.3 AANDB OVER L AND N RR (ABAND), BIN 005799 AND 005800
Type of Work OVERPASS REMOVAL
Project Length in Miles 0.880 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057835 BR 0005 (540) UTILITIES
OVERPASS REMOVAL
2022 $67 $17 $84
100038399 BR 0005 () CONSTRUCTION
OVERPASS REMOVAL
2022 $764 $191 $955
TOTAL COST: $831 $208 $1,038
Route SR-6 ProjectDescription
WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD
Type of Work INTERCHANGE
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065855 TRC-ST-063-006-018 () RIGHT OF WAY
INTERCHANGE
2019 $0 $455 $455
100064404 TRC-ACAA64404 ATRP (004)
CONSTRUCTION
INTERCHANGE
2019 $7,257 $1,814 $9,072
TOTAL COST: $7,257 $2,269 $9,526
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
295 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-6 ProjectDescription
ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 4.282 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065115 TRC-ST-063-999-039 () UTILITIES
INTERSECTION IMPROVEMENTS
2022 $0 $531 $531
100065114 TRC-ST-063-999-040 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2022 $0 $7,195 $7,195
TOTAL COST: $0 $7,725 $7,725
Route SR-6 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.410 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068733 NH 0006 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $408 $102 $510
100068734 NH 0006 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $612 $153 $765
100068735 NH 0006 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $24,482 $6,121 $30,603
TOTAL COST: $25,503 $6,376 $31,878
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
296 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-69 ProjectDescription
INTERSECTION IMPROVEMENT ON SR-69ATCR-84 (CHARLIE SHIRLEY RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.380 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057493 TRC-ST-063-999-035 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2021 $0 $105 $105
100057494 TRC-ST-063-999-036 () UTILITIES
INTERSECTION IMPROVEMENTS
2022 $0 $241 $241
100053306 TRC-ST-063-999-037 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2022 $0 $627 $627
TOTAL COST: $0 $973 $973
Route SR-69 ProjectDescription
REALIGNMENT OF INTERSECTION SR-69 AT CR-62 (UNION CHAPEL RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.360 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053651 TRC-ST-063-069-013 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2018 $0 $1,022 $1,022
TOTAL COST: $0 $1,022 $1,022
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
297 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-69 ProjectDescription
SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.430 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057986 TRC-ST-063-999-030 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $0 $2,081 $2,081
100057987 TRC-ST-063-999-031 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $0 $51,877
$51,877
TOTAL COST: $0 $53,959
$53,959
Route SR-7 ProjectDescription
REPLACE WARRIOR RIVER REL(7-63-10.6)ON US-11ATMP 70.0
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100013141 BR 0007 () RIGHT OF WAY
BRIDGE REPLACEMENT
2021 $29 $7 $36
100042253 BR 0007 () UTILITIES
BRIDGE REPLACEMENT
2021 $117 $29 $146
100013137 BR 0007 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $782 $196 $978
TOTAL COST: $928 $232 $1,160
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
298 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-7 ProjectDescription
REPLACE WARRIOR RIVER REL(7-63-11.5)ON US-11ATMP 70.9
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100013142 BR 0007 () RIGHT OF WAY
BRIDGE REPLACEMENT
2021 $29 $7 $36
100042254 BR 0007 () UTILITIES
BRIDGE REPLACEMENT
2021 $117 $29 $146
100013138 BR 0007 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $666 $166 $832
TOTAL COST: $812 $203 $1,014
Route SR-7 ProjectDescription
REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.262 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055891 BR 0007 (546) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $125 $31 $156
100055892 BR 0007 (546) UTILITIES
BRIDGE REPLACEMENT
2020 $141 $35 $176
100055893 BR 0007 (546) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,214 $304 $1,518
TOTAL COST: $1,480 $370 $1,850
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
299 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-7 ProjectDescription
SR-7 (US-11) ADD LANE FROM LOWER COALING RD (MP 92.960) TO HAGLER COALING RD (MP 94.007)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.047 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057792 STPAA 0007 (534) UTILITIES
ADDITIONAL ROADWAY LANES
2022 $2,405 $601 $3,006
100057793 STPAA 0007 (534) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2023 $4,458 $1,114 $5,572
TOTAL COST: $6,862 $1,716 $8,578
Route SR-7 ProjectDescription
ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.920 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068755 STPAA 0007 (549) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $4,848 $1,212 $6,060
100068756 STPAA 0007 (549) UTILITIES
ADDITIONAL ROADWAY LANES
2020 $4,896 $1,224 $6,121
100068757 STPAA 0007 (549) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $33,459 $8,365 $41,824
TOTAL COST: $43,204 $10,801
$54,005
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
300 of 305
HIGHWAY PROJECTS - TUSCALOOSA
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-64 ProjectDescription
BRIDGE ALONG CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK BIN # 11168
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060969 ACBRZ60969 ATRP (008)
CONSTRUCTION
BRIDGES AND APPROACHES
2019 $1,558 $389 $1,947
TOTAL COST: $1,558 $389 $1,947
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK BIN# 87
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060970 ACBRZ60970 ATRP (008)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $825 $206 $1,031
TOTAL COST: $825 $206 $1,031
Route I -22 ProjectDescription
PLANING AND RESURFACING ON I-22 FROM JUST EAST OF BYLER ROAD OVERPASS AT MP 40.3 TO JUST EAST OF EXIT 46 AT MP 47.185
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 6.910 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065945 IM I022 (307) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $7,142 $794 $7,935
TOTAL COST: $7,142 $794 $7,935
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
301 of 305
HIGHWAY PROJECTS - WALKER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-5 ProjectDescription
BIN #007638 ON SR-5 OVER SR-69 (US-78)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040851 BRF 0005 (534) UTILITIES
BRIDGE REPLACEMENT
2021 $23 $6 $29
100003188 BR 0005 (534) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $5,765 $1,441 $7,206
TOTAL COST: $5,788 $1,447 $7,235
Route SR-5 ProjectDescription
REMOVE BIN #004013, SR-5 (US-78) OVER ABANDONED FRISCO (BNSF) RAILROAD, NEAR DORA
Type of Work BRIDGE REMOVAL
Project Length in Miles 0.090 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065246 BR 0005 () PRELIMINARY ENGINEERING
BRIDGE REMOVAL
2020 $125 $31 $156
100042712 BR 0005 () RIGHT OF WAY
BRIDGE REMOVAL
2022 $12 $3 $15
100042711 BR 0005 () UTILITIES
BRIDGE REMOVAL
2022 $59 $15 $73
100042710 BR 0005 () CONSTRUCTION
BRIDGE REMOVAL
2023 $533 $133 $666
TOTAL COST: $728 $182 $910
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
302 of 305
HIGHWAY PROJECTS - WALKER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-69 ProjectDescription
REPLACE BRIDGE, BIN 004090, SR-69 OVER BURLINGTON RAILROAD, SOUTH OF SR-124 (SUFF=46, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049979 BR 0069 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
100049980 BR 0069 () UTILITIES
BRIDGE REPLACEMENT
2021 $35 $9 $44
100049945 BR 0069 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $2,639 $660 $3,299
TOTAL COST: $2,731 $683 $3,414
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
303 of 305
HIGHWAY PROJECTS - WALKER
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-5 ProjectDescription
REPLACE BRIDGE, BIN 001717, ON SR-5 OVER MUD CREEK. (SUFF 50.0,STAT=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.100 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051323 BR 0005 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $39 $10 $49
100051324 BR 0005 () UTILITIES
BRIDGE REPLACEMENT
2020 $219 $55 $273
100051325 BR 0005 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,934 $483 $2,417
TOTAL COST: $2,191 $548 $2,739
Route SR-5 ProjectDescription
SR-5 BRIDGE REPLACEMENT BIN 002261 AT CUB CREEK AND BIN 002262 AT MOCCASIN CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052919 BRF 0005 (527) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $5,153 $1,288 $6,442
TOTAL COST: $5,153 $1,288 $6,442
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
304 of 305
HIGHWAY PROJECTS - WILCOX
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-13 ProjectDescription
SR-13 FROM WALKER COUNTY LINE TO SR-74 (US-278) BASE AND PAVE
Type of Work BASE AND PAVE
Project Length in Miles 6.342 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004676 NH 0013 () PRELIMINARY ENGINEERING
BASE AND PAVE
2022 $335 $84 $419
100004671 NH 0013 () CONSTRUCTION
BASE AND PAVE
2023 $10,879 $2,720 $13,598
TOTAL COST: $11,214 $2,804 $14,018
Route SR-13 ProjectDescription
SR-13 FROM WALKER COUNTY LINE TO SR-74 (US-278) BASE AND PAVE
Type of Work GRADE AND DRAIN
Project Length in Miles 6.342 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100004681 NH 0013 () RIGHT OF WAY
GRADE AND DRAIN
2021 $2,451 $613 $3,063
100048225 NH 0013 () UTILITIES
GRADE AND DRAIN
2021 $350 $88 $438
100004672 NH 0013 () CONSTRUCTION
GRADE AND DRAIN
2022 $5,830 $1,457 $7,287
TOTAL COST: $8,630 $2,158 $10,788
2/12/2019 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
305 of 305
HIGHWAY PROJECTS - WINSTON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019