2 3ton per hour sand gold processing

6
第 1 第 第 6 第 1 my skype:evitalee55 whatsapp:0086 18637192252 my email: [email protected] welcome to my website! www.hiimac.com COMMERCIAL OFFER Sand Gold Processing Name Model Qty FOB Price (USD) Remarks Unit Price Total Price Bin 1 m³ 1 240 240 Belt Conveyor B500*12M 1 1,930 1,930 Trommel Screen GS1.0*3.0 1 2,850 2,850 Belt Conveyor B500*5M 1 1,050 1,050 Bucket Elevator D160*9M 1 3,210 3,210 Bin 5 m³ 1 1,310 1,310 Spiral Value 200*200 1 200 200 Page

Upload: evita-lee

Post on 10-Apr-2017

15 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: 2 3ton per hour sand gold processing

第 1 页 共 9 页

1

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

COMMERCIAL OFFER Sand Gold Processing

Name Model QtyFOB Price (USD)

RemarksUnit Price Total Price

Bin 1 m³ 1 240 240Belt Conveyor B500*12M 1 1,930 1,930Trommel Screen GS1.0*3.0 1 2,850 2,850Belt Conveyor B500*5M 1 1,050 1,050

Bucket Elevator D160*9M 1 3,210 3,210

Bin 5 m³ 1 1,310 1,310Spiral Value 200*200 1 200 200Vibrating Feeder GZ-1 1 1,260 1,260Ball Mill 900*2.1 1 8,920 8,920Grinding Ball 2 tons 1,060 2,120

Page

Page 2: 2 3ton per hour sand gold processing

第 2 页 共 9 页

2

Magnetic Separator CTB612 1 4,080 4,080 GS1500Mixing Tank XB-1000 2 1,370 2,740Shaking Table 6-S 2 1,610 3,220Diesel Generator R6105-75KW 1 5,210 5,210

USD38,340(FOB Qingdao, China) Total Power:38.05KW

2. Terms and Conditions: 其他条款A. Package: Bare package for equipments and wooden box for spare parts.B. Time of Delivery: 20 days after receipt of your deposit.C, Terms of Payment, the deposit (30% of the total) when we sign the contract and the rest 70% of the money should be paid by T/T before goods leaves factory.D, Port of Loading: Qingdao Port BasisE, Warranty: 100% brand new when leaving the factory. The seller shall guarantee that the commodity for 1 year, excluding the wearing parts, and the seller will offer the buyer the wearing parts all the time with favorable price.F, Installation: If the buyer requires the seller to send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the technician’s travel expense, insurance, accommodation abroad and salary. The salary for the engineer is 60 dollars per day.

Page

Page 3: 2 3ton per hour sand gold processing

第 3 页 共 9 页

3Page

Page 4: 2 3ton per hour sand gold processing

第 4 页 共 9 页

4Page

Page 5: 2 3ton per hour sand gold processing

第 5 页 共 9 页

5Page

Page 6: 2 3ton per hour sand gold processing

第 6 页 共 9 页

6Page

Page 7: 2 3ton per hour sand gold processing

第 7 页 共 9 页

7Page

Page 8: 2 3ton per hour sand gold processing

第 8 页 共 9 页

8

If you have other questions, welcome contact with me, we shall feel happy to be at your service all the time!

Page

Page 9: 2 3ton per hour sand gold processing

第 9 页 共 9 页

9

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page