1910 & 1916 boren ave final documentation

45
1910 & 1916 BOREN AVE PROJECT CITY OF SEATTLE REQUIRED EARLY COMMUNITY OUTREACH FOR DESIGN REVIEW OUTREACH DOCUMENTATION *With Updated Requirements Via Ordinance #126072 PROJECT NUMBER: #003819-21PA Table of Contents 1. Brief Summary of Outreach Methods and What We Heard from the Community 2. Detailed Checklist of Early Community Outreach for Design Review 3. Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted Initial Planning and DON Communication Listing on DON Blog Outreach Plan w/ equity requirements Printed Outreach: Direct Mail Project Poster Direct Mailing Distribution List List of Community Groups who Received Poster via Email Electronic/Digital Outreach: Project Website Website Content Website Traffic Electronic/Digital Outreach: Project Survey Community Feedback Summary Online Survey Text Online Survey Results Additional Emails/Comments Received Submitted by: Natalie Quick Consulting [email protected]| 206.779.0489 JULY 2021

Upload: others

Post on 16-Apr-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 BOREN AVE PROJECT

CITY OF SEATTLE REQUIRED EARLY COMMUNITY OUTREACH FOR DESIGN REVIEW

OUTREACH DOCUMENTATION *With Updated Requirements Via Ordinance #126072

PROJECT NUMBER: #003819-21PA

Table of Contents 1. Brief Summary of Outreach Methods and What We Heard from the Community 2. Detailed Checklist of Early Community Outreach for Design Review 3. Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted Initial Planning and DON Communication

• Listing on DON Blog • Outreach Plan w/ equity requirements

Printed Outreach: Direct Mail • Project Poster • Direct Mailing Distribution List • List of Community Groups who Received Poster via Email

Electronic/Digital Outreach: Project Website • Website Content • Website Traffic

Electronic/Digital Outreach: Project Survey • Community Feedback Summary • Online Survey Text • Online Survey Results • Additional Emails/Comments Received

Submitted by: Natalie Quick Consulting [email protected]| 206.779.0489 JULY 2021

Page 2: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project

Brief Summary of Outreach Methods and What We Heard from the Community

Project Address: 1910 & 1916 Boren Ave, Seattle, WA 98101 Brief Description: This project proposes construction of a new ten-to-eleven-story office building

with ground-level retail and below-grade parking. Contact: Natalie Quick Applicant: TC Northwest Development Inc Contact Information: [email protected] Type of building: Commercial Neighborhood: Denny Triangle In Equity Area: Yes

Brief Summary of Outreach Methods

Printed Outreach

• Choice: DIRECT MAILING, HIGH IMPACT • Requirement: Direct mailing to all residences and businesses within approximately 500-foot radius of the

proposed site. • What we did: Posters were mailed to 707 residences and businesses and shared with 16 neighborhood

community groups. Poster, details on distribution and list of community groups who received the poster via email are in Appendix A.

• Date completed: June 17th, 2021 Electronic/Digital Outreach

• Choice: PROJECT WEBSITE, HIGH IMPACT • Requirement: Interactive project website with public commenting function. • What we did: Project website established and publicized via poster. Monitored daily for comments from

the Website. Developed an interactive project website with project information and a public commenting function. Website included in Appendix A.

• Date Completed: June 17th, 2021

Electronic/Digital Outreach • Choice: SURVEY, HIGH IMPACT • Requirement: Create an online survey to allow for feedback on the proposed project. • What we did: Online survey established and publicized via poster with link to survey featured on project

website. Survey text and results included in Appendix A. • Date Completed: June 17th, 2021

Page 3: 1910 & 1916 Boren Ave FINAL Documentation

What We Heard From the Community

Summary of Comments/Questions Received Via Website Comment Form, Project Email and Project Survey: Design-Related Comments • Design. 80 percent of survey respondents noted environmentally friendly features were most important about

the design of a new building on this property; 60 percent said interesting and unique design; 40 percent said relationship to neighborhood character; 40 percent said parking; and 20 percent said attractive materials.

• Exterior. 100 percent of survey respondents said landscaping was the most important consideration for the exterior space of the property; 80 percent said seating options and places to congregate; and 60 percent said lighting and safety features. One respondent noted that the neighborhood lacks green spaces, and another suggested having open, creative spaces where non-employees can congregate for free and including interesting art for passersby to see.

Non-Design-Related Comments • Retail. When asked what retail components survey respondents were most interested in for this location, 100

percent said new restaurants or bars; 50 percent said new places for coffee or breakfast; and 25 percent said new stores for shopping. When asked what most inspires them to return when visiting a building, office, restaurant or retailer, 100 percent of survey respondents said great people and service; 100 percent said thoughtful design that is open and welcoming; 80 percent said a sense of openness and natural light; 60 percent said local businesses and small businesses; 20 percent said bustling, exciting energy; 20 percent said color and materials used in design; and 20 percent said calm, restful places to rest and relax. One respondent encouraged considering the whole community when planning and having a local, economically inclusive place for food and beverages since not everyone in the area is making six figures. Other respondents encouraged having small, local, interesting businesses at ground level such as a grocery collective / co-op or art gallery and offering retail that serves a real need. Another respondent noted the neighborhood needs more vegan restaurants.

• Impacts. One respondent encouraged the project team to consider appropriate hours for construction, as noise pollution is a real thing, and it is not possible to sleep in past 7:30 a.m. without disruption.

• Affordability. One respondent noted that affordable housing is needed instead of offices. • Traffic. One respondent encouraged the removal of cars and growth of pedestrian-only streets and bike lanes.

Miscellaneous • Oppose. A few respondents suggested that building downtown be stopped, as the history of what makes the

city unique is being torn down and there are plenty of empty buildings that can be reused as offices. • Support. One respondent expressed support for the project and tearing down the existing building as they

have witnessed many criminal acts on the property, and a new office building would be a welcome sight. • Outreach. Another respondent thanked the project team for asking the community for input.

Page 4: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Checklist: Early Community Outreach for Design Review

DON Rule Category Description Date

Completed Task Documentation

I.C. Project Information, Public Notice

Submit project information to DON, DON posts information online or other publicly available place

06/12/21 Provided project information via email to DON staff; DON staff confirmed the information was posted on DON blog. Email confirmation included in Appendix A.

I.D. II. A. 1

Types of Outreach Outreach Methods for the Plan

CHOICE: High Impact Direct mailing to all residences and businesses within approximately 500-ft radius of the proposed site Posters include all requirements in III.A

06/17/21 Poster mailed to 707 residences and businesses and shared with 16 neighborhood community groups. Map and details of mailing are in Appendix A.

I.D. II.A.2

Types of Outreach Outreach Methods for the Plan

CHOICE: High Impact Interactive project website with public commenting function.

06/17/21 Project website established and publicized via poster. Monitored daily for comments from the Website. Developed an interactive project website with project information and a public commenting function. Website included in Appendix A.

I.D. II.A.3

Types of Outreach Outreach Methods for the Plan

CHOICE: High Impact Online survey

06/17/21 Online survey established and publicized via poster with link to survey featured on the project website.

III.A. Printed All printed outreach materials shall: • Include a brief summary of the

proposal • Include the address of the

project/property and the SDCJ number if available

• Identify a project contact person • Provide an email address, survey

link, phone number or alternative way of providing feedback on the project directly to the applicant

• Include where any additional project information can be found (such as the Seattle Services Portal)

• Include a statement informing the public that any information collected may be made public

06/17/21 Copy of direct mailing poster included in Appendix A.

III.B. Electronic, Digital

All electronic/digital outreach material shall:

06/17/21- 07/08/21

Survey and project website established. Checked for comments

Page 5: 1910 & 1916 Boren Ave FINAL Documentation

• Include a brief summary of the proposal

• Include the address of the project/property and SDCK project number if available

• Identify a project contact person • Provide an email address, survey

link, phone number or alternative way of providing feedback on the project directly to the applicant

• Include where any additional project information can be found (such as the Seattle Services Portal)

• Be publicized on at least one printed outreach method

• Be publicly available for a minimum of 21 days

• Include a statement informing the public that any information collected may be made public

daily. Website content and survey results featured in Appendix A.

VI.A.1.

Outreach Documentation

Summary 07/08/21 Outreach Plan copy included in Appendix A.

VI.A.2. Outreach Documentation

Printed Material Documentation 07/08/21 See notation above for Print Outreach. Copies of poster and mailer distribution map to 707 residents and businesses included in Appendix A.

VI.A.3. Outreach Documentation

Digital Documentation 07/08/21 See notation above for Digital Outreach. Website content and survey results included in Appendix A.

Page 6: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project

Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted

Table of Contents Initial Planning and DON Communication

• Listing on DON Blog • Outreach Plan

Printed Outreach: Project Poster • Project Poster • Poster Distribution Details • List of Community Groups who Received Poster via Email

Electronic/Digital Outreach: Project Website • Website Content • Website Traffic

Electronic/Digital Outreach: Project Survey • Community Feedback Summary • Online Survey Text • Online Survey Results • Additional Emails/Comments Received

Page 7: 1910 & 1916 Boren Ave FINAL Documentation
Page 8: 1910 & 1916 Boren Ave FINAL Documentation

City of Seattle Design Review Required Outreach Outreach Plan | June 8th, 2021 Project Address: 1910 & 1916 Boren Ave, Seattle, WA 98101 Brief Description: This project proposes construction of a new ten-to-eleven-story office building

with ground-level retail and below-grade parking. Contact: Natalie Quick Applicant: TC Northwest Development Inc Contact Information: [email protected] Type of building: Commercial Neighborhood: Denny Triangle In Equity Area: Yes OUTREACH PLAN We will complete the following outreach components as part of our outreach plan, consistent with Section II.A in the Director’s Rule. All outreach methods will provide a disclaimer that information shared by the public may be made available to the general public. • Printed Outreach: Direct Mail

We will develop a full-color project poster and mail to residents and businesses within a 500-foot radius of the project. We will keep an address log of each location where the poster is sent. Posters will include SDCI project number, address and email address, as well as basic project information that directs interested parties to the project website and project survey. the project. We will keep an address log of each location where the poster is sent. Posters will include SDCI project number, address and email address, as well as basic project information that directs interested parties to the project website and project survey.

- The flyer will be translated into Vietnamese - The flyer will be translated into Chinese - The flyer will be translated into Spanish - In addition to community groups, we will email the flyer to a list of local community media

contacts provided by DON.

• Electronic / Digital Method #1: Website We will create a project website that includes a description of the project, details about the project team, details surrounding zoning, context and site map and relevant past projects completed by the project team. We will also include a link to the Seattle Services Portal, project email address and details about the overall timeline. A link to provide comments will be included on the site, along with a link to a project survey.

- The website will be translated into Vietnamese - The website will be translated in Chinese - The website will be translated into Spanish

• Electronic / Digital Method #2: Online Survey

We will create a brief project survey that is tailored to the project and includes opportunity to provide specific feedback about notable project and site components.

- The survey will be translated into Vietnamese - The survey will be translated in Chinese - The survey will be translated into Spanish

Page 9: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project

Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted

Table of Contents Initial Planning and DON Communication

• Listing on DON Blog • Outreach Plan

Printed Outreach: Direct Mail • Project Poster • Poster Distribution Details • List of Community Groups who Received Poster via Email

Electronic/Digital Outreach: Project Website • Website Content • Website Traffic

Electronic/Digital Outreach: Project Survey • Community Feedback Summary • Online Survey Text • Online Survey Results • Additional Emails/Comments Received

Page 10: 1910 & 1916 Boren Ave FINAL Documentation
Page 11: 1910 & 1916 Boren Ave FINAL Documentation
Page 12: 1910 & 1916 Boren Ave FINAL Documentation

Direct Mailing: 1910 & 1916 Boren Ave Project Poster Mailing Details

DISTRIBUTION DATE: June 17th, 2021

Project Address: 1910 & 1916 Boren Ave, Seattle, WA 98101 Brief Description: This project proposes construction of a new ten-to-eleven-story office building

with ground-level retail and below-grade parking. Contact: Natalie Quick Applicant: TC Northwest Development Inc Contact Information: [email protected] Type of building: Commercial Neighborhood: Denny Triangle In Equity Area: Yes

The project flyer was shared with 707 businesses and residents within a 500-foot radius of the project addresses of 1910 & 1916 Boren Ave. A map detailing the mailing radius and invoice confirming delivery follows.

MAILING MAP

Page 13: 1910 & 1916 Boren Ave FINAL Documentation

MAILING INVOICE

DATE INVOICE No. JOB No. CUSTOMER PO.

INVOICE38089

SOLD TO:

DESCRIPTION CHARGES

PAY THIS AMOUNT

SHIPPED TO:

Phoenix Mailing, LLC2647 39TH AVE W

Seattle WA 98199-3109Phone: 206-282-0188

Natalie Quick Consulting3847 76th Ave SeMercer Island WA 98040

EMAIL TO LISA KIDWELL

06/10/21 38089 21-3456

1910 & 1916 BOREN AVE 98101134.00  706

MAP AREA 500 FEET AROUND 1910 & 1916 BOREN AVE SEATTLE, WA 98101

ADD LISA KIDWELL'S ADDRESS

PURCHASE ONE TIME USE LIST

EMAIL MAP AND LIST TO CLIENT

Tax $13.53

$147.53

1.5% SERVICE CHARGE ON ALL ACCOUNTS OVER 30 DAYS PAST DUE

PRICES SUBJECT TO CHANGE WITHOUT NOTICENET 10TH OF FOLLOWING MONTH

Page 14: 1910 & 1916 Boren Ave FINAL Documentation

MAILING CONFIRMATION

Page 15: 1910 & 1916 Boren Ave FINAL Documentation

Community Group Notification: 1910 & 1916 Boren Ave Project

Poster E-Mailing Details E-MAILING DATE: June 18th, 2021

COMMUNITY GROUPS WHO RECEIVED PROJECT NOTIFICATION Notification of the 1910 & 1916 Boren Ave project was sent along with a copy of the project flyer to 16 community groups listed on the Department of Neighborhoods “Neighborhood Snapshot” for Denny Triangle on 06/18/21, including:

• Cascade Neighborhood Council • South Lake Union Community Council • South Lake Union Chamber of Commerce (SLU Chamber) • Downtown Seattle Association • Northwest Vietnamese News / Người Việt Tây Bắc • Phuong Dong Times • SBTN - Saigon Broadcasting Television Network • Saigon Bao • SBTN - Saigon Broadcasting Television Network • Conexion Contigo Radio • El Mundo • El Rey KKMO 1360 AM • AAT TV (Asian American TV) • Asia Today • China Press Weekly (Seattle) • Chinese Radio Seattle on KKNW 1150 AM Alternative Talk

Page 16: 1910 & 1916 Boren Ave FINAL Documentation

COMMUNITY GROUP NOTIFICATION EMAIL

Page 17: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project

Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted

Table of Contents Initial Planning and DON Communication

• Listing on DON Blog • Outreach Plan

Printed Outreach: Direct Mail • Project Poster • Poster Distribution Details • List of Community Groups who Received Poster via Email

Electronic/Digital Outreach: Project Website • Website Content • Website Traffic

Electronic/Digital Outreach: Project Survey • Community Feedback Summary • Online Survey Text • Online Survey Results • Additional Emails/Comments Received

Page 18: 1910 & 1916 Boren Ave FINAL Documentation

Project Website: 1910 & 1916 Boren Ave| WEBSITE TEXT Website: www.BorenAveProject.com

________________________________________________________________________________________

Project Address: 1910 & 1916 Boren Ave, Seattle, WA 98101 Brief Description: This project proposes construction of a new ten-to-eleven-story office building

with ground-level retail and below-grade parking. Contact: Natalie Quick Applicant: TC Northwest Development Inc Contact Information: [email protected] Type of building: Commercial Neighborhood: Denny Triangle In Equity Area: Yes _____________________________________________________________________________________________ HOME PAGE IMAGES: Project Site TEXT: Welcome to our Project Website, which is part of the City of Seattle’s Required

Outreach in advance of Design Review. While the project is in its early stages, the information on this site will give you a sense of the project vision, timelines and how we’re approaching design.

Please feel free to take the Project Survey and/or leave Comments. Note that all

information obtained will be part of the Documentation for this effort and is considered public comment.

This project proposes construction of a new ten-to-eleven-story office building with

ground-level retail and below-grade parking.

Contact us. This outreach is part of the City of Seattle’s required outreach process, in advance of Design Review. Note that all calls and emails are generally returned within 2-3 business days and are subject to City of Seattle public disclosure.

1910 & 1916 Boren Ave Project

1910 & 1916 Boren Ave, Seattle WA 98101 LINKS: Email- [email protected] TAB: PROJECT OVERVIEW TEXT: 1910 & 1916 Boren Ave Project

This outreach is part of the City of Seattle’s required outreach for design review, June 2021. Project# 003819-21PA

Page 19: 1910 & 1916 Boren Ave FINAL Documentation

Project Team: Developer: TC Northwest Development Inc & Trammell Crow Company Architect: Collins Woerman Project Timeline:

Permitting & Entitlement: Spring 2021-Winter 2023 Construction Starting: Fall 2023 Construction Completion: Winter 2024

Project Vision:

The 1916 Boren Ave S project proposes construction of a ten or eleven story building of approximately 255,000 square feet. Ground floor retail and amenities uses will front both Stewart Street and Boren Avenue and parking will be provided below grade with access from the alley. The scale and character of the building is envisioned to complement the other commercial structures in the neighborhood.

Zoning Site Context Site Plan Past Projects

IMAGES: Zoning

Site Context Site Plan Past Projects

LINK: none PAGE URL: www.BorenAveProject.com/project-overview TAB: FLYER TEXT: The flyer below was mailed to all households and businesses within a 500-foot radius of

the project site. IMAGES: Flyer Image LINK: none PAGE URL: www.BorenAveProject.com/flyer

Page 20: 1910 & 1916 Boren Ave FINAL Documentation

TAB: SURVEY TEXT: Survey. Take our online survey to share your thoughts about the project site and

components. LINK: 1910 & 1916 Boren Ave Project Survey Click Here PAGE URL: www.BorenAveProject.com/survey TAB: COMMENTS TEXT: Provide comments here.

Hello and thank you for visiting our 1910 & 1916 Boren Ave Project Required Outreach page. Please feel free to leave your comments here. All comments will be documented and submitted to the city as part of this process and are considered public comment.

LINKS: Email- [email protected] PAGE URL: www.BorenAveProject.com/comments

Page 21: 1910 & 1916 Boren Ave FINAL Documentation

WEBSITE IMAGES

Welcome to our Project Website, which is part of the City of Seattle’s Required Outreach in advance of Design Review. While the project is in its early stages, the information on this site will give you a sense of the project vision, timelines and how we’re approaching design.

Bienvenido a la página web de nuestro Proyecto, la cual es parte de la investigación requerida por la ciudad de Seattle para continuar a la Revisión del Diseño. Mientras el proyecto está en sus primeras etapas, la información en esta página le dará un sentido de la visión general del proyecto, los plazos y cómo avanzamos con el diseño

欢迎使用我们的项目网站,本网站是西雅图市要求在设计评审之前的推广活动的一部分。虽然该项目尚处于初期阶段,但这网站上的信息将有助您了解该项目的展望,时间表和我们进行设计的方式

Chào mừng bạn đến với Trang web Dự án của chúng tôi, đây là một phần của Chương trình Thu thập ý kiến theo qui định của Thành phố Seattle trước khi Duyệt xét Thiết kế. Mặc dù dự án đang trong giai đoạn đầu, thông tin trên trang web này sẽ cho bạn biết về tầm nhìn, tiến trình dự án và cách chúng tôi đang tiếp cận thiết kế.

Please feel free to take the Project Survey and/or leave Comments. Note that all information obtained will be part of the Documentation for this effort and is considered public comment. 

Por favor siéntase libre de tomar la Encuesta del Proyecto y/o dejar comentarios. Tenga en cuenta que toda la información obtenida será parte de la documentación de este esfuerzo y es considerada como comentario público.

请随时参与项目调查和/或发表评论。请注意,所获得的所有信息都将作为此工作的文档一部分,并被视为公众意见。

Xin vui lòng tham gia việc Khảo sát Dự án và / hoặc để lại Nhận xét. Lưu ý rằng tất cả thông tin thu được sẽ là một phần của Tài liệu cho nỗ lực này và được coi là bình luận công khai.

1910 & 1916 Boren Ave Project

Page 22: 1910 & 1916 Boren Ave FINAL Documentation

WEBSITE ANALYTICS

1910 & 1916 Boren Ave ProjectWebsite Analytics

Page 23: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project

Appendix A: Materials Demonstrating that Each Outreach Method Was Conducted

Table of Contents Initial Planning and DON Communication

• Listing on DON Blog • Outreach Plan

Printed Outreach: Project Poster • Project Poster • Mailing Area Map • Mailing Area Details • Direct Mailing Distribution List • List of Community Groups who Received Poster via Email

Electronic/Digital Outreach: Project Website • Website Content • Website Traffic

Electronic/Digital Outreach: Project Survey • Community Feedback Summary • Online Survey Text • Online Survey Results • Additional Emails/Comments Received

Page 24: 1910 & 1916 Boren Ave FINAL Documentation

Community Outreach: 1910 & 1916 Boren Ave Project

Comment Summary

Project Address: 1910 & 1916 Boren Ave, Seattle, WA 98101 Brief Description: This project proposes construction of a new ten-to-eleven-story office building

with ground-level retail and below-grade parking. Contact: Natalie Quick Applicant: TC Northwest Development Inc Contact Information: [email protected] Type of building: Commercial Neighborhood: Denny Triangle In Equity Area: Yes

Comment Total:

• From Website: 0 • From Email: 1 • From Survey: 5

Design-Related Comments • Design. 80 percent of survey respondents noted environmentally friendly features were most important about

the design of a new building on this property; 60 percent said interesting and unique design; 40 percent said relationship to neighborhood character; 40 percent said parking; and 20 percent said attractive materials.

• Exterior. 100 percent of survey respondents said landscaping was the most important consideration for the exterior space of the property; 80 percent said seating options and places to congregate; and 60 percent said lighting and safety features. One respondent noted that the neighborhood lacks green spaces, and another suggested having open, creative spaces where non-employees can congregate for free and including interesting art for passersby to see.

Non-Design-Related Comments • Retail. When asked what retail components survey respondents were most interested in for this location, 100

percent said new restaurants or bars; 50 percent said new places for coffee or breakfast; and 25 percent said new stores for shopping. When asked what most inspires them to return when visiting a building, office, restaurant or retailer, 100 percent of survey respondents said great people and service; 100 percent said thoughtful design that is open and welcoming; 80 percent said a sense of openness and natural light; 60 percent said local businesses and small businesses; 20 percent said bustling, exciting energy; 20 percent said color and materials used in design; and 20 percent said calm, restful places to rest and relax. One respondent encouraged considering the whole community when planning and having a local, economically inclusive place for food and beverages since not everyone in the area is making six figures. Other respondents encouraged having small, local, interesting businesses at ground level such as a grocery collective / co-op or art gallery and offering retail that serves a real need. Another respondent noted the neighborhood needs more vegan restaurants.

• Impacts. One respondent encouraged the project team to consider appropriate hours for construction, as noise pollution is a real thing, and it is not possible to sleep in past 7:30 a.m. without disruption.

• Affordability. One respondent noted that affordable housing is needed instead of offices. • Traffic. One respondent encouraged the removal of cars and growth of pedestrian-only streets and bike lanes.

Miscellaneous

Page 25: 1910 & 1916 Boren Ave FINAL Documentation

• Oppose. A few respondents suggested that building downtown be stopped, as the history of what makes the city unique is being torn down and there are plenty of empty buildings that can be reused as offices.

• Support. One respondent expressed support for the project and tearing down the existing building as they have witnessed many criminal acts on the property, and a new office building would be a welcome sight.

• Outreach. Another respondent thanked the project team for asking the community for input.

Page 26: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

Thank you for taking the time to complete our survey for the 1910 & 1916 Boren Ave project! This project proposes construction of a new ten- to eleven-story office building with ground-level retail and below-grade parking. We would like to hear your thoughts on our vision and

approach for this project.

This survey will be open from June 17th to July 8th, after which time we’ll start preparing for the design review process and other permitting steps. PLEASE NOTE: as part of the City of

Seattle's required outreach for design review, all data collected within this survey is considered public information according to the Public Records Act. Please do not share any sensitive or

personal information within your responses.

1. What is your connection to this development project?

___ I live very close to the project ___ I live in the general area ___ I own a business nearby ___ I visit the area often for work or leisure ___ I don’t have a direct connection, but I care about growth and development in Seattle ___ Other

2. What is most important to you about the design of a new building on this property?

___ Attractive Materials ___ Interesting & Unique Design ___ Environmentally-Friendly Features ___ Relationship to Neighborhood Character ___ Parking ___ Other ____________

3. What is most important consideration for the exterior space on this property?

Page 27: 1910 & 1916 Boren Ave FINAL Documentation

___ Landscaping ___ Lighting & Safety Features ___ Seating Options & Places to Congregate ___ Bike Parking ___ Other ____________

4. What retail components are you most interested in for this location?

___ New Stores for Shopping ___ New Places for Coffee or Breakfast ___ New Restaurants or Bars ___ Other ____________

5. When you visit a building, office, restaurant or retailer, what most inspires you to return? ___ Great people and service ___ Local businesses / small businesses ___ Thoughtful design that is open and welcoming ___ Bustling, exciting energy ___ Calm, restful places to reflect and relax ___ A sense of openness and natural light ___ Color and materials used in design ___ Other ____________

6. What do you value most as new developments are built in your neighborhood?

________________________________________________________________________

Page 28: 1910 & 1916 Boren Ave FINAL Documentation

7. Is there anything specific about this neighborhood or property that would be important for us to know?

________________________________________________________________________

8. What do you think are the top considerations for making this building successful?

________________________________________________________________________

9. Anything else you'd like to add?

________________________________________________________________________

FORM SUBMITTED PAGE Thank you for sharing thoughts! Your feedback is very helpful as we plan our proposed project. To track our progress through the design review and permitting process, look-up the project address (1910 & 1916 Boren Ave) in the Seattle Services Portal. To learn more about the early outreach for design review process, visit the Department of Neighborhoods webpage. You may also send us an email at [email protected].

Page 29: 1910 & 1916 Boren Ave FINAL Documentation

Khảo sát Dự án 1910 & 1916 Boren Ave Cảm ơn bạn đã dành thời gian hoàn thành bản khảo sát của chúng tôi về dự án 1910 & 1916 Boren Ave! Dự án này đề nghị xây dựng một tòa nhà văn phòng mới có 10 đến 11 tầng với tầng trệt là các cửa hàng bán lẻ và bãi đậu xe bên dưới. Chúng tôi muốn lắng nghe suy nghĩ của bạn về tầm nhìn và cách tiếp cận của chúng tôi về dự án này. Cuộc khảo sát này sẽ bắt đầu từ ngày XX đến ngày XX, sau thời gian đó, chúng tôi sẽ bắt đầu chuẩn bị cho quá trình duyệt xét thiết kế và các bước cấp phép khác. XIN LƯU Ý: theo qui định về hoạt động tiếp cận cần thiết của Thành phố Seattle để xem xét thiết kế, tất cả dữ liệu được thu thập trong cuộc khảo sát này được coi là thông tin công khai chiếu theo Đạo luật Hồ sơ Công cộng. Vui lòng không chia sẻ bất kỳ thông tin nhạy cảm hoặc thông tin cá nhân nào trong các câu trả lời của bạn. 1. Mối liên hệ của bạn với dự án phát triển này là gì? ___ Tôi sống rất gần dự án ___ Tôi sống ở khu vực chung ___ Tôi sở hữu một doanh nghiệp gần đây ___ Tôi thường đến khu vực này để làm việc hoặc giải trí ___ Tôi không có mối liên hệ trực tiếp, nhưng tôi quan tâm đến sự phát triển ở Seattle ___ Khác 2. Điều gì quan trọng nhất đối với bạn về việc thiết kế một tòa nhà mới trên khu đất này? ___ Vật liệu hấp dẫn ___ Thiết kế thú vị và độc đáo ___ Tính năng thân thiện với môi trường ___ Mối liên hệ với đặc điểm của khu vực chung quanh ___ Bãi đậu xe ___ Khác ____________ 3. Điều gì là quan trọng nhất đối với không gian bên ngoài của bất động sản này? ___ Cảnh quan ___ Tính năng chiếu sáng & biện pháp an toàn ___ Có chỗ ngồi & có địa điểm tụ tập ___ Bãi để xe đạp ___ Khác ____________ 4. Bạn quan tâm nhiều nhất đến các cửa hàng bán lẻ nào tại địa điểm này? ___ Cửa hàng mua sắm mới. ___ Địa điểm mới cho quán cà phê, điểm tâm. ___ Nhà hàng, quán bar mới. ___ Cửa hàng nào khác nữa ___________ 5. Khi bạn đến một tòa nhà văn phòng hay thương mại bán lẻ hoặc nhà hàng, điều gì chủ yếu nhất sẽ khiến bạn quay lại ?

Page 30: 1910 & 1916 Boren Ave FINAL Documentation

___ Địa điểm tuyệt vời và cung cách phục vụ ___ Các doanh nghiệp địa phương, doanh nghiệp nhỏ ___ Thiết kế sáng tạo lôi cuốn ___ Đông đúc, đầy sức sống ___ Yên tĩnh, nơi thư giãn nghỉ ngơi và trầm ngâm. ___ Tạo cảm giác rộng mở và chiếu sáng tự nhiên ___ Vật liệu và màu sắc dùng trong thiết kế ___ Điều gì khác nữa ____________________ 6. Bạn chú trọng điều gì nhất khi có một công trình xây dựng mới trong khu phố của bạn ? ______________________________________________________________________________ 7. Đối với bạn có điều gì đặc biệt về khu phố này hoặc về bất động sản mà bạn nghĩ rằng chúng tôi nên biết ? ______________________________________________________________________________ 8. Bạn nghĩ đâu là những cân nhắc hàng đầu để làm nên thành công của tòa nhà này? ________________________________________________________________________ 9. Bạn muốn thêm gì nữa không? ________________________________________________________________________ BIỂU MẪU ĐÃ ĐƯỢC DUYỆT Cảm ơn bạn đã chia sẻ suy nghĩ! Phản hồi của bạn rất hữu ích khi chúng tôi lập kế hoạch cho dự án đề xuất của mình. Để theo dõi tiến độ của chúng tôi thông qua quá trình đánh giá và cấp phép thiết kế, hãy tra cứu Dự án theo địa chỉ (1910 & 1916 Boren Ave) trên Cổng Thông tin Dịch vụ Seattle (Seattle Services Portal). Để tìm hiểu thêm về yêu cầu tiếp cận sớm cho qui trình duyệt xét thiết kế, hãy truy cập trang web của Department of Neighborhood. Bạn cũng có thể gửi email cho chúng tôi theo địa chỉ [email protected]

Page 31: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave项目调查

感谢您抽出宝贵的时间完成对 1910 & 1916 Boren Ave 项目的调查!本项目建议新建一栋有十至

十一层的办公楼,设有地面零售和地下停车场。我们希望听到您对我们对本项目的展望和发展的

想法。

这调查将于 XX 至 XX 期间开放。期间过后,我们将开始准备设计审核过程和相关许可证申请步

骤。请注意,作为西雅图市要求的设计审核推广的一部分,根据《公共记录法》,本调查收集的

所有数据均被视为公共信息。因此,请不要在您的回应中分享任何个人或敏感资料。

1. 您与此开发项目有什么联系?

___ 我住在这个项目附近

___ 我住在该地区

___ 我在附近拥有业务

___ 我经常去该地区工作或休闲

___ 我没有直接的联系,但我在乎西雅图的发展

___ 其他

2. 对您而言,在此物业上设计新建筑物最重要的是什么?

___ 有吸引力的材料

___ 有意思和独特的设计

___ 有环保功能

___ 与邻近特色的关系

Page 32: 1910 & 1916 Boren Ave FINAL Documentation

___ 停车处

___ 其他 ____________

3. 在此物业上的外部空间最重要的考虑因素是什么?

___ 美化环境

___ 照明与安全功能

___ 座位选择和聚会场所

___ 自行车停放处

___ 其他 ____________

4. 您对这个位置的哪些零售商店最感兴趣?

___ 新的购物商店

___ 有咖啡或早餐的新地方

___ 新餐厅或酒吧

___ 其他 ____________

5. 当您进入建筑物、办公室、餐厅或零售商店时,最能吸引您回来的是什么?

___ 很棒的人和服务

___ 本地企业 / 小型企业

___ 开放和欢迎式的细心设计

___ 繁华,令人兴奋的能量

___ 可以让人反思和放松的平静、宁静的地方

___ 开放感和自然光

___ 设计中使用的颜色和材料 ___ 其他 ____________

Page 33: 1910 & 1916 Boren Ave FINAL Documentation

6. 在您的社区新建房屋时,您最看重什么?

________________________________________________________________________

7. 有什么关于这个社区或物业的重要信息要我们知道吗?

________________________________________________________________________

8. 您认为使这座建筑物成功的首要考虑因素是什么?

________________________________________________________________________

9. 您还有其他意见吗?

________________________________________________________________________

表格提交页面

感谢您分享您的想法!在我们计划建议项目时,您的意见是非常有帮助的。要跟进我们设计审核

和相关许可证的申请进度,请在西雅图服务网站上搜索项目地址 (1910 & 1916 Boren Ave)。要

了解更多有关早期推广设计审查过程,请游览社区部门的网页。您也可以发送电子邮件到

[email protected]

Page 34: 1910 & 1916 Boren Ave FINAL Documentation

Encuesta Para el Proyecto 1910 & 1916 Boren Ave

Gracias por tomar el tiempo de completar nuestra encuesta sobre el proyecto 1910 & 1916 Boren Ave! Este proyecto propone la construcción de un nuevo edificio de oficinas de diez a

once pisos con el primer piso diseñado para uso comercial y con estacionamiento en el sótano. Nos gustaría escuchar su opinión sobre nuestra visión y enfoque para este proyecto.

Esta encuesta estará disponible desde 17 de junio hasta 8 de julio, después de ese tiempo,

comenzaremos a prepararnos para el proceso de revisión del diseño y otros pasos necesarios para obtener permisos de construcción. POR FAVOR TENGA EN CUENTA: Como parte del

proceso de investigación requerido por la Ciudad de Seattle para la revisión del diseño, todos los datos recopilados en esta encuesta se consideran información pública de acuerdo con la Ley de Registros Públicos. Por favor no comparta información confidencial o personal en sus

respuestas.

1. ¿Cuál es su conexión a este proyecto de desarrollo? a. Yo vivo muy cerca a la zona del proyecto b. Yo vivo en el área alrededor de la zona del proyecto c. Yo tengo un negocio cerca de esta zona d. Yo visito esta área regularmente por trabajo o durante mi tiempo libre e. No tengo una conexión directa, pero estoy atento al crecimiento y desarrollo en

Seattle f. Otro

2. ¿Qué es lo más importante para usted sobre el diseño de un nuevo edificio en esta

propiedad? a. Uso de materiales atractivos b. Un diseño único e interesante c. Características ecológicas d. Cómo encaja con la imagen del vecindario e. Estacionamiento f. Otro

3. ¿Cuál es la consideración más importante al crear los espacios exteriores?

a. El diseño del paisaje b. Características de iluminación y seguridad

Page 35: 1910 & 1916 Boren Ave FINAL Documentation

c. Áreas de descanso y lugares para congregarse d. Estacionamiento de bicicletas e. Otro

4. ¿Qué componentes comerciales le interesan más para esta ubicación?

a. Tiendas nuevas para comprar b. Nuevos lugares para tomar café o desayunar c. Nuevos restaurantes o bares d. Otro

5. Cuando visita un edificio, oficina, restaurante o tienda, ¿qué es lo que más lo inspira a

regresar? a. Personal amigable y buen servicio b. Negocios locales / Pequeños negocios c. Un diseño atento, abierto y acogedor. d. Un ambiente animado y emocionante e. Lugares de descanso que sean tranquilos para reflexionar y relajarse f. Un ambiente abierto con luz natural g. Los colores y materiales utilizados en el diseño h. Otro

6. ¿Qué es lo que más valora a medida que se construyen nuevos desarrollos en su

vecindario?

7. ¿Hay algo específico acerca de este vecindario o propiedad que es importante y deberíamos saber?

8. ¿Cuáles son las consideraciones más importantes que tenemos que tomar para que

este proyecto y edificio sean un éxito?

9. ¿Tiene algo más que le gustaría añadir? FORM SUBMITTED PAGE: ¡Muchas gracias por compartir sus opiniones! La información proveída será muy útil para planificar la propuesta de este proyecto. Para seguir nuestro progreso, desde revisión del diseño hasta los procesos de permiso, ingrese la dirección del proyecto (1910 & 1916 Boren Ave) en el Portal de Servicios de Seattle. Para averiguar más acerca de nuestras investigaciones iniciales para la revisión del diseño, visite la página web del Departamento de Vecindarios. También nos puede mandar un mensaje vía correo electrónico a [email protected].

Page 36: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

1 / 9

100.00% 5

0.00% 0

0.00% 0

20.00% 1

0.00% 0

Q1 What is your connection to this development project?Answered: 5 Skipped: 0

Total Respondents: 5

# OTHER (PLEASE SPECIFY) DATE

There are no responses.

I live veryclose to the...

I live in thegeneral area

I own abusiness nearby

I visit thearea often f...

I don’t have adirect...

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

ANSWER CHOICES RESPONSES

I live very close to the project

I live in the general area

I own a business nearby

I visit the area often for work or leisure

I don’t have a direct connection, but I follow growth and development in Seattle

Page 37: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

2 / 9

20.00% 1

60.00% 3

80.00% 4

40.00% 2

40.00% 2

Q2 What is most important to you about the design of a new building onthis property?Answered: 5 Skipped: 0

Total Respondents: 5

# OTHER (PLEASE SPECIFY) DATE

There are no responses.

AttractiveMaterials

Interesting &Unique Design

Environmentally-Friendly...

Relationshipto Neighborh...

Parking

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

ANSWER CHOICES RESPONSES

Attractive Materials

Interesting & Unique Design

Environmentally-Friendly Features

Relationship to Neighborhood Character

Parking

Page 38: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

3 / 9

100.00% 5

60.00% 3

80.00% 4

0.00% 0

Q3 What is most important consideration for the exterior space on thisproperty?

Answered: 5 Skipped: 0

Total Respondents: 5

# OTHER (PLEASE SPECIFY) DATE

There are no responses.

Landscaping

Lighting &Safety Features

SeatingOptions &...

Bike Parking

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

ANSWER CHOICES RESPONSES

Landscaping

Lighting & Safety Features

Seating Options & Places to Congregate

Bike Parking

Page 39: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

4 / 9

25.00% 1

50.00% 2

100.00% 4

Q4 What retail components are you most interested in for this location?Answered: 4 Skipped: 1

Total Respondents: 4

# OTHER (PLEASE SPECIFY) DATE

1 Grocery Collective/Co-op; art gallery; LOCAL, SMALL business (no chains or corps). 6/25/2021 7:48 PM

New Stores forShopping

New Places forCoffee or...

NewRestaurants ...

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

ANSWER CHOICES RESPONSES

New Stores for Shopping

New Places for Coffee or Breakfast

New Restaurants or Bars

Page 40: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

5 / 9

100.00% 5

60.00% 3

100.00% 5

20.00% 1

20.00% 1

80.00% 4

20.00% 1

Q5 When you visit a building, office, restaurant or retailer, what mostinspires you to return?

Answered: 5 Skipped: 0

Total Respondents: 5

# OTHER (PLEASE SPECIFY) DATE

1 Knowing they are doing something for the community 6/25/2021 7:48 PM

Great peopleand service

Localbusinesses /...

Thoughtfuldesign that ...

Bustling,exciting energy

Calm, restfulplaces to...

A sense ofopenness and...

Color andmaterials us...

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

ANSWER CHOICES RESPONSES

Great people and service

Local businesses / small businesses

Thoughtful design that is open and welcoming

Bustling, exciting energy

Calm, restful places to reflect and relax

A sense of openness and natural light

Color and materials used in design

Page 41: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

6 / 9

Q6 What do you value most as new developments are built in yourneighborhood?

Answered: 4 Skipped: 1

# RESPONSES DATE

1 Consideration of the people who actually live in the neighborhood, not just work in thebuildings. Offering places to sit even if you’re not an employee, some interesting art forpasserby’s to enjoy, or a local, economically inclusive place for food + beverages. Alfi’s waslocated on Stewart and Minor and closed this year, and it was in business for I think close to20 years, and while it wasn’t glamorous, it served a need. Not everyone in this area is making6figures, and I appreciate when the whole community is taken in to consideration whenplanning yet another big build like this one.

6/25/2021 7:48 PM

2 NOTHING. STOP BUILDING DOWNTOWN. It's awful living here & hearing construction noiseALL day. I do not appreciate tearing down the history of what makes this city unique, and thelack of affordable housing.

6/24/2021 4:19 PM

3 inclusion of greenery, natural elements, and places for people who live/work in theneighborhood to hangout

6/23/2021 9:47 AM

4 Removal of cars, growth of pedestrian only streets and bike lanes 6/21/2021 3:26 PM

Page 42: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

7 / 9

Q7 Is there anything specific about this neighborhood or property thatwould be important for us to know?

Answered: 4 Skipped: 1

# RESPONSES DATE

1 We’re already dealing with A LOT of construction in this area. I don’t get to sleep in past7:30am without disruption, and noise pollution is a real thing. Please consider appropriatehours for construction.

6/25/2021 7:48 PM

2 Yeah, don't build. We need affordable housing, not more offices. There are plenty of emptybuildings that can be reused as it is.

6/24/2021 4:19 PM

3 n/a 6/23/2021 9:47 AM

4 The neighborhood lacks green spaces 6/21/2021 3:26 PM

Page 43: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

8 / 9

Q8 What do you think are the top considerations for making this buildingsuccessful?

Answered: 3 Skipped: 2

# RESPONSES DATE

1 1) Keep the ENTIRE community in mind 2) Creative spaces for non-employees 3) Offer retailthat serves a real need

6/25/2021 7:48 PM

2 Not building it. But you're going to anyway. We need more vegan restaurants in thisneighborhood.

6/24/2021 4:19 PM

3 interesting retail space at the ground floor. 6/23/2021 9:47 AM

Page 44: 1910 & 1916 Boren Ave FINAL Documentation

1910 & 1916 Boren Ave Project Survey

9 / 9

Q9 Anything else you'd like to add?Answered: 3 Skipped: 2

# RESPONSES DATE

1 Thanks for asking the community for our input :) 6/25/2021 7:48 PM

2 stop building downtown. 6/24/2021 4:19 PM

3 Please consider designing open spaces where people can congregate for free (without payingfor a drink/food/holding up a table/etc)

6/21/2021 3:26 PM

Page 45: 1910 & 1916 Boren Ave FINAL Documentation

PROJECT EMAILS/COMMENTS

7/7/2021 Mail - Boren Ave Project - Outlook

https://outlook.office.com/mail/inbox/id/AAQkADk0ZThiMDE4LTQwNzgtNDBjOC04MDc4LTM2NzE0ODhhYjlmOQAQABEuFSsw4KNLhlUKybsU8x4%3D 1/1