    20 years of MHP in Indonesia and its future outlookin the perspective of turbine manufacturer

    GTZ-gate 1991 to GIZ MHPP 2 2011

    Jakarta , October 26 2011

    Ir. Kusetiadi Raharjo Director-Senior Hydropower Engineer

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    2/14

    MICROHYDRO B RIEF DEVEL OPM ENT IN INDON ESIA Tea Estate and Java Island , 1885 1925, more than 400 units micro-mini hydro

    built in Indonesia, all of the equipments imported from Europe

    IKIP Padang, R.M. Enoch , 1980, vocational teacher WRI, Irian Jaya, M. Johnson, 1985, Missionary

    FAKT, YTDS, Toraja and North Sumatra, 1987, Missionary GTZ-gate Yayasan Mandiri, 1991-1994, Technology Cooperation

    Directorate of Electricity and Energy Development, 1991, Government Heksa (steel structure), 1992, Manufacturer, Private Company Kramatraya Sejahtera, 1993, Manufacturer, Private Company

    HeksaHydro, 1995, EPC and Manufacturer, Private Company Yayasan IBEKA, 1995, EPC and Developer, NGO

    GTZ-MHPP MHPP 2 , 1998 , Mini Hydro Power Project for Capacity Development Cihanjuang Inti Teknik, 2001, Manufacturer, Private Company 2001 Present , more than 20 microhydro manufacturers established 2001 Present , 5 ministries have microhydro program ( ESDM, PDT, Kesra, PU, Depkop) 2001 Present, more than 30 regencies have microhydro program 2001 Present, many estates and developers are interested in micro-mini hydro

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    3/14

    Flashback young engineer with vision

    1992 - 1994, employee of GTZ -gateYayasan M andir i

    1992, MH PG Trai ni ng course, Swiss

    F ield engineer: si te survey, supervi si tur bin,

    controll er,erection& commi ssioning

    1994, Study EL C, Sri L anka

    1995, GTZ-gate terminated, jobless and

    joint wi th PT. H eksa and run H eksaH ydro

    division

    Self employee, assi sted by my wife and 1technician

    Start up capital : handl ing over equi pment

    from GTZ , rest payment of zair e project

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    4/14

    Flashback zero to micro, from scratch & scrap

    22 October 1995, rent a house in Ci mi ndi AK -4 Di ni ng room & garage as electr i cal workshop,

    whi le famil y room as small off i ce

    Turbi ne production internal- sub contract

    1999, invest mechani cal workshop in L I K B-30

    1999-2004, joint f acil i ty for machining & OS

    2004-2008, invest for machi ne, no more

    outsour cing (OS)

    2004, invest AK-4 as SOH O

    2007, i nvest backyard of AK-4 as warehouse 2008, invest another workshop in L I K B -78

    2008, invest AK-3 for extended off i ce

    2009, invest backyard of AK-3 as Renewable

    Energy Gal lery, Test Ri g and warehouse

    2010, invest AK -2 special for off i ce

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    5/14

    HEKSAHYDRO B RIEF PRODUCTIONS 1992-2010Pioneer Periods 1992 2000, total productions 42 units, per year 4 6 units, infrastructures

    (400 m2 office-workshop, 15 employees, 11 kVA power, 1 lathe machine, 1 milling machine, 2welding machine, 30% machining works were outsourcing )

    Survival Periods 2001 2005, total productions 27 units, per year 4 6 units,infrastructures(400 m2 office-workshop, 15 employees, 11 kVA power, 1 lathe machine, 1 milling machine, 2welding machine, 30% machining works were outsourcing )

    Booming Period 2006- 2010, total productions 185 units, per year 30-50 units, per month 2 5 unit, infrastructures (3800 m2 office-workshop, 40 employees, 130 kVA power, 7 lathemachine,7 milling machine, 15 welding machine, 5 shapping machine, 3 slotting machine, 2

    sand blasting machine, no machining works were outsourcing ) Total turbin yang sudah diproduksi s/d 2010 = 254 unit (domestic = 223 unit 88% , export

    = 31 unit 12%)

    Costumer domestic: Dirjen LPE, Dinas Pertambangan&Energi Propinsi-Kabupaten, LSM danPerorangan, Perkebunan dan Pertambangan

    Costumer export AFRIKA : Uganda, Zaire, Tanzania, Kamerun, Kongo, Madagaskar, Ethiopia,Nigeria, potensi yang belum tergarap (Kenya, Ecowest/Uni Afrika Barat) ASIA : Malaysia,Phillipina, Thailand, Laos, Nepal, potensi yang belum tergarap (Myanmar, Bhutan), EROPA :Wales, potensi yang belum tergarap/menunggu kontrak (Small farming di Irlandia-Skotlandia,Small IPP di Italy dan Swiss)

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    6/14

    HEKSAHYDRO DOMECTIC & ASEAN PROJ ECT

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    7/14

    HEKSAHYDRO EXPORT TO AF RICA

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    8/14

    GTZ-gate to giz - MHPP 2

    Not more than 3 workshop worked for micro hydro

    Not more than 5 engineers worked for micro hydro

    There was no university in Indonesia interested in micro hydro

    Only ESDM-DJLPE had micro hydro program

    There was no private company interested to invest in micro hydro

    (GTZ-gate period 1991 1994)

    More than 20 workshop work for micro-mini hydro

    More than 100 engineers work for micro-mini hydro

    Many universities are doing research and development in micro-mini hydro

    5 Ministries and more than 30 regencies have micro hydro program

    Many private companies interested to invest in mini hydro

    (GTZ-M H PP , giz M H PP 2 period 1998 Present)

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    9/14

    TECHNOLOGY CYCLE

    Tea Estate Neglasari, West Java, 41 kW

    Turbine Made in United Kingdom, 1929

    Boving & Co Ltd. London

    Alwen Water Treatment Work,

    Wales, United Kingdom, 25 kW

    Turbin Made in Indonesia, 2006

    Heksahydro, Cimahi-West Java

    (Europe intermediate technol ogy whi ch

    need ski l l l abor shoul d be relocated in thi rd

    countr y li ke I ndonesia )

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    10/14

    The First T-14 D300 100 kWBili-Bili, 1999

    Followed by Dewata 120 kW (2002)

    The Fisrt T-14 D150Long Lawen, Sarawak, Malaysia, 2001

    Now we are making the 90 th to 110 th

    The First T-7 (in Bandung)Curug Agung, 1992

    3 units only , terminated in 1993

    The First T-12 (in Bandung)Cibitung, 1993

    around 50 units, terminated in 1998

    The First T-14 D300 (in the World)Sedau, Lombok, 1998

    Now we are making the 80 th to 90 th

    The First T-15 D500 (in The World)Melong, West Java, 2005

    Now we are making the 8 th

    PROFILE progress step by step

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    11/14

    X-flow Turbine T-14 D225head: 3 100 meterpower: 5 100 kW

    Propeller S-Turbinehead: 2 13 meter

    power: 10 - 150 kW

    X-flow Turbine T-14 D300head: 3 100 meterpower: 10 150 kW

    X-flow Turbine T-14 D150head: 3 40 meterpower: 3 30 kW

    X-flow Turbine T-15 D500head: 5 100 meterpower: 50 700 kW

    Pelton Turbinehead: 70 300 meterpower: 50 1000 kW

    PROFILE product - turbine

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    12/14

    GTZ-MHPPNigerian microhydro training course

    Bandung, 2011, Kus as trainer

    TEST RIG HEKSAHYDROTest and modelling turbinee

    Cimindi 2009

    MHPG-SKAT-GTZ gatehydropower training courseSwiss, 1992, Kus as trainee

    Universitat Stuttgart , entec aglaboratory test T-14

    Germany, 1998

    Green EmpowermentAsian microhydro training course

    Bandung, 2003, Kus as trainer

    GALLERY HEKSAHYDROShow room & training center

    Cimindi, 20011

    PROFILE technology and partnership

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    13/14

    FUTURE OUTLOOK

    So far since 1992, I can grow and glow from micro hydro

    GTZ-gate technology cooperation has given opportunity a marginal engineerto be a hydro technopreneur

    Since 2001 , Indonesian Energy Policy is conducive for micro hydro development

    There is no china competitor especially for cross-flow turbine

    Foreign market for cross-flow turbine is still prospective especially for micro size

    Hydropower engineering is still an emerging market in Indonesia, since just

    7.54% are developed (Micro hydro = 28.31%)

    More challenges for mini hydro turbine manufacturing, especially from chinaMini hydro turbine manufacturing (francis, kaplan) will not grow in Indonesia,

    except there is a special protection or another technical & business-cooperation

    Technical & business cooperation: German-Indo (Voith-PT.Indo,WKV-PT.Indo) to compete with Sinohydro (China manufacturer)

    We may learn from Andritz Hydro (Austria-India)

  • 8/10/2019 2_-_Heksa_20th-GTZ-MHPP

    14/14

    We may survive without hydropower, butCan we live without water ??