Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in designated tuition.

Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in designated tuition.

Utility % Rate Change

2003 2004 2005 2006 4 Yr Average

Natural Gas

43.95% 8.11% 16.11% 30.70% 24.72%

Electricity 21.9% -8.37% 0.36% 9.57% 5.87%

Water 12.29% 8.67% 17.14% 11.62% 12.43%

3

• Fee Rate was set at $45 for 2006-2007• Lowered to $35 in 2007-2008 • No rate changes since Fall 2007.

Energy rates are tied to commodity market with wide price swings in times of shortage or over supply - volatile and somewhat unpredictable. Also affected by energy policy changes.

• Fee Rate was set at $45 for 2006-2007• Lowered to $35 in 2007-2008 • No rate changes since Fall 2007.

Energy rates are tied to commodity market with wide price swings in times of shortage or over supply - volatile and somewhat unpredictable. Also affected by energy policy changes.

4

Energy FeeEnergy Fee

RAC = Refiners’ Acquisition Cost

5

Utility RatesUtility RatesUtility RatesUtility Rates

Average FY09 Thermal Energy Rates: Steam/Hot Water = $13.82/MMBTU , Chillwater = $0.10/Ton-Hour

FY08 Purchased Utilities .•Electricity 63% $ 6,116,130•Natural Gas 27% $ 2,557,800•Water 10% $ 961,430

6

Going forward utility costs for new facilities should be covered by designated tuition. If continuation of the fee is requested, can the fee be downward adjusted?

Going forward utility costs for new facilities should be covered by designated tuition. If continuation of the fee is requested, can the fee be downward adjusted?

7

FY 2006 FY 2007 FY 2008 FY 2009 FY 2010

Designated Tuition

$7,531,668 $6,743,343 $6,743,343 $6,743,343 $8,234,500

Energy Fee 0 2,874,132 2,259,300 2,234,902 2,234,000

F&A (Overhead from Grants &

Contracts)

0 0 0 0 300,000

TOTAL $7,531,668 $9,617,475 9,002,643 8,978,245 10,768,500

Actual Expenditures

<8,548,495> <8,016,760> <9,960,169> <8,768,367> <10,600,000>

Prior Year Carryforward

<1,016,827> 583,888 <373,638> <163,760>

Cumulative Variance

<1,016,827> 583,888 <373,638> <163,760> 4,740

8

Square Footage and Energy Use Square Footage and Energy Use (E&G and Non-E&G)

Square Footage and Energy Use Square Footage and Energy Use (E&G and Non-E&G)

9

E&G Cost and Square FeetE&G Cost and Square FeetE&G Cost and Square FeetE&G Cost and Square Feet

10

Cost Reduction / Avoidance Cost Reduction / Avoidance MeasuresMeasuresCost Reduction / Avoidance Cost Reduction / Avoidance MeasuresMeasuresRecurring Amount

1604 Energy Performance Contract $ 346,500

Large Volume Natural Gas Discount 225,700

ITC Energy Performance Contract 192,600

New Utility Rate Structure 30,200

Variable Frequency Drive Retrofits – JPL 14,400

Lighting Retrofits – Student Housing 4,000

TOTAL $ 813,400

One-Time Amount

Peak Demand Limiting – North Thermal Energy Plant $ 74,000

HVAC Setback Thermostats 48,000

Utility Billing Audits – Rates, Meter Readings, Faulty Meters 43,300

TOTAL $ 165,300

11

Potential Future Cost Reduction Initiatives Potential Future Cost Reduction Initiatives – Under Evaluation– Under Evaluation

Potential Future Cost Reduction Initiatives Potential Future Cost Reduction Initiatives – Under Evaluation– Under Evaluation

Retrofit Campus Buildings with HVAC and Lighting Motion Sensor Technology

Implement Monterey Building Energy Audit Project recommendations, including but not limited to: Lighting efficiency upgrades Occupancy sensors Removal of overhead doors Temperature Setbacks Variable Frequency Drives

Reclaim blowdown water for irrigation at North and South Thermal Energy Plants

Retrofit Campus Buildings with HVAC and Lighting Motion Sensor Technology

Implement Monterey Building Energy Audit Project recommendations, including but not limited to: Lighting efficiency upgrades Occupancy sensors Removal of overhead doors Temperature Setbacks Variable Frequency Drives

Reclaim blowdown water for irrigation at North and South Thermal Energy Plants

12

Potential Cost Reduction Initiatives, Potential Cost Reduction Initiatives, ContinuedContinued

Potential Cost Reduction Initiatives, Potential Cost Reduction Initiatives, ContinuedContinued

Optimize energy efficiency through: Retro-commissioning of tri-Campus buildings Implement Campus-Wide Energy Awareness Program Implement HVAC temperature set point policy

(Summer: 78 ; Winter: 72) Implement Preventative Maintenance Program (Thermography to

Identify Inefficiency, Temperature Sensor Calibration, Ensure Efficient Operations)

Implement Energy Audit Program Install Complete Utility Metering to Identify Consumption and

Correct Inefficiency

Optimize energy efficiency through: Retro-commissioning of tri-Campus buildings Implement Campus-Wide Energy Awareness Program Implement HVAC temperature set point policy

(Summer: 78 ; Winter: 72) Implement Preventative Maintenance Program (Thermography to

Identify Inefficiency, Temperature Sensor Calibration, Ensure Efficient Operations)

Implement Energy Audit Program Install Complete Utility Metering to Identify Consumption and

Correct Inefficiency

13

14

FY 2010 ProposedFY 2011

ProposedFY 2012

Designated Tuition $8,234,500 $9,215,000(+980,500)

$9,615,000(+400,000)

Energy Fee 2,234,000 1,835,000(-399,000)

1,835,000

F&A (Overhead from Grants & Contracts)

300,000 400,000(+100,000)

400,000

TOTAL BUDGET 10,768,500 11,450,000 11,850,000

Actual / Projected Expenditures

<10,600,000>Projected (+20% inc)

<11,450,000> Projected (+8% inc)

<11,850,000> Projected

(+3.5% inc)