JUST IN TIME
Operational Systems for Manufacturing… JIT and Lean Production
![Page 2: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/2.jpg)
Informal review…
Work on this during class today. Thanks for your inputs…
![Page 3: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/3.jpg)
As a Manufacturing Leader...
You will play a critical role in the management and control of the companies critical information.
![Page 4: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/4.jpg)
The Problem of Manufacturing…
Getting the right material and physical resources together at the right place and at the right time to meet the customer’s requirements.
Desired features, On time delivery, High Quality, at the best price…
![Page 5: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/5.jpg)
Breaking down the problem…
Getting the material needed…Having enough inventory of material to support productionNot having too much inventory and extra costs…
![Page 6: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/6.jpg)
ROPEOQ
time
Inventory lead
time
demand (constant rate)
Economic Order Quantity and Reorder Point Planning Model
“saw tooth pattern”
A very limited model…
![Page 7: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/7.jpg)
Manufacturing and CIM Systems…
Where the action is!
![Page 8: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/8.jpg)
Background reading…
![Page 9: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/9.jpg)
JUST IN TIME:JUST IN TIME:
Only what is needed, nothing Only what is needed, nothing more...more... To have To have onlyonly the right materials, the right materials, parts and products in theparts and products in theright place at the right time.right place at the right time.
![Page 10: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/10.jpg)
THE SEVEN WASTESTHE SEVEN WASTES
from Shigeo Shingo in Robert W. Halls bookfrom Shigeo Shingo in Robert W. Halls bookAttaining Manufacturing ExcellenceAttaining Manufacturing Excellence, ,
19871987
Waste of over productionWaste of over production
Waste of waiting Waste of waiting
Waste of transportation Waste of transportation
Waste of processing itself Waste of processing itself
Waste of stocks Waste of stocks
Waste of motionWaste of motion
Waste of making defective Waste of making defective productsproducts
![Page 11: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/11.jpg)
Claims for JIT:Claims for JIT:
reduced inventoryreduced inventory
reduced WIPreduced WIP
shorter lead timesshorter lead times not too early, not to late...not too early, not to late...
JIT is the result businesses want, JIT is the result businesses want, not a starting pointnot a starting point
![Page 12: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/12.jpg)
What happens with JIT…What happens with JIT…
Eliminate non-value added activities Eliminate non-value added activities less time spent and less money spent...less time spent and less money spent...
Involve your suppliers and customersInvolve your suppliers and customers eliminate duplications, non value addded eliminate duplications, non value addded
activ.activ.
Shorter Set-up time and less WIP Shorter Set-up time and less WIP Faster through-put, less time, higher Faster through-put, less time, higher
qualityquality
![Page 13: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/13.jpg)
JIT Action Areas…
Develop peopleDevelop people - increase - increase skills,productivity, moraleskills,productivity, morale Eliminate waste in all areasEliminate waste in all areasOptimize mOptimize materials handling and aterials handling and production flowproduction flowControl Control ToolingToolingIncrease qualityIncrease qualityImprove continuously!Improve continuously!
![Page 14: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/14.jpg)
Develop the pipeline Develop the pipeline flow... then work to flow... then work to shorten it!shorten it!
Eliminate multiple locationsEliminate multiple locationsContract the plant layoutContract the plant layoutEliminate the "pipeline failures" Eliminate the "pipeline failures" ReliabilityReliability QualityQuality PeoplePeople
Reduce "changeover times” and “lot sizes" Reduce "changeover times” and “lot sizes" significantlysignificantlyUse "mind technology" before applying high Use "mind technology" before applying high technology!technology!
![Page 15: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/15.jpg)
Arvin Cell… with 6 operators
Bend Pipe and trim inlet end
Heat and form inlet end
Size and inspect/test
flange and product assembly
Weld flange brackets and assembly
Dimension check and leak test
![Page 16: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/16.jpg)
Traditional Production Line… 6 people
![Page 17: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/17.jpg)
First pass work cell design… 3 people
![Page 18: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/18.jpg)
Second try – work cell design – 1 person
![Page 19: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/19.jpg)
Floor SpaceReduction
nearly 50%
![Page 20: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/20.jpg)
Documented savings… Customer rejects reduced 95%
Scrap reduced 62%
Work in process reduced 91%
Changeover time reduced by 78%
Labor cost as % of sales reduced 41%
![Page 21: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/21.jpg)
The Name Game…
JITShort Cycle Mfg.Toyota Production SystemSynchronous Mfg.Lean Manufacturing Lean ProductionCommon Sense Mfg.
![Page 22: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/22.jpg)
The Vision of “Lean” in the USA
Perhaps best stated by James Womack, and Daniel Jones in two popular books…
First… The Machine That
Changed the World (1990)
![Page 23: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/23.jpg)
Unlocking the power of “Lean” requires more than just “tools”:
James Womack, and Daniel Jones second book…
Lean Thinking (1996)
![Page 24: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/24.jpg)
“Lean Thinking” presents…
An “Americanized” view of lean production Precisely specifying value by product Identifying the value stream for each product Making the value-creating steps flow without
interruptions Letting the customer “pull’ value from the
producer Pursuing perfection (continuously improving)
![Page 25: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/25.jpg)
Lean Production Challenges…
Developing beyond the “tools”…Inculcating the concepts and values of lean production into the fabric of an organization…Working to truly improve continuouslyExpanding lean efforts out to your customers and to all your suppliers
![Page 26: 1.JIT Solution (1)](https://reader030.vdocuments.net/reader030/viewer/2022032600/55cf92a0550346f57b982130/html5/thumbnails/26.jpg)
Lean Production can lead to lots of open questions…