1st Quarter Contractor Business Meeting. Facilities Session. March 9, 2012. Mike Kehoe. Plant Engineering. Agenda. Security Vendor Passes and Drive-in Tags – Natalie Joyner Camera Phones Contractor Crane Operations – Kehoe Lift Plans Contractor Crane Briefing - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 1st  Quarter  Contractor Business Meeting

1st Quarter Contractor Business Meeting

March 9, 2012

Mike KehoePlant Engineering

Facilities Session

Page 2: 1st  Quarter  Contractor Business Meeting

2

Agenda

– Security• Vendor Passes and Drive-in Tags – Natalie Joyner• Camera Phones

– Contractor Crane Operations – Kehoe• Lift Plans• Contractor Crane Briefing

– Pre-Task Planning – Kehoe– Unplanned Event – Sensitive Work Area – Kehoe– Safety – Rod Taylor

• Update to Y-1078– Cranes– Controls

• Scaffolds and Ladders– O55 Commercial Procurement – Ed Wright

Page 3: 1st  Quarter  Contractor Business Meeting

3

O15 Security Review

• NN 9327 – Non-Employee Access Badge Request

• Visitor Management System (VMS)– NNS Procedure 12-202 (Access to Company Premises)– NNS Procedure 12-200 (Identification Badges and Passes)

• Drive –In Tag Request– NN 9297 – Newport News Shipbuilding Drive-In Tag Request– NNS Procedure 12-206 (Vehicle Access)

• Camera Phone Reminder – They are not permitted anywhere in the plant.

Page 4: 1st  Quarter  Contractor Business Meeting

Contractor Crane Operations - Lift Plans!

• Lift plans are required for each and every lift while working for HII-NNS on or offsite.

• They must be briefed by the foreman prior to the lift.

• L&H consultants/management will monitor their use and shut down any lift that is not in compliance with this requirement.

4

Page 5: 1st  Quarter  Contractor Business Meeting

5

Lift Plans

• Yard-wide Lifting and Handling Requirements for Departments working with contractors. Lift plans are required for all suspended loads. This includes loads suspended from forklifts, backhoes, etc. Lift plan issues and accident reporting apply to rigging applications as well as crane work.

• Take two. Take time to review the lift plan, equipment and rigging. After the job is hooked up and the rigging is snug, stop before you lift and do a second check or a ‘take two’ to ensure everyone is really ready and the travel path is clear.

• Remember: ANYONE is authorized to stop the lift when conditions are questionable.

Page 6: 1st  Quarter  Contractor Business Meeting

6

Contractor Crane Briefing Class

• Mandatory for all contractor crane operators before performing lifting and handling operations. Attendance of riggers is recommended but optional.

• Scheduled only 1 day each month in B133-2.

• Class size is limited to 15.

• Ask your contract coordinator about class schedule.

• E- mail to [email protected] to sign up for class.

• Attendance records are maintained. Not required to attend more than once.

Page 7: 1st  Quarter  Contractor Business Meeting

7

Pre-Task Planning

• All projects are to have pre-task plans.

• Review plan with work crew before commencing the work

• Important to evaluate your work area

• Identify potential hazards

• Review required PPE (Personal Protective Equipment)

• Describe work to be performed, hazards associated with each step, and how to eliminate or control the hazard

• Identify sensitive work areas

• Work crew sign off

• Contract Coordinators/Field Engineers should audit pre-task plans.

Page 8: 1st  Quarter  Contractor Business Meeting

8

Pre-Task Planning

Page 9: 1st  Quarter  Contractor Business Meeting

9

Unplanned Event – B522 datacenter power outage

Page 10: 1st  Quarter  Contractor Business Meeting

10

Unplanned Event – B522 datacenter power outage

• Sensitive Work Areas –– What are the working conditions that may be unique to the area of work?– Sensitive work areas must be identified and required approvals must be given.

Page 11: 1st  Quarter  Contractor Business Meeting

11

Control of Hazardous Energy – Update to Y-1078

• Changes in Y-1078– Driving to try to lock everything

• One additional safety measure must be taken if only a tag can be used to secure an energy isolation device.

• Devices controlling gravity (blocking, stands, etc.) that are in direct proximity of the work area and clearly visible are excluded.

• General Foreman or equivalent approval must be obtained.

• If an energy source can re-accumulate hazardous energy levels, then zero energy must be verified at least at the beginning of each shift or more frequently if needed.

Page 12: 1st  Quarter  Contractor Business Meeting

12

Cranes

• Working around cranes

• Controls– In direct path of crane structure– Not in direct path of crane structure

Page 13: 1st  Quarter  Contractor Business Meeting

13

Scaffold and Ladders

• Scaffold ladder requirements are contained in the Contractor Resource Manual.

Page 14: 1st  Quarter  Contractor Business Meeting

Newport News Shipbuilding “Supplier Gateway“

http://supplier.huntingtoningalls.com/sourcing/index.stm

Page 15: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

*Facilities & Major Capital Projects Buying Team– Ed Wright 757-688-1533 – Dale Martin 757-688-5279– Carla Potter 757-688-4952

Page 16: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 17: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 18: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 19: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 20: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 21: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 22: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 23: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 24: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 25: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 26: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 27: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 28: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 29: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 30: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 31: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 32: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 33: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 34: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 35: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 36: 1st  Quarter  Contractor Business Meeting

O55 Commercial Procurement

Page 37: 1st  Quarter  Contractor Business Meeting

Newport News Shipbuilding “Supplier Gateway“

http://supplier.huntingtoningalls.com/sourcing/index.stm

Page 38: 1st  Quarter  Contractor Business Meeting

38

QUESTIONS????

• If you have questions regarding this presentation, please contact your Contract Coordinator or: