14.lil gea dc 014 (nesting procedure)

Upload: langcv

Post on 28-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    1/6

    Doc. No.:LIL-GEA-DC-014

    GREENSVILLE PROJECT

    NESTING PROCEDURE

    Lilama69-1 Joint Stock Company Page1 | 1

    LILAMA69-1

    Total sheets : [6]

    Vendor's NAME: Lilama 69-1 Joint Stock Company

    Owner Name:

    Purchaser: GEA Heat Exchangers, Inc.

    Plant Location: USAProject name: Greenville / USA

    P.O. No./ Date: 4500118183 / 09.11.2015

    Item number: Steam Ducting

    DOCUMENT TITLE: Nesting ProcedureDOCUMENT NO.: LIL-GEA-DC-014

    Enter Issue Purpose

    FA: For Approval

    FI: For Information

    FC: For Construction

    3

    2

    1

    0 11-Apr-2016 FA C.V.LANG V.T.THANG V.T.THANG

    Rev Submission DateIssue

    PurposePrepared Checked Approved

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    2/6

    NestingwillbeapplyCU.9toCU.3

    AndCU.10toCu.4ofrow-01torow-05

    how

    cantheyensurethat

    duringnestingp

    rocedure

    thedifferenttem

    porary

    supportswillrotateand

    bendwhatcouldcreate

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    3/6

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    4/6

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    5/6

    supportbeams

    mustbe

    fixed-e.g.byta

    ckwelding-

    toavoidrotation

    insidethe

    shelldurin

    tran

    sortation!

    asanalternative:

    ifthethenestedSDD

    aswellastherailingsystemwillbe

    properfixedtoea

    chotherleavethe

    railsysteminplaceduringtransortation!

    Pleasethinkabou

    tthepossibility!

  • 7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)

    6/6

    fixationbymeansof

    cableandrubber

    wontbestableenough-stresses

    occurredbytranspor

    tationmovingwill

    givendirectlytotheSDD

    internalswhat

    wontbeacceptable!