1c montlake lid
TRANSCRIPT
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 1/11
TOWARD A CONNECTED
MONTLAKE LID
Walking on Montlake Blvd
Bicycling on Montlake Blvd
Unsafe Underbridge Area
Connect to Neighborhood Greenways
Improve Regional Path UnderpassRethink East Montlake Lid
Connect Lid to East Montlake Park
Build Portage Bay Bridge Trail
Using drawings from WSDOT’s 2012 Community Design Process,
this document highlights failures and opportunities to connect the
Montlake Lid with neighborhoods, parks, light rail and UW.
An urban design review of Seattle’s SR-520 Replacement project
1
2
3
4
5
9 10
6
7
8
Unsafe Underbridge Area
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 2/11
TOWARD A CONNECTED MONTLAKE LID -- 1 -- WALKING ON MONTLAKE BLVD
1 LaneX-Walk
1 LaneX-Walk
4 LaneX-Walk
1 LaneX-Walk
4 LaneX-Walk
2 LaneX-Walk
4 LaneX-Walk
2 LaneX-Walk
5 LaneX-Walk
WestsideLanes to
Cross:
6
EastsideLanes toCross:
5
WestsideLanes to
Cross:
7
EastsideLanes to
Cross:
8
Vehicular
CapacityIncrease:
50%
2 LaneX-Walk
EXISTING MONTLAKE BLVD PROPOSED MONTLAKE BLVD
Biggerintersections,
more lanes to cross& increased trafficwill make walking
even more difficult.
Encourage walking
by providing safe,direct & traffic-
separated routes
The pedestrianenvironment of
Montlake Blvd isalready poor.
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 3/11
TOWARD A CONNECTED MONTLAKE LID
Larger intersectionscreate more conflicts for
bicycles in traffic.
Mixing pedestrians &bicycles on sidewalks
creates conflicts.
-- 2 -- BICYCLING ON MONTLAKE BLVD
EXISTING MONTLAKE BLVD
6 LaneBlvd
PROPOSED MONTLAKE BLVD
TrafficSignal
9 LaneBlvd
Expanded
Intersection
Additional
Intersection
VehicularCapacity
Increase:
50%
HOV Lanes createconflicts between
bikes & buses
Consider cycle tracks orother traffic-separated
routes for bicycles
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 4/11
TOWARD A CONNECTED MONTLAKE LID -- 3 -- EAST MONTLAKE UNDERBRIDGE AREA
65 Feet
280 Feet 10 Feet
Day
Evening
Use lids to make safe,direct and above-bridge
trail connections
Underbridge areasare low, dark &
potentially dangerous
Proposed East Shorelinewith Underbridge Trail
Existing East Shoreline(No Underbridge Access)
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 5/11
TOWARD A CONNECTED MONTLAKE LID -- 4 -- WEST MONTLAKE UNDERBRDGE AREA
Day Evening Evening
Use lids to make safe,direct and above-bridge
trail connections
Underbridge areasare low, dark &
potentially dangerous
Existing Bill Dawson Trail Proposed Bill Dawson Trail
85 Feet170 Feet
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 6/11
TOWARD A CONNECTED MONTLAKE LID -- 5 -- RETHINK REGIONAL PATH UNDERPASS
Widen tunnel to createseparate paths for bikes
& pedestrians.
Narrow tunnel will feelunsafe after dark.
Bicycles U-turnacross traffic
Fast moving bikeswill conflict with
pedestrians
Blind stair landingnext to tunnel
entrance.
Consider overpass option
to increase safety
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 7/11
TOWARD A CONNECTED MONTLAKE LID -- 6 -- RETHINK EAST MONTLAKE LID
Open space will feelisolated and unsafe.
Traffic lanes discourageaccess to park space.
Poor connection:Pedestrians andbicyclists must
cross ramp traffic.
Connect lid tostormwater park(see next page).
Consider ways tonaturally ventilate tunnel
& remove O&M facility.
Create multiplesmaller lids
for betterconnectivity.
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 8/11
TOWARD A CONNECTED MONTLAKE LID -- 7 -- CONNECT LID TO EAST MONTLAKE PARK
Connect lid tostormwater park
Integratestormwater pondand regional path
into a slopinglid wall.
Provide safe &direct connectionover the freeway.Out of
scale
Darkshadows
Createsbarrier
Reflectsnoise
40’ HighWall
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 9/11
TOWARD A CONNECTED MONTLAKE LID -- 8 -- CONNECT WITH NEIGHBORHOOD GREENWAYS
FOR SAFE & DIRECT PASSAGE OVER 520
... a safe, direct and trafficseparated path over 520.
Greenway ends without...
Existing bicycle route tobecome freeway access road.
YES! Connect with ArobretumNorth Entry Trail.
Existing Lake WashingtonBicycle Route
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 10/11
TOWARD A CONNECTED MONTLAKE LID -- 9 -- BUILD A PORTAGE BAY BRIDGE
REGIONAL TRAIL
Portage Bay Bridge Trailwould connect regional
greenways & neighborhoods.
SR-520 Regional Trail(under construction)
Easy climb upCapitol Hillencourages
walking & biking.
Connects UW,Capitol Hill &South LakeUnion urban
centers.
We are not adding a bikelane to a freeway,
we are adding freeway to abike lane.
Seattle Bike Master Plan - 2012 Draft
7/30/2019 1C Montlake Lid
http://slidepdf.com/reader/full/1c-montlake-lid 11/11
TOWARD A CONNECTED MONTLAKE LID -- 10 -- CONNECT PORTAGE BAY BRIDGE TRAIL
TO MONTLAKE BLVD
Connect Portage BayBridge Trail to...
...Montlake Playfield...Local Streets
Montlake Blvdsouthbound
Montlake Blvdnorthbound
Trail descends tounderbridge area...
...with arduous climb up toMontlake Blvd.