16 cost sheet eng
DESCRIPTION
Cost SheetTRANSCRIPT
16 Cost sheet
© beas group 2011 / Page 2
This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way.
The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training.
© beas group 2011 / Page 3
Requirements for this Tutorial
You will need a good grasp of: The basics of SAP financial accounting / cost centers be.as basics
© beas group 2011 / Page 4
Learning Targets
After working through the lesson, you will be able to: Understand how to integrate cost accounting Transfer bookings into cost accounting Create a cost sheet
© beas group 2011 / Page 5
Agenda
Master data resources
1: General
2: Work with cost accounting / cost sheet
© beas group 2011 / Page 6
SAP / be.as master data and interfaces
SAP account chart(GL/Accounts)
be.as cost center allocation
to SAP profit center
SAP Profit Center
Cost center group Distribution key Cost element groupDistribution key
SAP
be.asMap SAP account <->
be.as cost element through Assigment table
be.as import table (Finance Data)
© beas group 2011 / Page 7
General (Cost type / Cost element accounting)
Journal entry Cost element
allocation key
Cost element
Distribution key
Clearing cost center
SAP
be.as
Clearing cost center
Cost center 2Cost center 1
Profit center
Distribution key
Clearing cost center
Cost center 2Cost center 1
Cost centeraccounting
Cost elementaccounting
© beas group 2011 / Page 8
Cost Center
5100 Stock for raw goods5200 Stock for finished goods4100 Assembly4200 Packing
Costsl
xxxxxxxxxxxx
Cost center
4000 Production5000 Stock
(SAP account chart)
Map to SAP profit certer(production, management)
clearing cost center
Cost Center
Cost Elements
xxxxxxxxxxxx
Cost Elements
xxxxxx
Costsxxxxxx
Distribution key
V_1000 Allocation energyV_2000 Allocation lease
Distribution Key
U_1000 Allocation ProductionU_2000 Allocation Stock
SAP
be.as
Direct
Allocated
GeneralDistribution of costs
© beas group 2011 / Page 9
Agenda
Master data resources
1: General
2: Work with cost accounting / cost sheet
© beas group 2011 / Page 10
Work with cost accounting(Cost elements / Cost types)
Construction3000
Assembly4100
Production4000
Stock5000
Packing4200
Stock forraw material
5100
Stock for finished goods
5200
SAP Profit center = be.as Cost center
SAP Accounts = be.as Cost elements
4240 energy costs4500 vehicle's costs4210 lease costs
© beas group 2011 / Page 11
Work with cost accounting (Create statement cycles)
1. Create statement cycle
Create master data(sequence)
2. Create cost centers
3. Create cost types
4. Create distribution and allocation keys
5. Asign cost types to financial accounts
© beas group 2011 / Page 12
Work with cost accounting (Create statement cycles)
© beas group 2011 / Page 13
Work with cost accounting (Create cost centers)
© beas group 2011 / Page 14
Work with cost accounting (Create cost types)
© beas group 2011 / Page 15
Work with cost accounting (Create distribution keys)
© beas group 2011 / Page 16
Work with cost accounting (Assign accounts to costs types)
© beas group 2011 / Page 17
Work with cost accounting (Register incoming invoice)
© beas group 2011 / Page 18
Work with cost accounting Data import from SAP (Accounting)
© beas group 2011 / Page 19
Work with cost accounting (Cost sheet)
© beas group 2011 / Page 20
Work with cost accounting Extended Profit / Loss statement
Definition of own Structures – Display results in a report or export to Excel
Cost sheet menu -> Master data -> Structures for profit and loss statement
Definition of own structure for the report of a profit and loss statement
Any number of structures can be defined
© beas group 2011 / Page 21
Work with cost accounting Extended Profit / Loss statement
Create rows for structure:
Position: order in report Kind: select (currently only cost unit) for output in reportType: Budget. Output of defined budgets for cost unitCurrent: currently determined value for cost unitObject: select for output in report (Dropdown list – right click)
Available objects: Category (block / area header)Cost type; cost center; cost type group; cost center groupSum; Sum %
Selection: for „cost type“, „cost center“, „cost type group“ and „cost center group“: select via dropdown list for the respective objectfor „Sum“: enter comma-separated position numbers to be summed upfor „Sum %“: 2 position numbers, comma-separated, which to be related percentaged. Example: Pos 10 is percentage of Pos 20 -> enter: 10,20
Designation for output: designation of row, used in Profit / Loss statement
Special buttons:
Re-position: re-numbering in by increment of 10-er (sum objects considered).Refresh: reload data
Via Menu cost sheet -> reports cost sheet -> profit and loss statement a screen with the results of the structure definition is opened.
© beas group 2011 / Page 22
Work with cost accounting Extended Profit / Loss statement
Display of results
© beas group 2011 / Page 23
Summary
Now you can: Understand how to integrate of cost accounting Transfer bookings into cost accounting Create a cost sheet
Thank you for your participation!