18wrtt delivery - the pathway re-engineering challenge
DESCRIPTION
18wRTT Delivery - The Pathway Re-engineering Challenge. Denis Gizzi. Measuring V Delivering. The most defined measurement system will still only quantify a business process. RTT end-to-end stage recording, tracking & reporting is priceless, - PowerPoint PPT PresentationTRANSCRIPT
Measuring V Delivering
The most defined measurement system will still only quantify a business process.
RTT end-to-end stage recording, tracking & reporting is priceless,
BUT WON’T ,ON IT’S OWN, DELIVER AN 18 WEEK TOTAL CARE PATHWAY EXPERIENCE FOR PATIENTS
Learning So Far (re stage 1)local pioneer work
• Engineering is not difficult – culture change is• 18 week delivery is higher on the commissioner radar• Pragmatic & basic data collection systems are possible• Don’t assume basic systems are in place (e.g. clinic outcomes)• Easier to make changes where systems are owned• Commissioner should drive data specification• Sufficient knowledge in the system to drive through objectives• Diagnostic end-to-end stage measurement is critical• Define generic outcome collection 1st rather than consult• RTT for ICATS/T2 segment of pathway presented NO material problem• Interim IT solutions will have to suffice (until CFH delivers)• Variable understanding of 18wRTT & how fits with broader reform• Clinical engagement (or lack of) is an overused excuse for poor business planning
Learning So Far (re stage 1)Wider Pioneers
• Focus on business process change (define our data)• Get ready for the commissioner challenge (is this defined?)• Technical system change is not feasible (i.e. through PAS)• Easier to make changes because we own the process & system• Very little commissioner participation in RTT measurement• Diagnostic end-to-end stage measurement is critical• Defining generic outcome collection sheets is easy, getting consultants to use
it isn’t• Interim IT solutions will have to suffice (until CFH delivers)• Variable understanding of 18wRTT & fit with broader system and policy reform• Reconciling tactical RTT measures with core business systems is challenging!• Supporting reform products (e.g. ICATS) & wider alignments is vague
Commissioner led Pioneer – the specific challenges
• The PCT does not own or have defined operational knowledge of hospital PAS systems.
• We do not have a direct management relationship with hospital clinicians who are faced with 18wRTT changes.
• Commissioning & contractual levers for change require greater definition.
• Aligning reform programmes with 18wRTT requirements & keep the financial plates spinning in sequence.
• Raising the profile of WIP (re 18wRTT) to the top of everyone's agenda.
• Raising the bar – re Business Processes
• Programme spread throughout Economy
Driving 18wRTT Pathways – The Realisation
• The days of negotiating, cajoling, modernising to improve outcomes has come to an end?
• Specifications & agreed systematic pathways will drive lean outcomes
• Commissioning levers & incentives are critical (harvest local clinical knowledge & capacity) + expect financial penalties
• Drive continuous improvement via market management
• Systemising care processes, moving away from variation & disparate decision management for 80% of care processes.
• Disciplined (objective based) decision management (at each–to-end stage) is critical
The challenge of 18 weeks
The NHS needs to continue to reduce waits to first assessment and from decision to treat to treatment. This will require more activity and reform than ever before. In addition
the NHS needs to focus on the time from first assessment to decision to treat which historically has not been a major focus.
GP IPOP D OP
18 Weeks
GP Visit1st OutpatientAppointment
Decision to treat
Treatment
The time from the first (assessment) outpatient to decision to treat includes the most significant challenges including all diagnostics and
subsequent outpatients
Generic Pathway to be managed – Adapted from (DOH) model
GPCAS
Assessment
CAS Diagnostics
CAS Referral
1stOP
CAS Treatment
Diagnostics2ndOP
DTA1stIP
Treatment in OP
On bookedlist
• Commissioners need to drive delivery across this entire pathway
• Re-define the key stages along the pathway that PCTs need to monitor
• Standard thresholds & accountabilities at each stage to reduce variation
• ICATS / CASs (or equivalent) must be lean & deliver VFM & BR
• So what sort of business intelligence systems are required to enable this?
Knowledge System Challenge for Pathways
The 3 essential components
High Level - Strategic Consumer FacingReal Time -
Operational (WIP)
Enabling High-Level Performance Reporting
By Provider & Specialty (inc ICATS, IS Diag)
By HRG / Procedure Pathway
(inc ICATS, CAS)
CPA & Optimisation Reports
Enabling Dynamic / Real Time WIP Review
By Provider & Specialty (inc ICATS, IS Diag)
Aligned & Integrated BIS Solutions
CAB-CAS-OP-Diag-Therapies-Surgery-Financial & Output
Reporting
The focus for continuous improvementUnique tagging & tracking – Know the
Work in Progress (WIP) at any point in time
Enabling the Informed Service
User
100% planned, ordered, timed &
structured 18wRTT journey
Care Pathway Management (CPM) – Objectives
Defining the High-Level Objectives
• Remove variability in consumer experience
• All consumers have a structured and ordered care experience
• Accountabilities are described for each step within the pathway
• Resources are available at each step of the pathway
• Fixed standards (performance & outcomes & metrics) are clearly described
• 18w pathways are policy compatible & deliver value for money
• All 18w service providers work to a common set of standards
• Consumers and clinicians as equal partners in pathway design
Care Pathway Management (CPM) – Outputs
Defining the Core Outputs
• All consumers complete their RTT experience within 18weeks
• All consumers feel empowered and informed
• All CPM navigators (e.g. GPs) feel empowered and informed
• Zero consumer complaints concerning RTT experience
• Financial aspects of 18wRTT Care Pathways are described, structured, agreed and reportable.
• Performance of 18wRTT Care pathways is measurable and reportable.
• Standards for 18wRTT Care Pathways are stated, agreed, costed & reported
Our Approach in Oldham Commissioner Led - Lean Pathway Engineering
8 Stage Process
1. RTT Measurement Systems (define the Work in Progress)2. Systematically analyse all (18wRTT) pathways & inefficiencies3. Engineer-out the sub optimal / non value adding aspects4. Re-define the optimal pathway (cement the lean process)5. Specify the optimal pathway as the (commissioners) product
requirement6. Procure the product to the specified quality & capacity standards (via
the market & commercial processes)7. Performance manage (know the WIP & expected outcomes)and
assure delivery8. Continuous improvement (re-engineer the variations)
Our Approach in Oldham Commissioner Led - Lean Pathway Engineering
The Plan
1. Assess baseline current RTT performance for top 13 specialties2. Select top 25 high volume symptom / procedure pathways3. Undertake research on well-grounded pathway for each4. Undertake clinical consultation regarding efficiencies5. Overlay generic 18wRTT commissioning standard6. Describe standards to provider market (inc plural pathways)7. Undertake real capacity planning to ensure financial & PH probity8. Gauge views from clinical “firms” regarding their views on
opportunities9. Cement pathway maps into local prospectus & contracting regimes
Commissioning Pathways Summary
Risks & Challenges
• RTT tactical measurement solutions (for all 18w pathways) are required now.
• Work within clinical partnerships to re-engineer systems now.
• No slack time in the system (strategic IT solution won’t deliver in time)
• Assurance systems – embryonic at best (trust professional knowledge)
• RTT & data systems – specified for each pathway deliverer
Next Steps
• DSCN compliant processes
• Real demand & capacity planning
• 18wRTT systematic pathway reviews
• Capacity & Specialty engineering
• Specifications & Commissioning
• Performance & tracking & Incentives
• Clinical ownership of pathway maps
• Disciplined thinking, planning & operational execution (J.Coultard HSJ 29/06/06)
PTL & the Commissioner
Has to add value Has to be deliverable (with little or no added investment) Has to be accurate & timely Can not be merely Old School WL systems Has to be core product within business cycle Applies to all segments in the supply chain
Is critical to market management, therefore has to be a dynamic & timely product with correct design features
Capacity= what we could
do
Traditional Elective System
Activity = what we did
Demand = All requestsfor a service
= what we should do
Waiting list, queue= what we should have done
Not enough attention, therefore ill defined, variable & unregulated
PTLs are fixed points in systems (OP & IPE) – Risk of breach is mitigated by supply chain data
capture
Waiting list is a tool used to store WIP until a ‘do something critical’
point’ is reached.
Core business planning for service operators – should commissioners
describe it for them?
PTLs convert to activities – but little commissioner input &
insufficient assurance
Capacity= defined turnaround
requirement
Care Pathway Management Approach
Activity = what we planned to
undertake
Demand = All requests
Meet defined standards & are UBRN controlled
Scheduled & Organised Assessment Control= Available Diagnostics & Measured Outputs (RTT)+ Alignments to physical (community) resources
For PCT & PBC Partners to define, reduce variability.
PBC to determine regulatory (governance) framework
The commissioner should determine & direct “what should
be done” via specifications & commercial rigour
Waiting list is obsoleteScheduling & segmentation &
tracking is the keyPTL Control is critical!!How are we assured?
Core business planning for service operators – commissioners should
define a slot based procurement model
This should align with commissioner specification & assurance processes (PTLs)
Real Capacity Plans & tracking & assurance
process (PTLs)
18wRTT – Pathway & PTL
GPCAS
Assessment
CAS Diagnostics
CAS definitive decision
Consent & Pre-op
CAS Treatment
Booked theatre slot TCI
Action Discharge &
Charge
Via CAB & UBRN generated
Total End-End Stage has defined parameters
Total End-to-End Stage has defined parameters
These stages will require significant culture change
Non Admitted PTL
Admitted Pathway PTL
RED = Do something significant points
PTL Principles – For Commissioners
The Basics Rules for assessment control have to be set Rules for differentiating Admitted V Non Admitted Rules for Clinical outcome (decision recording) No patient added to list without booked TCI slot Trigger “assurance” points defined for each Standard Data collection items defined Patients enter APP after DSCP is reached (not before) Core business processing “cemented” in SLAs Shared customer & supply chain knowledge system
Generic 18wRTT Pathway Commissioning Template
Decision Threshold•Define minimum referral management standards •Define minimum work-up (the diagnostic pack)•UBRN based ordering •Slot based capacity matching
Via Clinical Partnership agreementsIncluding internally generated demand (con-to-con)
(led by PBC)
Assessment Control•Agreed set of pathways •Defined set of diagnostic capacity•Objective based decision management•Lean process management & UBRN based ordering•Time defined outputs•Integrated pathway management (direct listing)•Contractual performance metrics, incentives & penalties
Re-engineered services and/or re-procured Outpatient as
ICATS(outputs within 4 weeks average
6 weeks maximum)+ RTT recording & PTL tracking
Decision to Treat & Action•Define minimum direct listing standards •Define minimum work-up (1st & 2nd line diagnostic pack)•UBRN based ordering •Slot based capacity matching•Contractual performance metrics, incentives & penalties
Consistent standards for all providers
(outputs within 9 week average 14 week maximum)
+ RTT recording & PTL tracking
Capacity m
aps for each delivery component &
stage
RTT CLOCK STARTS
Provider Choice & Dynamic Market Management
Driving Faster Reform via Standardised (transferable) Processes
Weekly 18 week PTL
xxxxxxxxxx Primary Care Trust
Reporting period is as at midnight on (Sunday)Collected
number of patients who (from UBRN) will breach 3 days clinical triage standard if not dated & cleared in 24 hours
number of patients who (from UBRN) will breach 1st clinical assessment (14 day standard) if not dated & cleared within 5 days
number of patients who (from UBRN) will breach diagnostic clearance stage (30 days from UBRN) if not dated, reported and cleared within 5 days.number of patients who will breach assessment control total stage clearance time (42 days from UBRN) if not dated seen and cleared within 5 days.- DO SOMETHING SIGNIFICANT STAGEnumber of patients listed for 1st definitive treatment (within CATS) who will breach CATS standard (56 days from UBRN) if not dated & cleared within 5 days
Number of patients who will breach target in 29-42 days who do not have a TCI date within the target timeNumber of patients who will breach target in 15-28 days who do not have a TCI date within the target timeNumber of patients who will breach target in 1-14 days who do not have a TCI date within the target timeNumber of patients treated within the last 7 days who were not treated within 18 weeks of referralNumber of patients treated within the last 7 days who were treated within 18 weeks of referralTotal number of patients whose breach date has already passed
Number of patients who passed their breach date within the last 7 days
Commentary
LDP trajectory for Non-Admitted
LDP trajectory for Admitted
Number of clock starts (Weekly figure could be estimated from monthly RTT return)
18 WEEK - WEEKLY PTL - PATI ENTS WI THOUT A DECI SI ON TO ADMI T (within assessment control)
18 WEEK - WEEKLY PTL - PATI ENTS WI TH A DECI SI ON TO ADMI T (convert DTT & Action)
Reference Data
PTL sounds OK – the catch!
PCTs can’t own PTL production PTLs act as assurance / mitigation / tactical tools Supply chain owns WIP & therefore PTLs Model contracting for PTL production & access DSS = do something significant = triggers Currently no reference spine for UBRN across path PCT charged with assurance & customer navigation PTLs need careful specification & production What would PCTs do with them & how often?