2 3 4 supports co-equal goals of “delta vision” delta ecosystem restoration water supply...
TRANSCRIPT
![Page 1: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/1.jpg)
Water is crops
Water is life
Water is jobs
California’s Water CrisisDeveloping Solutions
![Page 2: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/2.jpg)
2
Newpaper Headlines
![Page 3: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/3.jpg)
Resource/Regulatory StrategyNear-Term MeasuresBay-Delta Conservation Plan
3
Bay-Delta Conservation Plan
Legislative FrameworkDelta policy billsBond measure
Delta Improvement StrategyDelta Improvement Strategy
![Page 4: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/4.jpg)
Resource/Regulatory StrategyBay-Delta Conservation Plan
4
Bay-Delta Conservation Plan
Supports co-equal goals of “Delta Vision”Delta ecosystem restorationWater supply reliability
Ecosystem ImprovementComprehensive multi-species/ecosystem approachHabitat & flow improvements
Conveyance ImprovementsDual-intake approach
Other Stressors ControlInvasive species, toxics, unscreened diversions
![Page 5: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/5.jpg)
What will the project look like?Where is the project?How would it operate?
What will it cost?How do we finance the costs?How do we split the costs?
What are the benefits & risks?What size should the project be?What can be delivered with new conveyance?What can be delivered without?
Bay-Delta Conservation PlanQuestions Everyone Wants Answers
toBay-Delta Conservation Plan
![Page 6: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/6.jpg)
Bay-Delta Conservation PlanThru-Delta Conveyance
Bay-Delta Conservation PlanThru-Delta Conveyance
Bay-Delta Conservation PlanConveyance Options
Bay-Delta Conservation PlanConveyance Options
6
SJ River
SJ RiverSWP PumpsCVP Pumps
Sac River
Stockton
Sacramento Two 3,000 cfs intakes, screens, pumps
12 mi. open canal
66 mi. existing levee retrofit
9 to 11 operable barriers
New fish salvage facility
2 tunnels (4.5 mi. length)
![Page 7: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/7.jpg)
Sacramento
7
SJ River
SJ RiverSWP PumpsCVP Pumps
Sac River
Stockton
Bay-Delta Conservation PlanDual-Conveyance − East Alignment
Bay-Delta Conservation PlanDual-Conveyance − East Alignment
Five 3,000 cfs intakes, screens, pumps
40 mi. open canal8 siphons; Pump #6
4 tunnels under rivers;2.2 mi. total length
Additional forebay
![Page 8: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/8.jpg)
8
SJ River
SJ RiverSWP PumpsCVP Pumps
Sac River
Stockton
Sacramento
Bay-Delta Conservation PlanDual-Conveyance − West AlignmentBay-Delta Conservation PlanDual-Conveyance − West Alignment
Five 3,000 cfs intakes, screens, pumps
Pumping plant #6 Two 17 mi. tunnels
(37 ft. diameter)
Addl. forebay 10 mi. open canal
28 mi. open canal; 12 siphons
![Page 9: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/9.jpg)
9
SJ River
SJ RiverSWP PumpsCVP Pumps
Sac River
Stockton
Sacramento
Bay-Delta Conservation PlanDual-Conveyance − Central Tunnel
Bay-Delta Conservation PlanDual-Conveyance − Central Tunnel
Five 3,000 cfs intakes, screens, pumps
Regulating forebay (18,000 acres)
Pumping plant #6 Two 35 mi. tunnels
(37 ft diameter) Additional forebay
![Page 10: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/10.jpg)
10
SJ River
SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps
Sac RiverSac River
StocktonStockton
SacramentoSacramento
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
![Page 11: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/11.jpg)
11
SJ River
SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps
Sac RiverSac River
StocktonStockton
SacramentoSacramento
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
![Page 12: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/12.jpg)
12
SJ River
SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps
Sac RiverSac River
StocktonStockton
SacramentoSacramento
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
Bay-Delta Conservation PlanDual-Conveyance − Intake Options
![Page 13: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/13.jpg)
Bay-Delta Conservation PlanOpen Canal Proposal
Bay-Delta Conservation PlanOpen Canal Proposal
California Aqueduct(200’ wide x 30’ deep)
Delta Cross Channel(500’ wide x 15’ deep)
700 ft.
1,400 ft.
LeveesUp to 35 ft high
~24 ft. depth
13
![Page 14: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/14.jpg)
Canal Dredging
Walking Dragline
14
![Page 15: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/15.jpg)
Siphon Section
15
Isolated Facility
4.0’ 30'30'26' 4.0’ 26'
182 ft.
34 ft.
![Page 16: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/16.jpg)
16
Tunnel Boring Machine
• Inland Feeder Tunnel• 12 ft diameter = 1,000 cfs
• Delta Tunnel• 2 @ 37 ft. diameter = 15,000 cfs
![Page 17: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/17.jpg)
History of Tunneling
Roman Aqueduct
17
Transcontinental Railroad
![Page 18: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/18.jpg)
Tunnel Boring Machine Types
Application Machine Type
Hard Rock Open, main beam
Mixed Ground Double Shield
Soft Ground Earth Pressure Balance (Clays & Mud)Slurry Shield (Sands & Gravel)
18
![Page 19: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/19.jpg)
Evolution of Tunnel Boring Machine Types
1856 – Early TBMs
1952 – Hard rock
1962 – Pressure bulkhead
1964 – Full-face slurry
1966 – Earth pressure balance
1972 – Double shield
19
![Page 20: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/20.jpg)
Tunnel Boring Machine Manufacturers
20
![Page 21: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/21.jpg)
Large Diameter Tunnels51 ft. – Shanghai, ChinaYangtze River highway tunnel; 2 bores
21
30 ft. – Chicago, USA109 mile sewer overflow tunnel30 tunnel boring machines
24 to 45 ft. – Cleveland, USASewer overflow tunnels
33 ft. – Nagarjuna Sagar NP, India27 mile water supply tunnels
41 ft. – Jinping, China40 mile hydroelectric tunnels
44 ft. – Kuala Lumpur, MalaysiaDual-deck transportation/stormwater
![Page 22: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/22.jpg)
Tunnel Boring MachineSize
600 ft. length
37 ft. diameter
8,000 hp engine
40 ft per day
$45 – 50 M each
20-25 crew per shift; 3 shifts/day
600 ft. length
22
![Page 23: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/23.jpg)
New Delta ConveyanceTunnel Facts
3.4 million cubic yards of concreteHoover Dam 3.25 million cy
15 million cubic yards of tunnel muck1000 story football field
3.8 million muck car trips
260 million feet of reinforcing steel2 times around the world
23
![Page 24: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/24.jpg)
Tunnel Boring … how does it work?Cutting through the Soil/Rock
24
![Page 25: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/25.jpg)
Tunnel Boring … how does it work?Earth Pressure Balance TBM
25
![Page 26: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/26.jpg)
Tunnel Boring … how does it work?Earth Pressure Balance TBM
Alaska Viaduct
54 ft. diameter
2001– 2016
26
![Page 27: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/27.jpg)
Tunnel Boring … how does it work?Concrete Tunnel Segment Installation
27
![Page 28: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/28.jpg)
Tunnel Shaft ConstructionInitial Soil Stabilization
Soil Stabilization
Tunnel
Shaft
28High Pressure Jet Grouting Shaft Construction
![Page 29: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/29.jpg)
Tunnel Shaft Construction
Tunnel Shaft Construction
Water Table Surface
29
TunnelTunnel150 ft.
![Page 30: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/30.jpg)
Concrete
Water Table
Tunnel Shaft Construction
30
Tunnel150 ft.
![Page 31: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/31.jpg)
East Canal ~ $8 billion *
West Canal ~ $9 - 11 billion *
All Tunnel ~ $10 -12 billion *
New Delta Conveyance Cost Analysis
Bay-Delta Conservation Plan
31
* URS developed initial cost estimates; Second independent expert cost analysis from 5RMK Inc completed in Jan. 2010.
* Includes 35% construction contingency on tunnel (25% on non-tunnel) and 18% for engineering/project management. Preliminary Subject to Revision
![Page 32: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/32.jpg)
2010 Deliveries30 – 50%: expected Table A deliveries600,000 – 1,000,000 AF: expected MWD deliveries
Bay-Delta Conservation Plan
32Preliminary Subject to Revision
New Delta Conveyance Water Supply Benefit Analysis
![Page 33: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/33.jpg)
Without Improved Conveyance60% − average SWP Table A deliveries1.2 million AF − average MWD deliveries
With Improved Conveyance80% − average SWP Table A deliveries1.6 million AF − average MWD deliveries
Bay-Delta Conservation Plan
33Preliminary Subject to Revision
New Delta Conveyance Water Supply Benefit Analysis
![Page 34: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/34.jpg)
Bay-Delta Conservation Plan
34
Total SWP-CVP Water Supply Cost per Acre-ft
East 6.27 million AF ~ $82/AF
West 6.27 million AF ~ $100/AF
Tunnel 6.27 million AF ~ $119/AF
Preliminary Subject to Revision
New Delta Conveyance Cost per Acre-Feet
Preliminary Subject to Revision
![Page 35: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/35.jpg)
Water QualityReduced salinity, organic carbon, bromidesReduced water treatment costs
Improved ReliabilityAvoids seismic risks of levee failureAvoids potential future regulatory restrictions
Bay-Delta Conservation Plan
35Preliminary Subject to Revision
New Delta Conveyance Other Benefits
![Page 36: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/36.jpg)
Over 100 technical expertsPlanning & PermittingEngineering & OperationsProcurement & ConstructionManagement & OversightPublic PerceptionLand Use
Reps from state, feds, water contractors & othersFocus on cost & schedule risks
Bay-Delta Conservation Plan
New Delta Conveyance Risk Assessment Workshop
36
![Page 37: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/37.jpg)
New Delta ConveyanceRisk Assessment Results
Bay-Delta Conservation Plan
Top Cost RisksDiffering geotech conditions (during construction)
Differing geotech conditions (during design)
Potential habitat mitigation (terrestrial)
Available tunnel contractor pool
Inability to adjust construction activities to avoid delay
37
![Page 38: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/38.jpg)
New Delta ConveyanceRisk Assessment Results
Bay-Delta Conservation Plan
Top Schedule Risks
Pump & valve procurement
Lawsuits
401 certification from State Water Board
Changes in alignment due to external pressures
Federal 'Nexus' in construction projects
38
![Page 39: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/39.jpg)
39
ScheduleEnd of 2010• Draft Conservation Plan• Draft EIR/S
End of 2011• Final EIR/S • Permits
2022• Construction complete
Preliminary Subject to Revision
![Page 40: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/40.jpg)
www.bewaterwise.com
An electronic copy of this presentation is located at:“ftp://blizzard.mwdh2o.com/baydelta/presentations”
Randall D. Neudeck(213) 217-7537
![Page 41: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem](https://reader038.vdocuments.net/reader038/viewer/2022110321/56649ce65503460f949b40d6/html5/thumbnails/41.jpg)
The DeltaThe DeltaSacramentoSacramento
StocktonStockton
Suisun BaySuisun Bay
State & Federal Pumping PlantsState & Federal Pumping Plants