2. deliverable list rev0 (1)

26
Halaman 1 / 17 PT. PERTADAYA GAS PT. WIJAYA KARYA (Persero) Tbk Alamat : Jl. D.I. Panjaitan Kav. 9 Lt. 6 , Jakarta 13340 Indonesia, Phone : +62-21 -8192808, 8508640, 8508650, Fax : +62-21-8198040 NAMA PROYEK : FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL PEMBERI KERJA : PT. PERTADAYA GAS KONTRAKTOR : PT. WIJAYA KARYA LOKASI : PESANGGARAN - MAKASAR JUDUL DOKUMEN : DELIVERABLE LIST REV DATE ISSUED WIKA PDG DATE

Upload: ediabc

Post on 29-Oct-2015

187 views

Category:

Documents


8 download

DESCRIPTION

dara

TRANSCRIPT

Halaman

1 / 17 PT. PERTADAYA GAS PT. WIJAYA KARYA (Persero) Tbk

Alamat : Jl. D.I. Panjaitan Kav. 9 Lt. 6 , Jakarta 13340 Indonesia, Phone : +62-21 -8192808, 8508640, 8508650, Fax : +62-21-8198040

NAMA PROYEK : FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL

PEMBERI KERJA : PT. PERTADAYA GAS

KONTRAKTOR : PT. WIJAYA KARYA

LOKASI : PESANGGARAN - MAKASAR

JUDUL DOKUMEN : DELIVERABLE LIST

REV DATE ISSUED FOR

WIKA PDGDATE

PREP'D CHK'D APPRV'D CHK'D APPRV'D 0 22 Jan 13 IFC FJR ARF AA

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 2 / 18

Rekaman Perubahan

Rev.No.

Paragraph No. Hal. Deskripsi Perubahan

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 3 / 18

DELIVERABLE LIST

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG

TRANSPORTATION AND RECEIVING TERMINAL (PESANGGRAHAN & MAKASAR)

No Document Number Description1 GENERAL PROCEDURES GENERAL1 - GEN - GEN - 001 Procedure for Numbering System2 - GEN - GEN - 002 Project Execution Plant3 - GEN - GEN - 003 Project Quality Plant

4 - GEN - GEN -004 Project Strategy - Philosophy 5 - GEN - GEN -005 Quality Level - Philosophy 6 - GEN - GEN -006 Key Technical Issue - Philosophy 7 - GEN - GEN -007 Equipment Design condition - Philosophy 8 - GEN - GEN -008 Emergency Shutdown - Philosophy 9 - GEN - GEN -009 Isolation Equipment & Zonal Relief - Philosophy 10 - GEN - GEN -0010 Relief System - Philosophy 11 - GEN - GEN -0011 Comminication - Philosophy 12 - GEN - GEN -0012 Plant layout - Philosophy 13 - GEN - GEN -0013 Fire & Gas Detection / Protection - Philosophy 14 - GEN - GEN -0014 Sparing - Philosophy 15 - GEN - GEN -0015 Maintenance - Philosophy 16 - GEN - GEN -0016 Loss Controll - Philosophy 17 - GEN - GEN -0017 Manning - Philosophy 18 - GEN - GEN -0018 Power Supply & Back Up Power Supply - Philosophy 19 - GEN - GEN -0019 Effluent Disposal - Flaring /Venting/Drainning -

Philosophy 20 - GEN - GEN -0020 Environmental Impact - Philosophy 21 - GEN - GEN -0021 Major cable Routing - Philosophy

22 - GEN - GEN - 022 Basic Engineering Desaign Data2 GEOPHYSISCS AND GEOTECHNICS STUDY1 - GT - RPT - 001 Topographic And Bathymetric Survey Result2 - GT - RPT - 002 Metocean Survey Result3 - GT - RPT - 003 Tidal Observation Result4 - GT - RPT - 004 Weather Observation Result5 - GT - RPT - 005 Geotechnical Survey Result6 - GT - RPT - 006 Summary of All Work Activities3 PROCESS GENERAL

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 4 / 18

1 - PRO - GEN - 001 Process Design Basis2 - PRO - GEN - 002 Process Control Phylosophy3 - PRO - GEN - 003 Material Selection Phylosophy4 - PRO - GEN - 004 Utility Desaign Basis5 - PRO - GEN - 005 Utility Design Philosophy6 - PRO - GEN - 006 Detailed Prcess Description7 - PRO - GEN - 007 Regasification Process Technology Selection8 - PRO - GEN - 008 Process Operating & Control Philosophy REPORT1 - PRO - RPT - 004 Process Simulation Report2 - PRO - RPT - 005 Blowdown Simulation Report3 - PRO - RPT - 006 Hydraulic Analysis CALCULATION1 - PRO - CAL - 001 Line Sizing2 - PRO - CAL - 002 Equipment Sizing

3 - PRO - CAL - 003

Power Supply Calculation (Compresor, Pump, Electricity

4 - PRO - CAL - 004 Instrument/Utility Calculation Note ????5 - PRO - CAL - 005 Utility Pump Sizing

6 - PRO - CAL - 006 Utility Line Sizing (sizing artinya sudah mencakup kalkulasi)

7 - PRO - CAL - 007 Flare System Sizing8 - PRO - CAL - 008 PSV Sizing

8 - PRO - CAL - 008 Process Calculation - PSV Sizing

LIST

1 - PRO - LIST - 001 Equipment List

2 - PRO - LIST - 002 Line List

PFD & UFD

1 - PRO - PFD - 001 PFD -LNG Receiving Facility

2 - PRO - PFD - 002 PFD-Pipe Line & Metering System

3 - PRO - PID - 003 UFD- Fuel System

4 - PRO - PID - 004 UFD -Instrument and Utility Air System

5 - PRO - PID - 005 UFD -Fire Water System

6 - PRO - PID - 006 UFD -Utility and Potable Water System

7 - PRO - PID - 007 UFD- Waste Water System

8 - PRO - PID - 008 UFD -Nitrogen System

HMB

1 EJGT - PRO - HMB - 008 Heat and Material Balance

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 5 / 18

P&ID

1 - PRO - PID - 001 P&ID-Drawing Index

2 - PRO - PID - 002 P&ID-Legend and Symbol

3 - PRO - PID - 003 P&ID-Loading Arm

4 - PRO - PID - 004 P&ID-LNG Tank

5 - PRO - PID - 005 P&ID-LNG Pump

6 - PRO - PID - 006 P&id-LNG Vaporizer

7 - PRO - PID - 007 P&ID-BOG Compressor

8 - PRO - PID - 008 P&ID-Gas PipeLine & LBCV

9 - PRO - PID - 009 P&ID-Gas Metering

10 - PRO - PID - 010 P&ID-Flare System

11 - PRO - PID - 011 P&ID-Fuel (Gas/Diesel) System

12 - PRO - PID - 012 P&ID-Instrument and Utility Air System

13 - PRO - PID - 013 P&ID-Fire Water System

14 - PRO - PID - 014 P&ID-Utility & Portable Water System

15 - PRO - PID - 015 P&ID-Waste Water System

16 - PRO - PID - 016 P&ID-Fire Water Ring Main

17 - PRO - PID - 017 P&ID-Closed Drain System

18 - PRO - PID - 018 P&ID-Nitrogen System

4 HSE

GENERAL

1 - HSE - GEN - 001 Health, Safety & Environment

2 - HSE - GEN - 002 Fire Fighting Supresion

3 - HSE - GEN - 003 Safety Loss Prevention

4 - HSE - GEN - 004 Hazid Study

5 - HSE - GEN - 005 Quantitative Risk Asessment Study

CALCULATION

1 - HSE - CAL - 001 Fire Extinguisher Calculation

2 - HSE - CAL - 002 Fire Water Supply Calculation

3 - HSE - CAL - 003 Fire Water Pump Sizing

4 - HSE - CAL - 004 Fire Supresion Calculation

SPECIFICATION

1 - HSE - SPC - 001 Specification for Personal Protection Equipment

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 6 / 18

2 - HSE - SPC - 002 Environmental Management and Monitoring System

3 - HSE - SPC - 003 Safety Specification for Fire Fighting Equipment

4 - HSE - SPC - 004 Safety Spesification for Fire & Gas Detector

5 - HSE - SPC - 005 Safety Spesification for Passive Fire Protection

6 - HSE - SPC - 006 Safety Spesification for Automatic Deluge Valves

7 - HSE - SPC - 007 Noise Level In Residential And Plant Area (Change to Spec Equipment Noise)

DATA SHEET

1 - HSE - DTS - 001 Delugas Valves Data Sheet

2 - HSE - DTS - 002 Hydrant Data Sheet

3 - HSE - DTS - 003 Fire Monitor Data Sheet

4 - HSE - DTS - 004 Eye Wash & Safety Shower Data Sheet

5 - HSE - DTS - 005 Fire Extinghuiser Data Sheet

LIST1 - HSE - LIST - 001 Safety Equipment List2 - HSE - LIST - 002 Hazardous Material List DRAWING1 - HSE - DWG - 001 Escape Ways Layout2 - HSE - DWG - 002 Fire and Gas Detector Layout3 - HSE - DWG - 003 Technical Building Fire and Gas Detection Layout4 - HSE - DWG - 004 Fire Fighting Equipment Layout5 - HSE - DWG - 005 Fire Water Layout5 MECHANICAL GENERAL - MEC - DB - 001 Mechanical Design Basis SPECIFICATION

1 - MEC - SPC - 001

Specification for Design and Fabrication of Pressure Vessels

2 - MEC - SPC - 002

Specification for Centrifugal Pump for Non Hydrocarbon Services

3 - MEC - SPC - 003

Spesification Centrifugal Pump Hydrocarbon Services

4 - MEC - SPC - 004 Specification for Over head Crane5 - MEC - SPC - 005 Specification for Diesel Driven Fire Water Pump6 - MEC - SPC - 006 Specification Diesel Engine Generator7 - MEC - SPC - 007 Specification for Open Rack Vaporizer

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 7 / 18

8 - MEC - SPC - 008 Specification for Ambient Air Vaporizer9 - MEC - SPC - 009 Specification for BOG Return Boiler

10 - MEC - SPC - 010 Spesification for LNG Pump11 - MEC - SPC - 011 Specification of Heat Exchanger12 - MEC - SPC - 012 Spesification for Cyrogenic Loading Arm13 - MEC - SPC - 013 Spesification for Cyrogenic Loading Hose14 - MEC - SPC - 014 Spesification for Atmospheric LNG Tank15 - MEC - SPC - 015 Spesification for lso LNG Tank16 - MEC - SPC - 016 Spesification for General Weldding17 - MEC - SPC - 017 Spesification for Nitrogen System (Bottle Bank)

18 - MEC - SPC - 018

Mechanical-Specification Instrumen Air Compressor Package

19 - MEC - SPC - 019

Mechanical-Specification Nitrogen Generation Package

20 - MEC - SPC - 020 Specification for CO2 Fire Extinguishing System21 - MEC - SPC - 021 Specification Painting

DATA SHEET

1 - MEC - DTS - 001 Mechanical Data Sheet LNG Vaporizer

2 - MEC - DTS - 002 Mechanical Data Sheet LNG Loading Pump

3 - MEC - DTS - 003 Mechanical Data Sheet BOG Compressor

4 - MEC - DTS - 004 Mechanical Data Sheet LNG Storage Tank

5 - MEC - DTS - 005

Mechanical Data Sheet Diesel Fuel Distribution Pumps

6 - MEC - DTS - 006 Mechanical Data Sheet Diesel Fuel Storage Tank

7 - MEC - DTS - 007 Mechanical Data Sheet Engine Generator

8 - MEC - DTS - 008 Mechanical Data Sheet Pressure Vessel

9 - MEC - DTS - 009 Mechanical Data Sheet Heat Exchanger

10 - MEC - DTS - 010 Mechanical Data Sheet Cryogenic Loading Arm

11 - MEC - DTS - 011 Mechanical Data Sheet Cryogenic Loading Hose

12 - MEC - DTS - 012 Mechanical Data Sheet Cryogenic Tank

13 - MEC - DTS - 013

Instrument Air Compressor & Dryer Package Data Sheet

14 - MEC - DTS - 014 Instrument Air Receiver Data Sheet

15 - MEC - DTS - 015 Utility Air Receiver Data Sheet

16 - MEC - DTS - 016 Mechanical Data Sheet Deep Well Water Pumps

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 8 / 18

17 - MEC - DTS - 017 Mechanical Data Sheet Utility Water Pumps

18 - MEC - DTS - 018

Mechanical Data Sheet Potable Water Treatment Package

19 - MEC - DTS - 019 Mechanical Data Sheet Nitrogen (N2) Bottle Package

20 - MEC - DTS - 020 Mechanical Data Sheet Firewater Pumps

21 - MEC - DTS - 021 Mechanical Data Sheet Jockey Pumps

22 - MEC - DTS - 022 Mechanical Data Sheet Potable Water Tank

23 - MEC - DTS - 023 Mechanical Data Sheet Overhead Crane

24 - MEC - DTS - 024 Mechanical Data Sheet Pig Receiver

25 - MEC - DTS - 025 Mechanical Data Sheet Pig Launcher

26 - MEC - DTS - 026 Mechanical Data Sheet CO2 Snuffing Package

CALCULATION

1 - MEC - CAL - 001 Mechanical Calculation LNG Tank

MTO

1 - MEC - MTO - 001 Mechanical MTO - Material Take Off

6 CIVIL & STRUKTURAL

GENERAL

1 - CIV - GEN - 001 Civil and Structural - Design Basis Design Criteria

SPECIFICATION

1 - CIV - SPC - 001 Civil Specification for Design Load Structure

2 - CIV - SPC - 002

Civil Specification for Structural Steel Design and Material

3 - CIV - SPC - 003 Civil Specification for Concrete Design and Material

4 - CIV - SPC - 004 Civil Specification for Building Design and Material

5 - CIV - SPC - 005 Civil Specification for Foundation

6 - CIV - SPC - 006 Civil Specification for Fencing and Gates Materials

7 - CIV - SPC - 007

Civil Specification for Roads, Parking, and Grading Areas

8 - CIV - SPC - 008 Civil Specification for Masonry Construction

9 - CIV - SPC - 009 Civil Specification for Grouting Design and Material

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 9 / 18

10 - CIV - SPC - 010 Civil Specification for Interior Plumbing and Material

11 - CIV - SPC - 011 Civil Specification for Sewer and Drainage System

12 - CIV - SPC - 012 Civil Specification for Water Pond

13 - CIV - SPC - 013 Civil Specification for Site Prepaation

14 - CIV - SPC - 014 Civil Specification for Earthworks & Soil Mix Desaign

15 - CIV - SPC - 015 Civil Specification for Piles and Sheet Pile

16 - CIV - SPC - 016 Civil Specification for Landscape

17 - CIV - SPC - 017 Civil Specification for Topography

18 - CIV - SPC - 018 Civil Specification for Civil Investigation

CALCULATION

1 - CIV - SPC - 001

Civil Calculation Sheet - Telecom, Battery, MCC & Control Room

2 - CIV - SPC - 002

Civil Calculation Sheet - Office/Administration Building

3 - CIV - SPC - 003

Civil Calculation Sheet - Werehouse and Workshop Building

4 - CIV - SPC - 004 Civil Calculation Sheet - Security / Guard Post5 - CIV - SPC - 005 Civil Calculation Sheet - Gen-set Shelter

6 - CIV - SPC - 006

Civil Calculation Sheet - Instrument Air / Landfall-Shelter

7 - CIV - SPC - 007 Civil Calculation Sheet - Fire Water Pond8 - CIV - SPC - 008 Civil Calculation Sheet - Water Jockey Pump Shelter9 - CIV - SPC - 009 Civil Calculation Sheet - Vent Stack

10 - CIV - SPC - 010

Civil Calculation Sheet - Piperack Steel Framing & Foundation

11 - CIV - SPC - 011 Civil Calculation Sheet - Vent Stack Foundation12 - CIV - SPC - 012 Civil Calculation Sheet - Piling Capacity Design13 - CIV - SPC - 013 Civil Calculation Sheet - Pipe Sleeper Foundation

14 - CIV - SPC - 014

Civil Calculation Sheet - Diesel Fuel Storage Tank Support Foundation

15 - CIV - SPC - 015

Civil Calculation Sheet - Tie In Gas Metering Foundation

16 - CIV - SPC - 016

Civil Calculation Sheet - Utility & Instrument Air Receiver Foundation

17 - CIV - SPC - 017 Civil Calculation Sheet - Slab On Grades Plan

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 10 / 18

18 - CIV - SPC - 018

Civil Calculation Sheet - Portable Water Storage Tank Tower Foundaton

19 - CIV - SPC - 019 Civil Calculation Sheet - Gas Manifold Foundation

20 - CIV - SPC - 020

Civil Calculation Sheet - Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slabe on Grade)

21 - CIV - SPC - 021

Civil Calculation Sheet - Flexible Road Pavement (Asphalt)

22 - CIV - SPC - 022

Civil Calculation Sheet - Rigid Road Pavement (Concrete)

23 - CIV - SPC - 023 Civil Calculation Sheet - Culvet & U-Ditch

DRAWING

1 - CIV - DRW- 001

General Note, Abrreviation & Symbol for Civil, Structures & Architecture

2 - CIV - DRW- 002 Pilling Plan3 - CIV - DRW- 003 Foundation Plan4 - CIV - DRW- 004 Fence and Gate Plan

5 - CIV - DRW- 005

Telecom, Battery, MCC & Control Room-Plans, View and Section

6 - CIV - DRW- 006

Telecom, Battery, MCC & Control Room-Roofing, Floor Plan, Columm & Beam Schedule and Detail

7 - CIV - DRW- 007

Office Administration, Building-Plans, View and Sections

8 - CIV - DRW- 008

Office Administration, Building-Roofing, Floor Slab, Columm & Beam Schedule and Detail

9 - CIV - DRW- 009

Ware House & Workshop Building - Plan, View and Sections

10 - CIV - DRW- 010

Ware House & Workshop Building - Floor, Roofing Plan Columm & Bean Schedule and Detail

11 - CIV - DRW- 011

Power Feeder Station (PLN House) - Plan, Views and Section

12 - CIV - DRW- 012

Power Feeder Station (PLN House) - Roofing Plan, Collum and Beam Schedule and Details

13 - CIV - DRW- 013 Security / Guard Post Plan, View and Section

14 - CIV - DRW- 014

Security / Guard Post Roofing Plan, Columm and Beam Schedule and Details

SHELTERS

15 - CIV - DRW- 015

Genset Shelter - Structure Plans, Foundation Plan, Views Section and Details

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 11 / 18

16 - CIV - DRW- 016 Genset Shelter - Roofing Plan

17 - CIV - DRW- 017

Instrument Air Shelter - Structure Plans, Foundation Plan, View Section and Details

18 - CIV - DRW- 018 Instrument Air Shelter - Roofing Plan

19 - CIV - DRW- 019

Landfall Sheller - Structure Plans, Foundation Plans, Views Section and Details

20 - CIV - DRW- 020 Landfall Sheller - Roofing Plan21 - CIV - DRW- 021 Pond Fire Water Jockey Pumps Sheller - Roofing Plan

22 - CIV - DRW- 022

Pond Fire Water Jockey Pumps Sheller - Structure Plans, Foundation Plan, Views Section and Details

UTILITIES23 - CIV - DRW- 023 Typical Vessel Support Plan, Section and Table

24 - CIV - DRW- 024

Vent Stack Support Structure - Plan, Section and Details

25 - CIV - DRW- 025 Vent Structure Foundation - Plan and Section Details

26 - CIV - DRW- 026

Piperack - Plan, Elevation and Steel Member Shcedule (1/2)

27 - CIV - DRW- 027

Piperack - Plan, Elevation and Steel Member Shcedule (2/2)

28 - CIV - DRW- 028 Piperack - Pilling and Foundation Plan

29 - CIV - DRW- 029

Typical Pipe Support and Pipe Sleeper Plan Elevation and Section

30 - CIV - DRW- 030

Instrument Air Shelter - Piling, Foundation and Roofing Plan

31 - CIV - DRW- 031

Typical Pipe Support and Pipe Sleeper Plan Elevation and Section

32 - CIV - DRW- 032

Potable Water Storage Tank Tower - Plan, Elevation and Stell Member Schedule

33 - CIV - DRW- 033

Potable Water Storage Tank Tower - Piling & Foundation Details

34 - CIV - DRW- 034

Diesel Fuel Storage Tank Support Plan, Section and Details

35 - CIV - DRW- 035 Slab on Grades Plan, Section and Table

36 - CIV - DRW- 036

Tie In Gas Metering Foundation - Plan and Section Details

37 - CIV - DRW- 037

Utility & Instrument Air Receiver Foundation - Plan and Section Details

38 - CIV - DRW- 038

Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slab on Grade)

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 12 / 18

39 - CIV - DRW- 039

Condensate Drum and Pump Foundation - Plan and Section Details

40 - CIV - DRW- 040 Road and Pavement - Plan, Section and Details41 - CIV - DRW- 041 Culvert / Bridge - Plan, Section and Details42 - CIV - DRW- 042 Fence and Gate Plan43 - CIV - DRW- 043 Fences - Sections and Details44 - CIV - DRW- 044 Gates - Section and Details45 - CIV - DRW- 045 Sewer & Drainege System - Plan, Section & Details LIST1 - CIV - LIST- 001 Drawing List Civil, Structure and Architecture

MTO1 - CIV - MTO- 001 MTO Civil and Structures7 PIPING GENERAL1 EJGT - PIP - DB - 001 Piping Design Basis SPECIFICATION1 - PIP - SPC - 001 Piping - Spesification Piping Design

2 - PIP - SPC - 002

Piping - Specification Piping Material Class (Include All Piping Accessories)

3 - PIP - SPC - 003 Piping - Specification Piping Plan Layot4 - PIP - SPC - 004 Piping - Specification Stress Design Basis DATA SHEET1 - PIP - DTS - 001 Specially Item Data Sheet2 DRAWING 3 - PIP - DRW - 001 General Plot Plan4 - PIP - DRW - 002 Equipment Layout5 - PIP - DRW - 003 Key Plan ORF6 - PIP - DRW - 004 Piping GA - Overall System ORF7 - PIP - DRW - 005 Piping GA - Slug Catcher ORF8 - PIP - DRW - 006 Fire Water System and Utility Water Pump CALCULATION1 - PIP - CAL - 001 Wall Thickness Calculation MTO1 - PIP - MTO - 001 Material Take Off Piping8 ELECTRICAL GENERAL1 - ELE - DB - 001 Electrical Design Basis2 - ELE - DB - 002 Electrical Power Distribution System3 - ELE - DB - 003 Hazardous Area Classification Design4 - ELE - DB - 004 Electrical Control System

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 13 / 18

5 - ELE - DB - 005 Electrical Power System REPORT1 - ELE - RPT - 006 Electrical Report - ETAP Power Study Report SPECIFICATION

1 - ELE - SPC - 001

Specification of General Electrical Instalation (Code and Standard Electrical)

2 - ELE - SPC - 002 Electrical Instalation Specification

3 - ELE - SPC - 003

Electrical Specification - Electrical Requirements For Package Unit

4 - ELE - SPC - 004 Electrical - Specification Power Generator5 - ELE - SPC - 005 Electrical - Specification Induction Motor

6 - ELE - SPC - 006

Specification of Low Voltage Switchgear & Motor Control Center

7 - ELE - SPC - 007

Electrical Specification - Electrical and Instrument Cable

8 - ELE - SPC - 008

Electrical Specification - Electrical and Instrument Cable Trays

9 - ELE - SPC - 009 Electrical Specification - DC Battery System

10 - ELE - SPC - 010

Electrical Specification - Uninterruptable Power System (UPS)

11 - ELE - SPC - 011 Electrical Specification - Lighting and Accessories

12 - ELE - SPC - 012

Electrical Specification - Grounding / Bounding System

13 - ELE - SPC - 013

Electrical Specification - Grounding System / EMC Base

14 - ELE - SPC - 014 Electrical Specification - Lighting Protection System

15 - ELE - SPC - 015

Electrical Specification - Oil Immerse Power Transformer

16 - ELE - SPC - 016 Electrical Specification - Catodic Protection CALCULATION1 - ELE - CAL - 001 Electrical Calculation - Cable Sizing2 - ELE - CAL - 002 Electrical Calculation - Voltage Drop3 - ELE - CAL - 003 Electrical Calculation - Short Circuit4 - ELE - CAL - 004 Electrical Calculation - Load Flow5 - ELE - CAL - 005 Electrical Calculation - Lighting6 - ELE - CAL - 006 Electrical Calculation - UPS7 - ELE - CAL - 007 Electrical Calculation - Battery Charger 24 VDC8 - ELE - CAL - 008 Generator Capacity Calculation9 - ELE - CAL - 009 Electrical Calculation - Power Consumption

10 - ELE - CAL - 010 Short Circuit Calculation

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 14 / 18

11 - ELE - CAL - 011 Grounding Calculation DATA SHEET1 - ELE - DTS - 001 Data Sheet Gas Engine Driven Generator2 - ELE - DTS - 002 Data Sheet Diesel Engine Generator3 - ELE - DTS - 003 Electrical Data Sheet LV Switchgear4 - ELE - DTS - 004 Data Sheet MCC5 - ELE - DTS - 005 Data Sheet Power & Distribution Transformer

6 - ELE - DTS - 006

Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System

7 - ELE - DTS - 007 Data Sheet 24 VDC Baterry Charger8 - ELE - DTS - 008 Data Sheet Earthing and Lighting Protection System9 - ELE - DTS - 009 Data Sheet Panel Distribution Board

10 - ELE - DTS - 010 Data Sheet Cable

LIST1 - ELE - LIST - 001 List - Electrical Equipment2 - ELE - LIST - 002 Electrical List - Load List Equipment

DRAWINGS1 - ELE - DWG - 001 Layot Hazardous Area ORF Grati2 - ELE - DWG - 002 Electrical Legend and Symbol3 - ELE - DWG - 003 Electrical Overall One Line Diagram4 - ELE - DWG - 004 Electrical Lighting Protection Layout5 - ELE - DWG - 005 Outdoor Lighting Layout ORF Grati6 - ELE - DWG - 006 Electrical Cable Ladder and Cable Routing Layout7 - ELE - DWG - 007 Building for E/t Telecom Layout

8 - ELE - DWG - 008

Electrical Typical Installation Detail Power and Control Works (35 Sheets)

9 - ELE - DWG - 009

Electrical MCC Arrangement Layout in Control Room at Building

MTO 1 - ELE - MTO - 001 MTO - Material Take Off Electrical

9 INSTRUMENT GENERAL

1 - INS - DB - 001

Instrument Design Basis - Instrument & Control Design Basis

SPECIFICATION

1 - INS - SPC - 001

Instrument Spesification - Instrument Mounted on Packages

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 15 / 18

2 - INS - SPC - 002

Instrument Spesification - Instrument Design & Instalation

3 - INS - SPC - 003 Instrument Spesification - Process Control System4 - INS - SPC - 004 Instrument Spesification - ESD Specification

5 - INS - SPC - 005

Instrument Spesification - Instrument Inspection & Testing Spesification

6 - INS - SPC - 006

Instrument Spesification - Gas Metering Specifcation

7 - INS - SPC - 007 Instrument Spesification - Gas Analyzer8 - INS - SPC - 008 CCTV, Paging and Alarm System Specification9 - INS - SPC - 009 Personal Announcement

10 - INS - SPC - 010 Jetty Emergency Shutdown System11 - INS - SPC - 011 Surge Arrester Specification

DATA SHEET

1 - INS - DTS - 001

Instrument Data Sheet - Orifice Plate and Restriction Orifice

2 - INS - DTS - 002 Instrument Data Sheet - DP Flow Transmitter

3 - INS - DTS - 003 Instrument Data Sheet - Level Transmitter

4 - INS - DTS - 004 Instrument Data Sheet - Temperature Gauge

5 - INS - DTS - 005 Instrument Data Sheet - Temperature Transmitter

6 - INS - DTS - 006

Instrument Data Sheet - Pressure Differential Gauge

7 - INS - DTS - 007 Instrument Data Sheet - Pressure Transmitter

8 - INS - DTS - 008 Instrument Data Sheet - Pessure Indicator

9 - INS - DTS - 009

Instrument Data Sheet - Shutdown and Blowdown Valves

10 - INS - DTS - 010 Instrument Data Sheet - Gas Cromatography

11 - INS - DTS - 011 Instrument Data Sheet - Gas Detector

12 - INS - DTS - 012 Instrument Data Sheet - Flame Detector

13 - INS - DTS - 013 Instrument Data Sheet - Manual Alarm Call Point

14 - INS - DTS - 014 Instrument Data Sheet - Heat Detector

15 - INS - DTS - 015 Instrument Data Sheet - Smoke Detector

16 - INS - DTS - 016 Instrument Data Sheet - Fire Alarm Panel

17 - INS - DTS - 017 Instrument Data Sheet - Control Valve

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 16 / 18

18 - INS - DTS - 018 Instrument Data Sheet - Junction Box

19 - INS - DTS - 019 Instrument Data Sheet - Gas Metering

20 - INS - DTS - 020 Instrument Data Sheet - Alarm Bell

21 - INS - DTS - 021 Instrument Cable Schedule

22 - INS - DTS - 022 Instrument Data Sheet - Pressure Safety Valve

23 - INS - DTS - 023 Instrument Data Sheet - Pressure Switch

24 - INS - DTS - 024 Instrument Data Sheet - Level Glass

25 - INS - DTS - 025

Instrument Data Sheet - Differential Pressure Level Transmitter

DRAWING1 - INS - DWG - 001 Instrument - Instrument Index ORF Grati

2 - INS - DWG - 002

Hook up Pressure Lead Tubing and Instrument Air Tubing (Typical) Shutdown Valve

3 - INS - DWG - 003

Instrument Layout of Fire and Gas Detection Cable Routing

4 - INS - DWG - 004

Instrument Main Cable Way & Main Cable Routing & Junction Box ORF Grati

5 - INS - DWG - 005 Layout Field Instrument Location & Cable Routing

6 - INS - DWG - 006

Instrument Hook Up (Typical) Temperature Transmitter

7 - INS - DWG - 007 Instrument Block Diagram8 - INS - DWG - 008 Instrument Hierarchy9 - INS - DWG - 009 Instrument Battery Limit DIAGRAM - INS - DWG - 009 Instrument Diagram - Cause and Effect Diagram

10 TELECOMMUNICATION GENERAL1 - INS - GEN - 001 Design Basis Supervisory Control and Data Acquisition 2 - INS - GEN - 002 Gas Management System3 - INS - GEN - 003 Coastal Radio SPECIFICATION

1 - INS - SPC - 001

Gas Management System Specification Radio Data and Voice Specification

2 - INS - SPC - 002 Network System Specification3 - INS - SPC - 003 IPBX Specification CALCULATIONS DRAWING1 - INS - DRW - 001 Overall System Configuration

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 17 / 18

2 - INS - DRW - 002 RTU Configuration3 - INS - DRW - 003 INSTRUMENT & TELECOM - SYSTEM CONFIGURATION4 - INS - DRW - 004 RTU -TYPICAL BLOCK DIAGRAM METERING5 - INS - DRW - 005 SCADA ARCHITECTURE

11 PIPELINE SPESIFIKASI1 - PL - SPC - 001 Spesification Pipeline Onshore2 - PL - SPC - 002 Spesification External Pipe Coating3 - PL - SPC - 003 Spesification Field Joint Coating Offshore4 - PL - SPC - 004 Spesification Hot Induction Bend

5 - PL - SPC - 005 Spesification Pipeline Offshore Construction

6 - PL - SPC - 006 Spesification for Internal Coating Epoxy Paint

7 - PL - SPC - 007 Spesification Wrapping

8 - PL - SPC - 008 Spesification For Concrete Coating

9 - PL - SPC - 009 Spesification For Insulating Joint

10 - PL - SPC - 010 Spesification Pipeline Welding

11 - PL - SPC - 011 Spesification Pre-Commissioning

12 - PL - SPC - 012 Spesification Painting Pipeline Onshore

CALCULATION

1 - PL - CAL - 001 Perhitungan Ketebalan Pipeline

2 - PL - CAL - 002 Perhitungan Field Bending

3 - PL - CAL - 003

Perhitungan Buckling, Collapse Pipeline Analysis Pipeline

4 - PL - CAL - 004 Perhitungan Pipeline Stability dan Bouyancy

5 - PL - CAL - 005 Perhitungan Freespan Pipeline Offshore

6 - PL - CAL - 006 Perhitungan On Bottom Stability Analysis Offshore

7 - PL - CAL - 007 Perhitungan Bending Stress Offshore

DATA SHEET

1 - PL - DTS - 001 Data Sheet for Pipeline Valve

2 - PL - DTS - 002 Data Sheet for Pipeline Special Item

DRAWINGS

1 - PL - DRW - 001 Key Plan Pipeline Route

2 - PL - DRW - 002

Pipeline Alignment Sheet 1 : 2000 Horizontal, 1 : 5000 Vertical

3 - PL - DRW - 003 Typical Anode Drawing

4 - PL - DRW - 004 Typical Pipeline Freespan Correction

DOC.NO : FEED-GEN-GEN-024

FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &

MAKASAR)

DELIVERABLE LISTREVISI : 0

HALAMAN : 18 / 18

5 - PL - DRW - 005 Typical Road Crossing

12 MATERIAL TAKE OFF

1 - PL - MTO - 001 MTO for Pipeline

13 SCHEDULE & COST

1 - SCH - - 001 Project Schedule 2 - SCH - - 002 List of Longlead Items & Construction services 3 - SCH - - 003 Delivery Periode for All Major Items of Equipment 4 - SCH - - 004 Vendor List

5 - EC - - 002 Engineering Cost Estimate