Page 1/1 UNIVERSITY BL 7132H Report Printed: 10/20/2013 178.Daily Partner Report Well Info API / UWI 4238338277 Region / Division PERMIAN District PERMIAN Field Name SPRABERRY TREND AREA Original Spud Date 8/18/2013 County REAGAN State/Province TEXAS Original KB/RT Elevation (ft) 2,845.00 Ground Elevation (ft) 2,829.00 Job Summary Job Category COMPLETIONS Last Casing String Production1, 16,003.7ftKB AFE Dur Total (days) Total AFE (Cost) 7,300,079.40 Cumulative Cost (Cost) 880.00 Daily Ops Summary Rig (Names) Wellbore End Depth (ftKB) 0.0 Depth Progress (ft) Daily Cost Total (Cost) 880.00 Weather CLEAR Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (& 0.08 Ops and Depth @ Morning Report Last 24hr Summary BUILT FRAC TANK DIKES 24hr Forecast INSTALL WELLHEAD EQUIPMENT Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Start Depth (ftKB) End Depth (ftKB) Operation 15:00 17:00 2.00 MIRU WELLPR PRLO P 17,793.0 JSA/GO CARD W/ ITS TO BUILD DIKES FOR FRAC TANKS Head Count / Manhours Company Function Personnel Type Count Time (hr) Tot Work Time (hr) CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 2.00 2.00 BIG D EQUIPMENT CO OTHER CONTRACTOR 5 2.00 10.00 Drilling Parameters Start (ftKB) End Depth (ftKB) Cum Depth (ft) Drilling Time (hr) Sliding Time (hr) Int ROP (ft/hr) Flow Rate (gpm) (gpm) WOB (1000lbf) RPM (rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi) Casing Strings Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi) Dens Fluid (lb/gal) Conductor 20 99.0 16.0 7/24/2013 65.00 Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 0.0 0.00 Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 0.0 0.00 Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00 Report Date: 10/20/2013 Report #: 1&

Upload: others

Post on 11-Dec-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 10/20/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)880.00

Daily Ops SummaryRig (Names) Wellbore End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

880.00WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&0.08

Ops and Depth @ Morning Report

Last 24hr SummaryBUILT FRAC TANK DIKES24hr ForecastINSTALL WELLHEAD EQUIPMENTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

15:00 17:00 2.00 MIRU WELLPR PRLO P 17,793.0 JSA/GO CARD W/ ITS TO BUILD DIKES FOR FRAC TANKSHead Count / Manhours

Company Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 2.00 2.00BIG D EQUIPMENT CO OTHER CONTRACTOR 5 2.00 10.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 0.0 0.00Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 0.0 0.00Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:10/20/2013Report #: 1&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 10/26/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,968.00

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

7,088.00WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&0.29

Ops and Depth @ Morning Report

Last 24hr SummaryNU WELLHEAD24hr ForecastTEST WELLHEADTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

13:00 15:00 2.00 MIRU WELLPR NUND P 17,793.0 JSA/GO CARD W/ ITS TO RU FLOWBACK AND NU WELLHEAD.INSTALL TUBING HANGER AND CHECK VALVE. NU WITH (2) 7 1/1610M FRAC VALVES, (1) 7 1/16 10M FLOW CROSS W/(4) 4 1/16 10MWINGVALVES, (2) 4 1/16 10M x 3 1502 ADAPTORS (1) 7 1/16 10M x 5½ BOWEN WIRELINE ADAPTOR.

15:00 16:00 1.00 MIRU WELLPR PRTS T JSA/GO CARD TO TEST WELLHEAD. ATTEMPT TO TESTWELLHEAD, BUT LEAKS IN TEST CONNECTIONS COULD NOT BEFIXED. NEW CONNECTIONS WILL BE BROUGHT OUT TOMORROW.

16:00 17:00 1.00 MIRU WELLPR PRTS P JSA/GO CARD TO DIG OUT CELLAR AND TEST RISERS ONSURFACE AND ANNULUS. TEST TO 2000 PSI FOR 5 MIN EACHTEST GOOD

17:00 18:00 1.00 MIRU WELLPR RURD P JSA/GO CARD TO INSTALL LITE TOWERS.Head Count / Manhours

Company Function Personnel Type Count Time (hr) Tot Work Time (hr)

COPPERHEAD ONSITE SUPERVISOR CONTRACTOR 1 5.00 5.00GUARDIAN WELLHEADPROTECTION

WELLHEAD HAND CONTRACTOR 2 5.00 10.00

KEY ENERGY SERVICES ROUSTABOUT CREW CONTRACTOR 1 2.00 2.00RENEGADE TORQUE & TEST WELLHEAD HAND CONTRACTOR 2 5.00 10.00CRESCENT SERVICES OTHER CONTRACTOR 1 1.00 1.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 1 5.00 5.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 0.0 0.00Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 0.0 0.00Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:10/24/2013Report #: 2&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 10/26/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)15,056.00

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

7,088.00WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&0.46

Ops and Depth @ Morning ReportWAITING ON WELL PREPLast 24hr SummaryREPLACED BOWEN CAP/TEST WELLHEAD/RIG UP FLOWBACK24hr ForecastWAITING ON WELL PREPTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 09:00 1.00 PROD1 RPCOMP SFTY P HOLD PJSM WITH CREWS09:00 09:30 0.50 PROD1 RPCOMP RURD P RELACED BOWEN CONNECTIONM09:30 10:00 0.50 PROD1 RPCOMP PRTS P TEST WELLHEAD LOW 250 PSI HOLD 5 MINUTE TEST GOOD

TEST WELLHEAD HIGH 10,000 PSI HOLD 5 MINUTE TEST GOOD10:00 10:30 0.50 PROD1 RPCOMP RURD P RIG DOWN RENEGADE TEST EQUIP10:30 11:30 1.00 PROD1 RPCOMP RTWH P REMOVED WELL CAP , REMOVED TUBING HANGER ,REMOVED

WELL CAP ,RD RENEGADE TORQUE RENCH11:30 11:45 0.25 PROD1 RPCOMP RURD P FLOWBACK FINISHED RIG UP11:45 12:00 0.25 PROD1 RPCOMP SFTY P SHUT DOWN FOR DAYHead Count / Manhours

Company Function Personnel Type Count Time (hr) Tot Work Time (hr)

COPPER HEAD ENERGYSERVICES

ONSITE SUPERVISOR CONTRACTOR 1 4.00 4.00

GE OIL AND GAS WELLHEAD HAND CONTRACTOR 1 4.00 4.00KEY / EDGE WELLHEAD HAND CONTRACTOR 4 4.00 16.00GUARDIAN WELLHEAD HAND CONTRACTOR 2 4.00 8.00

0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 0.0 0.00Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 0.0 0.00Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:10/25/2013Report #: 3&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 10/27/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)92,667.10

Daily Ops SummaryRig (Names) Wellbore End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

77,611.10WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&0.71

Ops and Depth @ Morning ReportWELL SI WO CTU FOR TCPLast 24hr SummaryMIRU PUMPING EQUIPMENT, START WELLPREP, TEST CASING24hr ForecastWO CTUTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

13:30 16:30 3.00 MIRU WELLPR RURD P JSA/GO CARD 2/ ITS TO RU FRAC EQUIPMENT16:30 17:30 1.00 MIRU WELLPR PRTS P JSA/GO CARD W/ ITS TO PRESSURE TEST LINES, TEST PUMP

TRIPS, POP OFF. TEST TREATING LINES TO 10,000 PSI FOR 5 MIN.TEST GOOD. SET PUMP TRIPS TO 2500 PSI AND TEST. TESTGOOD. STAGGER PUMP TRIPS FROM 8200 PSI-8400 PSI AND OPENWELL.

17:30 18:30 1.00 MIRU WELLPR STIM P OPEN WELL START PUMPING @4.7 BPM. PUMPED 413 GALS. ANDPUMP TRIPS TRIPPED @8677 PSI. PRESSURE HELD @ 8404 FOR5MIN. BLED PRESSURE TO 5000 PSI.REPRESSURE TO 8960 PSIAND MONITOR PRESSURE @ 8696 FOR 15 MIN. WITH NO CHANGE.JSA/ GO CARD TO RU TEST UNIT AND BRING PRESSURE TO 9250PSI. PRESSURE STABILIZED AND MONITORED ANNULUS FORFLOW FOR 5 MIN. HELD PRESSURE ON 5 1/2 CASING FOR 30 MIN.WITH NO NOTICIBLE LOSS OF PRESSURE.

18:30 19:30 1.00 MIRU WELLPR RURD P JSA/GO CARD TO RD ALL EQUIPMENT AND DEMOBE TO BAKERYARD

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 6.00 6.00BAKER ATLAS (BAKERHUGHES)

WIRELINE CREW CONTRACTOR 3 6.00 18.00

BAKER HUGHES OILFIELDOPER.

FRAC CREW CONTRACTOR 14 6.00 84.00

TNT CRANE & RIGGING INC. OTHER CONTRACTOR 2 6.00 12.00RENEGADE TORQUE AND TEST WELLHEAD HAND CONTRACTOR 2 6.00 12.00

OIL STATES WIRELINE CREW CONTRACTOR 2 6.00 12.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 6.00 6.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 0.0 0.00Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 0.0 0.00Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:10/26/2013Report #: 4&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/2/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)102,687.35

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

10,020.25Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

1.71Ops and Depth @ Morning ReportWELL SILast 24hr SummaryRD GUARDIAN FRAC TREE,RU AND PRESSURE TEST BTI FRAC TREE.24hr ForecastPULL GE HANGER AND 2 WAY VALVE PRESSURE TEST 5 1/2 BOWEN CONNECTION.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 MIRU WELLPR WODL P WAITING ON DAYLIGHT.08:00 08:30 0.50 MIRU WELLPR SFTY P HOLD PJSM WITH CREWS OVER RD GUARDIAN FRAC TREE. RU BTI

FRAC TREE.08:30 16:00 7.50 MIRU WELLPR NUND P RD GUARDIAN FRAC TREE. RU BTI FRAC TREE16:00 16:30 0.50 MIRU WELLPR SFTY P JSA / GO CARD DISCUSSION OVER PRESSURE TEST FRAC TREE.

16:30 20:00 3.50 MIRU WELLPR PRTS P PRESSURE TEST FRAC TREE. SHELL TEST 500 PSI LOW TESTGOOD. 10,000 PSI HIGH TEST GOOD, LOWER MANUAL MASTERVALVE 500 PSI LOW TEST GOOD. 10,000 PSI HIGH TEST GOOD.SHUT DOWN SECURE WELL

20:00 06:00 10.00 MIRU WELLPR WODL P NO ACTIVITYHead Count / Manhours

Company Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00RENAGADE WELLHEAD HAND CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 1 5.00 5.00STRC OTHER CONTRACTOR 1 6.00 6.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 1.00 2.00WOOD GROUP WELLHEAD HAND CONTRACTOR 1 5.00 5.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/1/2013Report #: 5Actual Days: 1.71

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/3/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)112,494.40

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

9,807.05WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&2.71

Ops and Depth @ Morning ReportWELL SILast 24hr SummaryPRESSURE TEST BTI FRAC TREE.24hr ForecastMOVE IN COIL TUBING FOR MILL RUN AND TCP RUN.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 MIRU WELLPR WODL P WAITING ON DAYLIGHT.08:00 08:30 0.50 MIRU WELLPR SFTY P HOLD PJSM WITH CREWS OVER: PRESSURE TEST FRAC TREE.08:30 14:30 6.00 MIRU WELLPR PRTS P PRESSURE TEST HYDRAULIC VALVE, NIGHT CAP AND FLOW

CROSS SECTION: LEAKS PRESENT AND REPAIRED: NEEDLEVALVE ON FLOWBACK HEADER, BOWEN SEAL ON NIGHTCAP,HAMMER UNION ON FLOW LINE, NEEDLE VALVE ON NIGHTCAP.FOUND PRESSURE LOCKED VALVE ON FLOW CROSS (INSIDE).SHUT DOWN.

14:30 15:00 0.50 MIRU WELLPR SFTY P HOLD PJSM WITH CREWS OVER: ND FLOW CROSS, NU FLOWCROSS. PRESSURE TEST FRAC TREE.

15:00 19:00 4.00 MIRU WELLPR NUND P REMOVE AND REPLACE FLOW CROSS SECTION AND RETESTSHELL 500 PSI LOW AND 10,000 HIGH, GOOD TEST.PRESSURETEST WING VALVES ON FLOW CROSS 500 PSI LOW AND 10,000 PSIHIGH. TEST GOOD.

SECURE LOCATION.

19:00 06:00 11.00 MIRU WELLPR WODL P NO ACTIVITYHead Count / Manhours

Company Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00BTI WELLHEAD HAND CONTRACTOR 1 11.00 11.00STRC OTHER CONTRACTOR 1 11.00 11.00WOOD GROUP WELLHEAD HAND CONTRACTOR 1 11.00 11.00TORQUED UP ENERGYSERVICES

WELLHEAD HAND CONTRACTOR 2 11.00 22.00

HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 4 4.00 16.00

E L FARMER TRUCKING TRUCKER CONTRACTOR 1 4.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/2/2013Report #: 6Actual Days: 2.71

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/3/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)117,915.65

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

5,421.25Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

3.15Ops and Depth @ Morning ReportCOIL TUBING OPSLast 24hr SummaryMIRU COIL TUBING. RIH FOR CLEANOUT WITH BAKER HUGHES MOTOR & MILL.24hr ForecastTCP RUN, RDMO COIL TUBING, MIRU FRAC CREW.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 11:00 5.00 MIRU WELLPR CTOP P MIRU COIL TUBING.11:00 15:00 4.00 MIRU WELLPR CTOP T SHUT DOWN RIG UP DUE TO HIGH WINDS.15:00 15:30 0.50 MIRU WELLPR SFTY P JSA / GO CARD DISCUSSION OVER: COIL TUBING OPS.15:30 16:30 1.00 MIRU WELLPR RURD P RU BAKER HUGHES MOTOR & MILL ASSEMBLY.

2.375 COIL CONNECTOR. 3.13 OD 1.31'2.88 DUAL BACK PRESSURE VALVE 2.88OD 1.94'FAU HYD DISCONNECT 2.00 OD 2.03'DUAL CIRCULATION SUB 2.88 OD 1.39'TEMPRESS SCREEN SUB 2.88 OD 2.44'TEMPRESS HYDRO PULL 2.88 OD 2.69'EXTREME AD MOTOR 2.88 OD 12.45'5 BLADE JUNK MILL 4.75 OD 1.35'FISH NECK (2.88x8 1/2)

TOTAL LENGTH: 25.60'

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING OTHER CONTRACTOR 2 6.00 12.00KEY RIG CREW CONTRACTOR 8 24.00 192.00RENEGADE WELLHEAD HAND CONTRACTOR 2 20.00 40.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 12.00 12.00TORNADO OTHER CONTRACTOR 1 24.00 24.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/3/2013Report #: 7Actual Days: 3.15

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/4/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)123,336.90

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

5,421.25Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

4.21Ops and Depth @ Morning Report

Last 24hr SummaryCLEAN OUT RUN WITH BAKER HUGHES MOTOT & MILL. TCP RUN.24hr ForecastRDMO CT. MIRU HALLIBURTON FRAC.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:30 2.50 COMPZN

WELLPR CTOP P RIH @ 41 FPM ,2.5 BPM IN 2.5 BPM OUT WITH 2100 PSICIRCULATING PRESSURE AND 25 PSI WELL HEAD PRESSURE. .25PIPE ON PIPE, .25 FR. TD 15,955' 20 BBL SWEEP, 20 BBL SPACER,20 SWEEP. SWEEPS CLEAR BHA.

08:30 13:30 5.00 COMPZN

WELLPR CTOP P POOH. 2.5 BPM IN, 2.5 BPM OUT. .5 PIPE ON PIPE, .25 FR 1745 PSICIRCULATING PRESSURE, 6 PSI WELLHEAD PRESSURE.GAINED 15,000 LBS DRAG BETWEEN 9700-9300'. BUMPED UPCLOSE CROWN FOR CASING TEST.

13:30 14:00 0.50 COMPZN

WELLPR SFTY P JSA / GO CARD DISCUSSION OVER PRESSURE TEST CASING, RDBAKER HUGHES MOTOR & MILL, RU WEATHERFORD TCP GUN.

14:00 15:30 1.50 COMPZN

WELLPR PRTS P TEST CASING 250PSI LOW. TEST GOOD9000 PSI HIGH. TEST GOODWHILE TEST PUMP ENGAGED PUMPING IT WOULD SHOW 9250 PSISHUT DOWN IT WOULD SHOW 9000 PSI CONDUCTED TEST @ 9000PSI.

15:30 16:00 0.50 COMPZN

WELLPR SFTY P JSA / GO CARD DISCUSSION OVER RD BAKER HUGHES MOTOR &MILL, RU WEATHERFORD TCP GUN.

16:00 18:00 2.00 COMPZN

WELLPR RURD P RU WEATHERFORD TCP GUN ASSEMBLY:

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00KEY RIG CREW CONTRACTOR 9 12.00 108.00RENEGADE WELLHEAD HAND CONTRACTOR 2 12.00 24.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 12.00 12.00TORNADO OTHER CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 5 4.00 20.00CRESENT VENDOR CONTRACTOR 2 6.00 12.00EDGE OTHER CONTRACTOR 1 12.00 12.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 16 11.00 176.00

CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 2.00 2.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 2.00 2.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00

Report Date: 11/4/2013Report #: 8Actual Days: 4.21

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/4/2013

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/4/2013Report #: 8Actual Days: 4.21

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/5/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)386,863.82

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

104,076.57Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

5.31Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryRDMO KEY COIL TUBING. MIRU HALLIBURTON FRAC.24hr ForecastRU HALLIBURTON FRAC. START STIMULATION OPS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAITING ON DAYLIGHT.

07:30 08:00 0.50 COMPZN

WELLPR SFTY P JSA / GO CARD DISCUSSION OVER RDMO COIL TUBING.

08:00 12:00 4.00 COMPZN

WELLPR RURD P RDMO COIL TUBING.

12:00 12:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER MIRU HALLIBURTON FRAC.

12:30 14:30 2.00 COMPZN

STIM RURD P RU HALLIBURTON FRAC.

14:30 20:30 6.00 COMPZN

STIM RURD T HALLIBURTON CRANE TRUCK SAFETY SYSTEM ON BOOM WOULDNOT LET BOOM OPERATE.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00KEY RIG CREW CONTRACTOR 12 16.00 192.00RENEGADE WELLHEAD HAND CONTRACTOR 2 16.00 32.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 4.00 4.00TORNADO OTHER CONTRACTOR 2 8.00 16.00CRESENT VENDOR CONTRACTOR 1 10.00 10.00EDGE OTHER CONTRACTOR 3 12.00 36.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 24 12.00 288.00

CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 3.00 3.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 1.00 1.00BTI WELLHEAD HAND CONTRACTOR 1 1.00 1.00WEATHERFORD WIRELINE CREW CONTRACTOR 4 8.00 32.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00TNT CRANE OTHER CONTRACTOR 2 12.00 24.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/5/2013Report #: 9Actual Days: 5.31

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/7/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)397,750.79

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

7,512.50Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

6.71Ops and Depth @ Morning ReportRD FRAC SPREADLast 24hr SummaryRU HALLIBURTON FRAC AND WEATHERFORD WIRELINE. START STIM OPS.24hr ForecastRD FRAC SPREAD AND MI RU CTUTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER RU HALLIBURTON FRAC ANDWEATHERFORD WIRELINE.

06:30 15:30 9.00 COMPZN

STIM RURD P RU HALLIBURTON FRAC AND WEATHERFORD WIRELINE.THE 6 PORT GOATHEAD WAS CONGESTED AROUND THE WELLHEAD DURING RIG UP CAUSING EXTRA TIME FOR RIG UP.

15:30 18:00 2.50 COMPZN

STIM OTHR P STARTING OF ALL EQUIPMENT AND CHECKING COMMUNICATIONWITH DATA VAN.

18:00 18:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER FLUSH BLENDER ANDDISCHARGE MANIFOLD TO OPEN TOP TANK, PRIME UPPUMPS,PRESSURE TEST AND STARTING STIM OPS.

18:30 20:00 1.50 COMPZN

STIM OTHR P FLUSH BLENDER AND DISCHARGE MANIFOLD TO OPEN TOPTANK,PRIME PUMPS.

20:00 22:30 2.50 COMPZN

STIM STIM T LEAK DETECTED ON ONE OF THE HALLIBURTON SWIVEL JOINTSON THE GOATHEAD. CHANGED RUBBER GASKET.

22:30 00:00 1.50 COMPZN

STIM PRTS P PRIME PUMPS, PRESSURE TEST SURFACE LINES. 9766 PSI TESTGOOD.

00:00 01:30 1.50 COMPZN

STIM OTHR P SET 2" POPOFF @ 1150 PSI AND 3"N2 POPOFF @ 8780 PSI

01:30 04:00 2.50 COMPZN

STIM STIM P STAGE #1 INITIAL PSI: 579 PSI BREAKDOWN: 4427 PSI MAX RATE: 55 BPM MAX PSI: 8653 PSI AVG RATE: 29.1 BPM AVG PSI: 7469 PSI

ISIP: 4250 PSI FG: 1.58

ACID (15% HCL-FERCHEK SC) 2000 GALS CLEAN VOLUME: 1,463 BBLS SLURRY VOLUME: 1,456 BBLS 40/70: 7,142 LB 30/50: 0 LB TLR: 1,456 BBLS

BROKE DOWN FORMATION WITH ACID, ESTABLISHED MAX RATEOF 55BPM. PUMPED TOTAL OF 7,142LBS OF 40/70 SAND, ONCETHE .75PPG SAND HIT FORMATION PRESSURE ROSE AND RATEWAS DROPPED TO CONTROL PRESSURE. CONTINUES TO PUMP @2BPM PUMPING 30VIS GEL SLUG. REACHED MAXIMUMALLOWABLE TREATING PRESSURE ON FLUSH. ESTIMATED SANDINTO FORMATION IS 6,142LBS.

04:00 06:00 2.00 COMPZN

STIM OTHR T RIG DOWN FRAC SPREAD AND PREPARE FOR CT UNIT FOR CLEANOUT. WELL SHUT IN.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 1 12.00 12.00

Report Date: 11/6/2013Report #: 10Actual Days: 6.71

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/7/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00KEY RIG CREW CONTRACTOR 12 16.00 192.00RENEGADE WELLHEAD HAND CONTRACTOR 2 16.00 32.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 4.00 4.00TORNADO OTHER CONTRACTOR 2 8.00 16.00CRESENT VENDOR CONTRACTOR 1 10.00 10.00EDGE OTHER CONTRACTOR 3 12.00 36.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 24 12.00 288.00

CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 3.00 3.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 1.00 1.00BTI WELLHEAD HAND CONTRACTOR 1 1.00 1.00WEATHERFORD WIRELINE CREW CONTRACTOR 4 8.00 32.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00TNT CRANE OTHER CONTRACTOR 2 12.00 24.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/6/2013Report #: 10Actual Days: 6.71

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/7/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)691,710.02

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

72,081.82Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

7.21Ops and Depth @ Morning Report

Last 24hr SummaryMIRU COIL TUBING RIH WITH BAKER HUGHES MOTOR & MILL FOR CLEAN OUT.24hr Forecast

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 11:30 5.50 COMPZN

STIM RURD T CLEAN UP HALLIBURTON FRAC EQUIPMENT TO FLOWBACK TANK.RD PART OF THE FRAC EQUIPMENT TO MAKE ROOM FOR COILTUBING.

11:30 12:00 0.50 COMPZN

STIM SFTY T JSA / GO CARD DISCUSSION OVER MIRU COIL TUBING.

12:00 16:00 4.00 COMPZN

STIM CTOP T MIRU COIL TUBING.

16:00 16:30 0.50 COMPZN

STIM SFTY T JSA / GO CARD DISCUSSION OVER RU BAKER HUGHES MOTOR &MILL ASSEMBLY.

16:30 18:00 1.50 COMPZN

STIM RURD T RU BAKER HUGHES MOTOR &MILL ASSEMBLY.

2.375 COIL CONNECTOR. 3.13 OD 1.31'2.88 DUAL BACK PRESSURE VALVE 2.88OD 1.94'FAU HYD DISCONNECT 2.00 OD 2.03'DUAL CIRCULATION SUB 2.88 OD 1.39'TEMPRESS SCREEN SUB 2.88 OD 2.44'TEMPRESS HYDRO PULL 2.88 OD 2.69'EXTREME AD MOTOR 2.88 OD 12.45'5 BLADE JUNK MILL 4.75 OD 1.35'FISH NECK (2.88x8 1/2)

TOTAL LENGTH: 25.60'

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00CRESENT VENDOR CONTRACTOR 2 7.00 14.00EDGE OTHER CONTRACTOR 4 8.00 32.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 30 8.00 240.00

BTI WELLHEAD HAND CONTRACTOR 1 12.00 12.00WEATHERFORD WIRELINE CREW CONTRACTOR 4 12.00 48.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 6 9.00 54.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 11.00 33.00PROTECHNICS CO OTHER CONTRACTOR 1 12.00 12.00

Report Date: 11/7/2013Report #: 11Actual Days: 7.21

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/7/2013

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/7/2013Report #: 11Actual Days: 7.21

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/9/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)805,979.03

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

89,062.05Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

8.71Ops and Depth @ Morning ReportSET BRIDGE PLUGLast 24hr SummaryRIH CLEAN OUT RUN.24hr ForecastRIH SET BRIDGE PLUG SPOT ACID, TCP RUNTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 COMPZN

STIM CTOP T CONTINUE TO CIRCULATE TO CLEAN OUT SAND PUMPINGFREQUENT 60 VIS GEL SWEEPS. EVERY 50' POOH 100' THEN RIHAND TAG SAND AGAIN. CURRENTLY AT 13,846' CIRCULATING 3BPMW/ 3.8BBL RETURNS AND 3800PI CIRCULATING PRESSURE.

08:00 10:00 2.00 COMPZN

STIM CTOP T 3800 PSI CIRCULATING, 950 PSI WELL HEAD 3 BPM IN AND 3.8 BPMOUT. 4 FPMSHORT TRIP TO 6100' WHILE PUMPING 10BBL SWEEP 20 BBLSPACER 10 BBL SWEEP. AND 20 BBL SWEEP WHILE RUNNINGTHROUGH HEEL.

10:00 12:00 2.00 COMPZN

STIM CTOP T RIH 2700 PSI CIRCULATING, 150 PSI WELL HEAD @84 FPM. 8200' 3.5BPM IN, 3.9 BPM OUT

2750 PSI CIRCULATING, 167 PSI WELL HEAD @ 105 FPM SEND 10BBL SWEEP 20 BBL SPACER 10 BBL SWEEP 14000' 3.5 BPM IN, 3.9BPM OUT.

TD 15,957' PULL UP 10' SHUT DOWN LET SWEEP PASS BHA.

12:00 15:30 3.50 COMPZN

STIM CTOP T POOH. SEND 10 BBL SWEEP 10 BBL SPACER 10 BBL SWEEP 2850PSI CIRCULATING, 95 PSI WELL HEAD @15,500' -48 FPM.

20 BBL SWEEP SENT @ 10,000'

10 BBL SWEEP 10 BBL SPACER 10 BBL SWEEP SENT @9500' TOCLEAN UP HEEL -75 FPM 2635 PSI CIRCULATING, 98 PSI WELLHEAD PRESSURE 3.5 BPM IN, 3.9 BPM OUT.

15:30 18:00 2.50 COMPZN

STIM CTOP T SHUT DOWN @ 1,395' THE LEVEL WEND ON THE CTU REELSTOPPED WORKING. REPLACE BRASS GUIDE SHIMS.

18:00 21:00 3.00 COMPZN

STIM RURD T POOH, BREAK OUT AND LD BAKER CLEAN OUT ASSEMBLY AND MU5 1/2" CBP ASSEMBLY:2.375" COIL CONNECTOR2.88" DUAL BPV2.88" HYD DISCONNECT2.88" CROSSOVER3.85" HYD. SETTING TOOL5.5" CBP ( 4.47"OD)

TOTAL LEGNTH: 16.9'

21:00 06:00 9.00 COMPZN

STIM CTOP T RIH PUMPING .5BPM @ 50PSI. SEEN RESISTANCE IN CSG ATCOLLARS WHILE RUNNING PLUG IN THE VERTICAL SECTION.REACHED TD @ 15,725'. PREPARE TO DROP 5/8" SETTNG BALL.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 4.00 4.00

Report Date: 11/8/2013Report #: 12Actual Days: 8.71

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/9/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 4.00 4.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 1.00 1.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 12 12.00 144.00

TNT CRANE OTHER CONTRACTOR 2 12.00 24.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 6 4.00 24.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 2 10.00 20.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 2 5.00 10.00

KEY COIL TUBING OTHER CONTRACTOR 11 24.00 264.00PINNACLE WIRELINE CREW CONTRACTOR 3 4.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/8/2013Report #: 12Actual Days: 8.71

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/10/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)893,974.76

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

87,995.73Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

9.71Ops and Depth @ Morning ReportPRIME SURFACE LINES AND PUMPS,PRESSURE TESTLast 24hr SummarySET BRIDGE PLUG, SPOT ACID, TCP RUN CONTINUE STIM OPS.24hr ForecastCONTINUE STIM OPS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 13:00 7.00 COMPZN

STIM CTOP T DROP 5/8 SETTING BALL PUMP BALL DOWN @ 2 BPM DROP RATETO 1 BPM 30 BBLS BEFORE BALL SEATS. BALL SEATS @ 2389 PSITHEN SETTING BRIDGE PLUG AND FALLING OFF TO 350 PSI. PU 5'PRESSURE UP TO 2000 PSI HOLD FOR 5 MIN TEST GOOD BLEEDDOWN AND POOH WHILE SPOTTING 2500 GALS OF 20% HCI ACID.

13:00 13:30 0.50 COMPZN

STIM SFTY T JSA / GO CARD DISCUSSION OVER RD CT LUBRICATOR, RD BAKERHUGHES SETTING TOOL, RU WEATHERFORD TCP.

13:30 15:30 2.00 COMPZN

STIM RURD T RD LUBRICATOR, RD BAKER HUGHES SETTING TOOL.RU WEATHERFORD TCP GUN ASSEMBLY: 3.13" COIL CONNECTOR,2.88" BPV, 2.88" UNIVERSAL DISCONNECT, 2.88" CROSSOVER TO3.375" GUN ASSEMBLY. W/ OWEN SUPER HERO SDP-3125-411NT ,6SPF, .36" EHD, 21G CHARGES.

15:30 21:30 6.00 COMPZN

STIM CTOP T RIH TAGGED PLUG @ 15728'PU TO 15,700' CLOSE BACKSIDE PRESSURE TO 2800 PSI TO SETOFF TCP GUN. CONTINUE UP HOLE.15,70015,63515,57015,50515,440CONFIRMATION OF GUNS GOING OFF ON SURFACE WITHWEATHERFORD AND WITH PINNACLE. POOH.

21:30 23:30 2.00 COMPZN

STIM OTHR INJECT 60BBL OF FRESH WATER TO DISPLACE ACID INTOFORMATION. 6BPM @ 4700PSI

23:30 06:00 6.50 COMPZN

STIM RURD RD MOVE OVER KEY CTU. RU REMAINING HALLIBURTON FRACPUMPS, FLUSH MANIFOLD AND PRIME ALL LINES FOR PRESSURETEST.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00CRESENT VENDOR CONTRACTOR 1 2.00 2.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 12 12.00 144.00

TNT CRANE OTHER CONTRACTOR 2 12.00 24.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 9 12.00 108.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 5.00 5.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 12.00 12.00

Report Date: 11/9/2013Report #: 13Actual Days: 9.71

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/10/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

WESTERN HOT OIL SVC OTHER CONTRACTOR 3 16.00 48.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 2 12.00 24.00

KEY COIL TUBING OTHER CONTRACTOR 2 1.00 2.00KEY COIL TUBING OTHER CONTRACTOR 8 18.00 144.00KEY COIL TUBING OTHER CONTRACTOR 8 6.00 48.00PINNACLE WIRELINE CREW CONTRACTOR 6 12.00 72.00BIG D EQUIPMENT CO ROUSTABOUT CREW CONTRACTOR 2 2.00 4.00WEATHERFORD TOOL HAND CONTRACTOR 1 6.00 6.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 11/9/2013Report #: 13Actual Days: 9.71

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)1,114,425.56

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

93,835.50Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

10.52Ops and Depth @ Morning Report

Last 24hr SummaryRU HALLIBURTON FRAC. FRAC STAGES 2-24hr ForecastCONTINUE STIM OPS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 COMPZN

STIM RURD T CLEAN UP MANIFOLD, PRIME PUMPS.

08:00 08:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PRESSURE TEST SURFACELINES, CONTINUE STIM OPS.

08:30 10:00 1.50 COMPZN

STIM PRTS P PRESSURE TEST SURFACE LINES 9800 PSI.TEST GOOD. SET N2 POP OFF 8780 PSI.

10:00 12:00 2.00 COMPZN

STIM STIM P STAGE #2 INITIAL PSI: 834 PSI BREAKDOWN: 5300 PSI MAX RATE: 91.8 BPM MAX PSI: 7915 PSI AVG RATE: 89.3 BPM AVG PSI: 6937 PSI

ISIP: 3191 PSI FG: .86

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 18,998 BBLS SLURRY VOLUME: 9,288 BBLS 100 MESH: 1,814 LB 40/70: 11,887 LB 30/50: 254,694 LB TLR: 10,454 BBLS

WATER TRANSFER:9,270 BBLS PUMPEDPOND START 13'1POND END 12'10TOTAL ON LOC: 4,158 BBLS

12:00 12:30 0.50 COMPZN

STIM SFTY P JSA GO CARD DISCUSSION OVER MIRU WEATHERFORDWIRELINE.

12:30 14:30 2.00 COMPZN

STIM RURD P MIRU WEATHERFORD WIRELINE.

Report Date:11/10/2013Report #: 14&

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

14:30 18:00 3.50 COMPZN

STIM PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5FT PERF RINGS @ 9 SHOTSPER FOOT (LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION (RP-43), 5.5 IN COMPOSITE FLOW THROUGHBRIDGE PLUG. RIH, SET PLUG, AND PERFORATED STG #3 ASFOLLOWS.

PLUG: 15415' PERF SHOT DEPTH: 1.) 15190' - 15192' 2.) 15240' - 15242' 3.) 15290' - 15292' 4.) 15340' - 15342' 5.) 15390' - 15392'

TBP: 483 BBLS @ 8 BPM MAX PSI: 3400

18:00 18:30 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#3 AND PERFS FOR STG #4.

18:30 19:00 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY

19:00 21:00 2.00 COMPZN

STIM STIM P STAGE #3 INITIAL PSI: 2323 PSI BREAKDOWN: 4779 PSI MAX RATE: 90.6 BPM MAX PSI: 7645 PSI AVG RATE: 90.1 BPM AVG PSI: 6073 PSI

ISIP: 3155 PSI FG: .85

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6705.5 BBLS SLURRY VOLUME: 6867.3 BBLS 100 MESH: 0 LB 40/70: 16,947 LB 30/50: 133,863 LB TLR: 17,160 BBLS

WATER TRANSFER:6,980 BBLS PUMPEDPOND START 12'10POND END 12'6TOTAL ON LOC: 4,158 BBLS

21:00 21:30 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#4 AND PERFS FOR STG #5.

21:30 23:30 2.00 COMPZN

STIM PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5FT PERF RINGS @ 9 SHOTSPER FOOT (LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION (RP-43), 5.5 IN COMPOSITE FLOW THROUGHBRIDGE PLUG. RIH, SET PLUG, AND PERFORATED STG #4 ASFOLLOWS.

PLUG: 15415' PERF SHOT DEPTH: 1.) 15190' - 15192' 2.) 15240' - 15242' 3.) 15290' - 15292' 4.) 15340' - 15342' 5.) 15390' - 15392'

TBP: BBLS @ 8 BPM MAX PSI: 3400

Report Date:11/10/2013Report #: 14&

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

23:30 01:30 2.00 COMPZN

STIM STIM P STAGE #4 INITIAL PSI: 2323 PSI BREAKDOWN: 4779 PSI MAX RATE: 90.6 BPM MAX PSI: 7645 PSI AVG RATE: 90.1 BPM AVG PSI: 6073 PSI

ISIP: 3155 PSI FG: .85

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6705.5 BBLS SLURRY VOLUME: 6867.3 BBLS 100 MESH: 0 LB 40/70: 16,947 LB 30/50: 133,863 LB TLR: 17,160 BBLS

WATER TRANSFER:6,980 BBLS PUMPEDPOND START 12'10POND END 12'6TOTAL ON LOC: 4,158 BBLS

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 3.00 3.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 30 12.00 360.00

TNT CRANE OTHER CONTRACTOR 2 12.00 24.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 9 12.00 108.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 16.00 48.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 6.00 6.00PINNACLE WIRELINE CREW CONTRACTOR 7 12.00 84.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 2.00 4.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 1 8.00 8.00

WEATHERFORD WIRELINE CREW CONTRACTOR 5 12.00 60.00WEATHERFORD WIRELINE CREW CONTRACTOR 1 3.00 3.00KEY COIL TUBING OTHER CONTRACTOR 8 8.00 64.00PROTECHNICS CO OTHER CONTRACTOR 1 10.00 10.00BTI WELLHEAD HAND CONTRACTOR 1 11.00 11.00RENEGADE WELLHEAD HAND CONTRACTOR 2 12.00 24.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/10/2013Report #: 14&

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)1,767,478.90

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

164,220.34Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

11.17Ops and Depth @ Morning Report

Last 24hr SummaryFRAC STG 4-24hr ForecastCONTINUE STIM OPSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#5 AND PERFS FOR STG #6.

08:00 08:30 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY

08:30 10:30 2.00 COMPZN

STIM STIM P STAGE #5 INITIAL PSI: 2260 PSI BREAKDOWN: 6318 PSI MAX RATE: 96.4 BPM MAX PSI: 7865 PSI AVG RATE: 91.72 BPM AVG PSI: 6218 PSI

ISIP: 3260 PSI FG: .867

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 9808 BBLS SLURRY VOLUME: 10191 BBLS 100 MESH: 2020 LB 40/70: 173,310 LB 30/50: 68,340 LB TLR: 26,968 BBL

ONLY PUMPED 1/2 OF STEP 16 1.75PPG 40/70SKIPPED STEP 17 2PPG 40/70PUMPED SWEEP 360 BBLS RAISED RATE TO 95 BPM. PUMPEDSTEP 18 1.25PPG 30/50 AND 1/2 OF STEP 19 1.5PPG 30/50.FLUSHED

WATER TRANSFER:9808 BBLS PUMPEDPOND START 12'5"POND END 12'TOTAL ON LOC: 4158 BBLS

Report Date:11/11/2013Report #: 15&

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

10:30 13:30 3.00 COMPZN

STIM PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5FT PERF RINGS @ 9 SHOTSPER FOOT (LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION (RP-43), 5.5 IN COMPOSITE FLOW THROUGHBRIDGE PLUG. RIH, SET PLUG, AND PERFORATED STG #6 ASFOLLOWS.

WTF CBP PLUG: 14,665' PERF SHOT DEPTH: 1.) 14640' - 14642' 2.) 14591' - 14593' 3.) 14541' - 14543' 4.) 14491' - 14493' 5.) 14441' - 14443'

TBP: BBLS @ 8 BPMMAX PSI:

13:30 14:00 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#6 AND PERFS FOR STG #7.

14:00 14:30 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY

14:30 16:30 2.00 COMPZN

STIM STIM P STAGE #6 INITIAL PSI: 2390 PSI BREAKDOWN: 7036 PSI MAX RATE: 100 BPM MAX PSI: 8089 PSI AVG RATE: 91.72 BPM AVG PSI: 6218 PSI

ISIP: 3375 PSI FG: .883

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6368 BBLS SLURRY VOLUME: 6645 BBLS 100 MESH: 1640 LB 40/70: 65730 LB 30/50: 0 LB TLR: 33.336 BBL

PUMPED 1/2 OF STEP 14 1.25PPG 40/70PUMPED 450BBBL FR SWEEP INCREASED RATE TO 100BPMPUMPED 400BBL GEL SWEEP PRESSURE INCREASED SHUTDOWN.

WATER TRANSFER:6140 BBLS PUMPEDPOND START 12'POND END- PUMPING INTOTOTAL ON LOC: 4158 BBLS

16:30 17:00 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#7 AND PERFS FOR STG #8.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 4.00 4.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00

Report Date:11/11/2013Report #: 15&

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 11/11/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 30 12.00 360.00

TNT CRANE OTHER CONTRACTOR 1 12.00 12.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 9 12.00 108.00WESTERN HOT OIL SVC OTHER CONTRACTOR 5 12.00 60.00PINNACLE WIRELINE CREW CONTRACTOR 5 12.00 60.00WEATHERFORD WIRELINE CREW CONTRACTOR 8 12.00 96.00WEATHERFORD WIRELINE CREW CONTRACTOR 1 3.00 3.00WEATHERFORD TOOL HAND CONTRACTOR 2 12.00 24.00PROTECHNICS CO OTHER CONTRACTOR 1 24.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00RENEGADE WELLHEAD HAND CONTRACTOR 2 10.00 20.00CRESCENT SERVICES VENDOR CONTRACTOR 1 2.00 2.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 1.00 1.00KEY ENERGY SERVICES OTHER CONTRACTOR 5 2.00 10.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 2 1.00 2.00

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/11/2013Report #: 15&

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 11/12/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)2,078,111.40

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

123,832.50Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

11.92Ops and Depth @ Morning Report

Last 24hr SummaryFRAC STG 9-24hr ForecastCONTINUE STIM OPSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5FT PERF RINGS @ 9 SHOTSPER FOOT (LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION (RP-43), 5.5 IN COMPOSITE FLOW THROUGHBRIDGE PLUG. RIH, SET PLUG, AND PERFORATED STG #9 ASFOLLOWS.

WTF CBP PLUG: 13,916' PERF SHOT DEPTH: 1.) 13891'-13893' 2.) 13841'-13843' 3.) 13791'-13793' 4.) 13742'-13744' 5.) 13692'-13694'

TBP: 374.4 BBLS @ 14.1 MAX BPM MAX PSI: 3600

07:30 08:00 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#9 AND PERFS FOR STG #10.

08:00 09:30 1.50 COMPZN

STIM PRTS P PRIME PUMPS & PRESSURE TEST TREATING LINES AND WELLHEAD TO 9800 PSI, HELD FOR 5 MIN, ALL LINES CHECKED OKAY

LEAK ON ONE OF THE FRAC PUMP FLUID END BLEED DOWN FIXLEAK.

Report Date:11/12/2013Report #: 16&

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 11/12/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

09:30 12:00 2.50 COMPZN

STIM STIM P STAGE #9 INITIAL PSI: 2350 PSI BREAKDOWN: 4095 PSI MAX RATE: 98.7 BPM MAX PSI: 8115 PSI AVG RATE: 93.28 BPM AVG PSI: 6325 PSI

ISIP: 3334 PSI FG: .88

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 10,316 BBLS SLURRY VOLUME: 10,642 BBLS 100 MESH: 1153 LB 40/70: 198782 LB 30/50: 85313 LB TLR: 43,652 BBL

LOST FR-66 1/2 WAY INTO STEP 8 .5PPG CUT SAND TURNED GELON FOR 360 BBLS FR-66 BACK ONLINE LAST 120 BBLS OF STEP 9.DURING STEP 14 1.25 PPG THE 9-5/8 X5-1/2 ANNULUS INCREASEDFROM 0 TO 135 PSI FOR 360 BBLS THEN BACK TO 0 FORREMAINDER OF STAGE. STEP 17 CUT SAND 120BBLS EARLY RUN360 BBLS FR SWEEP STARTED INTO STEP 18 INCREASED RATEFROM 95 BPM TO 97.5 BPM STARTED 30/50 1PPG AFTER 360BBLSINCREASED TO 1.25PPG. STEP 18 1.5PPG FOR 475BBLSINCREASED SAND TO 2PPG FOR 238BBLS THEN FLUSHED WELL.

WATER TRANSFER:10,200 BBLS PUMPEDPOND START 12.5'POND END- 11' 10"TOTAL ON LOC: 4158 BBLS

12:00 13:30 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5FT PERF RINGS @ 9 SHOTSPER FOOT (LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION (RP-43), 5.5 IN COMPOSITE FLOW THROUGHBRIDGE PLUG. RIH, SET PLUG, AND PERFORATED STG #10 ASFOLLOWS.

WTF CBP PLUG: 13,667' PERF SHOT DEPTH: 1.) 13442'-13444' 2.) 13492'-13494' 3.) 13542'-13544' 4.) 13742'-13744' 5.) 13692'-13694'

TBP: 305 BBLS @ 13.5 MAX BPM MAX PSI: 3570

13:30 14:00 0.50 COMPZN

STIM SFTY P CONDUCTED A GO CARD /JSA DISCUSSION OVER PUMPING STG#10 AND PERFS FOR STG #11.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING OTHER CONTRACTOR 2 12.00 24.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 4.00 4.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00

Report Date:11/12/2013Report #: 16&

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 11/12/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 30 12.00 360.00

TNT CRANE OTHER CONTRACTOR 1 12.00 12.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 9 12.00 108.00WESTERN HOT OIL SVC OTHER CONTRACTOR 5 12.00 60.00PINNACLE WIRELINE CREW CONTRACTOR 5 12.00 60.00WEATHERFORD WIRELINE CREW CONTRACTOR 8 12.00 96.00WEATHERFORD WIRELINE CREW CONTRACTOR 1 3.00 3.00PROTECHNICS CO OTHER CONTRACTOR 1 24.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00CRESCENT SERVICES VENDOR CONTRACTOR 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/12/2013Report #: 16&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/13/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)2,547,865.31

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

160,967.00WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&12.90

Ops and Depth @ Morning Report

Last 24hr SummaryFRAC STG 12-24hr ForecastCONTINUE STIM OPSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

06:30 08:00 1.50 COMPZN

STIM OTHR T TRANSFERRING FR-66 FROM TRANSPORT TO POLLY TOTES SOTHEY CAN SEND TRANSPORT INTO ODESSA TO BE RELOADED.

08:00 10:00 2.00 COMPZN

STIM STIM P STAGE #12 INITIAL PSI: 2469 PSI BREAKDOWN: 4516 PSI MAX RATE: 97.1 BPM MAX PSI: 7882 PSI AVG RATE: 90.6 BPM AVG PSI: 6702 PSI

ISIP: 3565 PSI FG: 0.91

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 10391 BBLS SLURRY VOLUME: 10776 BBLS 100 MESH: 1,399 LB 40/70: 144,892 LB 30/50: 99,667 LB TLR: 72,481 BBL

1/2 WAY THROUGH STEP 15 1.5PPG 40/70 CUT SAND SENT 310 BBLFR SWEEP PRESSURE DROPPED CONTINUED 1.5PPG SENT 310 FRSWEEP SKIPPED STEP 16-18 STARTED STEP 19 1.25PPG 30/50THEN STEP 20 1.5PPG 30/50.

WATER TRANSFER:10,430 BBLS PUMPED

TOTAL ON LOC: 4158 BBLS

Report Date:11/13/2013Report #: 17&

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/13/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

10:00 12:30 2.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SHOTS(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #13 AS FOLLOWS.

WTF CBP PLUG: 12,917' PERF SHOT DEPTH: 1.) 12693'-12695' 2.) 12743'-12745' 3.) 12793'-12795' 4.) 12843'-12845' 5.) 12893'-12895'

TBP: 316 BBLS @ 14 MAX BPM MAX PSI: 4010 PSI

12:30 13:00 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

13:00 13:30 0.50 COMPZN

STIM OTHR P BTI GREASE WELL HEAD HYD & MANUAL MASTER VALVES

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 33 12.00 396.00

TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TNT CRANE OTHER CONTRACTOR 2 24.00 48.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00WESTERN HOT OIL SVC OTHER CONTRACTOR 5 12.00 60.00PINNACLE WIRELINE CREW CONTRACTOR 5 12.00 60.00WEATHERFORD WIRELINE CREW CONTRACTOR 8 12.00 96.00WEATHERFORD TOOL HAND CONTRACTOR 2 12.00 24.00PROTECHNICS CO OTHER CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00CRESCENT SERVICES VENDOR CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/13/2013Report #: 17&

Page 1/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)3,672,120.48

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

389,457.11WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&16.58

Ops and Depth @ Morning ReportPUMPING STG #20Last 24hr SummaryFRAC STGS 16-19 AND STARTED PUMPING STG 20.24hr ForecastCONTINUE STIM OPS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

STIM STIM P STAGE #16 INITIAL PSI: 2558 PSI BREAKDOWN: 3968 PSI MAX RATE: 91 BPM MAX PSI: 7438 PSI AVG RATE: 90.2 BPM AVG PSI: 6044 PSI

ISIP: 3282 PSI FG: .86

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8673 BBLS SLURRY VOLUME: 8989 BBLS 100 MESH: 1958 LB 40/70: 212,617 LB 30/50: 76,720 LB TLR: 105,320 BBL

STAGE WENT GOOD SKIPPED STEP 18 238BBL SWEEP BETWEEN40/70 & 30/50. ALL SAND PUMPED.

WATER TRANSFER:8,440 BBLS PUMPED

TOTAL ON LOC: 4,140 BBLS

07:00 07:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 17.

07:30 09:30 2.00 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #17 AS FOLLOWS.

WTF CBP PLUG: 11919' PERF SHOT DEPTH: 1.) 11894'-11896' 2.) 11844'-11846' 3.) 11794'-11796' 4.) 11748'-11750' 5.) 11694'-11696'

TBP: 259 BBLS @ 14 MAX BPM MAX PSI: 3259 PSI

Report Date:11/16/2013Report #: 20&

Page 2/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

09:30 11:30 2.00 COMPZN

STIM STIM P STAGE #17 INITIAL PSI: 2081 PSI BREAKDOWN: 8150 PSI MAX RATE: 92.7 BPM MAX PSI: 7337 PSI AVG RATE: 90.9 BPM AVG PSI: 6162 PSI

ISIP: 3216 PSI FG: .85

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8487 BBLS SLURRY VOLUME: 8749 BBLS 100 MESH: 2,497 LB 40/70: 222,833 LB 30/50: 20,281 LB TLR: 105,320 BBL

PUMPED ALL THE 40/70 SENT 475 BBL FR SWEEP STARTEDSTEP19 1.25PPG 30/50 FOR 525 BBLS PRESSURE INCREASEDFROM 6300PSI TO 6700 CUT SAND SKIPPED STEP 20 1.5PPG WENTTO FLUSH .

WATER TRANSFER:7980 BBLS PUMPED

TOTAL ON LOC: 4,150 BBLS

11:30 12:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 18.

12:00 14:00 2.00 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #18 AS FOLLOWS.

WTF CBP PLUG: 11669' PERF SHOT DEPTH: 1.) 11644'-11645.5' 2.) 11594'-11595.5' 3.) 11544'-11545.5' 4.) 11494'-11495.5' 5.) 11444'-11445.5'

TBP: 218 BBLS @ 14 MAX BPM MAX PSI: 3600 PSI

14:00 14:30 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

14:30 16:30 2.00 COMPZN

STIM STIM P STAGE #18 INITIAL PSI: 2,360 PSI BREAKDOWN: 3,960 PSI MAX RATE: 91.1 BPM MAX PSI: 8,421 PSI AVG RATE: 90.4 BPM AVG PSI: 5,757 PSI

ISIP: 3,740 PSI FG: 0.92

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6,694 BBLS SLURRY VOLUME: 6,969 BBLS 100 MESH: 2,290 LB 40/70: 180,141 LB 30/50: 0 LB TLR: 113,073 BBLS

Report Date:11/16/2013Report #: 20&

Page 3/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

16:30 20:30 4.00 COMPZN

STIM STIM T FROM THE BEGINNING OF 1.5 PPG TO 1.75 PPG 40/70 SAND,PRESS INCREASE FROM 5600 PSI TO 6000 PSI. AS SO AS THE 1.75PPG HIT THE FORMATION, PRESS RAMPED UP FROM 6000 PSI TO7000 PSI. 2 PPG HAD JUST STARTED WHEN SCREWS WERE CUT.PRESS CONTINUED UP TO 8200 PSI WHEN PUMPS BEGAN TO TRIPOUT. ATTEMPTED FOR 20 MIN TO PUMP REMAINING SAND AWAY,HOWEVER WELL CONTINUED TO PRESS OUT. PUMPS WERE SHUTDOWN AND WELL OPENED TO FLOWBACK @ 6 BPM FOR 48 MIN(280 BBLS) W/ PRESS @ 1530 PSI. ATTEMPTED TO ESTABLISHINJECTION @ 5 BPM, PUMPED ONE CSG VOL AND STARTEDWORKING RATE UP, PRESS @ 3700. AFTER REACHED REQUIREDWIRELINE PUMP DOWN RATE OF 14 BPM AND PRESS STABILIZING@ 4300 PSI, A 30 BBL GEL SWEEP WAS SENT AND FLUSH AWAY.SHUT DOWN AND RU WIRELINE.

TOTAL WATER PUMPED TO CLEAN OUT CSG: 1,121 BBLS.

20:30 21:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 19.

21:00 23:15 2.25 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #19 AS FOLLOWS.

WTF CBP PLUG: 11419' PERF SHOT DEPTH: 1.) 11394'-11395.5' 2.) 11344'-11345.5' 3.) 11294'-11295.5' 4.) 11244'-11245.5' 5.) 11195'-11196.5'

TBP: 222 BBLS @ 14 MAX BPM MAX PSI: 4400 PSI

23:15 23:45 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

Report Date:11/16/2013Report #: 20&

Page 4/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

23:45 01:30 1.75 COMPZN

STIM STIM P STAGE #19 INITIAL PSI: 2,452 PSI BREAKDOWN: 4,018 PSI MAX RATE: 92.1 BPM MAX PSI: 8,178 PSI AVG RATE: 88.2 BPM AVG PSI: 6,950 PSI

ISIP: 4,588 PSI FG: 1.05

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 7,443 BBLS SLURRY VOLUME: 7,628 BBLS 100 MESH: 2,150 LB 40/70: 167,096 LB 30/50: 0 LB TLR: 120,738 BBL

AS 1.75 PPG 40/70 STARTED, PRESS INCREASED FROM 7000 PSITO 7650 WITHIN 1 MIN. CUT SAND SCREWS AND SENT 270 BBLSWEEP. PRESS CONTINUED TO INCREASE TO 8178 PSI, TWOPUMPS TRIPPED OUT CAUSING RATE TO DROP TO 80 BPM.SWEEP HIT PERFS AND PRESS STABILIZED @ 7900 PSI W/ ASTEADY DECLINE. BROUGHT SAND BACK ON @ 0.75 PPG ANDINCREASED RATE TO 85 BPM. DID NOT SEE ANY BENEFIT WITHRATE INCREASE. PRESS MAINTAINED @ 8000 PSI W/ A SLIGHTINCREASE. CUT SAND SCREWS AND WENT TO FLUSH WHENPRESS CONTINUED TO INCREASE TO 8100 PSI AFTER 1 PPG SANDHIT THE PERFS.

WATER TRANSFER: 7,170 BBLS PUMPED

TOTAL ON LOC: 4,150 BBLS

01:30 02:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 20.

02:00 04:00 2.00 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #20 AS FOLLOWS.

WTF CBP PLUG: 11170' PERF SHOT DEPTH: 1.) 11145'-11146.5' 2.) 11095'-11096.5' 3.) 11045'-11046.5' 4.) 10995'-10996.5' 5.) 10945'-10946.5'

TBP: 178 BBLS @ 13 MAX BPM MAX PSI: 5272 PSI

04:00 05:15 1.25 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

05:15 06:00 0.75 COMPZN

STIM STIM P OPENED WELL AND STARTED PUMPING STAGE #20.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING SAFETY PERSONNEL CONTRACTOR 1 8.00 8.00

Report Date:11/16/2013Report #: 20&

Page 5/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 34 12.00 408.00

TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00PINNACLE WIRELINE CREW CONTRACTOR 4 12.00 48.00WEATHERFORD WIRELINE CREW CONTRACTOR 10 12.00 120.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 12.00 36.00PROTECHNICS CO OTHER CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 6 8.00 48.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/16/2013Report #: 20&

Page 1/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)3,828,429.48

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

156,309.00WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&17.58

Ops and Depth @ Morning ReportPUMPING STG #24Last 24hr SummaryFRAC STGS 20-23 AND PERFORATED STG 24.24hr ForecastCONTINUE STIM OPSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

STIM STIM P STAGE #20 INITIAL PSI: 2,632 PSI BREAKDOWN: 4,747 PSI MAX RATE: 95.4 BPM MAX PSI: 7654 PSI AVG RATE: 90.07 BPM AVG PSI: 6,094 PSI

ISIP: 3361 PSI FG: .87

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6805 BBLS SLURRY VOLUME: 6980 BBLS 100 MESH: 1048 LB 40/70: 159,457 LB 30/50: 0 LB TLR: 127,543 BBL

AS 1.75 PPG 40/70 STARTED AT PERFS, PRESS INCREASED FROM5900 PSI TO 6900 WITHIN 1 MIN. CUT SAND SCREWS AND SENT 270BBL SWEEP. PRESS CONTINUED TO INCREASE TO 7150 PSI, SHUTDOWN DID NOT RUN ANY 30/50

WATER TRANSFER: 6,700 BBLS PUMPED

TOTAL ON LOC: 4,158 BBLS

07:00 07:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 21.

07:30 09:00 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #21 AS FOLLOWS.

WTF CBP PLUG: 10920' PERF SHOT DEPTH: 1.) 10895'-10896.5' 2.) 10845'-10846.5' 3.) 10795'-10796.5' 4.) 10745'-10746.5' 5.) 10695'-10696.5'

TBP: 233 BBLS @ 13 MAX BPM MAX PSI: 3800 PSI

Report Date:11/17/2013Report #: 21&

Page 2/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

09:00 10:00 1.00 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

10:00 12:00 2.00 COMPZN

STIM STIM T H2S MONITORS WENT OFF GATHERED EVERYONE IN MUNSTERAREA CHECK FOR H2S ONSITE WITH MULTI METER NOTHINGFOUND. WAS FALSE ALARM TURNED OFF MONITORS UNTIL THEYCAN BE CHECKED OUT. USING PERSONAL MONITORS

12:00 13:00 1.00 COMPZN

STIM STIM P STAGE #21 INITIAL PSI: 2,438 PSI BREAKDOWN: 4,146 PSI MAX RATE: 93.7 BPM MAX PSI: 8,363 PSI AVG RATE: 91.0 BPM AVG PSI: 6,191 PSI

ISIP: 5,303 PSI FG: 1.13

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6,768 BBLS SLURRY VOLUME: 6,923 BBLS 100 MESH: 2001 LB 40/70: 139,670 LB 30/50: 0 LB TLR: 127,543 BBL

TOTAL ON LOC: 4,158 BBLS

13:00 15:30 2.50 COMPZN

STIM STIM T SCREENED OUT ON 1.5PPG 40/70 PRESSURE INCRESED FROM6000 PSI TO 8400 PSI SHUT DOWN TRIED TO PUMP ON AT 5 BPMPRESSURE INCRESED TO 8400 PSI. SHUT DOWN STARTED FLOWBACK OPEN AT 3500 PSI @ 4.5 BPM INCRESED RATE TO 8 BPM2000 PSI FOR 248 BBLS SHUT DWN FLOW BACK. STARTEDPUMPING @ 5 BPM FOR 124BBLS INCRESED RATE TO 7BPMPRESSURE INCREASE UP TO 6500PSI THEN FELL OFF TO 5500PSIINCREASED RATE TO TO 12 BPM SENT 35 BBL GEL SWEEP 35 VISCPUMPED 268 BBLS @ 14BPM 5500 PSI SHUT DOWN.

15:30 16:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 22.

16:00 17:45 1.75 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #22 AS FOLLOWS.

WTF CBP PLUG: 10670' PERF SHOT DEPTH: 1.) 10645'-10646.5' 2.) 10595'-10596.5' 3.) 10545'-10546.5' 4.) 10495'-10496.5' 5.) 10445'-10446.5'

TBP: 209 BBLS @ 14 MAX BPM MAX PSI: 6900 PSI

17:45 19:00 1.25 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

Report Date:11/17/2013Report #: 21&

Page 3/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

19:00 21:00 2.00 COMPZN

STIM STIM P STAGE #22 INITIAL PSI: 2,634 PSI BREAKDOWN: 5,391 PSI MAX RATE: 102 BPM MAX PSI: 8,167 PSI AVG RATE: 98.4 BPM AVG PSI: 7,082 PSI

ISIP: 4,978 PSI FG: 1.09

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 6,885 BBLS SLURRY VOLUME: 7,092 BBLS 100 MESH: 2,165 LB 40/70: 189,845 LB 30/50: 0 LB TLR: 134,637 BBL

PUMPED STG @ 100 BPM MAINTAINING AN AVERAGE OF 7000 PSI.PRESS STARTED TO INCREASE AS 1.5 PPG WAS ON PERFS ANDRAMPED UP TO 7900 PSI WHILE 1.75 PPG WAS GOING INTOFORMATION. CALLED FLUSH AND MOVE ON TO NEXT STG.

WATER TRANSFER: 6,780 BBLS PUMPED

TOTAL ON LOC: 4,150 BBLS

21:00 21:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 23.

21:30 23:00 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #23 AS FOLLOWS.

WTF CBP PLUG: 10670' PERF SHOT DEPTH: 1.) 10395'-10396.5' 2.) 10345'-10346.5' 3.) 10296'-10297.5' 4.) 10246'-10247.5' 5.) 10196'-10197.5'

TBP: 143 BBLS @ 14 MAX BPM MAX PSI: 4790 PSI

23:00 00:00 1.00 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY. RETESTED N2 POP-OFF AND SET @ 8780 PSI.

00:00 01:30 1.50 COMPZN

STIM OTHR T WAITING ON FR TRANSPORT TO ARRIVE ON LOCATION.

Report Date:11/17/2013Report #: 21&

Page 4/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

01:30 03:00 1.50 COMPZN

STIM STIM P STAGE #23 INITIAL PSI: 2,534 PSI BREAKDOWN: 3,880 PSI MAX RATE: 100.3 BPM MAX PSI: 8,010 PSI AVG RATE: 92.7 BPM AVG PSI: 6,163 PSI

ISIP: 3,432 PSI FG: 0.88

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 7,321 BBLS SLURRY VOLUME: 7,683 BBLS 100 MESH: 2,170 LB 40/70: 204,170 LB 30/50: 9,230 LB TLR: 142,101 BBL

WHILE PRESS STARTED TO INCREASE DURING 2 PPG 40/70, RATEWAS INCREASED FROM 96 BPM TO 98 BPM IN ATTEMPTS TOINCREASE FRAC WIDTH AND STABILIZE PRESS. PRESS RAMPEDUP FROM 6300 PSI TO 7500 PSI. CUT SCREWS WENT TO PAD FOR30/50 SAND STG. PRESS STARTED TO STABILIZE @ 7600, STARTED1.25 PPG 30/50, PRESS SPIKED TO 8010 PSI, CALLED FLUSH.

WATER TRANSFER: 7,390 BBLS PUMPED

TOTAL ON LOC: 4,150 BBLS

03:00 03:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 24.

03:30 05:00 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #24 AS FOLLOWS.

WTF CBP PLUG: 10171'' PERF SHOT DEPTH: 1.) 10146'-10147.5' 2.) 10096'-10097.5' 3.) 10046'-10047.5' 4.) 9996'- 9997.5' 5.) 9946'- 9947.5'

TBP: 143 BBLS @ 14 MAX BPM MAX PSI: 3620 PSI

05:00 06:00 1.00 COMPZN

STIM PRTS P REPLACED TWO PUMPS. PRIMED AND PRESSURE TEST TREATINGLINES AND WELLHEAD TO 9800 PSI, HELD FOR 5 MIN, ALL LINESCHECKED OKAY.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 34 12.00 408.00

TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00

Report Date:11/17/2013Report #: 21&

Page 5/5

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PINNACLE WIRELINE CREW CONTRACTOR 4 12.00 48.00WEATHERFORD WIRELINE CREW CONTRACTOR 10 12.00 120.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 12.00 36.00PROTECHNICS CO OTHER CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 6 8.00 48.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/17/2013Report #: 21&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)4,362,742.77

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

116,984.00Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

17.81Ops and Depth @ Morning Report

Last 24hr Summary

24hr ForecastCONTINUE STIM OPSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM STIM T WAITING ON LAST 40/70 SAND TRUCK TO OFF LOAD.

06:30 08:30 2.00 COMPZN

STIM STIM P STAGE #24 INITIAL PSI: 2,474 PSI BREAKDOWN: 4,127 PSI MAX RATE: 100.4 BPM MAX PSI: 8,178 PSI AVG RATE: 99.5 BPM AVG PSI: 6,050 PSI

ISIP: 3,831 PSI FG: 0..95

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8,980 BBLS SLURRY VOLUME: 9,306 BBLS 100 MESH: 1,498 LB 40/70: 225,784 LB 30/50: 73,481 LB TLR: 151,081 BBL

STARTED STAGE 24 @ 100 BPM AND FR @ 1.STEP 10-14 .25-1.25PPG DROPPED 40 PSI WITH EACH SANDINCREASE UNTIL STEP15-17 1.5-2PPG INCREASED 50 PSI WITHEACH SAND CHANGE. PUMPED 350 BBL SWEEP THEN STARTED1.25PPG 30/50 PUMPED ALL 1.25PPG STEP 20 1.5PPG CUT SHORT90SKS. THEN PRESSURED UP TO 8500 PSI ON FLUSH WAS ABLETO FLUSH WELL BORE.

WATER TRANSFER: 8,550 BBLS PUMPED

TOTAL ON LOC: 4,150 BBLS

08:30 09:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 25.

Report Date:11/18/2013Report #: 22&

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 11/18/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

09:00 10:30 1.50 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #25 AS FOLLOWS.

WTF CBP PLUG: 9921'' PERF SHOT DEPTH: 1.) 9896'-9897.5' 2.) 9846'-9847.5' 3.) 9796'-9797.5' 4.) 9746'- 9747.5' 5.) 9696'- 9697.5'

TBP: 132 BBLS @ 14 MAX BPM MAX PSI: 3750 PSI

10:30 11:30 1.00 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 6.00 6.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 34 12.00 408.00

TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TNT CRANE OTHER CONTRACTOR 3 12.00 36.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00PINNACLE WIRELINE CREW CONTRACTOR 4 12.00 48.00WEATHERFORD WIRELINE CREW CONTRACTOR 10 12.00 120.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 12.00 36.00PROTECHNICS CO OTHER CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 4 8.00 32.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 6.00 6.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/18/2013Report #: 22&

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 11/19/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)4,948,102.86

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

236,851.10Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

19.06Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryFRAC 30-31 RDMO FRAC.24hr ForecastRDMO HALLIBURTON FRAC TO THE 7143HTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM STIM P STAGE #29 INITIAL PSI: 2,640 PSI BREAKDOWN: 7,955 PSI MAX RATE: 106.2 BPM MAX PSI: 7,956 PSI AVG RATE: 97.07 BPM AVG PSI: 5,435 PSI

ISIP: 3,570 PSI FG: 0.91

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8,663 BBLS SLURRY VOLUME: 8,985 BBLS 100 MESH: 2,048 LB 40/70: 221,777 LB 30/50: 73,699 LB TLR: 193,468 BBL

PUMPED STG @105 BPM FR@ 1.25 STAGE WENT AS PLANNED ALLSAND PUMPED.

WATER TRANSFER: 8,520 BBLS PUMPED

FRAC POND 1- 11' 9"FRAC POND 2- 9' 8"

TOTAL ON LOC: 4,150 BBLS

06:30 07:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 30.

07:00 08:00 1.00 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #30 AS FOLLOWS.

WTF CBP PLUG: 8672' PERF SHOT DEPTH: 1.) 8647'-8648.5' 2.) 8598'-8599.5' 3.) 8548'-8549.5' 4.) 8494'-8495.5'

5.) 8448'-8449.5'

TBP: 74 BBLS @ 13 MAX BPM MAX PSI: 4006 PSI

Report Date:11/19/2013Report #: 23&

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 11/19/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 09:00 1.00 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY. PRIMED PUMPS.WORK ON TWO PUMPS.

09:00 11:00 2.00 COMPZN

STIM STIM P STAGE #30 INITIAL PSI: 2,565 PSI BREAKDOWN: 3,646 PSI MAX RATE: 106.1 BPM MAX PSI: 6,577 PSI AVG RATE: 105.7 BPM AVG PSI: 5,444 PSI

ISIP: 3,285 PSI FG: 0.87

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8,739 BBLS SLURRY VOLUME: 9,069 BBLS 100 MESH: 1,790 LB 40/70: 223,540 LB 30/50: 79,390 LB TLR: 202,207 BBL

PUMPED STG @105 BPM FR@ 1 UNTIL STEP 9 THEN 1.25 ON FR.STAGE WENT AS PLANNED ALL SAND PUMPED.

WATER TRANSFER: 8,500 BBLS PUMPED

FRAC POND 1- 11' 9"FRAC POND 2- 9' 8"

TOTAL ON LOC: 4,150 BBLS

11:00 11:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER PERFORATING AND PUMPINGSTG 31.

11:30 12:30 1.00 COMPZN

PERF PERF P RU 1OK WIRE LINE LUBRICATOR W/ PACK-OFF AND PRESSURETESTED THE CONNECTION TO 8,500 PSI USING A LUBRICATORTEST SUB. GUN ASSY CONSISTED OF OWENS SETTING TOOL, 31/8 SLICK GUN CONSISTING OF (5) -1.5 FT PERF RINGS @ 6 SPF(LOADED W/ OWEN SUPERHERO SDP-3125-411NT. 6 SPF, 0.36 EHD, 21.0 GRAMS CHARGERS, @ 60 PHASING (42.5 PENETRATION(RP-43), 5.5 IN COMPOSITE FLOW THROUGH BRIDGE PLUG. RIH,SET PLUG, AND PERFORATED STG #31 AS FOLLOWS.

WTF CBP PLUG: 8423' PERF SHOT DEPTH: 1.) 8398'-8399.5' 2.) 8348'-8349.5' 3.) 8298'-8299.5' 4.) 8248'-8249.5'

5.) 8198'-8199.5'

TBP: 57 BBLS @ 12 MAX BPM MAX PSI: 3100 PSI

12:30 13:00 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER RDMO WEATHERFORDWIRELINE.

13:00 14:00 1.00 COMPZN

STIM RURD P RDMO WEATHERFORD WIRELINE.

14:00 15:00 1.00 COMPZN

STIM STIM T WORK ON PUMP FLUID ENDS CHANGE SEATS.

15:00 15:30 0.50 COMPZN

STIM PRTS P PRESSURE TEST TREATING LINES AND WELL HEAD TO 9800 PSI,HELD FOR 5 MIN, ALL LINES CHECKED OKAY.

Report Date:11/19/2013Report #: 23&

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 11/19/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

15:30 17:30 2.00 COMPZN

STIM STIM P STAGE #30 INITIAL PSI: 2,565 PSI BREAKDOWN: 3,646 PSI MAX RATE: 106.1 BPM MAX PSI: 6,577 PSI AVG RATE: 105.7 BPM AVG PSI: 5,444 PSI

ISIP: 3,285 PSI FG: 0.87

ACID (15% HCL-FERCHEK SC) 5000 GALS CLEAN VOLUME: 8,739 BBLS SLURRY VOLUME: 9,069 BBLS 100 MESH: 1,790 LB 40/70: 223,540 LB 30/50: 79,390 LB TLR: 202,207 BBL

PUMPED STG @105 BPM FR@ 1 UNTIL STEP 9 THEN 1.25 ON FR.STAGE WENT AS PLANNED ALL SAND PUMPED.

WATER TRANSFER: 8,500 BBLS PUMPED

FRAC POND 1- 11' 9"FRAC POND 2- 9' 8"

TOTAL ON LOC: 4,150 BBLS

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 4.00 4.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OTHER CONTRACTOR 4 12.00 48.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 34 12.00 408.00

TNT CRANE OTHER CONTRACTOR 4 12.00 48.00TNT CRANE OTHER CONTRACTOR 2 12.00 24.00TAN MAR RENTALS OTHER CONTRACTOR 10 12.00 120.00PINNACLE WIRELINE CREW CONTRACTOR 4 12.00 48.00WEATHERFORD WIRELINE CREW CONTRACTOR 10 12.00 120.00WESTERN HOT OIL SVC OTHER CONTRACTOR 4 12.00 48.00PROTECHNICS CO OTHER CONTRACTOR 2 12.00 24.00BTI WELLHEAD HAND CONTRACTOR 2 12.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 6.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/19/2013Report #: 23&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/21/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,397,566.59

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

4,251.50Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&

20.58Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryRD GOAT HEAD SECURE LOCATION.24hr ForecastWELL SHUT INTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 09:00 3.00 COMPZN

STIM WODL P WAITING ON DAY LIGHT.

09:00 09:30 0.50 COMPZN

STIM SFTY P JSA / GO CARD DISCUSSION OVER RD GOAT HEAD OFF WELLHEAD. PRESSURE TEST

09:30 14:00 4.50 COMPZN

STIM OTHR P RD GOAT HEAD OFF WELL HEAD SHELL TEST WELL HEAD 9500 PSITEST GOOD.

14:00 06:00 16.00 COMPZN

STIM OTHR P NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

TSC SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 8.00 8.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 6.00 6.00HALLIBURTON ENERGYSERVICES

FRAC CREW CONTRACTOR 25 8.00 200.00

TNT CRANE OTHER CONTRACTOR 2 8.00 16.00TAN MAR RENTALS OTHER CONTRACTOR 2 12.00 24.00PINNACLE WIRELINE CREW CONTRACTOR 2 12.00 24.00WESTERN HOT OIL SVC OTHER CONTRACTOR 3 6.00 18.00PROTECHNICS CO OTHER CONTRACTOR 1 4.00 4.00CRESCENT SERVICES VENDOR CONTRACTOR 1 6.00 6.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 9.00 18.00BIG D EQUIPMENT CO ROUSTABOUT CREW CONTRACTOR 3 6.00 18.00RENEGADE WELLHEAD HAND CONTRACTOR 2 8.00 16.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/20/2013Report #: 24&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/26/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,425,810.50

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

5,030.50WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&20.60

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryBEGIN CLEANING SAND FROM FLOW BACK TANK.24hr ForecastWELL SHUT INTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

WELLPR SFTY P JSA/GO CARD DISCUSSION ON DAYS PLANS TO CLEAN SANDFROM FLOW BACK TANK. HAZARDS AND MITIGATION MEASURES.

06:30 06:30 COMPZN

WELLPR OTHR P WASH AND VACUUM SAND FROM FLOW BACK TANK

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 4 5.00 20.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/26/2013Report #: 25&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/27/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,435,562.00

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

9,751.50WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&21.60

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONTINUE CLEANING SAND FROM FLOWBACK TANK USING PUMP TRUCK AND VACUUM24hr ForecastWELL SHUT INTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 COMPZN

WELLPR WODL T WAITING ON EQUIPMENT TO ARRIVE. ROADWAY CLOSED FORREPAIRS

08:00 08:30 0.50 COMPZN

WELLPR SFTY P JSA / GO CARD REVIEW FOR TANK CLEANING. HAZARDAWARENESS, MITIGATION, HAND AND FINGER DISCUSSION

08:30 15:30 7.00 COMPZN

WELLPR OTHR P USE PUMP TRUCK AND VACUUM TO CLEAN SAND FROMFLOWBACK TANK.

15:30 16:30 1.00 COMPZN

WELLPR OTHR P RIG DOWN TRUCK EQUIPMMENT, JSA FOR SAFE JOURNEY TOPORT

16:30 06:00 13.50 COMPZN

WELLPR OTHR P NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 3 8.50 25.50TAYLOR SAFETY ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/27/2013Report #: 26&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 11/29/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,445,313.50

Daily Ops SummaryRig (Names) Wellbore

Sidetrack 1End Depth (ftKB)

0.0Depth Progress (ft) Daily Cost Total (Cost)

9,751.50WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&21.96

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONTINUE CLEANING SAND FROM FLOWBACK TANK USING PUMP TRUCK AND VACUUM24hr ForecastWELL SHUT INTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

09:00 09:30 0.50 COMPZN

WELLPR SFTY P JSA / GO CARD REVIEW FOR TANK CLEANING. HAZARDAWARENESS, MITIGATION, HAND AND FINGER DISCUSSION

09:30 16:30 7.00 COMPZN

WELLPR OTHR P USE PUMP TRUCK AND VACUUM TO CLEAN SAND FROMFLOWBACK TANK.

16:30 17:30 1.00 COMPZN

WELLPR OTHR P RIG DOWN TRUCK EQUIPMMENT, JSA FOR SAFE JOURNEY TOPORT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 5 8.50 42.50CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 8.50 8.50SIGNA ENGINEERING SAFETY PERSONNEL CONTRACTOR 1 8.50 8.50KEY ENERGY SERVICES TRUCKER CONTRACTOR 1 6.50 6.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:11/29/2013Report #: 27&

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 12/30/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,561,720.44

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)6,352.50

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&22.96

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryMIRU COIL UNIT AND ALL DRILL OUT EQUIPMENT.24hr ForecastN/U INJECTOR HEAD AND TEST RISER AND BOP STACK, P/U TOOLS, RIH AND START DRILL OUT OPERATIONS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 09:00 3.00 COMPZN

RPEQPT SFTY P WAIT ON CREWS TO ARRIVE, HOLD J.S.A. SAFETY MEETING ONSPOTTING AND RIGGING UP EQUIPMENT.

09:00 18:00 9.00 COMPZN

RPEQPT RURD P MIRU KEY CT, TORNADO FLUID SERVICES, NABORS,TRANSFERRED WATER FROM THE BL7131H WORKING TANKS TOTHE BL7132 WORKING TANKS. BTI SET HYDRAULICACCUMULATOR AND FUNCTION TESTED HYDRAULIC VALVE, EDGERU DUAL PLUG CATCHER AND FLOW LINES TO GAS BUSTERS ONOPEN TOP TANK , BIG D MADE REPAIRS TO LEASE ROAD WATERCROSSING, PUT BURMS AROUND WORKING TANKS AND MADEMINOR PAD REPAIRS FOR HOLES. MOVED MANLIFT FROM THE BL7131H TO THE BL 7132H. RENAGADE INSTALLED AND TORQUED 41/16 10 K DUAL WING VALVE.

18:00 06:00 12.00 COMPZN

RPEQPT SISW P SECURE WELL, NO ACTIVITY AT REPORT TIME.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00BIG D EQUIPMENT CO OTHER CONTRACTOR 2 9.00 18.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 4 9.00 36.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 3 4.00 12.00

KEY ENERGY SERVICES OTHER CONTRACTOR 7 8.00 56.00BTI WELLHEAD HAND CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:12/28/2013Report #: 28&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 12/31/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,571,862.94

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)6,352.50

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&23.96

Ops and Depth @ Morning ReportCIRCULATING SWEEP OUTLast 24hr SummaryCONTINUED TO R/U COIL, TEST BOP, P/U TOOL, RIH, DRILL OUT PLUGS 1-7, ON PLUG 8 AT REPORT TIME, CIRCULATING SWEEP OUT.24hr ForecastCONTINUE CLEAN OUT OPERATIONS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

RPEQPT SISW P WAITING ON CREWS TO ARRIVE ON LOCATION

07:00 07:30 0.50 COMPZN

RPEQPT SFTY P JSA/GO CARD SAFETY MEETING WITH ALL PERSONEL

07:30 10:00 2.50 COMPZN

RPEQPT RURD P RIG UP KEY RISERS, AND GROUND ALL EQUIPMENT ON LOCATION

10:00 12:30 2.50 COMPZN

STIM PRTS P FILL COIL REEL WITH WATER, STAB RISER AND TORQUE IT UP,RUN DOWN AND TAG LOWER MASTER VALVE. FUNCTION TESTBOP S AND PRESSURE TESTED BOP S ( 500 PSI LOW/8500 PSIHIGH ). GOOD TEST.

12:30 14:30 2.00 COMPZN

STIM PULD P BREAK RISER OFF AND MAKE UP BAKER 2 7/8 MOTOR AND MILLBHA. TEST MOTOR ON SURFACE @ 2.5 BBL S/MIN. (GOOD TEST).

14:30 15:00 0.50 COMPZN

STIM RURD P STAB RISER AND TEST TO 8,500 PSI. GOOD TEST.

15:00 18:00 3.00 COMPZN

STIM CTOP P RUN IN HOLE WITH COIL TUBING. STOPPED AT 5,000 ANDCHECKED PICK UP WEIGHT.

18:00 18:45 0.75 COMPZN

STIM CTOP P TAG PLUG #1 AT 8,430 . TAGGED PLUG AT 18:00. PLUG GONE AT18:45. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

18:45 19:30 0.75 COMPZN

STIM CTOP P TAG PLUG #2 AT 8,677 . TAGGED PLUG AT 18:45. PLUG GONE AT19:30. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

19:30 20:30 1.00 COMPZN

STIM CTOP P TAG PLUG #3 AT 9,182 . TAGGED PLUG AT 19:30. PLUG GONE AT20:30. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

20:30 23:15 2.75 COMPZN

STIM CTOP P PUMP 20 BBL 80 VIS SWEEP AND CHASE IT OUT OF THE HOLE TO6,021',CIRCULATE SWEEP OUT, RIH AND TAG BACK UP ON PLUG 4.

23:15 23:30 0.25 COMPZN

STIM CTOP P TAG PLUG #4AT 9,430 . TAGGED PLUG AT 23:15. PLUG GONE AT23:30. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

23:30 00:00 0.50 COMPZN

STIM CTOP P TAG PLUG #5 AT 9,671 . TAGGED PLUG AT 23:30. PLUG GONE AT00:00. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

00:00 00:30 0.50 COMPZN

STIM CTOP P TAG PLUG #6 AT 9,925 . TAGGED PLUG AT 00:00. PLUG GONE AT00:30. PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

00:30 03:15 2.75 COMPZN

STIM CTOP P PUMP 20 BBL 80 VIS SWEEP AND CHASE IT OUT OF THE HOLE TO6,021',CIRCULATE SWEEP OUT, RIH AND TAG BACK UP ON PLUG 7.

03:15 03:30 0.25 COMPZN

STIM CTOP P TAG PLUG #7 AT 10,171 . TAGGED PLUG AT 03:15. PLUG GONE AT03:30 20 PUMP 10 BBL SWEEP AND CONTINUE TO RUN IN HOLEMILLING PLUGS.

Report Date:12/29/2013Report #: 29&

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 12/31/2013

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

03:30 06:00 2.50 COMPZN

STIM CIRC T TAG PLUG #8 AT 10,425 . TAGGED PLUG AT 03:30. LOST W/H PSI.PUMPED 20 BBL SWEEP, WELL GIVE UP LARGE AMOUNTS OFSAND.W/H PSI, AFTER SAND, CIR @ 3,800 PSI. CONTINUE TOPUMP AT 3 ½ BPM AND GETTING 2 BPM ON RETURNS. PUMPED 20BBL SWEEP 20 VIS, WAITING ON SWEEP AT REPORT TIME.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00BIG D EQUIPMENT CO OTHER CONTRACTOR 2 9.00 18.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 4 9.00 36.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 3 4.00 12.00

KEY ENERGY SERVICES OTHER CONTRACTOR 7 8.00 56.00BTI WELLHEAD HAND CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:12/29/2013Report #: 29&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 12/31/2013

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,664,012.94

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)92,150.00

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&24.96

Ops and Depth @ Morning ReportMILLING PLUGSLast 24hr SummaryFREEDED STUCK PIPE. CONDITIONED AND CLEANED HOLE, MADE SHORT TRIPS TO ENSURE WELL BORE WAS CLEAN BEFORE CONTINUINGDRILL OUT OPPS.24hr ForecastCONTINUE DRILL OUT OPERATIONSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD JSA, SAFETY MEETING WITH ALL PERSONEL

06:30 14:30 8.00 COMPZN

STIM CTOP WORKED PIPE FREE AND CIRCULATED HOLE CLEAN PUMPINGHIGH VISC SWEEPS.

14:30 17:30 3.00 COMPZN

STIM CTOP RUN IN HOLE DRILLING PLUGS #7 @ 10,171 THROUGH PLUG #9 @10,670 PUMP 10 BBL SWEEP/10BBL SPACER/20BBL SWEEP.WAITED FOR SWEEP TO REACH BOTTOM AND CHASED SWEEP UPHOLE.

17:30 20:30 3.00 COMPZN

STIM CTOP RUN IN HOLE DRILLING PLUGS #9 @ 10,420 THROUGH PLUG #10 @10,670, PUMP 10 BBL SWEEP/10BBL SPACER/20BBL SWEEP.WAITED FOR SWEEP TO REACH BOTTOM AND CHASED SWEEP UPHOLE.

20:30 22:30 2.00 COMPZN

STIM CTOP MAKE SHORT TRIP TO 6,100' WHILE CIRCULATING HOLE CLEAN.

22:30 00:30 2.00 COMPZN

STIM CTOP RUN IN HOLE DRILLING PLUGS #11 @ 10,900 THROUGH PLUG #12@ 11,154 PUMP 10 BBL SWEEP/10BBL SPACER/20BBL SWEEP.WAITED FOR SWEEP TO REACH BOTTOM AND CHASED SWEEP UPHOLE.

00:30 05:30 5.00 COMPZN

STIM CTOP MAKE SHORT TRIP TO 6,100' WHILE CIRCULATING HOLE CLEAN.

05:30 06:00 0.50 COMPZN

TAG PLUG 14 @ 11,650, DRILLING OUT AT SHIFT CHANGE.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00BIG D EQUIPMENT CO OTHER CONTRACTOR 0 9.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 4 12.00 48.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

KEY ENERGY SERVICES OTHER CONTRACTOR 12 12.00 144.00BTI WELLHEAD HAND CONTRACTOR 2 2.00 4.00BAKER OIL TOOLS CONTRACTOR 1 24.00 24.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date:12/30/2013Report #: 30&

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 12/31/2013

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:12/30/2013Report #: 30&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/1/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)5,894,474.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)117,140.27

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&25.96

Ops and Depth @ Morning ReportMILLING PLUGSLast 24hr SummaryCONTINUED MILLING PLUGS 13 - 16 PUMPING HIGH VISC SWEEPS AND MAKING SHORT TRIPS AFTER EVERY TWO PLUGS.24hr ForecastCONTINUE DRILL OUT OPERATIONSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD JSA/SAFETY MEETING WITH ALL PERSONNEL ON LOCATION.

06:30 09:30 3.00 COMPZN

STIM CTOP RUN IN HOLE MILLING PLUG #13 @ 11,419' THROUGH PLUG #14 @11,669'. TAG PLUG #15 @ 11,919'. PUMP 10 BBL SWEEP, 10BBLSPACER FOLLOWED BY A 20 BBL HIGH VISC SWEEP.

09:30 12:30 3.00 COMPZN

STIM CTOP MAKE SHORT TRIP TO 6,100' . GOT TO 8,500' AND 20 BBL 120 VISCSWEEP HIT SURFACE

AND PLUGGED OFF FLOW BACK IRON GOING TO PLUG CATCHER.PICKED UP ON PIPE AND PIPE WAS STICKING. STOPPED ANDPUMPED ANOTHER HIGH VISC SWEEP TO TRY AND CLEAROBSTRUCTION.

12:30 14:00 1.50 COMPZN

STIM CTOP GOT PIPE FREE AND CONTINUE SHORT TRIP TO 6,000'.

14:00 16:00 2.00 COMPZN

STIM CTOP CALLED OFFICE AND DECISION WAS MADE TO POOH AND CHECKMOTOR AND MILL WHILE OPEN TOP TANKS ARE BEING CHANGEDOUT.

16:00 19:30 3.50 COMPZN

STIM CTOP CIR SAND , PICKED UP ON PIPE AND PIPE WAS STICKING.CONTINUED TO SLOWLY WORK PIPE TO SURFACE. POH,INSPECTED MILL. MILL CIRCULATING CENTER PORT CLOGGEDWITH PLUG PIECES AND SIDES ROUNDED OFF. R/R MILL.

19:30 20:30 1.00 COMPZN

STIM CTOP CHANGE OUT MILL 4.703. PRESSURE TEST TO 5000 PSI. GOODTEST

20:30 22:30 2.00 COMPZN

STIM CTOP RIH, WEIGHT CHECK @10,300 FT, INJECTION WEIGHT 33,474 WELLHEAD PSI 1,537 CIRCULATING PSI 3,773. RIH.

22:30 01:30 3.00 COMPZN

STIM CTOP RUN IN HOLE MILLING PLUG #15 @ 11,938' THROUGH PLUG #15 @11,980'. TAG PLUG #16 @ 12,192'. THROUGH PLUG #16 @ 12,201'.TAG PLUG #17 @ 12,418 'PUMP 10 BBL SWEEP, 10BBL SPACERFOLLOWED BY A 20 BBL HIGH VISC SWEEP.

01:30 06:00 4.50 COMPZN

STIM CTOP MAKE SHORT TRIP TO 5,500' . GOT TO 6,960' AND SWEEP HITSURFACE.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00BIG D EQUIPMENT CO OTHER CONTRACTOR 0 9.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 4 12.00 48.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

KEY ENERGY SERVICES OTHER CONTRACTOR 12 12.00 144.00BTI WELLHEAD HAND CONTRACTOR 2 2.00 4.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00

Report Date:12/31/2013Report #: 31&

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/1/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date:12/31/2013Report #: 31&

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/2/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,025,818.75

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)131,344.37

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&26.96

Ops and Depth @ Morning ReportSHORT TRIPLast 24hr SummaryCONTINUED MILLING PLUGS # 17 @ 12425' TO 13550' PUMPING HIGH VISC SWEEPS AND MAKING SHORT TRIPS AFTER EVERY TWO PLUGS.24hr ForecastCONTINUE DRILL OUT OPERATIONSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM CTOP HELD SAFETY MEETING/JSA WITH ALL PERSONNEL

06:30 08:30 2.00 COMPZN

STIM CTOP RIH TO CONTINUE MILLING PLUGS

08:30 12:00 3.50 COMPZN

STIM CTOP MILL PLUG #17@12425' THROUGH #19,12921'. RAN DOWN ANDTAGGED PLUG #20 13159'. PUMPED TWO HIGH VISC SWEEPS10BBL/10BBL SPACER/20BBL.

12:00 16:45 4.75 COMPZN

STIM CTOP P MAKE SHORT TRIP TO 5,800'

16:45 18:45 2.00 COMPZN

STIM CTOP RUN BACK IN HOLE TO CONTINUE MILLING PLUGS.

18:45 20:00 1.25 COMPZN

STIM CTOP P MILL PLUG # 20, 13159' RUN 10 BBL SWEEP,RAN INSTART CLEANING AT13400'. MILLED 1 HOUR AND COULD NOT GODOWN. RAN 10 BBL SWEEP W/85 VISC. MADE NO FOOTAGE.

20:00 00:00 4.00 COMPZN

STIM CTOP MAKE SHORT TRIP up to 9200'TRASH ON MILL CLEANED OFFRIH

00:00 00:30 0.50 COMPZN

STIM CTOP MILL ON PLUG AT 13412'3.5 BBL'S IN AND 3.5 BBL'S OUT

00:30 03:30 3.00 COMPZN

STIM CTOP CLEANED TO 13550'RAN SWEEPS AND MADE NO FOOTAGE

03:30 06:00 2.50 COMPZN

STIM CTOP MAKE SHORT TRIP

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 8.00 16.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

KEY ENERGY SERVICES OTHER CONTRACTOR 12 12.00 144.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 1/1/2014Report #: 32Actual Days: 26.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/2/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/1/2014Report #: 32Actual Days: 26.96

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/3/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,122,703.18

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)122,696.26

WeatherCLEAR

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&27.96

Ops and Depth @ Morning ReportWIPER TRIP PULLING UP / 10,000'Last 24hr SummaryPOOH. CUT 50' 2 3/8" TUBINGCHANGE MOTOR AND MILL,4,5/8"BLADED OPTICUTPRESSURE TEST 5000 PSIRIH TAG AT PLUG # 22 @ 13,686RESUME MILLING PLUGSINJECTION 3 BBLS/MIN. AND RETURNS 3 BBLS/MIN. .25/10 BBL'S PIPE ON PIPEMILLED # 23 @ 13,938 AND TAGGED SAND AT 13,965''PUMPED SWEEPS AND CLEANED TO PLUG # 24 @ 14,190' RAN HIGH VISC SWEEP( 5 BBL/5 BBL PAD AND 10 BBL 100 VISC SWEEP.MADE WIPER TRIP24hr ForecastFINISH WIPER TRIPCONTINUE TO DRILL OUT REMAINING PLUGSSTARTING AT 14,190'Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD JSA/SAFETY MEETING WITH ALL PERSONEL ON LOCATION.

06:30 10:30 4.00 COMPZN

STIM CTOP CONTINUED MAKING SHORT TRIP. COIL GOT HUNG UP AT 5,987'.WORKED COIL TUBING TO TRY AND FREE PIPE. PUMPED SWEEPSATTEMPTING FREE OBSTRUCTION. SPOTTED A 20 BBL PILL OFBECA LUBE AND CONTINUED WORKING PIPE.

10:30 11:00 0.50 COMPZN

STIM CTOP GOT PIPE MOVING. PUMPED ANOTHER 20 BBL SWEEP TO TRYAND KEEP OBSTRUCTION/TRASH ABOVE TOOL STRING AS WEPULLED OUT OF THE HOLE.

11:00 14:30 3.50 COMPZN

STIM CTOP CONTINUE PULLING OUT OF HOLE TO CHANGE OUT MOTOR ANDMILL ASSEMBLY.

14:30 18:30 4.00 COMPZN

STIM CTOP LAY DOWN BHA . CUT 50 OF PIPE.PULL TESTEDCHANGE OUT MOTOR AND MILL,4 5/8" BLADED OPTICUT MILL

18:30 19:00 0.50 COMPZN

STIM SFTY HELD JSA/SAFETY MEETING WITH ALL PERSONEL ON LOCATION.

19:00 19:30 0.50 COMPZN

STIM CTOP PRESSURE TEST TO 5000 PSIBLEED DOWN AND EQUALIZED

19:30 00:00 4.50 COMPZN

STIM CTOP RIH WITH NEW MOTOR AND MILLTAG PLUG # 22 @13,686

00:00 03:00 3.00 COMPZN

STIM CTOP MILL OUT PLUG # 22 @ 13,686'.RUN SWEEP, MILL OUT PLUG # 23 AT 13,938RUN SWEEPS,RIH TAGGED 13,965'' SANDPUMPED SWEEPS AND CLEANED TO PLUG # 24 @ 14,190' RANHIGH VISC SWEEP( 5 BBL/5 BBL PAD AND 10 BBL 100 VISC SWEEP.

03:00 06:00 3.00 COMPZN

STIM CTOP MAKE SHORT WIPER TRIP TO 6,000'

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 8.00 16.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

Report Date: 1/2/2014Report #: 33Actual Days: 27.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/3/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

KEY ENERGY SERVICES OTHER CONTRACTOR 16 12.00 192.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 2 12.00 24.00PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/2/2014Report #: 33Actual Days: 27.96

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/5/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,329,221.75

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)120,901.28

WeatherWINDY & COLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&28.96

Ops and Depth @ Morning ReportSHORT TRIP PULLING UP / 8000'Last 24hr SummaryFINISH MAKING SHORT TRIP TO 5,800'. RAN BACK DOWN AND MILLED PLUG # 24 @ 14,175' THROUGH #25 @ 14,425'. STARTING FIGHTINGFRICTION. TRIED FOR AN HOUR TO WASH DOWN TO PLUG 26. DECIDED TO MAKE SHORT TRIP AND CLEAN WELL BORE TO 5900'LET SWEEPS CLEAN WELL BORE. A LOT OF SAND.RIH HOLE TAG AT 14,490'. CLEAN OUT TO PLUG AND MILLED # 26 AT 14,660', CLEAN TO 14907'.STARTED GETTING STICKY, WORKED PIPE AND RAN SWEEPS. FINISH CLEAN TO 14,970' RAN 5BBL HIGH VISC, 5 BBL PAD AND 10 BBL HIGH VISC.START WIPER TRIP. AT 6 AM 8000'3.5 BBL'S IN, 3/4 PIPE ON PIPE/103.5 BBL'S OUT , THE ONLY AMOUNT OF SAND WAS ON THE WIPER TRIP AROUND 7 PMPLUG CATCHERS CHECKED EVERY 30 TO 1 HOUR, WE DID GET SMALL PLUG PARTS.

24hr ForecastCONTINUE DRILL OUT OPERATIONSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD JSA/SAFETY MEETING WITH ALL PERSONNEL ON LOCATION.

06:30 07:30 1.00 COMPZN

STIM CTOP FINISHED MAKING SHORT TRIP TO 5,800'

07:30 10:00 2.50 COMPZN

STIM CTOP RBIH TO PLUG #24 @ 14,416'.

10:00 14:30 4.50 COMPZN

STIM CTOP MILLED PLUG #24 @ 14,175 CTM, PLUG #25 @ 14,425 CTM. FOUGHTFRICTION AND SAND HEADING TO PLUG #26. MADE DECISION TOMAKE SHORT TRIP TO ENSURE WELL BORE WAS CLEAN. PUMPEDTWO 20BBL SWEEPS AND PULLED SLOWLY TO MAKE SURE NOTTO OUT RUN SWEEPS.

14:30 17:30 3.00 COMPZN

STIM CTOP MAKE SHORT TRIP TO 7500'

17:30 18:00 0.50 COMPZN

STIM CTOP HELD JSA/SAFETY MEETING WITH ALL PERSONNEL ON LOCATION.

18:00 19:00 1.00 COMPZN

STIM CTOP MAKE SHORT TRIP TO 5900,

19:00 19:30 0.50 COMPZN

STIM CTOP LET SWEEPS FINNISH CLEANING WELL A LOT OF SAND

19:30 22:00 2.50 COMPZN

STIM CTOP RIH, TAG @ 14,490'

22:00 03:00 5.00 COMPZN

STIM CTOP CLEANED OUT FROM 14,490' TO PLUG # 26, AT 14,660'.MILLED PLUG AND RUN SWEEPS,CLEANED OUT TO 14,900' STARTED GETTING STICKY WORKEDPIPE AND RAN SWEEP.RIH, CLEAN FROM 14,900 TO PLUG# 27 AT 14,907' MILLED, RANSWEEP, CLEAN 14,970STARTED GETTING STICKY WORKED PIPE AND RAN SWEEP

03:00 06:00 3.00 COMPZN

STIM CTOP RAN HIGH VISC SWEEP 5 BBL, 5 BBL PAD AND 10 BBL HIGH VISCRUNNING WIPER TRIP

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

Report Date: 1/3/2014Report #: 34Actual Days: 28.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/5/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

TSC SAFETY SAFETY PERSONNEL CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES OTHER CONTRACTOR 16 12.00 192.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 7.00 14.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/3/2014Report #: 34Actual Days: 28.96

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/6/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,452,230.19

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)123,008.44

WeatherHIGH WINDS / COLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&29.96

Ops and Depth @ Morning ReportOUT OF HOLE. WAIT ON WINDTO CALM DOWNLast 24hr SummaryCONTINUED MAKING SHORT TRIP TO 5,900'. SHUT DOWN PUMP AND CLEAN OUT SAND IN OTT'S. RBIH TO CONTINUE MILLING PLUGS.TAGGED UP ON PLUG #28 @ 15,136' CTM. PUMPING 3.5BBL/MIN IN AND GETTING 4BBL/MIN OUT. PLUGS SEEM TO BE COMING UP THE HOLE ANDGETTING STUCK IN THE PERFORATIONS. CONTINUED WASHING DOWN TO PLUG #29. @ 15,363' MADE IT TO15,391' COULD NOT MAKE ANYFOOTAGE. PUMP SWEEPS AND POOH. JSA MEET AND DECIDE IF IT IS TO WINDY TO CHANGE OUT BHA.24hr ForecastCHANGE OUT MILL AND MOTOR. TIH. MILL REMAINING 3 PLUGS AND CLEAN WELL UP.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD PRE-JOB SAFETY MEETING/JSA WITH ALL PERSONEL ONLOCATION.

06:30 12:00 5.50 COMPZN

STIM CTOP FINISHED MAKING SHORT TRIP INTO VERTICAL AT 5,800'. SHUTDOWN COIL PUMP AND CLEAN OUT 4' OF SAND IN OPEN TOPTANKS.

12:00 14:45 2.75 COMPZN

STIM CTOP RUN BACK IN HOLE TO CONTINUE MILLING PLUGS.

14:45 18:00 3.25 COMPZN

STIM CTOP TAGGED UP ON PLUG #28 @ 15,136' CTM. PUMPING 3.5BBL/MIN INAND GETTING 4BBL/MIN OUT. PLUGS SEEM TO BE COMING UP THEHOLE AND GETTING STUCK IN THE PERFORATIONS. CONTINUEDWASHING DOWN TO PLUG #29. @ 15,363'

18:00 18:30 0.50 COMPZN

STIM SFTY HELD PRE-JOB SAFETY MEETING/JSA WITH ALL PERSONEL ONLOCATION.

18:30 23:00 4.50 COMPZN

STIM CTOP MILLED PLUG #29 TO 15,391' RAN SWEEPS. COULD NOT MAKEANY HOLE.WORKED UP AND DOWN AND RAN SWEEPS

23:00 05:30 6.50 COMPZN

STIM CTOP POOH TO CHECK MOTOR AND MILL

05:30 06:00 0.50 COMPZN

STIM CTOP JSA AND DECIDE IF IT IS TO WINDY TO CHANGE OUT BHA.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

TSC SAFETY SAFETY PERSONNEL CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES OTHER CONTRACTOR 16 12.00 192.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 7.00 14.00PRIORITY ENERGY OTHER CONTRACTOR 3 5.00 15.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 1/4/2014Report #: 35Actual Days: 29.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/6/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/4/2014Report #: 35Actual Days: 29.96

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/6/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,599,041.86

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)146,811.67

WeatherLIGHT WIND AND COLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&30.96

Ops and Depth @ Morning Report

Last 24hr SummaryWINDS DIED DOWN ENOUGH TO CHANGE OUT BHA. MADE UP NEW 2 7/8" MOTOR AND 4.7 OD, 5 BLADE JUNK MILL . TEST MOTOR ON SURFACE AT2.5 BBL/MIN. GOOD TEST. MAKE UP RISER AND TEST ALL IRON TO 8,000 PSI. RUN BACK IN HOLE TO MILL REMAINING 3 PLUGS. TAGGED UP INPERFS AT 8,390' CTM. PU 10' AND HEAD BACK IN HOLE. NEVER SAW PLUG #29. TAGGED PLUG #30 @15,626 CTM. DRILLED PLUG AND RAN DOWNAND TAGGED UP AT 15,750'.NEVER MADE FOOTAGE. RAN SWEEP AND MADE WIPER TRIP.RBIH. TAG AT 15,733' FELL. CHASED TO 15,962 CLEANEDTO BPTD AT 15,965'. NEVER SEEN PLUG # 31 AT 15,906. CIRCULATED HOLE CLEAN WITH HIGH VISC SWEEPS AND TOOH.24hr ForecastFINISH TOOH. TIH AND LOG.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM SFTY HELD PRE-JOB SAFETY MEETING/JSA WITH ALL PERSONEL ONLOCATION.

06:30 08:00 1.50 COMPZN

STIM CTOP BREAK OFF RISER FROM WELLHEAD AND CHANGE OUT MOTORAND MILL BHA. CHANGED MILL TO A 4.72" OD. STAB RISER ANDTEST ALL IRON TO 8,000 PSI.

08:00 11:00 3.00 COMPZN

STIM CTOP RIH TO CONTINUE MILLING PLUGS. TAGGED UP IN PERFS AT 8,390'CTM. PU 10' AND HEAD BACK IN HOLE.

11:00 14:00 3.00 COMPZN

STIM CTOP CONTINUE WASHING DOWN TO MILL PLUGS.

14:00 16:00 2.00 COMPZN

STIM CTOP RAN DOWN AND NEVER SAW PLUG #29. TAGGED PLUG #30@15,626 CTM. DRILLED PLUG AND RAN DOWN AND TAGGED UP AT15,750'. TRIED MILLIING DOWN FROM THERE AND COULDN'T MAKEANY HEADWAY. PICKED UP 175' TO TRY AND GAIN MOMENTUM.STACKED OUT AT 15,702'.

16:00 18:00 2.00 COMPZN

STIM CTOP LOCKED REAL DOWN AND WEIGHT STARTED TO SLOWLY COMEBACK. MADE IT BACK DOWN TO 15,747' AND CONTINUE TO TRYAND MILL THROUGH PERFORATIONS.

18:00 18:30 0.50 COMPZN

STIM SFTY HELD PRE-JOB SAFETY MEETING/JSA WITH ALL PERSONEL ONLOCATION.

18:30 19:00 0.50 COMPZN

STIM CTOP RAN 5 BBL SWEEP W/ BEADSWAITED FOR SWEEP TO EXIT END OF TUBING

19:00 01:00 6.00 COMPZN

STIM CTOP SHORT WIPER TRIP

01:00 03:00 2.00 COMPZN

STIM CTOP RIH, SLIGHT TAG AT 15,733' FELL.CHASED AND SEEN NO PLUG # 31 AT 15,905'CHASED TO 15,962' CLEANED TO15,965'. PBTDCIRCULATED HOLE W/ HIGH VISC SWEEP TO CLEAN WELL.

03:00 06:00 3.00 COMPZN

STIM CTOP POOH

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

TSC SAFETY SAFETY PERSONNEL CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES OTHER CONTRACTOR 16 12.00 192.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00

Report Date: 1/5/2014Report #: 36Actual Days: 30.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/6/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 7.00 14.00PRIORITY ENERGY OTHER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/5/2014Report #: 36Actual Days: 30.96

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/7/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,756,077.73

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)139,921.29

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&31.96

Ops and Depth @ Morning ReportRD EQUIPMENTLast 24hr SummaryPULL OUT OF HOLE WITH COIL. PICK UP PROTECHNICS LOGGING TOOL AND RIH TO LOG HORIZONTAL SECTION OF WELLBORE.LOG FROM 15,481' RUNNING 30'/MIN. UP TO 5600'POOH. SISW / 1230 PSIRD LOG TOOL AND DOWN LOAD INFORMATIONCIRCULATED BRINE WATER IN COIL TUBING AND BLEW DRY.ND CT WELL HEAD ASSEMBLY.RD ALL EQUIPMENT24hr ForecastFINISH RD AND RU FOR FLOW BACKTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM CTOP HELD PRE-JOB SAFETY MEETING/JSA WITH ALL PERSONEL ONLOCATION.

06:30 09:00 2.50 COMPZN

STIM CTOP FINISH TOOH WITH COIL

09:00 10:30 1.50 COMPZN

STIM CTOP BROKE OFF RISER. BREAK OFF MOTOR AND MILL BHA. MU PRO-PROTECHNICS LOGGING TOOL. STAB RISER AND TEST TO 8,000PSI.

10:30 13:30 3.00 COMPZN

STIM CTOP EQUALIZE WITH WELL AND RIH WITH LOGGING TOOL.CIRCULATING 1BBL/MIN IN AND 1BBL/MIN IN RETURNS.

13:30 17:00 3.50 COMPZN

STIM CTOP BROUGHT RATE UP TO 2.5BPM IN AND 2.5BPM OUT WHEN WEREACHED THE KOP. PUMPING .5 GAL/10 ON FR AND POP. MADE ITTO 15,481' AND SAT DOWN. MADE CALL TO OFFICE AND DECISIONWAS MADE TO LOG WELL FROM THAT DEPTH.

17:00 23:30 6.50 COMPZN

STIM CTOP LOGGING WELL FROM 15,481' RUNNING 30'/MIN. UP TO 5600'POOHSISW / 1230 PSI

23:30 00:00 0.50 COMPZN

STIM CTOP BLED DOWN.RD INJECTION AND LOGGING TOOL.

00:00 01:00 1.00 COMPZN

STIM CTOP DOWN LOAD PROTECHNIC LOG ON COMPUTER TO MAKE SURELOG WAS GOOD.

01:00 04:00 3.00 COMPZN

STIM CTOP PUMP 80 BBLS BRINE WATER THROUGH COIL TUBING AND BLOWTUBING DRY WITH N2

04:00 06:00 2.00 COMPZN

STIM RURD RD CTU, ND INJECTOR HEAD, LUBRICATOR, BOPAND ALLEQUIPMENT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00PALSTER & WALDCONSULTING

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

TSC SAFETY SAFETY PERSONNEL CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES OTHER CONTRACTOR 16 12.00 192.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 4 12.00 48.00

EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 1 24.00 24.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 7.00 14.00

Report Date: 1/6/2014Report #: 37Actual Days: 31.96

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/7/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PRIORITY ENERGY OTHER CONTRACTOR 0 0.00PROTECHNICS CO OTHER CONTRACTOR 1 12.00 12.00RENAGADE WELLHEAD HAND CONTRACTOR 2 15.00 30.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/6/2014Report #: 37Actual Days: 31.96

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 1/8/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,766,177.73

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)10,100.00

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&32.17

Ops and Depth @ Morning Report

Last 24hr SummaryFINISH RDMO KEY COIL UNIT ADN ALL RELATED EQUIPMENT. SECURE WELL AND STANDBY FOR WELL TEST OPERATIONS.24hr ForecastWELL TESTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

STIM CTOP HELE PRE-JOB SAFETY MEETING WITH ALL PERSONEL ONLOCATION.

06:30 11:00 4.50 COMPZN

STIM CTOP FINISH RDMO KEY COIL UNIT AND ALL RELATED EQUIPMENT.SECURE WELL AND STANDBY FOR WELL TEST OPERATIONS.

11:00 11:00 COMPZN

STIM OTHR STANDBY FOR WELL TEST OPERATIONS.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

AIR ENERGI ONSITE SUPERVISOR CONTRACTOR 0 0.00SIGNA ONSITE SUPERVISOR CONTRACTOR 0 0.00TSC SAFETY SAFETY PERSONNEL CONTRACTOR 1 3.00 3.00KEY ENERGY SERVICES OTHER CONTRACTOR 0 0.00TORNADO TECHNOLOGIES INC OTHER CONTRACTOR 0 0.00

EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 6.00 12.00BAKER OIL TOOLS TOOL HAND CONTRACTOR 0 0.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 7.00 14.00PRIORITY ENERGY OTHER CONTRACTOR 0 0.00PROTECHNICS CO OTHER CONTRACTOR 0 0.00RENAGADE WELLHEAD HAND CONTRACTOR 2 4.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/7/2014Report #: 38Actual Days: 32.17

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 1/8/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,768,457.73

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)2,280.00

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&32.33

Ops and Depth @ Morning ReportSI TIL FLOWBACKLast 24hr SummaryRU FLOWLINE TO BATTERY, RESPACE LITE TOWERS.24hr ForecastRU FLOWBACK LINES AND EQUIPMENT, EMPTY FRAC TANKS.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

12:00 14:00 2.00 COMPZN

EVALWB RURD P RU FLOWLINE FROM FRAC TANKS TO PRODUCTION LINE.

14:00 16:00 2.00 COMPZN

EVALWB RURD P MOVE LITE TOWERS AWAY FROM FRAC TANKS.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 3 2.00 6.00CRESCENT SERVICES PORTABLE TOILET HAND CONTRACTOR 3 2.00 6.00BIG D EQUIPMENT CO ROUSTABOUT CREW CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/8/2014Report #: 39Actual Days: 32.33

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 1/9/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,782,227.73

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,770.00

WeatherCOOL

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&32.79

Ops and Depth @ Morning ReportSI TIL FLOWBACKLast 24hr SummaryRU FLOWBACK IRON, SAND TRAP, 3 PHASE SEPARATOR, FLARE STACK. EMPTY FRAC TANKS.24hr ForecastCOMPLETE FLOWBACK RU AND OPEN WELL.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 09:00 1.00 COMPZN

EVALWB RURD P JSA/ GO CARD ITS FOR FLOWBACK RU, MOVE WATER W/ VACCUMTRUCKS, RU TRANSFER PUMP.

09:00 19:00 10.00 COMPZN

EVALWB RURD P RU FLOWBACK EQUIPMENT, WATER TRANSFER PUMPS, MOVEWATER OFF LOCATION

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 5 5.00 25.00CRESCENT SERVICES PORTABLE TOILET HAND CONTRACTOR 2 7.00 14.00EDGE OILFIELD SERVICE ROUSTABOUT CREW CONTRACTOR 6 10.00 60.00RED ROCK TRANSPORTATION TRUCKER CONTRACTOR 2 1.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/9/2014Report #: 40Actual Days: 32.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/11/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,797,556.73

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,329.00

WeatherCOOL

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&33.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@15:30 HRS OPENED WELL FOR FLOW BACK. SI PRESSURE 1331 PSI, OPENED ON A 10/64 CHOKE, FCP 1293 PSI.@ 05:00 HR CHOKE:14/64 ADJ, FCP 1084 PSI, BWPH: 40 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 15:30 9.50 COMPZN

FLOWT SIPB P WELL SHUT INCOMPLETED RIG UP OF SEPARATOR AND FLUID LINES.

15:30 19:30 4.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@15:30 HRS OPENED WELL FOR FLOW BACK. SI PRESSURE 1331PSI, OPENED ON A 10/64 CHOKE, FCP 1293 PSI.

19:30 06:00 10.50 COMPZN

FLOWT PRDT P @ 19:30 HRS, AS PER INSTRUCTIONS, OPENED WELL TO 14/64CHOKE.

@ 05:00 HR CHOKE:14/64 ADJ, FCP 1084 PSI, BWPH: 40 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 455 BBLS, TLLTR: 210,781 BBLS, % OF LR:0.215%CHLORIDES: 25,000 WATER WEIGHT: 8.5,TOTAL WATER RECOVERED LAST 24HR:455 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 455 BBLSOILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PENDINGGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS:SAND: TraceCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 2 12.00 24.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 2 5.00 10.00CRESCENT OTHER CONTRACTOR 1 3.00 3.00HB RENTALS OTHER CONTRACTOR 4 5.00 20.00BIG D OTHER CONTRACTOR 1 2.00 2.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00

Report Date: 1/10/2014Report #: 41Actual Days: 33.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/11/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/10/2014Report #: 41Actual Days: 33.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/12/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,813,399.98

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,843.25

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&34.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@16:00 HR CHOKE: 14/64 ADJ, FCP 988 PSI, BWPH: 35 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD05:00 HR CHOKE: 18/64, FCP 795 PSI, BWPH: 74 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@16:00 HR CHOKE: 14/64 ADJ, FCP 988 PSI, BWPH: 35 BBLS, BOPH:0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 866 BBLS, TLLTR: 210,370 BBLS, % OF LR:.41%CHLORIDES: 47,000 WATER WEIGHT: 8.7,TOTAL WATER RECOVERED LAST 11HR: 411 BBLS,TOTAL WATER PUMPED LAST 11 HR: 204 BBLSTOTAL WATER ON LOCATION: 656 BBLSTOTAL WATER PUMPED: 204OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PENDINGGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACECO2: N/AH2S: N/A

@ 05:00 HR CHOKE: 18/64, FCP 795 PSI, BWPH: 74 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 1774 BBLS, TLLTR: 209,462 BBLS, % OFLR: 0.840%CHLORIDES: 47,000 WATER WEIGHT: 8.7,TOTAL WATER RECOVERED LAST 24HR: 1319 BBLS,TOTAL WATER PUMPED LAST 24 HR: 204 BBLSTOTAL WATER ON LOCATION: 1864 BBLSTOTAL WATER PUMPED: 204OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: C/C TO A 18/64 @ 6:00PM. FLOWING WELL TO OPENTOP TANK.SAND: TraceCO2: 0.0%H2S: 0.0 ppm

Report Date: 1/11/2014Report #: 42Actual Days: 34.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/12/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CRESCENT OTHER CONTRACTOR 1 3.00 3.00BIG D OTHER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 4.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/11/2014Report #: 42Actual Days: 34.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/13/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,826,351.98

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,952.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&35.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 18/64 ADJ, FCP 720 PSI, BWPH: 68 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 20/64 ADJ, FCP 580 PSI, BWPH: 75 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 18/64 ADJ, FCP 720 PSI, BWPH: 68 BBLS, BOPH:0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 2072 BBLS, TLLTR: 209,164 BBLS, % OFLR:0.98%CHLORIDES: 51,000 WATER WEIGHT: 8.75,TOTAL WATER RECOVERED LAST 11HR: 753 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1693 BBLS (Between 3.2 and3.5 bbls per min @ 75 psi on line production line.)TOTAL WATER ON LOCATION: 890 BBLSTOTAL WATER PUMPED: 1897OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS: TRACE OF GAS EMERGINGSAND: TRACECO2: 0.0%H2S: 0.0%

@ 05:00 HR CHOKE: 20/64, FCP 580 PSI, BWPH: 75 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 3054 BBLS, TLLTR: 208,182 BBLS, % OFLR: 1.44%CHLORIDES: 51,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1735 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1776 BBLSTOTAL WATER ON LOCATION: 1865 BBLSTOTAL WATER PUMPED: 1980OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: C/C to a 20/64 @ 6:00PM. WATER SAMPLE

COLLECTED AT 05:00 HRSSAND: TraceCO2: 0.0%H2S: 0.0 ppm

Report Date: 1/12/2014Report #: 43Actual Days: 35.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/13/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 4.00 4.00TAS SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/12/2014Report #: 43Actual Days: 35.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/14/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,839,372.98

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,021.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&36.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 20/64 ADJ, FCP 530 PSI, BWPH: 70 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 20/64, FCP 481 PSI, BWPH: 61 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 20/64 ADJ, FCP 530 PSI, BWPH: 70 BBLS, BOPH:0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 3868 BBLS, TLLTR: 207,368 BBLS, % OFLR: 1.83%CHLORIDES: 51,000 WATER WEIGHT: 8.75,TOTAL WATER RECOVERED LAST 11HR: 767 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1170 BBLS (3.4 BBLS PERMINUTE @ 85 PSI ON PRODUCTION LINE)TOTAL WATER ON LOCATION: 890 BBLSTOTAL WATER PUMPED: 3424OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACECO2: N/AH2S: N/A

@ 05:00 HR CHOKE: 20/64, FCP 481 PSI, BWPH: 61 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 4713 BBLS, TLLTR: 206,523 BBLS, % OFLR: 2.23%CHLORIDES: 67,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1612 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1468 BBLSTOTAL WATER ON LOCATION: 1471 BBLSTOTAL WATER PUMPED: 3652OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: TraceCO2: 0.0%H2S: 0.0 ppm

Report Date: 1/13/2014Report #: 44Actual Days: 36.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/14/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 2.00 2.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 2.00 2.00CRESCENT SERVICES FUEL HAULER CONTRACTOR 1 2.00 2.00HB RENTALS OTHER CONTRACTOR 1 1.00 1.00CRESCENT SERVICES OTHER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/13/2014Report #: 44Actual Days: 36.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/15/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,858,659.98

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)46,207.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&37.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 20/64, FCP 442 PSI, BWPH: 62 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 20/64, FCP 407 PSI, BWPH: 61 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 20/64, FCP 442 PSI, BWPH: 62 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 5384 BBLS, TLLTR: 205,852 BBLS, % OFLR: 2.54%CHLORIDES: 57,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 11HR: 671 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1705 BBLS (3.4 bbls @min.and 90 psi on production line)TOTAL WATER ON LOCATION: 625 BBLSTOTAL WATER PUMPED: 5357OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACECO2: N/AH2S: N/A

@ 05:00 HR CHOKE: 20/64, FCP 407 PSI, BWPH: 61 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 6179 BBLS, TLLTR: 205,057 BBLS, % OFLR: 2.92%CHLORIDES: 54,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1466 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1905 BBLS (3.4 bbls @min. and90 psi on production line)TOTAL WATER ON LOCATION: 1274 BBLSTOTAL WATER PUMPED: 5557OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: TraceCO2: 0.0%H2S: 0.0 ppm

Report Date: 1/14/2014Report #: 45Actual Days: 37.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/15/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CRESCENT SERVICES FUEL HAULER CONTRACTOR 1 1.00 1.00HB RENTALS OTHER CONTRACTOR 1 1.00 1.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/14/2014Report #: 45Actual Days: 37.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/16/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,867,890.48

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)9,230.50

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&38.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 20/64, FCP 376 PSI, BWPH: 56 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 20/64, FCP 348 PSI, BWPH: 53 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELL

Report Date: 1/15/2014Report #: 46Actual Days: 38.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/16/2014

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 20/64, FCP 376 PSI, BWPH: 56 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 6801 BBLS, TLLTR: 204,435 BBLS, % OFLR: 3.22%CHLORIDES: 59,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 11HR: 622 BBLSTOTAL WATER PUMPED LAST 11 HR: 1254 BBLS (3.4 BBLS PERMIN. W/ 80 PSI ON 6 SWD LINE)TOTAL WATER ON LOCATION: 734 BBLSTOTAL WATER PUMPED: 6611OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLSTOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS: UNMEASURABLE AMOUNTS OF GAS AREPERIODICALLY SEEN IN HALF TANK.NO SIGNS OF OIL HAVE SURFACED THUS FARSAND: TRACECO2: N/AH2S: N/A

@ 05:00 HR CHOKE: 20/64, FCP 348 PSI, BWPH: 53 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 7514 BBLS, TLLTR: 203,722 BBLS, % OFLR: 3.55%CHLORIDES: 57,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1335 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1254 BBLS, (3.4 BBLS PERMIN. W/ 80 PSI ON 6 SWD LINE)TOTAL WATER ON LOCATION: 1564 BBLSTOTAL WATER PUMPED: 6611OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD, UNMEASURABLEAMOUNTS OF GAS ARE PERIODICALLY SEEN IN HALF TANK

COMMENTS: Collected water sample @ 5:00am.SAND: TraceCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CRESCENT SERVICES FUEL HAULER CONTRACTOR 1 1.00 1.00HB RENTALS FUEL HAULER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/15/2014Report #: 46Actual Days: 38.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/17/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,880,565.48

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&39.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 20/64, FCP 326 PSI, BWPH: 54 BBLS, BOPH: 0 BBLS, GAS RATE: UNMEASURABLE TRACE@ 05:00 HR CHOKE: 20/64, FCP 304 PSI, BWPH: 53 BBLS, BOPH: 0 BBLS, GAS RATE: UNMEASURABLE TRACE24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 20/64, FCP 326 PSI, BWPH: 54 BBLS, BOPH: 0BBLS, GAS RATE: UNMEASURABLE TRACEWATERTLTR: 211,236 BBLS, TLR: 8093 BBLS, TLLTR: 203,143 BBLS, % OFLR: 3.83%CHLORIDES: 60,000, WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 11HR: 579 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1459 BBLSTOTAL WATER ON LOCATION: 606 BBLSTOTAL WATER PUMPED: 8070OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 20/64, FCP 304 PSI, BWPH: 53 BBLS, BOPH: 0BBLS, GAS RATE: UNMEASURABLE TRACEWATERTLTR: 211,236 BBLS, TLR: 8762 BBLS, TLLTR: 202,474 BBLS, % OFLR: 4.14%CHLORIDES: 58,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1248 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1459 BBLSTOTAL WATER ON LOCATION: 1330 BBLSTOTAL WATER PUMPED: 8070OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water sample @ 5:00am.SAND: TRACE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00NABORS VENDOR CONTRACTOR 1 1.00 1.00

Report Date: 1/16/2014Report #: 47Actual Days: 39.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/17/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/16/2014Report #: 47Actual Days: 39.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/19/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,895,573.48

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,150.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&40.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 279 PSI, BWPH: 48 BBLS, BOPH: 0 BBLS, GAS RATE: UNMEASURABLE TRACE@ 05:00 HR CHOKE: 22/64, FCP 258 PSI, BWPH: 44 BBLS, BOPH: 0 BBLS, GAS RATE: UNMEASURABLE TRACE24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 0800 HRS OPEN CHOKE TO A 22/64 POS. W/ 302 PSI FCP.

@ 16:00 HR CHOKE: 22/64, FCP 279 PSI, BWPH: 48 BBLS, BOPH: 0BBLS, GAS RATE: UNMEASURABLEWATERTLTR: 211,236 BBLS, TLR: 9315 BBLS, TLLTR: 201,921 BBLS, % OFLR: 4.41%CHLORIDES: 60,000, WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 11HR: 553 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1062 BBLSTOTAL WATER ON LOCATION: 766 BBLSTOTAL WATER PUMPED: 9132OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS: C/C to a 22/64 @ 8:00am.SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 258 PSI, BWPH: 44 BBLS, BOPH: 0BBLS, GAS RATE: UNMEASURABLE TRACEWATERTLTR: 211,236 BBLS, TLR: 9931 BBLS, TLLTR: 201,305 BBLS, % OFLR: 4.70%CHLORIDES: 61,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1169 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1062 BBLSTOTAL WATER ON LOCATION: 1313 BBLSTOTAL WATER PUMPED: 9132OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Report Date: 1/17/2014Report #: 48Actual Days: 40.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/19/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CRESCENT FUEL HAULER CONTRACTOR 1 1.00 1.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 1.00 1.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00

HB RENTALS FUEL HAULER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/17/2014Report #: 48Actual Days: 40.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/20/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,908,249.48

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,676.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&41.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 244 PSI, BWPH: 45 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 228 PSI, BWPH: 42 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 244 PSI, BWPH: 45 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 10,431 BBLS, TLLTR: 200,805 BBLS, % OFLR: 4.93%CHLORIDES: 61,000, WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 11HR: 500 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1044 BBLSTOTAL WATER ON LOCATION: 727 BBLSTOTAL WATER PUMPED: 10,176OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 228 PSI, BWPH: 42 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 11,009 BBLS, TLLTR: 200,227 BBLS, % OFLR: 5.21%CHLORIDES: 61,000 WATER WEIGHT: 8.8,TOTAL WATER RECOVERED LAST 24HR: 1078 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1044 BBLSTOTAL WATER ON LOCATION: 1320 BBLSTOTAL WATER PUMPED: 10,176OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CRESCENT SERVICES PORTABLE TOILET HAND CONTRACTOR 1 1.00 1.00

Report Date: 1/18/2014Report #: 49Actual Days: 41.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/20/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/18/2014Report #: 49Actual Days: 41.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/20/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,921,619.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,369.80

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&42.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 213 PSI, BWPH: 43 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 200 PSI, BWPH: 41 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 213 PSI, BWPH: 43 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 11,466 BBLS, TLLTR: 199,770 BBLS, % OFLR: 5.42%CHLORIDES: 63,000, WATER WEIGHT: 8.85,TOTAL WATER RECOVERED LAST 11HR: 457 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1126 BBLSTOTAL WATER ON LOCATION: 688 BBLSTOTAL WATER PUMPED: 11,302OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 200 PSI, BWPH: 41 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 12,009 BBLS, TLLTR: 199,227 BBLS, % OFLR: 5.68%CHLORIDES: 63,000 WATER WEIGHT: 8.85TOTAL WATER RECOVERED LAST 24HR: 1000 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1126 BBLSTOTAL WATER ON LOCATION: 1254 BBLSTOTAL WATER PUMPED: 11,302OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

Report Date: 1/19/2014Report #: 50Actual Days: 42.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/20/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 6 12.00 72.00CRESCENT SERVICES FUEL HAULER CONTRACTOR 1 1.00 1.00HB RENTALS FUEL HAULER CONTRACTOR 1 1.00 1.00CD CONSULTING SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/19/2014Report #: 50Actual Days: 42.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/21/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,934,294.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&43.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 189 PSI, BWPH: 43 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 176 PSI, BWPH: 41 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 189 PSI, BWPH: 43 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 12,475 BBLS, TLLTR: 198,761 BBLS, % OFLR: 5.90%CHLORIDES: 63,000, WATER WEIGHT: 8.85,TOTAL WATER RECOVERED LAST 11HR: 466 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1145 BBLSTOTAL WATER ON LOCATION: 525 BBLSTOTAL WATER PUMPED: 12,447OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64 POS, FCP 176 PSI, BWPH: 41 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 12,996 BBLS, TLLTR: 198,240 BBLS, % OFLR: 6.15%CHLORIDES: 63,000 WATER WEIGHT: 8.85TOTAL WATER RECOVERED LAST 24HR: 987 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1145 BBLSTOTAL WATER ON LOCATION: 886 BBLSTOTAL WATER PUMPED: 12,447OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 6 12.00 72.00

0.00

Report Date: 1/20/2014Report #: 51Actual Days: 43.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/21/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/20/2014Report #: 51Actual Days: 43.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/22/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,946,969.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&44.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 167 PSI, BWPH: 32 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 160 PSI, BWPH: 37 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 167 PSI, BWPH: 32 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 13,381 BBLS, TLLTR: 197,855 BBLS, % OFLR: 6.33%CHLORIDES: 63,000, WATER WEIGHT: 8.85,TOTAL WATER RECOVERED LAST 11HR: 385 BBLS,TOTAL WATER PUMPED LAST 11 HR: 851 BBLSTOTAL WATER ON LOCATION: 441 BBLSTOTAL WATER PUMPED: 13,298OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64 POS, FCP 160 PSI, BWPH: 37 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 13,863 BBLS, TLLTR: 197,373 BBLS, % OFLR: 6.56%CHLORIDES: 64,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 867 BBLS,TOTAL WATER PUMPED LAST 24 HR: 851 BBLSTOTAL WATER ON LOCATION: 1073 BBLSTOTAL WATER PUMPED: 13,298OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 6 12.00 72.00

0.00

Report Date: 1/21/2014Report #: 52Actual Days: 44.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/22/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/21/2014Report #: 52Actual Days: 44.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/23/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,958,492.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)11,523.00

WeatherCOOL AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&45.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 150 PSI, BWPH: 34 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 141 PSI, BWPH: 34 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 150 PSI, BWPH: 34 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 14,249 BBLS, TLLTR: 196,987 BBLS, % OFLR: 6.74%CHLORIDES: 65,000, WATER WEIGHT: 8.85,TOTAL WATER RECOVERED LAST 11HR: 386 BBLS,TOTAL WATER PUMPED LAST 11 HR: 939 BBLSTOTAL WATER ON LOCATION: 469 BBLSTOTAL WATER PUMPED: 14,237OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64 POS, FCP 141 PSI, BWPH: 34 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 14,701 BBLS, TLLTR: 196,535 BBLS, % OFLR: 6.96%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 838 BBLS,TOTAL WATER PUMPED LAST 24 HR: 939 BBLSTOTAL WATER ON LOCATION: 940 BBLSTOTAL WATER PUMPED: 14,237OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 2.00 2.00

Report Date: 1/22/2014Report #: 53Actual Days: 45.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/23/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CRESCENT FUEL HAULER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 2 1.00 2.00CCI ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/22/2014Report #: 53Actual Days: 45.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/24/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,976,782.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&46.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 133 PSI, BWPH: 32 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 157 PSI, BWPH: 32 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 133 PSI, BWPH: 32 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 15,049 BBLS, TLLTR: 196,187 BBLS, % OFLR: 7.12%CHLORIDES: 65,000, WATER WEIGHT: 8.85,TOTAL WATER RECOVERED LAST 11HR: 348 BBLS,TOTAL WATER PUMPED LAST 11 HR: 817 BBLSTOTAL WATER ON LOCATION: 403 BBLSTOTAL WATER PUMPED: 15,054OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 157 PSI, BWPH: 32 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 15,049 BBLS, TLLTR: 195,854 BBLS, % OFLR: 7.28%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 681 BBLS,TOTAL WATER PUMPED LAST 24 HR: 817 BBLSTOTAL WATER ON LOCATION: 771 BBLSTOTAL WATER PUMPED: 15,054OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00WILD BLUE OTHER CONTRACTOR 2 2.00 4.00

Report Date: 1/23/2014Report #: 54Actual Days: 46.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/24/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CRESCENT FUEL HAULER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/23/2014Report #: 54Actual Days: 46.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/25/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)6,989,457.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&47.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 144 PSI, BWPH: 26 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 146 PSI, BWPH: 26 BBLS, BOPH: UNMEASURABLE TRACE, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 144 PSI, BWPH: 26 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 15,648 BBLS, TLLTR: 195,552 BBLS, % OFLR: 7.42%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 302 BBLS,TOTAL WATER PUMPED LAST 11 HR: 362 BBLSTOTAL WATER ON LOCATION: 1071 BBLSTOTAL WATER PUMPED: 15,416OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 146 PSI, BWPH: 26 BBLS, BOPH:UNMEASURABLE TRACE, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 16,031 BBLS, TLLTR: 195,205 BBLS, % OFLR: 7.58%CHLORIDES: 63,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 649 BBLS,TOTAL WATER PUMPED LAST 24 HR: 609 BBLSTOTAL WATER ON LOCATION: 973 BBLSTOTAL WATER PUMPED: 15,663OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: LIGHT FILM,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water sample @ 5:00am.SAND: TRACEOIL - UNMEASURABLE TRACE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 1/24/2014Report #: 55Actual Days: 47.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/25/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

WILD BLUE OTHER CONTRACTOR 1 2.00 2.00CRESCENT SERVICES OTHER CONTRACTOR 1 1.00 1.00

SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/24/2014Report #: 55Actual Days: 47.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/26/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,002,132.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&48.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 145 PSI, BWPH: 26 BBLS, BOPH: UNMEASURABLE TRACE, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 140 PSI, BWPH: 27 BBLS, BOPH: UNMEASURABLE TRACE, GAS RATE: 0 MCFD

24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 145 PSI, BWPH: 26 BBLS,BOPH: UNMEASURABLE TRACE, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 16,316 BBLS, TLLTR: 194,920 BBLS, % OFLR: 7.72%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 285 BBLS,TOTAL WATER PUMPED LAST 11 HR: 606 BBLSTOTAL WATER ON LOCATION: 637 BBLSTOTAL WATER PUMPED: 16,269OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 140 PSI, BWPH: 27 BBLS, BOPH:UNMEASURABLE TRACE, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 16,662 BBLS, TLLTR: 194,574 BBLS, % OFLR: 7.88%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 631 BBLS,TOTAL WATER PUMPED LAST 24 HR: 606 BBLSTOTAL WATER ON LOCATION: 1,002 BBLSTOTAL WATER PUMPED: 16,269OILTOR: 0 BBLS, TOTAL OIL RECOVERED LAST 24HR: 0 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 0 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00WILD BLUE OTHER CONTRACTOR 2 3.00 6.00

Report Date: 1/25/2014Report #: 56Actual Days: 48.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/26/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/25/2014Report #: 56Actual Days: 48.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/27/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,014,807.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&49.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 139 PSI, BWPH: 28 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 133 PSI, BWPH: 25 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 139 PSI, BWPH: 28 BBLS, BOPH: 0.5BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 16,959 BBLS, TLLTR: 194,277 BBLS, % OFLR: 8.02%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 297 BBLS,TOTAL WATER PUMPED LAST 11 HR: 717 BBLSTOTAL WATER ON LOCATION: 549 BBLSTOTAL WATER PUMPED: 16,986OILTOR: 5 BBLS, TOTAL OIL RECOVERED LAST 11HR: 5 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 5 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFD

COMMENTS: WATER AND OIL EMULSIFYINGSAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 133 PSI, BWPH: 25 BBLS, BOPH: 0.5BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 17,294 BBLS, TLLTR: 193,942 BBLS, % OFLR: 8.18%CHLORIDES: 65,000 WATER WEIGHT: 8.75TOTAL WATER RECOVERED LAST 24HR: 632 BBLS,TOTAL WATER PUMPED LAST 24 HR: 717 BBLSTOTAL WATER ON LOCATION: 932 BBLSTOTAL WATER PUMPED: 16,986OILTOR: 11.5 BBLS, TOTAL OIL RECOVERED LAST 24HR: 11.5 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 11.5 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water sample @ 5:00am.SAND: Trace

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 1/26/2014Report #: 57Actual Days: 49.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/27/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00

WILD BLUE OTHER CONTRACTOR 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/26/2014Report #: 57Actual Days: 49.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/28/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,027,482.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&50.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 130 PSI, BWPH: 26 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 157 PSI, BWPH: 25 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 130 PSI, BWPH: 26 BBLS,BOPH: 0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 17,576 BBLS, TLLTR: 193,660 BBLS, % OFLR: 8.32%CHLORIDES: 64,000, WATER WEIGHT: 8.75,TOTAL WATER RECOVERED LAST 11HR: 282 BBLS,TOTAL WATER PUMPED LAST 11 HR: 515 BBLSTOTAL WATER ON LOCATION: 791 BBLSTOTAL WATER PUMPED: 17,501OILTOR: 17 BBLS, TOTAL OIL RECOVERED LAST 11HR: 5.5 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 17 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 157 PSI, BWPH: 25 BBLS, BOPH: 0.5BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 18,324 BBLS, TLLTR: 192,912 BBLS, % OFLR: 8.67%CHLORIDES: 60,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 622 BBLS,TOTAL WATER PUMPED LAST 24 HR: 515 BBLSTOTAL WATER ON LOCATION: 932 BBLSTOTAL WATER PUMPED: 17,501OILTOR: 23.5 BBLS, TOTAL OIL RECOVERED LAST 24HR: 12 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 23.5 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water and oil sample @ 5:00am.SAND: NONE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00WILD BLUE OTHER CONTRACTOR 1 2.00 2.00

Report Date: 1/27/2014Report #: 58Actual Days: 50.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/28/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

CHAMPION TECHNOLOGIESINC

OTHER CONTRACTOR 1 1.00 1.00

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/27/2014Report #: 58Actual Days: 50.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/29/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,040,157.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)12,675.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&51.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64 POS, FCP 124 PSI, BWPH: 24 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64 POS, FCP 159 PSI, BWPH: 25 BBLS, BOPH: 0.3 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64 POS, FCP 124 PSI, BWPH: 24 BBLS,BOPH: 0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 18,588 BBLS, TLLTR: 192,648 BBLS, % OFLR: 8.80%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 264 BBLS,TOTAL WATER PUMPED LAST 11 HR: 713 BBLSTOTAL WATER ON LOCATION: 650 BBLSTOTAL WATER PUMPED: 18,214OILTOR: 25.5 BBLS, TOTAL OIL RECOVERED LAST 11HR: 2 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 25.5 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS: ALL FLUID WILL BE PLACE IN FRAC TANKS AND WILLBE CHEMICALLY TREATED TOMORROW FOR EMULSION.SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 159 PSI, BWPH: 25 BBLS, BOPH: .3BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 18,912 BBLS, TLLTR: 192,324 BBLS, % OFLR: 8.95%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 588 BBLS,TOTAL WATER PUMPED LAST 24 HR: 713 BBLSTOTAL WATER ON LOCATION: 927 BBLSTOTAL WATER PUMPED: 18,214OILTOR: 27 BBLS, TOTAL OIL RECOVERED LAST 24HR: 2.5 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 27 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.EMULSION IS PROBLEMATIC, WILL BE TREATING FLUID W/CHEMICAL THIS PM.SAND: Trace

Report Date: 1/28/2014Report #: 59Actual Days: 51.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/29/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/28/2014Report #: 59Actual Days: 51.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/30/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,055,006.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,849.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&52.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 118 PSI, BWPH: 23 BBLS, BOPH: 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 114 PSI, BWPH: 25 BBLS, BOPH: 0.0 BBLS, GAS RATE: 0 MCFD

AMOUNT OF OIL ON LOCATION WILL BE MORE ACCURATELY DETERMINED THIS MORNING AFTER SUN UP.24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 118 PSI, BWPH: 23 BBLS, BOPH: 0.5BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 19,176 BBLS, TLLTR: 192,060 BBLS, % OFLR: 9.08%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 264 BBLS,TOTAL WATER PUMPED LAST 11 HR: 0 BBLSTOTAL WATER ON LOCATION: 1255 BBLSTOTAL WATER PUMPED: 18,214OILTOR: 27.8 BBLS, TOTAL OIL RECOVERED LAST 11HR: 1 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 27.8 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS: 1100 BBLS FLUID TREATED WITH EMULSIONBREAKERSAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 114 PSI, BWPH: 25 BBLS, BOPH: 0.0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 19,491 BBLS, TLLTR: 191,745 BBLS, % OFLR: 9.23%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 579 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 1679 BBLSTOTAL WATER PUMPED: 18,214OILTOR: PENDING. (WILL KULOR KUT AT SUN UP TO DETERMINETOTAL OIL RECOVERED)TOTAL OIL SOLD LAST 24 HRS: 0API Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: None

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

Report Date: 1/29/2014Report #: 60Actual Days: 52.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/30/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 1 9.00 9.00CHAMPION TECHNOLOGIESINC

OTHER CONTRACTOR 1 1.00 1.00

CRESCENT SERVICES FUEL HAULER CONTRACTOR 1 1.00 1.00HB RENTALS FUEL HAULER CONTRACTOR 1 1.00 1.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 2.00 2.00

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

CRESCENT SERVICES OTHER CONTRACTOR 2 1.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/29/2014Report #: 60Actual Days: 52.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 1/31/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,056,032.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,875.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&52.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 114 PSI, BWPH: 22 BBLS, BOPH: 0.0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 110 PSI, BWPH: 23 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 114 PSI, BWPH: 22 BBLS, BOPH: 0.0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 19,71 BBLS, TLLTR: 191,495 BBLS, % OFLR: 9.35%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 250 BBLS,TOTAL WATER PUMPED LAST 11 HR: 320 BBLSTOTAL WATER ON LOCATION: 1543 BBLSTOTAL WATER PUMPED: 18,534OILTOR: 31 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 31 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCHEMICAL TREATMENT OF FLUID SUCCESSFUL. OIL COUNT ISCORRECT.COMMENTS:SAND: TRACE

@ 05:00 HR CHOKE: 22/64, FCP 110 PSI, BWPH: 23 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 20,061 BBLS, TLLTR: 191,175 BBLS, % OFLR: 9.50%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 570 BBLS,TOTAL WATER PUMPED LAST 24 HR: 631 BBLSTOTAL WATER ON LOCATION: 1168 BBLSTOTAL WATER PUMPED: 18,845OILTOR: 33 BBLS, TOTAL OIL RECOVERED LAST 24HR: 2 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 33 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: None

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

Report Date: 1/30/2014Report #: 61Actual Days: 52.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 1/31/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 6.00 12.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

CHAMPION TECHNOLOGIESINC

OTHER CONTRACTOR 1 1.00 1.00

CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 1.00 1.00CRESCENT SERVICES OTHER CONTRACTOR 2 1.00 2.00WILD BLUE SERVICES OTHER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/30/2014Report #: 61Actual Days: 52.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/2/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,038,888.28

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,496.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&53.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 109 PSI, BWPH: 23 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 106 PSI, BWPH: 22 BBLS, BOPH: 0 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 109 PSI, BWPH: 23 BBLS, BOPH: 0.0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 20,308 BBLS, TLLTR: 190,928 BBLS, % OFLR: 9.61%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 247 BBLS,TOTAL WATER PUMPED LAST 11 HR: 1041 BBLSTOTAL WATER ON LOCATION: 516 BBLSTOTAL WATER PUMPED: 19,886OILTOR: 36 BBLS, TOTAL OIL RECOVERED LAST 11HR: 3 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 33 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NONE

@ 05:00 HR CHOKE: 22/64, FCP 106 PSI, BWPH: 22 BBLS, BOPH: 0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 20,596 BBLS, TLLTR: 190,640 BBLS, % OFLR: 9.75%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 535 BBLS,TOTAL WATER PUMPED LAST 24 HR: 1041 BBLSTOTAL WATER ON LOCATION: 746 BBLSTOTAL WATER PUMPED: 19,886OILTOR: 40 BBLS, TOTAL OIL RECOVERED LAST 24HR: 7 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 40 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

06:00 06:00 COMPZN

Report Date: 1/31/2014Report #: 62Actual Days: 53.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/2/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00

CONOCOPHILLIPS CO ENGINEER EMPLOYEE 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 1/31/2014Report #: 62Actual Days: 53.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/2/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,053,961.68

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,073.40

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&54.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 106 PSI, BWPH: 22 BBLS, BOPH: 0.0 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 102 PSI, BWPH: 22 BBLS, BOPH: 1 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 106 PSI, BWPH: 22 BBLS, BOPH: 0.0BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 20,833 BBLS, TLLTR: 190,403 BBLS, % OFLR: 9.86%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 237 BBLS,TOTAL WATER PUMPED LAST 11 HR: 472 BBLSTOTAL WATER ON LOCATION: 456 BBLSTOTAL WATER PUMPED: 20,358OILTOR: 45 BBLS, TOTAL OIL RECOVERED LAST 11HR: 5 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 45 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: None

@ 05:00 HR CHOKE: 22/64, FCP 102 PSI, BWPH: 22 BBLS, BOPH: 1BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 21,118 BBLS, TLLTR: 190,118 BBLS, % OFLR: 10.00%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 522 BBLS,TOTAL WATER PUMPED LAST 24 HR: 472 BBLSTOTAL WATER ON LOCATION: 651 BBLSTOTAL WATER PUMPED: 20,358OILTOR: 52 BBLS, TOTAL OIL RECOVERED LAST 24HR: 12 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 52 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD, COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: None

Report Date: 2/1/2014Report #: 63Actual Days: 54.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/2/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 1.00 1.00

HB RENTALS FUEL HAULER CONTRACTOR 1 2.00 2.00RV SERVICE OTHER CONTRACTOR 1 3.00 3.00HB RENTAL OTHER CONTRACTOR 3 1.00 3.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/1/2014Report #: 63Actual Days: 54.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/4/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,069,221.68

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,260.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&55.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 90 PSI, BWPH: 22 BBLS, BOPH: 0 TO .5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 86 PSI, BWPH: 19 BBLS, BOPH: 0 TO .5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 90 PSI, BWPH: 22 BBLS, BOPH: 0TO .5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 21,348 BBLS, TLLTR: 189,888 BBLS, % OFLR: 10.11%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 230 BBLS,TOTAL WATER PUMPED LAST 11 HR: 365 BBLSTOTAL WATER ON LOCATION: 554 BBLSTOTAL WATER PUMPED: 20,723OILTOR: 56 BBLS, TOTAL OIL RECOVERED LAST 11HR: 4 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 56 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:

SAND: None

@ 05:00 HR CHOKE: 22/64, FCP 86 PSI, BWPH: 19 BBLS, BOPH: 0to .5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 21,618 BBLS, TLLTR: 189,618 BBLS, % OFLR: 10.23%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 500 BBLS,TOTAL WATER PUMPED LAST 24 HR: 365 BBLSTOTAL WATER ON LOCATION: 793 BBLSTOTAL WATER PUMPED: 20,723OILTOR: 60 BBLS, TOTAL OIL RECOVERED LAST 24HR: 8 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 60 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 2/2/2014Report #: 64Actual Days: 55.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/4/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

H & B RENTALS OTHER CONTRACTOR 1 1.00 1.00WILDBLUE OTHER CONTRACTOR 1 3.00 3.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/2/2014Report #: 64Actual Days: 55.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/4/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,098,806.68

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,325.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&57.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 86 PSI, BWPH: 22 BBLS, BOPH: 0.0 - 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 83 PSI, BWPH: 20 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 86 PSI, BWPH: 22 BBLS, BOPH: 0.0 -0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 21,847 BBLS, TLLTR: 189,389 BBLS, % OFLR: 10.34%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 229 BBLS,TOTAL WATER PUMPED LAST 11 HR: 421 BBLSTOTAL WATER ON LOCATION: 576 BBLSTOTAL WATER PUMPED: 21,144OILTOR: 64 BBLS, TOTAL OIL RECOVERED LAST 11HR: 4 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 64 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:

SAND: None@ 05:00 HR CHOKE: 22/64, FCP 83 PSI, BWPH: 20 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 22,101 BBLS, TLLTR: 189,135 BBLS, % OFLR: 10.46%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 502 BBLS,TOTAL WATER PUMPED LAST 24 HR: 421 BBLSTOTAL WATER ON LOCATION: 825 BBLSTOTAL WATER PUMPED: 21,144OILTOR: 70 BBLS, TOTAL OIL RECOVERED LAST 24HR: 10 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 70 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EPI CONSULTANTS ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

Report Date: 2/3/2014Report #: 66Actual Days: 57.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/4/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

WILD BIRD OTHER CONTRACTOR 1 2.00 2.00WILD BIRD OTHER CONTRACTOR 1 1.00 1.00CRESCENT SERVICES OTHER CONTRACTOR 1 1.00 1.00CRESCENT SERVICES OTHER CONTRACTOR 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/3/2014Report #: 66Actual Days: 57.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/5/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,110,329.68

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)11,523.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&58.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 82 PSI, BWPH: 19 BBLS, BOPH: 0.0 - 0.5 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 78 PSI, BWPH: 18 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 82 PSI, BWPH: 19 BBLS, BOPH: 0.0 -0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 22,333 BBLS, TLLTR: 188,903 BBLS, % OFLR: 10.57%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 211 BBLS,TOTAL WATER PUMPED LAST 11 HR: 421 BBLSTOTAL WATER ON LOCATION: 625 BBLSTOTAL WATER PUMPED: 21,565OILTOR: 75 BBLS, TOTAL OIL RECOVERED LAST 11HR: 4 BBLS,TOTAL OIL SOLD LAST 11 HRS: 5TOTAL OIL ON LOCATION: 75 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm

@ 05:00 HR CHOKE: 22/64, FCP 78 PSI, BWPH: 18 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 22,584 BBLS, TLLTR: 188,652 BBLS, % OFLR: 10.59%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 462 BBLS,TOTAL WATER PUMPED LAST 24 HR: 421 BBLSTOTAL WATER ON LOCATION: 803 BBLSTOTAL WATER PUMPED: 21,565OILTOR: 81 BBLS, TOTAL OIL RECOVERED LAST 24HR: 11 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 81 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD, COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 2/4/2014Report #: 67Actual Days: 58.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/5/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

H & B RENTALS OTHER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO OTHER EMPLOYEE 1 1.00 1.00H B RENTALS OTHER CONTRACTOR 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/4/2014Report #: 67Actual Days: 58.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/6/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,153,185.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)15,105.70

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&59.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 76 PSI, BWPH: 20 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 88 PSI, BWPH: 15 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 76 PSI, BWPH: 20 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 22,792 BBLS, TLLTR: 188,444 BBLS, % OFLR: 10.79%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 208 BBLS,TOTAL WATER PUMPED LAST 11 HR: 438 BBLSTOTAL WATER ON LOCATION: 623 BBLSTOTAL WATER PUMPED: 22,003OILTOR: 88 BBLS, TOTAL OIL RECOVERED LAST 11HR: 7 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 88 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm@ 05:00 HR CHOKE: 22/64, FCP 88 PSI, BWPH: 15 BBLS, BOPH: 0.0-0.5 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 23,035 BBLS, TLLTR: 188,201 BBLS, % OFLR: 10.90%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 4451 BBLS,TOTAL WATER PUMPED LAST 24 HR: 438 BBLSTOTAL WATER ON LOCATION: 875 BBLSTOTAL WATER PUMPED: 22,003OILTOR: 92 BBLS, TOTAL OIL RECOVERED LAST 24HR: 11 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 92 BBLSAPI Gravity @ 60 deg.: PendingGASTOTAL GAS FLARED LAST 24HR: 0 MCFD, COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 2/5/2014Report #: 68Actual Days: 59.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/6/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

CONOCOPHILLIPS CO OTHER EMPLOYEE 1 2.00 2.00CONOCOPHILLIPS CO OTHER EMPLOYEE 2 1.00 2.00HOT SHOT OTHER CONTRACTOR 1 2.00 2.00ENERSAFE OTHER CONTRACTOR 1 2.00 2.00H B RENTALS OTHER CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/5/2014Report #: 68Actual Days: 59.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/7/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,166,685.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,500.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&60.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 78 PSI, BWPH: 19 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 72 PSI, BWPH: 18 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 78 PSI, BWPH: 19 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 23,240 BBLS, TLLTR: 187,996 BBLS, % OFLR: 11.00%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 205 BBLS,TOTAL WATER PUMPED LAST 11 HR: 467 BBLSTOTAL WATER ON LOCATION: 571 BBLSTOTAL WATER PUMPED: 22,470OILTOR: 98 BBLS, TOTAL OIL RECOVERED LAST 11HR: 6 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 98 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm@ 05:00 HR CHOKE: 22/64, FCP 72 PSI, BWPH: 18 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 23,478 BBLS, TLLTR: 187,764 BBLS, % OFLR: 11.11%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 437 BBLS,TOTAL WATER PUMPED LAST 24 HR: 467 BBLSTOTAL WATER ON LOCATION: 741 BBLSTOTAL WATER PUMPED: 22,470OILTOR: 106 BBLS, TOTAL OIL RECOVERED LAST 24HR: 14 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 106 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Report Date: 2/6/2014Report #: 69Actual Days: 60.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/7/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

OTHER NOT LISTED CONTRACTOR 4 8.00 32.00CONOCOPHILLIPS CO EMPLOYEE 1 8.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/6/2014Report #: 69Actual Days: 60.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/8/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,178,958.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,500.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&61.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 72 PSI, BWPH: 17 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 70 PSI, BWPH: 17 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 72 PSI, BWPH: 17 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 23,665 BBLS, TLLTR: 187,571 BBLS, % OFLR: 11.20%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 193 BBLS,TOTAL WATER PUMPED LAST 11 HR: 467 BBLSTOTAL WATER ON LOCATION: 625 BBLSTOTAL WATER PUMPED: 22,748OILTOR: 110 BBLS, TOTAL OIL RECOVERED LAST 11HR: 4 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 110 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm

@ 05:00 HR CHOKE: 22/64, FCP 70 PSI, BWPH: 17 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 23,878 BBLS, TLLTR: 187,361 BBLS, % OFLR: 11.30%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 403 BBLS,TOTAL WATER PUMPED LAST 24 HR: 278 BBLSTOTAL WATER ON LOCATION: 1036 BBLSTOTAL WATER PUMPED: 22,748OILTOR: 110 BBLS, TOTAL OIL RECOVERED LAST 24HR: 10 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 116 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppmInternet connection problems

Report Date: 2/7/2014Report #: 70Actual Days: 61.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/8/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

NABORS WELL SERVICES LTD CONTRACTOR 1 6.00 6.00CONOCOPHILLIPS CO EMPLOYEE 2 2.00 4.00LONESTAR ELECTRICAL CONTRACTOR 3 6.00 18.00CONOCOPHILLIPS CO CONTRACTOR 1 1.00 1.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/7/2014Report #: 70Actual Days: 61.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/10/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,193,308.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,500.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&62.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 67 PSI, BWPH: 17 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 66 PSI, BWPH: 17 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFD

24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 67 PSI, BWPH: 17 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,062 BBLS, TLLTR: 187,174 BBLS, % OFLR: 11.39%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 187 BBLS,TOTAL WATER PUMPED LAST 11 HR: 553 BBLSTOTAL WATER ON LOCATION: 610 BBLSTOTAL WATER PUMPED: 23,301OILTOR: 121 BBLS, TOTAL OIL RECOVERED LAST 11HR: 5 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 121 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm

@ 05:00 HR CHOKE: 22/64, FCP 66 PSI, BWPH: 17 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,267 BBLS, TLLTR: 186,969 BBLS, % OFLR: 11.49%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 392 BBLS,TOTAL WATER PUMPED LAST 24 HR: 553 BBLSTOTAL WATER ON LOCATION: 816 BBLSTOTAL WATER PUMPED: 23,301OILTOR: 127 BBLS, TOTAL OIL RECOVERED LAST 24HR: 11 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 127 BBLSAPI Gravity @ 60 deg.: 32.4

GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Report Date: 2/8/2014Report #: 71Actual Days: 62.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/10/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

CRESCENT SERVICES CONTRACTOR 2 1.00 2.00WILD BLUE CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/8/2014Report #: 71Actual Days: 62.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/10/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,207,610.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,302.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&63.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 65 PSI, BWPH: 15 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 15 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.

@ 16:00 HR CHOKE: 22/64, FCP 65 PSI, BWPH: 15 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,440 BBLS, TLLTR: 186,796 BBLS, % OFLR: 11.57%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 173 BBLS,TOTAL WATER PUMPED LAST 11 HR: 367 BBLSTOTAL WATER ON LOCATION: 759 BBLSTOTAL WATER PUMPED: 23,668OILTOR: 132 BBLS, TOTAL OIL RECOVERED LAST 11HR: 5 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 132 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:

SAND: NoneCO2: 0.0%H2S: 0.0 ppm@ 05:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 15 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,624 BBLS, TLLTR: 186,612 BBLS, % OFLR: 11.66%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 374 BBLS,TOTAL WATER PUMPED LAST 24 HR: 367 BBLSTOTAL WATER ON LOCATION: 968 BBLSTOTAL WATER PUMPED: 23,668OILTOR: 139 BBLS, TOTAL OIL RECOVERED LAST 24HR: 12 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 139 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD, COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 2/9/2014Report #: 72Actual Days: 63.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/10/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

H & B RENTALS CONTRACTOR 1 2.00 2.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/9/2014Report #: 72Actual Days: 63.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/11/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,221,110.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,500.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&64.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 16 BBLS, BOPH: 0.0 - 0.75 BBLS, GAS RATE: 0 MCFD@ 05:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 14 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFD24hr ForecastFLOWING WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:00 24.00 COMPZN

FLOWT PRDT P FLOWING WELL AND MONITORING FLUID AND GAS RETURN.@ 16:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 16 BBLS, BOPH: 0.0 -0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,791 BBLS, TLLTR: 186,445 BBLS, % OFLR: 11.74%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 167 BBLS,TOTAL WATER PUMPED LAST 11 HR: 363 BBLSTOTAL WATER ON LOCATION: 721 BBLSTOTAL WATER PUMPED: 24,031OILTOR: 145 BBLS, TOTAL OIL RECOVERED LAST 11HR: 6 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 145 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFDCOMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm

@ 05:00 HR CHOKE: 22/64, FCP 63 PSI, BWPH: 14 BBLS, BOPH: 0.0-0.75 BBLS, GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 24,996 BBLS, TLLTR: 186,240 BBLS, % OFLR: 11.83%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 357 BBLS,TOTAL WATER PUMPED LAST 24 HR: 363 BBLSTOTAL WATER ON LOCATION: 968 BBLSTOTAL WATER PUMPED: 24,031OILTOR: 154 BBLS, TOTAL OIL RECOVERED LAST 24HR: 15 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 154 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,COMMENTS: Collected water & oil sample @ 5:00 p.m.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00

Report Date: 2/10/2014Report #: 73Actual Days: 64.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/11/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

PLASTER & WALDCONSULTING CORP.

ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

LONE STAR ELECTRICAL OTHER CONTRACTOR 4 8.00 32.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 8.00 8.00KEY ENERGY SERVICES WELLHEAD HAND CONTRACTOR 5 1.00 5.00CONOCOPHILLIPS CO EMPLOYEE 2 1.00 2.00H & B RENTALS CONTRACTOR 2 2.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/10/2014Report #: 73Actual Days: 64.79

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/12/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,234,610.38

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)13,500.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&65.79

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr Summary

24hr ForecastRIG UP EQUIPMENTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 06:30 0.50 COMPZN

FLOWT SFTY P JSA REVIEW WITH HAND AND FINGER DISCUSSIONS

06:30 08:30 2.00 COMPZN

FLOWT PRDT P @ 05:00 HR SHUT IN, SICP 310 PSI, BWPH: 0 BBLS, BOPH: 0.0 BBLS,GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 25,050 BBLS, TLLTR: 186,186 BBLS, % OFLR: 11.86%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 54 BBLS,TOTAL WATER PUMPED LAST 24 HR: 398 BBLSTOTAL WATER ON LOCATION: 585 BBLSTOTAL WATER PUMPED: 24,429OILTOR: 156 BBLS, TOTAL OIL RECOVERED LAST 24HR: 2 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 156 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS:SAND: NoneCO2: 0.0%H2S: 0.0 ppm

08:30 06:00 21.50 COMPZN

FLOWT PRTS P SHUT IN WITH 69 PSI ON WELL AT 5 AM 310 PSI

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EDGE OILFIELD SERVICE WELLHEAD HAND CONTRACTOR 5 12.00 60.00SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00LONE STAR ELECTRICAL OTHER CONTRACTOR 3 10.00 30.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 8.00 8.00KEY ENERGY SERVICES WELLHEAD HAND CONTRACTOR 5 8.00 40.00CONOCOPHILLIPS CO EMPLOYEE 3 8.00 24.00H & B RENTALS CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/11/2014Report #: 74Actual Days: 65.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/13/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,390,052.09

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)24,524.00

WeatherCOLD AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&66.79

Ops and Depth @ Morning ReportFLOW WELLLast 24hr SummaryTRY TO BALANCE WELL24hr ForecastBALANCE WELL AND RIG UP EQUIPMENTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

FLOWT PRDT P WELL SHUT IN WITH 320 PSI

07:00 07:30 0.50 COMPZN

FLOWT SFTY P JSA REVIEW, WITH ALL CONTRACTORS

07:30 09:00 1.50 COMPZN

WELCTL OPNW P BLEED OFF WELL, WILL NOT BLEED

09:00 12:30 3.50 COMPZN

FLOWT PRTS P ELECTRICIANS FINISHED WIRING UP TO WELL HEAD AREA

12:30 14:00 1.50 COMPZN

WELCTL NUND P CLOSE BOTTOM FRAC VALVE START BLEEDING DOWN ANDFOUND FRAC VALVE WASHED OUT.

14:00 15:30 1.50 COMPZN

WELCTL NUND P RU PUMP TRUCK

15:30 17:30 2.00 COMPZN

WELCTL CIRC P WITH 250 PSI, PUMP 80 BBL'S BRINE, BLEED BACK WITH 250 PSI

17:30 19:30 2.00 COMPZN

WELCTL RURD P RD PUMP TRUCK AND BOP EQUIPMENT

19:30 06:00 10.50 COMPZN

FLOWT OPNW P OPEN WELL UP TO BLEED DOWN START ON 14/64 CHOKE@ 05:00 CHOKE 28/64, FCP 65 PSI, BWPH: 22 BBLS, BOPH: 0.0 BBLS,GAS RATE: 0 MCFDWATERTLTR: 211,236 BBLS, TLR: 25,288 BBLS, TLLTR: 185,948 BBLS, % OFLR: 11.97%CHLORIDES: 65,000 WATER WEIGHT: 8.9TOTAL WATER RECOVERED LAST 24HR: 238 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 823 BBLSTOTAL WATER PUMPED: 24,429OILTOR: 156 BBLS, TOTAL OIL RECOVERED LAST 24HR: 2 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 156 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 15.00 15.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 4 9.00 36.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 1 8.00 8.00BIRD ELECTRIC OTHER EMPLOYEE 3 7.00 21.00H & B RENTALS OTHER CONTRACTOR 0 0.00T&T OTHER CONTRACTOR 2 14.00 28.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 8.00 32.00

Report Date: 2/12/2014Report #: 75Actual Days: 66.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/13/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

EL FARMER TRUCKER CONTRACTOR 3 12.00 36.00BTI WELLHEAD HAND CONTRACTOR 2 9.00 18.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00PIPE PROS ROUSTABOUT CREW CONTRACTOR 2 5.00 10.00NABORS TRUCKER CONTRACTOR 3 7.00 21.00RANGER TRUCKING TRUCKER CONTRACTOR 1 5.00 5.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/12/2014Report #: 75Actual Days: 66.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/14/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,444,455.52

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES COIL UNIT

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)42,867.55

WeatherWARM AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&67.79

Ops and Depth @ Morning ReportSI AND MONITOREDLast 24hr SummaryBALANCED WELL WITH 200 BBL'S 10# BRINEINSTALLED 2 WAY CHECK VALVEND FRAC STACK, NU BOPRU PULL UNIT. TESTED BOP STACK AND PULLED 2 WAY CHECK VALVESISW FOR NIGHT24hr ForecastCHECK WELL PSI,PU 4 5/8" BIT CSG SCRAPPER 2 3/8" 4.7# 8 rd TUBING GO IN THE HOLE CHECK FOR FILLTOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

FLOWT OPNW P OPEN WELL TO 32/64 CHOKE, 38 PSI, 20 BBLS/HR

07:30 08:30 1.00 COMPZN

WELCTL SFTY P SAFETY MEET WITH ALL CREWS

08:30 12:30 4.00 COMPZN

WELCTL CIRC P RU PUMP TRUCK AND PUMP 200 BBL'S 10 # BRINE AT 140 PSIPSI DROPPED TO 12 PSI BLEED WELL DOWN

12:30 17:30 5.00 COMPZN

WELCTL NUND P ND TOP VALVE AND FOUND HYD VALVE WOULD NOT OPEN ALLTHE WAYINSTALLED 2 WAY CHECK VALVEND FRAC STACK AND LOADED ON TRUCKNU BOP

17:30 21:30 4.00 COMPZN

WELCTL RURD P RD CRANE AND RU KEY SU

21:30 00:30 3.00 COMPZN

WELCTL NUND P NU ANN. AND TEST BOP STACKBLINDS LOW 25O PSI AND HIGH 3000 PSI2 3/8" PIPE RAMS LOW 250 PSI AND 3000 PSIANN. LOW 200 PSI AND HIGH 3000 PSI AND ALL GOOD TESTS ANDCHARTEDREMOVED 2 WAY CHECK VALVESISW FOR NIGHT

00:30 06:00 5.50 COMPZN

RPEQPT SIPB P WELL SHUT IN FOR NIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 15.00 15.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 4 9.00 36.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 1 6.00 6.00BIRD ELECTRIC OTHER EMPLOYEE 3 7.00 21.00H & B RENTALS OTHER CONTRACTOR 0 0.00T&T OTHER CONTRACTOR 2 14.00 28.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 8.00 32.00EL FARMER TRUCKER CONTRACTOR 3 12.00 36.00BTI WELLHEAD HAND CONTRACTOR 2 9.00 18.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 1 1.00 1.00PIPE PROS ROUSTABOUT CREW CONTRACTOR 2 5.00 10.00

Report Date: 2/13/2014Report #: 76Actual Days: 67.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/14/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

NABORS TRUCKER CONTRACTOR 3 7.00 21.00RANGER TRUCKING TRUCKER CONTRACTOR 1 5.00 5.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/13/2014Report #: 76Actual Days: 67.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/16/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,463,571.53

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)19,116.01

WeatherWARM AND DRY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&68.79

Ops and Depth @ Morning ReportSI AND MONITOREDLast 24hr SummaryFINISH RU EQUIPMENT AND LOAD TUBING ON RACKSTALLY AND PU 4 5/8" BIT CSG SCRAPPER 2 3/8" 4.7# 8 rd TUBING GO IN THE HOLE CHECK FOR FILLTOOH24hr ForecastCHECK WELL PSI,PU 4 5/8" BIT CSG SCRAPPER 2 3/8" 4.7# 8 rd TUBING GO IN THE HOLE CHECK FOR FILLTOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 08:00 2.00 COMPZN

FLOWT SIPB P SI AND MONITORED 0 PSI

08:00 09:00 1.00 COMPZN

RPCOMP SFTY P EXTRA GOOD JSA MEETINGS FOUND PEOPLE THAT AREHESITANT ABOUT USEING STOP PROGRAM

09:00 13:00 4.00 COMPZN

FLOWT RURD P RU LAY DOWN MECHINE PIPE RACKS

13:00 18:30 5.50 COMPZN

RPCOMP PUTB P TALLY AND PU 4 5/8" BIT CSG SCRAPPER 242 JTS 2 3/8" 4.7# 8 rdTUBING GO IN THE HOLE CHECK FOR FILLTAG AT 7840' WORKED TUBING UP AND DOWN COULD GET DOWNFARTHER BUT IT WOULD DRAGWHILE PULLING

18:30 20:00 1.50 COMPZN

RPCOMP TRIP P POOH TO 5671 AND SISW FOR NIGHT

20:00 06:00 10.00 COMPZN

WELCTL SIPB P SIWS MONITOR WELL PSI

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 1.50 1.50CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 0.50 0.50EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 4 6.00 24.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00T&T OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 12.00 48.00EL FARMER TRUCKER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 1 3.00 3.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PROS ROUSTABOUT CREW CONTRACTOR 2 12.00 24.00NABORS TRUCKER CONTRACTOR 3 9.00 27.00RANGER TRUCKING TRUCKER CONTRACTOR 1 5.00 5.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 2/14/2014Report #: 77Actual Days: 68.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/16/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/14/2014Report #: 77Actual Days: 68.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/16/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,489,692.14

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)26,120.61

WeatherVERY WARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&69.79

Ops and Depth @ Morning ReportSI AND MONITOREDLast 24hr SummaryTOOH, CHANGED BIT, TIH CIRCULATED CLEAN AND SISW FOR NIGHT24hr ForecastCHECK WELL PSI, IF 0 PSITOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

FLOWT SIPB P SI AND MONITORED 0 PSI

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P EXTRA GOOD JSA MEETINGS ABOUT HAND AND FINGERPROGRAM

08:00 10:30 2.50 COMPZN

RPCOMP TRIP P TOOH AND CHANGED OUT BIT

10:30 11:00 0.50 COMPZN

RPCOMP SFTY P JSA ON CHANGING OUT AND SETTING PUMP AND PITS

11:00 13:00 2.00 COMPZN

RPCOMP RURD P SPOT PUMP AND PIT AND RIG IT UP

13:00 16:00 3.00 COMPZN

RPCOMP TRIP P PU 4 5/8" ROCK BIT, CHANGE OVER SUB AND 249 jts 2 3/8" L804.7# 8 rd tubing TIH TO 8100'NO FILL, PULLED UP TO 8070'

16:00 18:30 2.50 COMPZN

RPCOMP CIRC P CIRCULATE HOLE CLEAN WITH 10 # BRINEWE STOPPED AND THE TUBING AND CSG WAS FLOWING ANDBUILT UP TO 75 PSI

18:30 19:00 0.50 COMPZN

RPCOMP SIPB P SISW FOR NIGHT

19:00 06:00 11.00 COMPZN

RPCOMP SIPB P NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 0.50 0.50EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 4 6.00 24.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 1 3.00 3.00T&T OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 12.00 48.00EL FARMER TRUCKER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 1 3.00 3.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 12.00 12.00NABORS TRUCKER CONTRACTOR 2 8.00 16.00HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 2 3.00 6.00

Report Date: 2/15/2014Report #: 78Actual Days: 69.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/16/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/15/2014Report #: 78Actual Days: 69.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/17/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,515,812.75

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)26,120.61

WeatherVERY WARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&70.79

Ops and Depth @ Morning ReportSI AND MONITOREDLast 24hr SummaryTRY BLEED WELL DOWN WOULD NOT QUIT FLOWING.PUMP 20 BBL'S 10# BRINE QUICK STOP CHECK FOR VACUUM FLOWING START PUMPING 11 BBL'S STOP CHECK, STILL FLOWING24hr ForecastCHECK WELL PSI, IF 0 PSITOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

FLOWT SIPB P SI AND MONITORED 12 PSI

07:30 08:30 1.00 COMPZN

RPCOMP SFTY P EXTRA GOOD JSA MEETINGS ABOUT HAND AND FINGERPROGRAM

08:30 16:30 8.00 COMPZN

FLOWT CIRC P WELL FLOWING 2 BBLS / HRPUMP 20 BBLS 10 # BRINE QUICK STOP CHECK FOR VACCUM,STILL FLOWING.PUMP 11 BBLS AND CHECK STILL FLOWINGPUMPED 180 BBLS TOTAL WITH HOLDING BACK PRES.OF 50 PSITO TRY TO BALANCE WELL.SHUT WELL IN. MONITOR PRES. AT 2;30 PM178 PSI CSG, 8 TUBINGAT 4 PM 105 CSG , AND 80 TUBINGLEFT WELL SHUT IN FOR NIGHT AND MONITOR.

16:30 06:00 13.50 COMPZN

FLOWT SIPB P MONITOR PRES. ALL NIGHTTUBING = 31 PSICASING = 50 PSI AT 5 PM

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 1.00 1.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00T&T OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 9.00 36.00EL FARMER TRUCKER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 2 6.00 12.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 9.00 9.00NABORS TRUCKER CONTRACTOR 2 6.00 12.00HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 2/16/2014Report #: 79Actual Days: 70.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/17/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/16/2014Report #: 79Actual Days: 70.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/18/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,541,508.76

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)25,336.01

WeatherVERY WARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&71.79

Ops and Depth @ Morning ReportFLOWING WELLLast 24hr SummaryFLOW WELL BACK ON 10/64 CHOKE STARTED AT 57 PSI AND 5 BBL/HR

24hr ForecastCHECK WELL PSI, AND FLOWING.PUMP 10.5 # CALCIUM CARBONATE

ATTEMPT TO BALANCE WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

FLOWT SIPB P SHUT IN MONITOR WELL PRESSURE

07:00 07:30 0.50 COMPZN

FLOWT SFTY P JSA SAFETY MEET ALL CREWS

07:30 06:00 22.50 COMPZN

WELCTL KLWL P FLOW WELL 10/64 CHOKE START AT 54 PSI AND 5 BBL/HR

CHK: 10/64 ADJ, FCP 49 PSI, BWPH: 3 BBLS, BOPH: 0 BBLS, GASRATE: 0 MCFD

WATERTLTR: 211,516 BBLS, TLR: 25,467 BBLS, TLLTR: 186,049 BBLS, % OFLR: 12.04%CHLORIDES: 65,000, WATER WEIGHT: 8.9,TOTAL WATER RECOVERED LAST 11HR: 28 BBLS,TOTAL WATER PUMPED LAST 11 HR: 485 BBLSTOTAL WATER ON LOCATION: 726 BBLSTOTAL WATER PUMPED: 24,916NO OIL

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 0.50 0.50EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 3 5.00 15.00CRESCENT SERVICES OTHER CONTRACTOR 2 5.00 10.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 10.00 40.00EL FARMER TRUCKER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 2 6.00 12.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.00 10.00NABORS TRUCKER CONTRACTOR 1 0.50 0.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00

Report Date: 2/17/2014Report #: 80Actual Days: 71.79

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/18/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/17/2014Report #: 80Actual Days: 71.79

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 2/19/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,589,608.37

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)30,473.61

WeatherVERY WARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&72.79

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryS/I Well @ 7:50AM @ 53PSI, FCP 74 PSI, TRUCKS TRANSPORTING 10.5 FLUID AND SETTING UP TO BALANCE WELL IN AM

24hr ForecastCHECK WELL PSI,PUMP 10.5 # CALCIUM CARBONATE

ATTEMPT TO BALANCE WELLTOOHPU DUMMY PUMP TIHTOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELCTL KLWL P FLOW WELL 10/64 CHOKE

07:30 08:00 0.50 COMPZN

WELCTL SFTY P JSA REVIEW

Report Date: 2/18/2014Report #: 81Actual Days: 72.79

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 2/19/2014

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 06:00 22.00 COMPZN

WELCTL KLWL P SHUT IN WELL AND MONITOR PRESSURES/I Well @ 7:50AM @ 53PSI, FCP 74 PSI, BWPH: 0 BBLS, BOPH: 0

BBLS, GAS RATE: 0 MCFD

WATERTLTR: 211,516 BBLS, TLR: 25,473 BBLS, TLLTR: 186,043 BBLS, % OFLR: 12.04%CHLORIDES: , WATER WEIGHT: 9.7,TOTAL WATER RECOVERED LAST 11HR: 6 BBLS,TOTAL WATER PUMPED LAST 11 HR: 241 BBLSTOTAL WATER ON LOCATION: 370 BBLSTOTAL WATER PUMPED: 25,157

OILTOR: 156 BBLS, TOTAL OIL RECOVERED LAST 11HR: 0 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 156 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFD

COMMENTS: Shut In Well at 7:50AM at 53PSI. Monitoring Well.@ 05:00 HR CHOKE: 0/64, TBG 22 PSI, CSG 84 PSI, BWPH: 0 BBLS,BOPH: 0.0 BBLS, GAS RATE: 0 MCFD

WATERTLTR: 211,236 BBLS, TLR: 25,473 BBLS, TLLTR: 186,043 BBLS, % OFLR: 12.04%CHLORIDES: , WATER WEIGHT: 9.7,TOTAL WATER RECOVERED LAST 11HR: 0 BBLS,TOTAL WATER PUMPED LAST 24 HR: 241 BBLSTOTAL WATER ON LOCATION: 370 BBLSTOTAL WATER PUMPED: 25,157WATER HAULED INBelow is the breakdown on how they mixed the mud for us.

We started with a 28 vis 10.0ppg NaCl brine water and started addingBARAZAN D PLUS (xanthan gum polymer) which brought our viscosityup to roughly 35 sec/qt. We then added 1 sack of Caustic for PH of 9 andadded 6 pounds per bbl of ZEOGEL (salt water gel). This brought ourviscosity up to 40 sec/qt. We then added BARACARB 150 and broughtthe weight up from 10.0ppg to 10.5ppg. Once all of this was done wethen added 2 cans of ALDACIDE G (microbiocide for bacteria).

With us using the BARAZAN D PLUS as the main viscosifier everythingshould stay in suspension for the duration of your job. If it does get to beover a week or so we may need to run a check and add additionalviscosifier and bacteriacide if necessary.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 0.50 0.50EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 3 5.00 15.00CRESCENT SERVICES OTHER CONTRACTOR 2 5.00 10.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 10.00 40.00EL FARMER TRUCKER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 2 6.00 12.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00

Report Date: 2/18/2014Report #: 81Actual Days: 72.79

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 2/19/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.00 10.00NABORS TRUCKER CONTRACTOR 1 0.50 0.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/18/2014Report #: 81Actual Days: 72.79

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/20/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,620,081.98

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)30,473.61

WeatherVERY WARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&73.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryS/I Well @ 7:50AM @ 53PSI, FCP 84 PSI, PUMP 217 BBL'S 10.5 FLUID AND BALANCE WELLTOOH LAY DOWN BITPU DUMMY PUMP TIH 35 STANDS24hr ForecastFINISH TIH DUMMY PUMPTOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELCTL KLWL P WELL SHUT IN

07:30 08:00 0.50 COMPZN

WELCTL SFTY P JSA REVIEW

08:00 12:00 4.00 COMPZN

WELCTL KLWL P PUMP We started with a 28 vis 10.0ppg NaCl brine water and startedadding BARAZAN D PLUS (xanthan gum polymer) which brought ourviscosity up to roughly 35 sec/qt. We then added 1 sack of Caustic for PHof 9 and added 6 pounds per bbl of ZEOGEL (salt water gel). Thisbrought our viscosity up to 40 sec/qt. We then added BARACARB 150 and brought the weight up from 10.0ppg to 10.5ppg. Once allof this was done we then added 2 cans of ALDACIDE G (microbiocide forbacteria).

With us using the BARAZAN D PLUS as the main viscosifier everythingshould stay in suspension for the duration of your job. If it does get to beover a week or so we may need to run a check and add additionalviscosifier and bacteriacide if necessary. 217 BBLS WELL BALANCED

12:00 14:30 2.50 COMPZN

RPCOMP TRIP P TOOH LAY DOWN BIT

14:30 15:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

15:00 20:00 5.00 COMPZN

RPCOMP TRIP P PU PUMP AND RU CABLE SHIVE AND TIH 33 STANDS

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 24.00 24.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ENGINEERING ONSITE SUPERVISOR EMPLOYEE 1 1.00 1.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 12.50 62.50SCHLUMBERGER TECH OTHER CONTRACTOR 2 8.00 16.00BTI WELLHEAD HAND CONTRACTOR 0 0.00

Report Date: 2/19/2014Report #: 82Actual Days: 73.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/20/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.00 10.00BOOMERANGE TRUCKER CONTRACTOR 1 9.50 9.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/19/2014Report #: 82Actual Days: 73.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/21/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,646,261.99

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)29,540.01

WeatherVERY WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&74.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPRES 0FINISH TIH TAG AT 7557'PULL OUT SLOW TO 6005'SHUT DOWN FOR HIGH WINDS24hr ForecastTOOH WITH DUMMY PUMPTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P SI MONITOR PRES PSI 0

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

08:00 11:30 3.50 COMPZN

RPCOMP TRIP P TIHAT 7537 TO 7547 WAS DRAG ABOUT 2KFROM 7547 TO 7549 TO 7553 DRAG ABOUT 3KFROM 7553 TO 7555 DRAG ABOUT 4 K TILL 7557 STOP WITH 9K

11:30 13:00 1.50 COMPZN

RPCOMP TRIP P TOOH SLOW TO 6005'FROM7557' UP TO 7552' DRAG 4K OVER THAN ALL WAS FREE

13:00 15:00 2.00 COMPZN

RPCOMP SIPB X SHUT DOWN WAIT ON WIND TO CALM DOWN

15:00 06:00 15.00 COMPZN

RPCOMP SIPB P SHUT IN AND MONITOR PRESSURE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ENGINEERING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 5.00 10.00BTI WELLHEAD HAND CONTRACTOR 0 0.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00BOOMERANGE TRUCKER CONTRACTOR 1 4.50 4.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 2/20/2014Report #: 83Actual Days: 74.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/21/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/20/2014Report #: 83Actual Days: 74.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/21/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,673,422.00

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)29,020.01

WeatherWIND 5 MPH

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&75.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPRES 0FINISH TOOH FROM 6005'INSPECT AND RECORD CABLE AND PUMP24hr Forecast

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P SI AND MONITORED 0 PSI

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWED AND DISCUSSED WITH STOP GO CARDS

08:00 16:00 8.00 COMPZN

RPCOMP TRIP P TOOH SLOWLY TO MONITOR AND RECORD ALL CABLE AND PUMPTOOH FOUND RUB SPOTS AT 6427 193 JTS AND AT 6442 194 JTSFOUND 3 DRAG MARKS AT 7078 216 JTS, 7158 DRAG MARKS ON SECOND PUMP FROM TOP 7507 AND BANDMISSING.BOTTOM THIRD PUMP IS MISSING BAND, BOTTOM AGH BROKENBANDS AND DRAG MARKSMLE BENT , MLE BOTTOM OF LOWER PROTECTOR DAMAGEDARMORGOOD DRAG MARKS ON BOTTOM SECTION AND LAST 1 TO 1 ½ .

LAY PUMP ASS. DOWN ON TRAILER AND SISW.

16:00 06:00 14.00 COMPZN

RPCOMP SIPB P SI AND MONITOR PRESSURE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ENGINEERING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 5 12.00 60.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 1 5.00 5.00BTI WELLHEAD HAND CONTRACTOR 0 0.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00BOOMERANGE TRUCKER CONTRACTOR 1 4.50 4.50

Report Date: 2/21/2014Report #: 84Actual Days: 75.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/21/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/21/2014Report #: 84Actual Days: 75.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/25/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,700,278.02

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,534.01

WeatherWIND 5 MPH

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&77.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPRES 0MONITOR WELLNO ACTIVITY24hr ForecastMONITOR WELL 50 PSINO ACTIVITYTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P MONITOR WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

08:00 06:00 22.00 COMPZN

RPCOMP SIPB P MONITOR WELL, 50 PSI CSG

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 0 0.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ENGINEERING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 5 12.00 60.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 1 5.00 5.00BTI WELLHEAD HAND CONTRACTOR 0 0.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00BOOMERANGE TRUCKER CONTRACTOR 1 4.50 4.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/23/2014Report #: 86Actual Days: 77.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/25/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,714,812.03

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)14,534.01

WeatherWIND 5 MPH

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&78.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPRES 0MONITOR WELLNO ACTIVITY24hr ForecastMONITOR WELL 60 PSIRIG CREW CLEANED UP TOOLSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P MONITOR WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

08:00 06:00 22.00 COMPZN

RPCOMP SIPB P MONITOR WELL, 50 PSI CSG

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 0 0.00TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ENGINEERING ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 5 12.00 60.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00H & B RENTALS OTHER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 1 5.00 5.00BTI WELLHEAD HAND CONTRACTOR 0 0.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00BOOMERANGE TRUCKER CONTRACTOR 1 4.50 4.50HUGHES OILFLD TRANSP TRUCKER CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/24/2014Report #: 87Actual Days: 78.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 2/25/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,739,643.44

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)24,831.41

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&79.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPRES 74MONITOR WELLNU DRIP PAN AND BE READY FOR RUNNING ESP DUMMY RUN TOMORROWMONITOR WELL24hr ForecastBLEED WELL DOWN PUMP AND BALANCEPU 3.5" DUMMY PUMPAND TIHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P MONITOR WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

08:00 15:00 7.00 COMPZN

RPCOMP SIPB P MONITOR WELL, 74 PSI CSGWAIT ON DRIP PAN AND ENVIROVAC

15:00 18:00 3.00 COMPZN

RPCOMP NUND P RD FLOOR AND STRIP HEADNU DRIP PAN AND STRIP HEAD RU FLOOR

18:00 06:00 12.00 COMPZN

RPCOMP SIPB P MONITOR WELLPRESSURE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00

TSC ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CD CONSULTING ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00SIGNA ONSITE SUPERVISOR EMPLOYEE 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 3 12.00 36.00LONE STAR IND OTHER CONTRACTOR 0 0.00GE OIL AND GAS WELLHEAD HAND CONTRACTOR 0 0.00BIRD ELECTRIC OTHER EMPLOYEE 0 0.00ENVIRO VAC OTHER CONTRACTOR 1 0.50 0.50CRESCENT SERVICES OTHER CONTRACTOR 1 2.50 2.50KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 10.50 42.00SCHLUMBERGER TECH OTHER CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 0 0.00ENERSAFE SAFETY PERSONNEL CONTRACTOR 0 0.00KEY ENERGY SERVICES SAFETY PERSONNEL CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 0 0.00BOOMERANGE TRUCKER CONTRACTOR 0 0.00NABORS TRUCKER CONTRACTOR 1 0.50 0.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 2/25/2014Report #: 88Actual Days: 79.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 2/25/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/25/2014Report #: 88Actual Days: 79.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/26/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,764,489.45

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)24,846.01

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&80.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SM WITH AOL, SICP 85 PSI. DELAYED OPERATIONS UNTIL 1200 HRS DUE TO ICE IN DERRICK. PUMPED 85 BBLS 10.5 KILL FLUID.MONITER WELL.24hr ForecastRECEIVE 264 BBLS 10.5 PPG KILL FLUID, KILL WELL. PU AND RIH WITH DUMMY ESP PUMP AND CABLE, POOH CHECK FOR DAMAGE TO CABLE.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:00 08:00 1.00 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 13:00 5.00 COMPZN

WELLPR OTHR T OPERATIONS DELAYED DUE TO FREEZING RAIN ON DERRICKTUBING BOARD.

13:00 16:00 3.00 COMPZN

WELLPR OTHR P SICP 85 PSI. OPEN WELL UP ON 10/64 CHOKE ATTEMPT TO BLOWDOWN. BLEED TO 0 PSI WELL FLOWING. RU PUMP LINES ANDPUMP 85 BBLS 10.5 PPG KILL FLUID WITH NO SUCCESS. SICP 98PSI. SECURED WELL SDFN.

16:00 06:00 14.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 0 0.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 3 12.00 36.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 8.00 16.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00BOOMERANG TRUCKER CONTRACTOR 1 3.50 3.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/26/2014Report #: 89Actual Days: 80.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/27/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,789,903.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)25,414.01

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&81.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryHOLD SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 55 PSI, BLEED TO 0 PSI WELL FLOWING SHUT IN AND WAITED ON KILLFLUID. PUMPED 247 BBLS 10.5 KILL FLUID 1.9 BPM AT 330 PSI, LAST 50 BBL PRESSURE WAS UP TO 550 PSI. SICP 382 PSI. OBSERVED PRESSUREDROP FROM 382 PSI TO 126 PSI IN 4 HRS. WILL CONTINUE TO MONITER WELL WITH FLOW BACK CREW24hr ForecastCHECK SICP ATTEMPT TO PU SCHLUMBERGER ESP PUMP AND RIH IF DEAD.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:00 07:30 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

07:30 09:00 1.50 COMPZN

WELLPR RURD P RU SCHLUMBERGER CABLE SHEAVE TO TUBING BOARD

09:00 17:00 8.00 COMPZN

WELLPR OTHR P PUMPED 247 BBL 10.5 KILL FLUID AT 1.9 BPM AT 350 TO 550 PSI.AND MONITER WELL. SICP 382 PSI. PRESSURE DROPPINGSLOWLY DROPPED 256 PSI IN 4 HRS. CONTINUE MONITER WELL.

17:00 06:00 13.00 COMPZN

WELLPR WODL P MONITER WELL WITH FLOWBACK AND WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00CD CONSULTING ONSITE SUPERVISOR CONTRACTOR 0 0.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 9.00 45.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 9.00 18.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 9.00 9.00BAROID TRUCKER CONTRACTOR 3 1.00 3.00CRESCENT OTHER CONTRACTOR 1 1.50 1.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/27/2014Report #: 90Actual Days: 81.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 2/28/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,812,689.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)22,786.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&82.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 68 PSI, OPEN UP ON 10/64" CHOKE AND BLEED WELL DOWN TO 4 PSI.THEN OPEN TO FULL 2" AVERAGE FLOW RATE 12 BPH. FOR 4 HRS, SI FOR 1 HOUR BUILD UP. 50 PSI. OPEN BACK UP AND FLOWED AVERAGE 22BBLS IN TWO HOUR, FLUID WT 10.4 PPG. SHUT WELL IN AND MONITOR PRESSURE THRU NIGHT.24hr ForecastPUMP 200 BBL'S. 11 PPG KILL FLUID AND OBSERVE WELL. IF DEAD PU AND RIH WITH SCHLUMBERGER ESP DUMMY PUMP.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:00 1.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:00 07:30 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB.

07:30 13:30 6.00 COMPZN

WELLPR OTHR P SICP 68 PSI. OPEN WELL UP ON 10/64" ADJ CHOKE BLEW DOWN TO4 PSI OPEN CHOKE WIDE OPEN FLOWED AT AVERAGE 13 BPH.SHUT WELL IN FOR 1 HR. BUILD UP TO 50 PSI. OPEN BACK UP,FLOWED 20 BBLS 1ST HOUR THEN 24 BBLS. SHUT IN AND SECUREWELL.

13:30 06:00 16.50 COMPZN

WELLPR OTHR P MONITER WELL PRESSURE

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 0.00 0.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 8.00 16.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 2/28/2014Report #: 91Actual Days: 82.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/1/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,844,693.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)32,004.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&83.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 138 PSI. OPEN UP ON 10/64 ADJUSTABLE CHOKE BLEED DOWN TO 76PSI. PUMP 164 BBLS 11.0 PPG KILL FLUID. ISIP 277 PSI. OBSERVE WELL FOR 4 HRS. PRESSURE BLEED TO 0 PSI. PU AND ASSEMBLESCHLUMBERGER ESP DUMMY MOTOR, TUBING AND CABLE TO 2068.46'. RAN 2 ADDITIONAL STANDS TO 2196.02' AND SECURE WELL AND SDFN.24hr ForecastCONTINUE RIH WITH PUMP AND TUBING TO 8098 FT. POOH AND INSPECT CABLE AND PUMP.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR OTHR P OBSERVE AND MONITOR PRESSURE

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 10:00 2.00 COMPZN

WELLPR OTHR P SICP 138 PSI, BLEED TO 76 PSI IN 15 MIN. HOOK UP PUMP LINESAND PUMP AND PUMP 164 BBL'S 11.0 PPG KILL FLUID.

10:00 14:00 4.00 COMPZN

WELLPR OTHR P ISIP 277 PSI, MONITOR PRESSURE DROP TO 1 PSI. OPEN WELL UPNO FLOW.

14:00 16:00 2.00 COMPZN

WELLPR PULD P PU SCHLUMBERGER ESP PUMP AND ASSEMBLE

16:00 18:00 2.00 COMPZN

WELLPR TRIP P TRIP IN HOLE WITH PUMP, TUBING AND CABLE TO 2065.46' RUN 2ADDITIONAL STANDS TO 2196.02' SECURE WELL AND SDFN.

18:00 06:00 12.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 0.00 0.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 11.00 55.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 11.00 22.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.50 10.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/1/2014Report #: 92Actual Days: 83.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/3/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,875,407.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)30,714.00

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&84.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONTINUE RIH WITH TUBING AND DUMMY PUMP TO 8098'. POOH TO 2196' SECURE WELL AND SDFN.24hr ForecastCONTINUE POOH WITH TUBING, CABLE AND INSPECT CABLE AND PUMP.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 14:00 6.00 COMPZN

WELLPR TRIP P CONTINUE RIH WITH TUBING AND PUMP TO 8090.56'

14:00 17:00 3.00 COMPZN

WELLPR TRIP P POOH TO 2196.02' USED 20 BBLS TO FILL HOLE WHILE POOH.

17:00 06:00 13.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 10.00 50.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 10.00 20.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.00 10.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/2/2014Report #: 93Actual Days: 84.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/4/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,906,055.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)30,648.00

WeatherCOLD

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&85.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 4 PSI. NO FLOW. CONTINUE POOH WITH TUBING, CABLE AND PUMP.INSPECTING CABLE, BANDS AND CABLE GUIDES FOR DAMAGE. LD PUMP, RIH WITH 46 STANDS, PUMP 10 BBLS DOWN TBG. SECURE WELL SDFN.24hr ForecastCHECK PRESSURE, POOH LD 2 3/8" TBG, PU 2 7/8" WORK STRING FOR CLEAN OUT TO PBTD. DECISION ABOUT PUMP WILL BE MADE.

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 16:00 8.00 COMPZN

WELLPR TRIP P CONTINUE POOH WITH TUBING, CABLE, PUMP, BANDS, ANDCABLE GUIDES. NOTE: LAST 5 STANDS WERE FULL OF FINE SAND.BREAK DOWN PUMP ASSEMBLY. HOT SHOT TO MIDLAND FORFINAL INSPECTION. RIH 46 STANDS, PUMP 10 BBLS DOWN TBG.SECURE WELL SDFN.

16:00 06:00 14.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 8.00 40.00SCHLUMBERGER TECH OTHER CONTRACTOR 2 6.00 12.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 6.00 6.00CONOCOPHILLIPS CO OTHER EMPLOYEE 2 4.50 9.00BOOMERANG TRUCKER CONTRACTOR 1 2.50 2.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/3/2014Report #: 94Actual Days: 85.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/5/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryDRILLING

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,930,286.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)24,231.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&86.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 49 PSI. BLEED TO 6 PSI. SLIGHT FLOW. PUMP 10 BBLS BRINE WITHCALCIUM CARBONATE MONITOR WELL SICP 44 PSI.24hr ForecastWAIT ON NEW PROCEDURETime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 15:00 7.00 COMPZN

WELLPR OTHR P PUMP 10 BBLS 10.1 BRINE WITH CALCIUM CARBONATE ANDMONITER PRESSURE AND WAIT ON NEW PROCEDURE

15:00 06:00 15.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00TSC ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00SIGNA ONSITE SUPERVISOR CONTRACTOR 1 0.00 0.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 9.00 45.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 1 4.00 4.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/4/2014Report #: 95Actual Days: 86.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/5/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryDRILLING

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,951,151.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)20,865.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&87.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 49 PSI OPEN UP AND BLEED TO 4 PSI. WITH SLIGHT FLOW. SHUTWELL IN AND OBSERVE PRESSURE. UNLOAD 2 7/8" PH6 WORK STRING AND TALLY24hr ForecastPOOH AND STAND BACK 2 3/8" TBG. CHANGE OUT RAM BLOCKS TO 2 7/8", PU JUNK BASKET AND TBG FOR CLEAN OUTAND RETRIEVE CABLEBANDS AND SAND.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 08:30 0.50 COMPZN

WELLPR OTHR P SICP 49 PSI BLEED DOWN TO 4 PSI WITH SLIGHT FLOW.

08:30 14:30 6.00 COMPZN

WELLPR OTHR P OBSERVE PRESSURE

14:30 17:00 2.50 COMPZN

WELLPR OTHR P UNLOAD AND TALLY 275 JTS 2 7/8" PH6 WORK STRING. SECUREWELL SDFN

17:00 06:00 13.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 10.50 52.50PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.50 10.50LOGAN TRANSPORTATION INC TRUCKER CONTRACTOR 2 2.00 4.00

0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/5/2014Report #: 96Actual Days: 87.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/6/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,975,525.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)24,374.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&88.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 80 PSI. OPEN WELL UP AND BLEED TO 4 PSI WITH SLIGHT FLOW. 20BPH, INCREASED TO 18 PSI. AND 60 BBL'S LAST HOUR TOTAL 203 BBL'S RECOVERED. SHUT WELL IN AND MONITOR PRESSURE BUILD UP.24hr ForecastCHECK SICP AND DETERMINE PLAN GOING FOWARD.Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 16:30 8.50 COMPZN

WELLPR OTHR P SICP 80 PSI. OPEN WELL UP AND BLEED TO 4 PSI WITH SLIGHTFLOW. MONITER PRESSURE AND FLOW THRU DAY. FLOWED 203BBLS. SHUT WELL IN AND MONITOR PRESSURE BUILD UP.

16:30 06:00 13.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 9.00 45.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 9.00 9.00MOONLIGHT OTHER CONTRACTOR 1 9.00 9.00BLOWOUT TOOLS INC. CONTRACTOR 1 6.00 6.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/6/2014Report #: 97Actual Days: 88.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/7/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)7,997,922.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)22,397.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&89.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryCONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THE JOB. SICP 330 PSI. OPEN WELL UP AND FLOW WELL AT 93 PSI. FLOWED 758BBLS WATER, SAND AND TRACE OF OIL.24hr ForecastWELL SHUT IN AND SECURED. SHUT DOWN FOR WEEKENDTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

07:30 08:00 0.50 COMPZN

WELLPR SFTY P CONDUCT SAFETY MEETING WITH AOL ABOUT HAZARDS OF THEJOB

08:00 17:00 9.00 COMPZN

WELLPR OTHR P FLOW WELL TO OPEN TOP TANK AND TRANSFER TO FRAC TANK.FLOWED 758 BBLS. SHUT WELL IN AND SECURED. SDF WEEKEND.

17:00 06:00 13.00 COMPZN

WELLPR WODL P WAIT ON DAYLIGHT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

MIDESSA CONSULTING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 3.00 15.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 3.00 3.00MOONLIGHT OTHER CONTRACTOR 1 3.00 3.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/7/2014Report #: 98Actual Days: 89.38

Page 1/3

UNIVERSITY BL 7132H

Report Printed: 3/11/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,019,126.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)21,204.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&90.38

Ops and Depth @ Morning ReportWELL FLOWINGLast 24hr SummaryOPENED WELL ON 10/64 CHOKE AT 4 AMMOVED CHOKE UP TO 18/64 BY 9AMFROM 2 PM OPEN CHOKE 2/64 EVERY HOUR TRY TO REACH 80 BBL'S/HOUR24hr ForecastAT 6 PM OPENED TO 30/64 CHOKE230 PSI AND 57 BBL'S/HRATTEMPT TO FLOW WELL DOWN ENOUGH TO TRIP PIPETime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

WELCTL OPNW P OPENED WELL AT 4 AM 760 PSI 10/ 64 CHOKE

07:30 08:00 0.50 COMPZN

WELCTL SFTY P JSA REVIEW, OVER OPERATIONS OF WATCHING WELL

Report Date: 3/10/2014Report #: 99Actual Days: 90.38

Page 2/3

UNIVERSITY BL 7132H

Report Printed: 3/11/2014

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 06:00 22.00 COMPZN

WELCTL OPNW P AT 2 PM WE STARTED CHANGING CHOKES EVERY HOUR TO SEEIF WE CAN REACH 80 BBL'S/HRAT 6 PM IT WAS ON A 28/64 CHOKE AND 230 PSI, FLOWING 57BBLS/HR AT THIS TIME WE CHANGED TO 30/64 CHOKEOPENED WELL ON 10/64 CHOKE AT 4 AMMOVED CHOKE UP TO 18/64 BY 9AMAT 11:00 18/64 233 PSI AT 43 BBLS/HRAT 12:00 18/64 245 PSI AT 43 BBLS/HR@ 16:00 HR CHOKE: 22/64, TBG 0 PSI, CSG 258 PSI, BWPH: 53BBLS, BOPH: 1.0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 27,017 BBLS, TLLTR: 185,099 BBLS, % OFLR:12.74%CHLORIDES: 67,320 , WATER WEIGHT: 9.0,TOTAL WATER RECOVERED LAST 11HR: 656 BBLS,TOTAL WATER PUMPED LAST 11 HR: 0 BBLSTOTAL WATER ON LOCATION: 1551 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 227 BBLS, TOTAL OIL RECOVERED LAST 11HR: 69 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 227 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFD

COMMENTS:Opened Well at 4AM on 10/64 Adj. flowing to tanks. SICP 762.Opened to 12/64 @ 5AMOpened to 14/64 @ 7AMOpened to 18/64 @ 9AMOpened to 22/64 @ 2PMOPEN CHOKE EVERY HOUR 2/64Opened to 24/64 @3PMOpened to 26/64 @ 4PMGoal is 80BPH and currently we are getting back 58BPH before going to26/64.NOTE*** The 600bbls of kill fluid pumped to kill well has been added intothe TLR on report.Flowing well to tanks through CSG@ 05:00 HR CHOKE: 38/64, TBG 0 PSI, CSG 172 PSI, BWPH: 77BBLS, BOPH: 3 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 27,908 BBLS, TLLTR: 184,208 BBLS, % OFLR: 13.16%CHLORIDES: WATER WEIGHT: 8.92TOTAL WATER RECOVERED LAST 24HR: 1291 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 2387 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 258 BBLS, TOTAL OIL RECOVERED LAST 24HR: 100 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 258 BBLSAPI Gravity @ 60 deg.: 32.4GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Flowing Well to Tanks

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 8.00 32.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00MOONLIGHT OTHER CONTRACTOR 1 8.00 8.00

Report Date: 3/10/2014Report #: 99Actual Days: 90.38

Page 3/3

UNIVERSITY BL 7132H

Report Printed: 3/11/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/10/2014Report #: 99Actual Days: 90.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/12/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,040,330.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)21,204.00

WeatherWARM AND WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&91.38

Ops and Depth @ Morning ReportWELL FLOWINGLast 24hr SummaryWELL FLOWING ON 48/64 CHOKE47 PSI/ 35 BBLS HOUR 30% OIL CUT24hr ForecastFLOW WELLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P FLOWING WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

Report Date: 3/11/2014Report #: 100Actual Days: 91.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/12/2014

178.Daily Partner Report

Time Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

08:00 06:00 22.00 COMPZN

RPCOMP OPNW P @ 16:00 HR CHOKE: W/O, TBG 0 PSI, CSG 86 PSI, BWPH: 58 BBLS,BOPH: 8 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 28,584 BBLS, TLLTR: 183,532 BBLS, % OFLR:13.48%CHLORIDES: 67,320 , WATER WEIGHT: 9.0,TOTAL WATER RECOVERED LAST 11HR: 656 BBLS,TOTAL WATER PUMPED LAST 11 HR: 0 BBLSTOTAL WATER ON LOCATION: 1813 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 336 BBLS, TOTAL OIL RECOVERED LAST 11HR: 78 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 336BBLSAPI Gravity @ 70 deg.: 33.0GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFD

COMMENTS:Opened to 38/64 @ 4AMOpened to 40/64 @ 5AMOpened to 42/64 @ 6AMOpened to 44/64 @ 7AMOpened to 46/64 @ 8AMOpened to 48/64 @ 9AMOpened Choke Wide Open on 3/4 Seat to Tanks @ 10AMCurrently 8 Loads of flowback have been hauled. There is a load of oilbeing loaded and transferred to battery now as well.

@ 05:00 HR CHOKE: W/O, TBG 0 PSI, CSG 47 PSI, BWPH: 35 BBLS,BOPH: 6 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 29,181 BBLS, TLLTR: 182,935 BBLS, % OFLR: 13.76%CHLORIDES: 55,865 WATER WEIGHT: 8.88TOTAL WATER RECOVERED LAST 24HR: 1273 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 1500 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 422 BBLS, TOTAL OIL RECOVERED LAST 24HR: 164 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 422 BBLSAPI Gravity @ 60 deg.: 33GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 8.00 32.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00MOONLIGHT OTHER CONTRACTOR 1 8.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/11/2014Report #: 100Actual Days: 91.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/13/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,057,674.46

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)19,274.00

WeatherWARM AND WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&92.38

Ops and Depth @ Morning ReportSHUT INLast 24hr SummaryWELL FLOWING ON 48/64 CHOKE30 PSI/ 30 BBLS HOUR 30% OIL CUT24hr ForecastPUMP 11# CALSIUM CLORIDE IN TUBING TIH W/2 3/8 TUBING PUMP 11# AROUND AND TOOHTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P FLOWING WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW

08:00 06:00 22.00 COMPZN

RPCOMP OPNW P @ 16:00 HR CHOKE: W/O, TBG 0 PSI, CSG 28 PSI, BWPH: 27 BBLS,BOPH: 10 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 29,483 BBLS, TLLTR: 182,633 BBLS, % OFLR:13.90%CHLORIDES: 55,865 , WATER WEIGHT: 8.88,TOTAL WATER RECOVERED LAST 11HR: 302 BBLS,TOTAL WATER PUMPED LAST 11 HR: 0 BBLSTOTAL WATER ON LOCATION: 1693 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 531 BBLS, TOTAL OIL RECOVERED LAST 11HR: 109 BBLS,TOTAL OIL SOLD LAST 11 HRS: 0TOTAL OIL ON LOCATION: 531 BBLSAPI Gravity @ 70 deg.: 33.0GASTOTAL GAS FLARED LAST 11HR: 0 MCFD,TOTAL GAS SALES LAST 11HR: 0 MCFD

COMMENTS:Flowing to tank through wide open 3/4 seat.@ 05:00 HR CHOKE: 0/64, TBG 0 PSI, CSG 22 PSI, BWPH: 0 BBLS,BOPH: 0 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 29,720 BBLS, TLLTR: 182,396 BBLS, % OFLR: 14.01%CHLORIDES: 55,865 WATER WEIGHT: 8.88TOTAL WATER RECOVERED LAST 24HR: 539 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 1750 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 659 BBLS, TOTAL OIL RECOVERED LAST 24HR: 237 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 659 BBLSAPI Gravity @ 60 deg.: 33GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

COMMENTS: Flowed to tanks over night, shut in well at well head at 4AMper consultant till further notice.SAND: NoneCO2: 0.0%H2S: 0.0 ppm

Report Date: 3/12/2014Report #: 101Actual Days: 92.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/13/2014

178.Daily Partner Report

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 4 8.00 32.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 8.00 8.00MOONLIGHT OTHER CONTRACTOR 1 8.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/12/2014Report #: 101Actual Days: 92.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/14/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,089,956.16

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)32,281.70

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&93.38

Ops and Depth @ Morning ReportWELL FLOWINGLast 24hr SummaryWELL SHUT IN AT 4 AM6 AM 200 PSIAT 3 PM 337 PSI OPENED ON 12/64 CHOKE BLEED DOWN 1 HOURFLOWING 2 PSI / 10/HR24hr ForecastPUMP 11# CALSIUM CLORIDE IN TUBINGTIH W/2 3/8 TUBING PUMP 11# AROUND AND TOOHPU 2 7/8 PH6 WITH JUNK BASKET TIH CLEAN OUT FILLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 15:00 9.00 COMPZN

RPCOMP SFTY P DROVE TO MIDLAND ON SAFETY STAND DOWN

15:00 15:30 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWED

15:30 06:00 14.50 COMPZN

RPCOMP OPNW P 337 PSI. OPENED WELL ON 12/64 CHOKE BLEAD DOWN 1 HOUR@ 05:00 HR CHOKE: W/O, TBG 0 PSI, CSG 2 PSI, BWPH: 0 BBLS,BOPH: 2 BBLS, GAS RATE: 0 MCFDWATERTLTR: 212,116 BBLS, TLR: 29,720 BBLS, TLLTR: 182,396 BBLS, % OFLR: 14.01%CHLORIDES: 55,865 WATER WEIGHT: 8.88TOTAL WATER RECOVERED LAST 24HR: 539 BBLS,TOTAL WATER PUMPED LAST 24 HR: 0 BBLSTOTAL WATER ON LOCATION: 1914 BBLSTOTAL WATER PUMPED: 25,157OILTOR: 683 BBLS, TOTAL OIL RECOVERED LAST 24HR: 24 BBLS,TOTAL OIL SOLD LAST 24 HRS: 0TOTAL OIL ON LOCATION: 683 BBLSAPI Gravity @ 60 deg.: 33GASTOTAL GAS FLARED LAST 24HR: 0 MCFD,

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 0 0.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 0 0.00MOONLIGHT OTHER CONTRACTOR 0 0.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 5 2.00 10.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/13/2014Report #: 102Actual Days: 93.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/16/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,121,201.37

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)26,154.20

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&94.38

Ops and Depth @ Morning ReportOPEN TO FLOW BACKLast 24hr SummaryPUMP 6 BBL'S TUBINGRU STRIP HEADTIH TO 7100' PUMP 11 # AND MAKE CONNECTIONS TO 7404'CIRCULATED 11# TO SURFACE LOST 2/3 FLUIDCHANGE RAMS TO 2 7/8 AND CHANGE EQUIPMENT TO 2 7/8"TURN OVER TO FLOW BACK24hr ForecastTEST PIPE RAMSPU 2 7/8" PH6 TUBING AND CLEAN OUT FILLTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P WELL FLOWING 4 BBLS/HR AND 2 PSI

07:30 08:30 1.00 COMPZN

RPCOMP SFTY P JSA REVIEW/ AND TALKED ABOUT SAFETY STAND DOWNGOT EVERYONE INVOLVED

08:30 09:00 0.50 COMPZN

RPCOMP CIRC P PUMPED 6 BBLS 11# DOWN TUBING

09:00 10:30 1.50 COMPZN

RPCOMP NUND P ND WORK PLATE AND NU STRIPPING HEAD

10:30 13:00 2.50 COMPZN

RPCOMP TRIP P TIH TO 7130'AND CIRCULATE EACH STAND DOWN TO 7411'

13:00 15:00 2.00 COMPZN

RPCOMP CIRC P CIRCULATE DOWN TUBING WITH 11 # CALCIUM CHLORIDE TOLOAD HOLE.230 BBL'S TO TRY TO GET CIRCULATION

15:00 17:00 2.00 COMPZN

RPCOMP TRIP P TOOH

17:00 19:00 2.00 COMPZN

RPCOMP OTHR P CHANGE OUT 2 3/8" RAMS TO 2 7/8" RAMSCHANGE OUT EQUIPMENT TO RUN 2 7/8" PH6 TUBING

19:00 06:00 11.00 COMPZN

RPCOMP OPNW P TURN WELL OVER TO FLOW BACK TO MONITOR WELLAT1900 HRS O PSI ON WELL

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 11.00 55.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 10.00 10.00BTI WELLHEAD HAND CONTRACTOR 1 6.00 6.00MOONLIGHT OTHER CONTRACTOR 1 11.00 11.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 6.00 12.00CRESCENT SERVICES OTHER CONTRACTOR 1 0.50 0.50ENERSAFE OTHER CONTRACTOR 1 1.50 1.50CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 2.00 2.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 1 2.00 2.00

SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 3/14/2014Report #: 103Actual Days: 94.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/16/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/14/2014Report #: 103Actual Days: 94.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/17/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,148,965.57

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)27,764.20

WeatherVERY WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&95.38

Ops and Depth @ Morning ReportOPEN TO FLOW BACKLast 24hr SummaryRU AND TEST BOP24hr ForecastPU SHOE AND 2 7/8" TUBINGTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P MONITOR WELL

07:30 08:30 1.00 COMPZN

RPCOMP SFTY P JSA REVIEWS

08:30 11:30 3.00 COMPZN

RPCOMP BOPE P RU TEST BLIND RAMS WOULD NOT HOLD RESET AND TEST NOTESTCHANGE OUT TUBING HANGER AND TEST NO TESTFOUND TRUCK VALVE BLEEDING

11:30 13:00 1.50 COMPZN

RPCOMP EQRP T REPAIRED TEST TRUCK

13:00 14:00 1.00 COMPZN

RPCOMP BOPE P BLIND RAMS LOW TEST 250 PSI 5 MINUTES, HIGH TEST 3000 PSI 10MINUTESPIPE RAMS LOW TEST 2 7/8" PIPE RAMS FAILED AND HIGH TESTFAILEDHYDRILL LOW TEST 150 PSI 5 MINUTES AND HIGH TEST 2000 PSI10 MIN

14:00 17:30 3.50 COMPZN

RPCOMP BOPE T WAIT ON NEW 2 7/8" RAMS

17:30 19:00 1.50 COMPZN

RPCOMP BOPE P REPLACE RAMS AND TEST

19:00 20:00 1.00 COMPZN

RPCOMP BOPE P LOW TEST 250 PSI FOR 5 MINUTES, HIGH TEST 3000 PSI 10MINUTES/ TEST GOODRD TESTERS

20:00 06:00 10.00 COMPZN

RPCOMP OPNW P TURN OVER TO FLOW BACK, OPEN WELL AND MONITOR0 PSI AND NO RETURNS

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 11.00 55.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 7.00 7.00BTI WELLHEAD HAND CONTRACTOR 1 2.00 2.00GO ENERGY WELLHEAD HAND CONTRACTOR 1 12.00 12.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 2 7.00 14.00MOONLIGHT OTHER CONTRACTOR 1 7.00 7.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 1 8.50 8.50CRESCENT SERVICES OTHER CONTRACTOR 2 1.00 2.00ENERSAFE OTHER CONTRACTOR 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00

SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 3/15/2014Report #: 104Actual Days: 95.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/17/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/15/2014Report #: 104Actual Days: 95.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/17/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,175,535.57

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)26,570.00

WeatherVERY WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&96.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryPU SHOE AND 2 7/8" TUBING24hr ForecastRU POWER SWIVEL AND CIRCULATE CLEAN OUTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P MONITOR WELL 0 PSI

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW WITH ALL CREWS

08:00 17:30 9.50 COMPZN

RPCOMP PUTB P PU 4.6875 SHOE, 248 JTS PH6 2 7/8" P110 TUBING TAG AT 7740'FELT LIKE FILL WE SET DOWN IN AND NO DRAG BEFOREPULL UP 2 JTS' SISW FOR NIGHTTURN OVER TO FLOW BACK

17:30 06:00 12.50 COMPZN

RPCOMP OPNW P MONITOR PRESSURETBG 0 PSI, CSG 0 PSI,

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 4 12.00 48.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 12.00 60.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 12.00 12.00BTI WELLHEAD HAND CONTRACTOR 0 0.00GO ENERGY WELLHEAD HAND CONTRACTOR 0 0.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 0 0.00MOONLIGHT OTHER CONTRACTOR 1 12.00 12.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00ENERSAFE OTHER CONTRACTOR 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00

SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/16/2014Report #: 105Actual Days: 96.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/18/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,203,735.45

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)21,248.70

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&97.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryRU POWER SWIVEL AND BREAK CIRCULATIONCLEAN OUT TO 8100'TOOH LAY DOWN PH6 TUBING24hr ForecastFINISH LAY DOWN PH6 AND LAY DOWN 2000' 2 3/8 TUBINGTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP OPNW P 0 PSI ON WELL

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW ALL CREWS

08:00 10:30 2.50 COMPZN

RPCOMP RURD P RU POWER SWIVEL AND STRIP HEADBREAK CIRCULATION

10:30 16:00 5.50 COMPZN

RPCOMP FCO P CLEAN OUT FROM 7740' TO 8104' CIRCULATE CLEANONLY GOT PLUG PARTS AND FRAC SAND WITH CARBONATE IN IT

16:00 17:00 1.00 COMPZN

RPCOMP RURD P RD POWER SWIVEL

17:00 19:00 2.00 COMPZN

RPEQPT PULD P LAY DOWN 85 JTS PH6 2 7/8" TUBING TO 5408''SISW FOR NIGHT

19:00 06:00 11.00 COMPZN

RPCOMP SIPB P SHUT IN MONITOR PRESSURE6 AM 1 PSI CSG

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 14.00 14.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 6 12.00 72.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 13.00 13.00BTI WELLHEAD HAND CONTRACTOR 0 0.00GO ENERGY WELLHEAD HAND CONTRACTOR 0 0.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 0 0.00MOONLIGHT OTHER CONTRACTOR 1 13.00 13.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 3.00 6.00CRESCENT SERVICES OTHER CONTRACTOR 2 1.00 2.00ENERSAFE OTHER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00

SAFETY PERSONNEL CONTRACTOR 1 14.00 14.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/17/2014Report #: 106Actual Days: 97.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/20/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,263,830.55

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)48,357.60

WeatherWARM AND WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&98.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryKILL WELL LAY DOWN WORK STRING

24hr ForecastRUN ESPTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P WELL SHUT IN MONITOR PRESSURE 80 PSI TUBING 1 PSI CSG

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWED

08:00 09:00 1.00 COMPZN

RPCOMP KLWL P KILL WELL 10 BBL'S TUBING AND 40 BBL'S CSG WELL STATIC

09:00 13:00 4.00 COMPZN

RPCOMP PULD P FINISH LAY DOWN 2 7/8" PH6 TUBING AND SHOE ONE PIECE OF ABAND IN SHOE

13:00 14:30 1.50 COMPZN

RPCOMP RURD P CHANGE OVER TO RUN 2 3/8" L80 TUBINGCHANGE OUT TO 2 3/8" RAMS

14:30 15:30 1.00 COMPZN

RPCOMP BOPE P LOW TEST 250 PSI FOR 5 MINUTES AND HIGH TEST 3000 PSI FOR 0MINUTES ON 2 3/8 RAMSREMOVED TUBING HANGER AND 2 WAY CHECK VALVE

15:30 16:30 1.00 COMPZN

RPCOMP TRIP P TIH WITH 32 STANDS TUBING

16:30 17:30 1.00 COMPZN

RPCOMP PULD P TRIP OUT LAY DOWN 64 JTS TUBINGSISW FOR NIGHT

17:30 18:00 0.50 COMPZN

RPCOMP RURD P ND STRIP HEAD AND NU WORK PLATE

18:00 06:00 12.00 COMPZN

RPCOMP SIPB P TURN OVER TO FLOW BACK TO MONITOR PRES.

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 12.00 12.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 11.00 55.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 11.00 11.00BTI WELLHEAD HAND CONTRACTOR 2 4.00 8.00GO ENERGY WELLHEAD HAND CONTRACTOR 2 5.00 10.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 1 5.00 5.00MOONLIGHT OTHER CONTRACTOR 1 7.00 7.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 2 2.00 4.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00ENERSAFE OTHER CONTRACTOR 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00

SAFETY PERSONNEL CONTRACTOR 1 12.00 12.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Report Date: 3/18/2014Report #: 107Actual Days: 98.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/20/2014

178.Daily Partner Report

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/18/2014Report #: 107Actual Days: 98.38

Page 1/2

UNIVERSITY BL 7132H

Report Printed: 3/20/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,304,904.15

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)41,073.60

Weather Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&99.38

Ops and Depth @ Morning Report

Last 24hr SummaryPU ESP 3 JT 2 3/8 L80 SLIDING SLEEVE AND TUBINGSTRIP OFF BOP STACK AND NU WELL HEADTIE IN ESP ELECTRICTURN ON CHECK PUMP TO OPEN TANK24hr ForecastRD RIG MOVE EQUIPMENTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P SHUT IN, MONITOR PRES, 0 PSI

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWS

08:00 17:00 9.00 COMPZN

RPCOMP OTHR P PU ESP end of pump 6075'SENSORMOTOR2-- PROTECTORSINTAKE 6043.47AGH3--- PUMPS3-- 2 3/8" TUBINGSLIDE SLEEVE 5915.07 CMD SLICK LINE DOWN SHIFT TO OPENUP SHIFT TO CLOSE182-- 2 3/8 TUBING

17:00 20:30 3.50 COMPZN

RPCOMP OTHR P ND BOP STACKNU WELL HEAD SPOOL

20:30 22:30 2.00 COMPZN

RPCOMP OTHR P WIRE IN ELECTRICAL AND TUBING HANGERAND PLUMB IN WELL HEAD

22:30 23:30 1.00 COMPZN

RPCOMP OTHR P WORK ON ELECTRIC TURN ON AND CHECK PUMP ONLY PULLING32 AMPSPUMPING GOOD SISW FOR NIGHT

23:30 06:00 6.50 COMPZN

RPCOMP SIPB P SHUT IN. FLOW BACK TRANSFERRING WATER TO BAT

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 14.50 14.50EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 14.50 72.50PIPE PRO ROUSTABOUT CREW CONTRACTOR 1 12.00 12.00BTI WELLHEAD HAND CONTRACTOR 2 9.50 19.00GO ENERGY WELLHEAD HAND CONTRACTOR 0 0.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 2 7.50 15.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 1 3.00 3.00BOOMERANGE TRUCKER CONTRACTOR 1 2.00 2.00AMERICAN EAGLE TRUCKER CONTRACTOR 1 5.00 5.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00ENERSAFE OTHER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 2 12.00 24.00CONOCOPHILLIPS CO ONSITE SUPERVISOR EMPLOYEE 0 0.00

SAFETY PERSONNEL CONTRACTOR 1 14.50 14.50SCHLUMBERGER TECH TOOL HAND CONTRACTOR 3 14.50 43.50

Report Date: 3/19/2014Report #: 108Actual Days: 99.38

Page 2/2

UNIVERSITY BL 7132H

Report Printed: 3/20/2014

178.Daily Partner Report

Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/19/2014Report #: 108Actual Days: 99.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/21/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,546,511.09

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)16,613.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&100.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryRD ALL EQUIPMENT AND RELEASE24hr ForecastFINISH TRANSFERRING FLOW BACK WATER TO BAT.CLEANING OPEN TOP TANKSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 10:00 4.00 COMPZN

RPCOMP SIPB P TRANSFER 997 BBLS FLOW BACK WATER TO BAT.

10:00 10:30 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWED FOR RIG DOWN EQUIPMENT

10:30 13:30 3.00 COMPZN

RPCOMP RURD P RIG DOWN RIG

13:30 15:30 2.00 COMPZN

RPCOMP RURD P RIG DOWN EQUIPMENT AND MOVE OFF LOCATION

15:30 06:00 14.50 COMPZN

RPCOMP SIPB P TRANSFERED 1052 BBLS FLUID BY 5 PM2331 BBLS TOTAL BY 5 AM

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 10.00 10.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 5 6.00 30.00PIPE PRO ROUSTABOUT CREW CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 0 0.00GO ENERGY WELLHEAD HAND CONTRACTOR 0 0.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 0 0.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 1 4.00 4.00BOOMERANGE TRUCKER CONTRACTOR 0 0.00AMERICAN EAGLE TRUCKER CONTRACTOR 0 0.00CRESCENT SERVICES OTHER CONTRACTOR 0 0.00ENERSAFE OTHER CONTRACTOR 1 1.00 1.00CONOCOPHILLIPS CO ENGINEER EMPLOYEE 0 0.00SIGNA ENGINEERING OTHER CONTRACTOR 1 8.50 8.50

SAFETY PERSONNEL CONTRACTOR 1 10.00 10.00SCHLUMBERGER TECH TOOL HAND CONTRACTOR 0 0.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/20/2014Report #: 109Actual Days: 100.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/23/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,571,864.52

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)11,070.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&101.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr Summary MOVING EQUIPMENT, AND CLEANING LOCATION

24hr ForecastMOVE OUT EQUIPMENTTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP RURD P RD FLOW EQUIPMENT

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEWS

08:00 17:00 9.00 COMPZN

RPCOMP RURD P , PULL BOTTOMS OF FRAC TANKSMOVE REVERSE EQUIPMENT AND FLOW BACK EQUIPMENTSTART CLEANING LOCATION

17:00 06:00 13.00 COMPZN

RPCOMP SIPB P SHUT IN NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 10.00 10.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 12.00 24.00KEY ENERGY SERVICES RIG CREW CONTRACTOR 1 5.50 5.50PIPE PRO ROUSTABOUT CREW CONTRACTOR 0 0.00BTI WELLHEAD HAND CONTRACTOR 0 0.00GO ENERGY WELLHEAD HAND CONTRACTOR 0 0.00GE OIL & GAS WELLHEAD HAND CONTRACTOR 0 0.00NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 5 7.00 35.00SUAREZ BROS TRUCKER CONTRACTOR 2 0.00 0.00BIG D ROUSTABOUT CREW CONTRACTOR 3 1.00 3.00CRESCENT SERVICES OTHER CONTRACTOR 2 1.50 3.00SIGNA ENGINEERING OTHER CONTRACTOR 1 10.00 10.00TSC SAFETY PERSONNEL CONTRACTOR 1 10.00 10.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/21/2014Report #: 110Actual Days: 101.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/23/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,577,984.52

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)6,120.00

WeatherWARM

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&102.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummarySAFE MEETING, CLEAN OUT TANKS AND REMOVE EQUIPMENT24hr ForecastLOAD TO OPEN TOP TANKS, TRANSFER PUMP AND EDGE CAMPERSTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 07:30 1.50 COMPZN

RPCOMP SIPB P SHUT IN NO ACTIVITY

07:30 08:00 0.50 COMPZN

RPCOMP SFTY P JSA REVIEW/ MEETING WITH ALL CONTRACTORS

08:00 19:00 11.00 COMPZN

RPCOMP RURD P CLEAN OUT OPEN TOP TANKSMOVE OUT FRAC TANKSMOVE OUT ALL FLOW BACK EQUIPMENT

19:00 06:00 11.00 COMPZN

RPCOMP SIPB P NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 10.00 10.00TSC SAFETY PERSONNEL CONTRACTOR 1 10.00 10.00SIGNA ENGINEERING OTHER CONTRACTOR 1 10.00 10.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 5 4.50 22.50NABORS WELL SERVICES LTD TRUCKER CONTRACTOR 6 9.50 57.00SUAREZ BROS TRUCKER CONTRACTOR 2 1.50 3.005J OILFIELD SERVICES LLC TRUCKER CONTRACTOR 2 1.50 3.00CRESCENT SERVICES OTHER CONTRACTOR 2 4.00 8.00Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/22/2014Report #: 111Actual Days: 102.38

Page 1/1

UNIVERSITY BL 7132H

Report Printed: 3/23/2014

178.Daily Partner Report

Well InfoAPI / UWI4238338277

Region / DivisionPERMIAN

DistrictPERMIAN UNCONVENTIONAL

Field NameSPRABERRY TRENDAREA

Original Spud Date8/18/2013

CountyREAGAN

State/ProvinceTEXAS

Original KB/RT Elevation (ft)2,845.00

Ground Elevation (ft)2,829.00

Job SummaryJob CategoryCOMPLETIONS

Last Casing StringProduction1, 16,003.7ftKB

AFE Dur Total (days) Total AFE (Cost)7,300,079.40

Cumulative Cost (Cost)8,584,104.52

Daily Ops SummaryRig (Names)KEY ENERGY SERVICES KEY 6051

WellboreSidetrack 1

End Depth (ftKB)0.0

Depth Progress (ft) Daily Cost Total (Cost)6,120.00

WeatherCOLD AND WINDY

Hole Condition Drilling Hours (hr) Avg ROP (ft/hr) Cum TL Days from Spud (&103.38

Ops and Depth @ Morning ReportWELL SHUT INLast 24hr SummaryMOVED OUT ALL EQUIPMENT24hr ForecastTURN OVER TO PRODUCTIONTime Log

Start Time End Time Dur (hr) Phase Op CodeActivityCode

TimeP-T-X

Start Depth(ftKB)

End Depth(ftKB) Operation

06:00 10:00 4.00 COMPZN

RPCOMP SIPB P SHUT IN NO ACTIVITY

10:00 16:00 6.00 COMPZN

RPCOMP RURD P MOVING OUT EQUIPMENT

16:00 06:00 14.00 COMPZN

RPCOMP SIPB P SHUT IN NO ACTIVITY

Head Count / ManhoursCompany Function Personnel Type Count Time (hr) Tot Work Time (hr)

SIERRA ENGINEERING ONSITE SUPERVISOR CONTRACTOR 1 8.00 8.00TSC SAFETY PERSONNEL CONTRACTOR 1 8.00 8.00SIGNA ENGINEERING OTHER CONTRACTOR 1 8.00 8.00EDGE OILFIELD SERVICE OTHER CONTRACTOR 2 2.00 4.00SHALE TRUCKING TRUCKER CONTRACTOR 4 1.50 6.00NABORS TRUCKER CONTRACTOR 1 0.50 0.50Drilling Parameters

Start (ftKB) End Depth (ftKB) Cum Depth (ft)Drilling Time

(hr)Sliding Time

(hr) Int ROP (ft/hr)Flow Rate

(gpm) (gpm) WOB (1000lbf)RPM(rpm) SPP (psi) Drill Tq TFO (°) dP (SPP) (psi)

Casing Strings

Csg Des OD (in) Set Depth (ftKB) Top (ftKB) Run Date Drift Min (in) Wt/Len (lb/ft) P LeakOff (psi)Dens Fluid

(lb/gal)Conductor 20 99.0 16.0 7/24/2013 65.00Surface 13 3/8 1,034.5 16.0 8/18/2013 54.50 686.3 12.58Intermediate1 9 5/8 4,675.0 16.0 8/22/2013 40.00 2,826.1 11.49Production1 5 1/2 16,003.7 16.0 9/24/2013 17.00

Report Date: 3/23/2014Report #: 112Actual Days: 103.38