16.bill of material

12
BY SUBBU PULLELA TALLY AT YOUR FINGER TIPS

Upload: subbu-pullela

Post on 06-Aug-2015

27 views

Category:

Education


2 download

TRANSCRIPT

Page 1: 16.bill of material

BY

SUBBU PULLELA

TALLY AT YOUR FINGER TIPS

Page 2: 16.bill of material

BILL OF MATERIAL

A Bill of Materials is a list of constituent items along with quantity details that can be allotted for the manufacture of a certain product, by-product or likewise. This facilitates immediate reduction in stock of the item automatically. This process of listing the items that make up another item is made possible in Tally by enabling the Bill of Materials Facility.

Bill of Material (BoM) is created only for those items that are being assembled in-house. Therefore, you need to specify a BoM at the time of creating a Stock Item or while altering the stock item. For trading items, you do not need a BoM.

Page 3: 16.bill of material

Activating Features: Gateway of Tally

Inventory Info

Stock Item

Create

F12

All Components List Details (Bill of Materials) – Yes

Page 4: 16.bill of material

Creating Bill of Material

BoM is created only for those items that are being assembled in-house, For trading item. We do not need BoM. Therefore we need to specify BoM at the time of creating a Stock Item or when altering its Master.

Let us create a new Stock Item PEN and specify BoM. 

Gateway of Tally

Inventory Info

Stock Item

Create

Page 5: 16.bill of material

Enter the Stock Item Name, select the appropriate Stock Group and specify the appropriate Unit of Measurement in Unit field.

Set Component List: To create the component list required to manufacture the Finished goods enable this option to Yes.

Page 6: 16.bill of material

Press Enter to view Stock Item Multi Components (M BOM) screen.

In Stock Item Multi Components (M BOM) screen. Under Name of BOM specify component list Name - Standard

and press enter to view Stock Item Components (BOM) screen.

Page 7: 16.bill of material

In this field mention the quantity of Raw Material required to manufacture the finished goods.

Observe to create 1 PEN we require 3 Different inputs. The Quantity of inputs consumed to manufacturer finished goods is 1 each of 3 different inputs.

Page 8: 16.bill of material

Specify other required details in the stock item master and accept the screen.If you are involved in the manufacturing process in which raw materials are consumed and finished goods are produced, then you can alter Stock Journal voucher or create a Manufacturing Journal Voucher. Altering Stock Journal for the Purpose of BOM:

Gateway of Tally

Accounts Info / Inventory Info

Voucher Types

Alter

Stock Journal Use as a Manufacturing Journal - Yes

Page 9: 16.bill of material

Gateway of Tally

Create

Creating Manufacturing journal:

ORAccounts Info / Inventory Info

Voucher Types

Page 10: 16.bill of material

Creating Manufacturing journal:

Page 11: 16.bill of material

Report: Gateway of Tally

Stock Summary

F 12

Show Opening Balance – YesShow Goods Inward – YesShow Goods Outward – YesShow Closing Balance – Yes

In addition to Stock Summery also check Balance Sheet and Profit & Loss Account

Page 12: 16.bill of material

FOR ANY ASSISTANCE MAIL US ON

[email protected]

You can follow us on

www.facebook.com/theworldofaccounting