20 years of MHP in Indonesia and its future outlookin the perspective of turbine manufacturer
GTZ-gate 1991 to GIZ MHPP 2 2011
Jakarta , October 26 2011
Ir. Kusetiadi Raharjo Director-Senior Hydropower Engineer
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
2/14
MICROHYDRO B RIEF DEVEL OPM ENT IN INDON ESIA Tea Estate and Java Island , 1885 1925, more than 400 units micro-mini hydro
built in Indonesia, all of the equipments imported from Europe
IKIP Padang, R.M. Enoch , 1980, vocational teacher WRI, Irian Jaya, M. Johnson, 1985, Missionary
FAKT, YTDS, Toraja and North Sumatra, 1987, Missionary GTZ-gate Yayasan Mandiri, 1991-1994, Technology Cooperation
Directorate of Electricity and Energy Development, 1991, Government Heksa (steel structure), 1992, Manufacturer, Private Company Kramatraya Sejahtera, 1993, Manufacturer, Private Company
HeksaHydro, 1995, EPC and Manufacturer, Private Company Yayasan IBEKA, 1995, EPC and Developer, NGO
GTZ-MHPP MHPP 2 , 1998 , Mini Hydro Power Project for Capacity Development Cihanjuang Inti Teknik, 2001, Manufacturer, Private Company 2001 Present , more than 20 microhydro manufacturers established 2001 Present , 5 ministries have microhydro program ( ESDM, PDT, Kesra, PU, Depkop) 2001 Present, more than 30 regencies have microhydro program 2001 Present, many estates and developers are interested in micro-mini hydro
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
3/14
Flashback young engineer with vision
1992 - 1994, employee of GTZ -gateYayasan M andir i
1992, MH PG Trai ni ng course, Swiss
F ield engineer: si te survey, supervi si tur bin,
controll er,erection& commi ssioning
1994, Study EL C, Sri L anka
1995, GTZ-gate terminated, jobless and
joint wi th PT. H eksa and run H eksaH ydro
division
Self employee, assi sted by my wife and 1technician
Start up capital : handl ing over equi pment
from GTZ , rest payment of zair e project
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
4/14
Flashback zero to micro, from scratch & scrap
22 October 1995, rent a house in Ci mi ndi AK -4 Di ni ng room & garage as electr i cal workshop,
whi le famil y room as small off i ce
Turbi ne production internal- sub contract
1999, invest mechani cal workshop in L I K B-30
1999-2004, joint f acil i ty for machining & OS
2004-2008, invest for machi ne, no more
outsour cing (OS)
2004, invest AK-4 as SOH O
2007, i nvest backyard of AK-4 as warehouse 2008, invest another workshop in L I K B -78
2008, invest AK-3 for extended off i ce
2009, invest backyard of AK-3 as Renewable
Energy Gal lery, Test Ri g and warehouse
2010, invest AK -2 special for off i ce
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
5/14
HEKSAHYDRO B RIEF PRODUCTIONS 1992-2010Pioneer Periods 1992 2000, total productions 42 units, per year 4 6 units, infrastructures
(400 m2 office-workshop, 15 employees, 11 kVA power, 1 lathe machine, 1 milling machine, 2welding machine, 30% machining works were outsourcing )
Survival Periods 2001 2005, total productions 27 units, per year 4 6 units,infrastructures(400 m2 office-workshop, 15 employees, 11 kVA power, 1 lathe machine, 1 milling machine, 2welding machine, 30% machining works were outsourcing )
Booming Period 2006- 2010, total productions 185 units, per year 30-50 units, per month 2 5 unit, infrastructures (3800 m2 office-workshop, 40 employees, 130 kVA power, 7 lathemachine,7 milling machine, 15 welding machine, 5 shapping machine, 3 slotting machine, 2
sand blasting machine, no machining works were outsourcing ) Total turbin yang sudah diproduksi s/d 2010 = 254 unit (domestic = 223 unit 88% , export
= 31 unit 12%)
Costumer domestic: Dirjen LPE, Dinas Pertambangan&Energi Propinsi-Kabupaten, LSM danPerorangan, Perkebunan dan Pertambangan
Costumer export AFRIKA : Uganda, Zaire, Tanzania, Kamerun, Kongo, Madagaskar, Ethiopia,Nigeria, potensi yang belum tergarap (Kenya, Ecowest/Uni Afrika Barat) ASIA : Malaysia,Phillipina, Thailand, Laos, Nepal, potensi yang belum tergarap (Myanmar, Bhutan), EROPA :Wales, potensi yang belum tergarap/menunggu kontrak (Small farming di Irlandia-Skotlandia,Small IPP di Italy dan Swiss)
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
6/14
HEKSAHYDRO DOMECTIC & ASEAN PROJ ECT
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
7/14
HEKSAHYDRO EXPORT TO AF RICA
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
8/14
GTZ-gate to giz - MHPP 2
Not more than 3 workshop worked for micro hydro
Not more than 5 engineers worked for micro hydro
There was no university in Indonesia interested in micro hydro
Only ESDM-DJLPE had micro hydro program
There was no private company interested to invest in micro hydro
(GTZ-gate period 1991 1994)
More than 20 workshop work for micro-mini hydro
More than 100 engineers work for micro-mini hydro
Many universities are doing research and development in micro-mini hydro
5 Ministries and more than 30 regencies have micro hydro program
Many private companies interested to invest in mini hydro
(GTZ-M H PP , giz M H PP 2 period 1998 Present)
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
9/14
TECHNOLOGY CYCLE
Tea Estate Neglasari, West Java, 41 kW
Turbine Made in United Kingdom, 1929
Boving & Co Ltd. London
Alwen Water Treatment Work,
Wales, United Kingdom, 25 kW
Turbin Made in Indonesia, 2006
Heksahydro, Cimahi-West Java
(Europe intermediate technol ogy whi ch
need ski l l l abor shoul d be relocated in thi rd
countr y li ke I ndonesia )
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
10/14
The First T-14 D300 100 kWBili-Bili, 1999
Followed by Dewata 120 kW (2002)
The Fisrt T-14 D150Long Lawen, Sarawak, Malaysia, 2001
Now we are making the 90 th to 110 th
The First T-7 (in Bandung)Curug Agung, 1992
3 units only , terminated in 1993
The First T-12 (in Bandung)Cibitung, 1993
around 50 units, terminated in 1998
The First T-14 D300 (in the World)Sedau, Lombok, 1998
Now we are making the 80 th to 90 th
The First T-15 D500 (in The World)Melong, West Java, 2005
Now we are making the 8 th
PROFILE progress step by step
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
11/14
X-flow Turbine T-14 D225head: 3 100 meterpower: 5 100 kW
Propeller S-Turbinehead: 2 13 meter
power: 10 - 150 kW
X-flow Turbine T-14 D300head: 3 100 meterpower: 10 150 kW
X-flow Turbine T-14 D150head: 3 40 meterpower: 3 30 kW
X-flow Turbine T-15 D500head: 5 100 meterpower: 50 700 kW
Pelton Turbinehead: 70 300 meterpower: 50 1000 kW
PROFILE product - turbine
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
12/14
GTZ-MHPPNigerian microhydro training course
Bandung, 2011, Kus as trainer
TEST RIG HEKSAHYDROTest and modelling turbinee
Cimindi 2009
MHPG-SKAT-GTZ gatehydropower training courseSwiss, 1992, Kus as trainee
Universitat Stuttgart , entec aglaboratory test T-14
Germany, 1998
Green EmpowermentAsian microhydro training course
Bandung, 2003, Kus as trainer
GALLERY HEKSAHYDROShow room & training center
Cimindi, 20011
PROFILE technology and partnership
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
13/14
FUTURE OUTLOOK
So far since 1992, I can grow and glow from micro hydro
GTZ-gate technology cooperation has given opportunity a marginal engineerto be a hydro technopreneur
Since 2001 , Indonesian Energy Policy is conducive for micro hydro development
There is no china competitor especially for cross-flow turbine
Foreign market for cross-flow turbine is still prospective especially for micro size
Hydropower engineering is still an emerging market in Indonesia, since just
7.54% are developed (Micro hydro = 28.31%)
More challenges for mini hydro turbine manufacturing, especially from chinaMini hydro turbine manufacturing (francis, kaplan) will not grow in Indonesia,
except there is a special protection or another technical & business-cooperation
Technical & business cooperation: German-Indo (Voith-PT.Indo,WKV-PT.Indo) to compete with Sinohydro (China manufacturer)
We may learn from Andritz Hydro (Austria-India)
-
8/10/2019 2_-_Heksa_20th-GTZ-MHPP
14/14
We may survive without hydropower, butCan we live without water ??
THANK YOU -Terima Kasih