17783 floor drain - korpinen€¦ · always perform unclogging by moving the implement in the...

9
x8 x8 2/2020 320104 20104 20108 20209 20210 20114 20127 20118 20128 Gaius DUO, installation instructions. 17782 wall drain 17783 floor drain 17782 17783 17782 17783 6219-Z x8 x8 x8 x1 x1 x1 4pcs 2pcs 1 1pc L1200mm

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

x8

x8

2/2020

320104

2010420108

2020920210

2011420127

2011820128

Gaius DUO, installation instructions.17782 wall drain17783 floor drain

17782 17783

1778217783

6219-Zx8

x8

x8

x1

x1

x1

4pcs

2pcs

1

1pc L1200mm

Page 2: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

Structure

Electrics

HVAC

The product has undergone static load testing at 500 kg. The size of the wall mounting fixtures is 700x1150 mm. The fixtures must be affixed to solid structures. The fixtures must be mounted in accordance with the measurements specified in the diagram.

The electrical junction box must be positioned to the right of the mid-line, as shown in the draw-ing. IP44 or higer junction box (not included)The base comes with a 230V AC 10A socket.A residual-current device is recommended for the 230 V AC power supply.A qualified electrician must perform the connection.

The water connection must be positioned to the left of the mid-line, as shown in the drawing.1. Mid-line2. Wall3. Electrical connection4. Water connection. Water supply with a shut-off valve equipped with a 1/2” external thread (G15). Thread downwards5. Wall mounting fixtures 6. Finished floor7. Wastewater connection on the wall or on the floor (Ø110 mm). The pipe is cut at the level of the wall.8. Reinforce area, plywood 36mm or over, solid wood 45mm or over.

Note the dimensions!

70 110 mm

The electrical and water connection must not extend from the wall by more than 50 mm. NOTE! Exceeding the maximum depth of 50 mm prevents the toilet seat’s downward move-ment!

150

mm

= 0 mm!

560

5

2

4

6

110110

3

1

700

1150

40

2

2

585

8

17782

76 mm

17783

0 110 mm

7

Page 3: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

Connect electricity: Affix the frame to the wall:

D

B

C

Notice! General instructions: Use motor up and down to help installation.If frame don´t go down by motor, press moving frame by hand.

230 V

Authorised personnel only!

L350mm+box connection

A

2-15

mm

8x

2. Install hose 1200mm,threaddownwards

1. Add hose holder

Connect hose:

17782 wall drain

Drain:

1a

1b

2a2b

1c

3

1. Add clamp ONLY 17783, �oor drain.

1.

2.

17783 floor drain

Page 4: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

E

4

1. Wrap motor cable2. Add water pipe

1.

2.

F

G

1. Pull out water hose, from right2. Add water tank3. Notice water pipe4. Press water tank on it´s place

2.

3.

1.

4.

4.

1.

1. Water tank on it´s place2. Connect hose to water tank

1.1b. Tie on water hose to clampwith ground wire

1a. Tie on water hose to clamp

G1

G3G2

1. 1.

1. Add threaded rods.See depth and widefrom wc-bowl installationinstructions.

1a

1b

2a

17783

2b. Clamp

2a

Drain:

H

Page 5: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

5

I

1. Disconnect hand control2. Choose side to install hand control3. Pop-up three pieces from cover A4. Install plug on cover A

Testingup & down

Mind the water pipes andcables

2.

2.1.

3.

4.

A

A

A

J

1.

2.

4.

3.

3.

x4

Lock 1.

2.

Page 6: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

� �

Measure the pipe:

� �

� � �� � �� � � �� � �

� �� �

� �

� �

!

A

D

B

C

6

Page 7: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

L

x8

x8

Mount the cover, seat and support rails:

A

D

C

x8

7

B

x8

‘CLICK’

‘CLICK’

Mount the toilet roll holder, remote control and push button:

Page 8: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

8

0mm90°

2

!

A

‘CLICK’

B C

ED

2

3

1

1

2

E1

F G

Page 9: 17783 floor drain - Korpinen€¦ · Always perform unclogging by moving the implement in the direction of the building’s drain pipes. 9 In a case of checking or clogging: 1. Lift

Do not try to unclog any blockage via the toilet bowl as this may damage the flexible pipe.

Always perform unclogging by moving the implement in the direction of the building’s drain pipes.

9

In a case of checking or clogging:1. Lift Duo as up you can2. Remove screws, 4 pcs3. Remove under cover4. Squeeze black drain pipe

4.

1.

x43.2.