14.lil gea dc 014 (nesting procedure)
TRANSCRIPT
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
1/6
Doc. No.:LIL-GEA-DC-014
GREENSVILLE PROJECT
NESTING PROCEDURE
Lilama69-1 Joint Stock Company Page1 | 1
LILAMA69-1
Total sheets : [6]
Vendor's NAME: Lilama 69-1 Joint Stock Company
Owner Name:
Purchaser: GEA Heat Exchangers, Inc.
Plant Location: USAProject name: Greenville / USA
P.O. No./ Date: 4500118183 / 09.11.2015
Item number: Steam Ducting
DOCUMENT TITLE: Nesting ProcedureDOCUMENT NO.: LIL-GEA-DC-014
Enter Issue Purpose
FA: For Approval
FI: For Information
FC: For Construction
3
2
1
0 11-Apr-2016 FA C.V.LANG V.T.THANG V.T.THANG
Rev Submission DateIssue
PurposePrepared Checked Approved
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
2/6
NestingwillbeapplyCU.9toCU.3
AndCU.10toCu.4ofrow-01torow-05
how
cantheyensurethat
duringnestingp
rocedure
thedifferenttem
porary
supportswillrotateand
bendwhatcouldcreate
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
3/6
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
4/6
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
5/6
supportbeams
mustbe
fixed-e.g.byta
ckwelding-
toavoidrotation
insidethe
shelldurin
tran
sortation!
asanalternative:
ifthethenestedSDD
aswellastherailingsystemwillbe
properfixedtoea
chotherleavethe
railsysteminplaceduringtransortation!
Pleasethinkabou
tthepossibility!
-
7/25/2019 14.LIL GEA DC 014 (Nesting Procedure)
6/6
fixationbymeansof
cableandrubber
wontbestableenough-stresses
occurredbytranspor
tationmovingwill
givendirectlytotheSDD
internalswhat
wontbeacceptable!