Page 1: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Water is crops

Water is life

Water is jobs

California’s Water CrisisDeveloping Solutions

Page 2: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

2

Newpaper Headlines

Page 3: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Resource/Regulatory StrategyNear-Term MeasuresBay-Delta Conservation Plan

3

Bay-Delta Conservation Plan

Legislative FrameworkDelta policy billsBond measure

Delta Improvement StrategyDelta Improvement Strategy

Page 4: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Resource/Regulatory StrategyBay-Delta Conservation Plan

4

Bay-Delta Conservation Plan

Supports co-equal goals of “Delta Vision”Delta ecosystem restorationWater supply reliability

Ecosystem ImprovementComprehensive multi-species/ecosystem approachHabitat & flow improvements

Conveyance ImprovementsDual-intake approach

Other Stressors ControlInvasive species, toxics, unscreened diversions

Page 5: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

What will the project look like?Where is the project?How would it operate?

What will it cost?How do we finance the costs?How do we split the costs?

What are the benefits & risks?What size should the project be?What can be delivered with new conveyance?What can be delivered without?

Bay-Delta Conservation PlanQuestions Everyone Wants Answers

toBay-Delta Conservation Plan

Page 6: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Bay-Delta Conservation PlanThru-Delta Conveyance

Bay-Delta Conservation PlanThru-Delta Conveyance

Bay-Delta Conservation PlanConveyance Options

Bay-Delta Conservation PlanConveyance Options

6

SJ River

SJ RiverSWP PumpsCVP Pumps

Sac River

Stockton

Sacramento Two 3,000 cfs intakes, screens, pumps

12 mi. open canal

66 mi. existing levee retrofit

9 to 11 operable barriers

New fish salvage facility

2 tunnels (4.5 mi. length)

Page 7: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Sacramento

7

SJ River

SJ RiverSWP PumpsCVP Pumps

Sac River

Stockton

Bay-Delta Conservation PlanDual-Conveyance − East Alignment

Bay-Delta Conservation PlanDual-Conveyance − East Alignment

Five 3,000 cfs intakes, screens, pumps

40 mi. open canal8 siphons; Pump #6

4 tunnels under rivers;2.2 mi. total length

Additional forebay

Page 8: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

8

SJ River

SJ RiverSWP PumpsCVP Pumps

Sac River

Stockton

Sacramento

Bay-Delta Conservation PlanDual-Conveyance − West AlignmentBay-Delta Conservation PlanDual-Conveyance − West Alignment

Five 3,000 cfs intakes, screens, pumps

Pumping plant #6 Two 17 mi. tunnels

(37 ft. diameter)

Addl. forebay 10 mi. open canal

28 mi. open canal; 12 siphons

Page 9: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

9

SJ River

SJ RiverSWP PumpsCVP Pumps

Sac River

Stockton

Sacramento

Bay-Delta Conservation PlanDual-Conveyance − Central Tunnel

Bay-Delta Conservation PlanDual-Conveyance − Central Tunnel

Five 3,000 cfs intakes, screens, pumps

Regulating forebay (18,000 acres)

Pumping plant #6 Two 35 mi. tunnels

(37 ft diameter) Additional forebay

Page 10: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

10

SJ River

SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps

Sac RiverSac River

StocktonStockton

SacramentoSacramento

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Page 11: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

11

SJ River

SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps

Sac RiverSac River

StocktonStockton

SacramentoSacramento

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Page 12: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

12

SJ River

SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps

Sac RiverSac River

StocktonStockton

SacramentoSacramento

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Bay-Delta Conservation PlanDual-Conveyance − Intake Options

Page 13: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Bay-Delta Conservation PlanOpen Canal Proposal

Bay-Delta Conservation PlanOpen Canal Proposal

California Aqueduct(200’ wide x 30’ deep)

Delta Cross Channel(500’ wide x 15’ deep)

700 ft.

1,400 ft.

LeveesUp to 35 ft high

~24 ft. depth

13

Page 14: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Canal Dredging

Walking Dragline

14

Page 15: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Siphon Section

15

Isolated Facility

4.0’ 30'30'26' 4.0’ 26'

182 ft.

34 ft.

Page 16: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

16

Tunnel Boring Machine

• Inland Feeder Tunnel• 12 ft diameter = 1,000 cfs

• Delta Tunnel• 2 @ 37 ft. diameter = 15,000 cfs

Page 17: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

History of Tunneling

Roman Aqueduct

17

Transcontinental Railroad

Page 18: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring Machine Types

Application Machine Type

Hard Rock Open, main beam

Mixed Ground Double Shield

Soft Ground Earth Pressure Balance (Clays & Mud)Slurry Shield (Sands & Gravel)

18

Page 19: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Evolution of Tunnel Boring Machine Types

1856 – Early TBMs

1952 – Hard rock

1962 – Pressure bulkhead

1964 – Full-face slurry

1966 – Earth pressure balance

1972 – Double shield

19

Page 20: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring Machine Manufacturers

20

Page 21: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Large Diameter Tunnels51 ft. – Shanghai, ChinaYangtze River highway tunnel; 2 bores

21

30 ft. – Chicago, USA109 mile sewer overflow tunnel30 tunnel boring machines

24 to 45 ft. – Cleveland, USASewer overflow tunnels

33 ft. – Nagarjuna Sagar NP, India27 mile water supply tunnels

41 ft. – Jinping, China40 mile hydroelectric tunnels

44 ft. – Kuala Lumpur, MalaysiaDual-deck transportation/stormwater

Page 22: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring MachineSize

600 ft. length

37 ft. diameter

8,000 hp engine

40 ft per day

$45 – 50 M each

20-25 crew per shift; 3 shifts/day

600 ft. length

22

Page 23: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

New Delta ConveyanceTunnel Facts

3.4 million cubic yards of concreteHoover Dam 3.25 million cy

15 million cubic yards of tunnel muck1000 story football field

3.8 million muck car trips

260 million feet of reinforcing steel2 times around the world

23

Page 24: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring … how does it work?Cutting through the Soil/Rock

24

Page 25: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring … how does it work?Earth Pressure Balance TBM

25

Page 26: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring … how does it work?Earth Pressure Balance TBM

Alaska Viaduct

54 ft. diameter

2001– 2016

26

Page 27: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Boring … how does it work?Concrete Tunnel Segment Installation

27

Page 28: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Shaft ConstructionInitial Soil Stabilization

Soil Stabilization

Tunnel

Shaft

28High Pressure Jet Grouting Shaft Construction

Page 29: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Tunnel Shaft Construction

Tunnel Shaft Construction

Water Table Surface

29

TunnelTunnel150 ft.

Page 30: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Concrete

Water Table

Tunnel Shaft Construction

30

Tunnel150 ft.

Page 31: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

East Canal ~ $8 billion *

West Canal ~ $9 - 11 billion *

All Tunnel ~ $10 -12 billion *

New Delta Conveyance Cost Analysis

Bay-Delta Conservation Plan

31

* URS developed initial cost estimates; Second independent expert cost analysis from 5RMK Inc completed in Jan. 2010.

* Includes 35% construction contingency on tunnel (25% on non-tunnel) and 18% for engineering/project management. Preliminary Subject to Revision

Page 32: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

2010 Deliveries30 – 50%: expected Table A deliveries600,000 – 1,000,000 AF: expected MWD deliveries

Bay-Delta Conservation Plan

32Preliminary Subject to Revision

New Delta Conveyance Water Supply Benefit Analysis

Page 33: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Without Improved Conveyance60% − average SWP Table A deliveries1.2 million AF − average MWD deliveries

With Improved Conveyance80% − average SWP Table A deliveries1.6 million AF − average MWD deliveries

Bay-Delta Conservation Plan

33Preliminary Subject to Revision

New Delta Conveyance Water Supply Benefit Analysis

Page 34: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Bay-Delta Conservation Plan

34

Total SWP-CVP Water Supply Cost per Acre-ft

East 6.27 million AF ~ $82/AF

West 6.27 million AF ~ $100/AF

Tunnel 6.27 million AF ~ $119/AF

Preliminary Subject to Revision

New Delta Conveyance Cost per Acre-Feet

Preliminary Subject to Revision

Page 35: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Water QualityReduced salinity, organic carbon, bromidesReduced water treatment costs

Improved ReliabilityAvoids seismic risks of levee failureAvoids potential future regulatory restrictions

Bay-Delta Conservation Plan

35Preliminary Subject to Revision

New Delta Conveyance Other Benefits

Page 36: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

Over 100 technical expertsPlanning & PermittingEngineering & OperationsProcurement & ConstructionManagement & OversightPublic PerceptionLand Use

Reps from state, feds, water contractors & othersFocus on cost & schedule risks

Bay-Delta Conservation Plan

New Delta Conveyance Risk Assessment Workshop

36

Page 37: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

New Delta ConveyanceRisk Assessment Results

Bay-Delta Conservation Plan

Top Cost RisksDiffering geotech conditions (during construction)

Differing geotech conditions (during design)

Potential habitat mitigation (terrestrial)

Available tunnel contractor pool

Inability to adjust construction activities to avoid delay

37

Page 38: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

New Delta ConveyanceRisk Assessment Results

Bay-Delta Conservation Plan

Top Schedule Risks

Pump & valve procurement

Lawsuits

401 certification from State Water Board

Changes in alignment due to external pressures

Federal 'Nexus' in construction projects

38

Page 39: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

39

ScheduleEnd of 2010• Draft Conservation Plan• Draft EIR/S

End of 2011• Final EIR/S • Permits

2022• Construction complete

Preliminary Subject to Revision

Page 40: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

www.bewaterwise.com

An electronic copy of this presentation is located at:“ftp://blizzard.mwdh2o.com/baydelta/presentations”

Randall D. Neudeck(213) 217-7537

[email protected]

Page 41: 2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem

The DeltaThe DeltaSacramentoSacramento

StocktonStockton

Suisun BaySuisun Bay

State & Federal Pumping PlantsState & Federal Pumping Plants