1985 2012. system integration & wash pad design 1% slope on pad shallow trench minimal...

37
1985 2012

Upload: trever-eland

Post on 31-Mar-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

1985 2012

Page 2: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

System Integration &

Wash Pad Design

Page 3: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Wash Pad Design

1% Slope on Pad

Shallow Trench

Minimal underground water

Page 4: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Get the solids out...

• Filter with the wash pad– Everything dissolves in water.– Settled solids go anaerobic causing odors– Settled solids in a separator or pit collect more TPH,

Metals and COD making the disposal most costly.– Keep the solids from entering the system initially.– The less solids that enter the system, the less the user has

to remove from the system. LESS MAINTENANCE AND COST!!!!!

– Maintenance Instructions to the user is very important!!

Page 5: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Theory of Solids Separation

• Three Stage Separator– Capacity = 600 gallons

Page 6: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

True to Life Solids Separation

• Three Stage Separator– Capacity = 60 gallons

Page 7: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

True to Life Solids Separation

Although these separators work there are problems with their use.

• Sight unseen

• If in ground, the removal of solids becomes difficult so it wont be done.

• They harbor biological growth

Page 8: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Logistics

• Where are you?– Freeze potential– Rain patterns– Clay or Sand

• Covered or uncovered wash pad• Overflow to sanitary sewer or tank

Page 9: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

What are you washing & washing off?

• Sand, clay, heavily organic soils

• Sanitary waste equipment or leachate

• Grass/HIP’s

• Heavy grease/oil, solvents

• Fertilizer

• Tank wash outs

Page 10: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

System Basics

Gallons per minute Gallons per hour Gallons per day Hours per day demand Days per week demand Sanitary sewer availability Discharge or recycle

Page 11: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Analyze the Condition

Solids content Free oil Emulsified oils BOD/COD loading Heavy Metals Detergents & Cleaners

Page 12: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

System Design Driven By

Type of Application Budget restraints Available space Treated water goal Disposal options Maintenance demand

Page 13: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Site Evaluation Form

• It’s about communication

• It’s about buy-in (Customer Commitment)

• The beginning of the installation history

• Good planning

• Project guide

• Making the form do more for your project

Page 14: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Site Evaluation Form

• Electrical Requirements– Voltage

• 120, 208, 230, 460

– 1 or 3 phase– Amperage load

• Space• Flow rates• Usage level

Page 15: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Site Evaluation Form

• Chemicals– Lower water quality– Address application, now– Limit the number of chemicals used– Some uses may be eliminated

• Save money with conservation

• Discuss & note expected frequency of system cleaning and maintenance

Page 16: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Site Evaluation Form

• Learn from previous projects• Take your time with this step• Take digital photos• Typically this is rushed or skipped

Page 17: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Was Pad Design andApplications

Page 18: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Typical Side Trench Wash Pad

Page 19: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Typical Side Trench Wash Pad

Page 20: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Typical Heavy Equipment Wash Pad

Page 21: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Above Ground Wash Pads

9’ x 18’ 18’ x 18” Custom

Page 22: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Above Ground Wash Pad with WashMaster

Page 23: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Above Ground Wash Pad with WashMaster

Page 24: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Automobile Washing

WATCH OUT FOR ME!!!

Page 25: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Golf Course

Page 26: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Golf Course

Page 27: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Mining Camp Bio-Sorb

Page 28: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Marinas

Page 29: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Marinas

Page 30: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Heavy Equipment Rental

• Look for large volumes of solids /Chem– Design the wash pad to filter the solids– Look for chemicals that are used to keep

equipment clean during the rental period– Look at each location and inquire about where

the equipment is being rented to

Page 31: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Heavy Equipment Rental

Page 32: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Heavy Equipment Rental

Page 33: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Heavy Equipment De-mucking System

Page 34: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Solid Waste

• Look for large volumes of solids /Chem– Design the wash pad to filter the solids and

floatable trash– Look for chemicals that are used to keep

equipment clean– Heavy Biological Loading

Page 35: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Solid Waste

Page 36: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Solid Waste

Page 37: 1985 2012. System Integration & Wash Pad Design 1% Slope on Pad Shallow Trench Minimal underground water

Questions?