 Paul Stott 6 th October 2010 MAR8007 Marine Production Technology Launching and retrieval methods

Upload: bharat-verma

Post on 21-Jul-2015

20 views

Category:

Documents


0 download

TRANSCRIPT

MAR8007 Marine Production Technology Launching and retrieval methodsPaul Stott 6th October 2010

Module structure1: Shipyards and markets1. Shipyard types and constraints 2. Launching and retrieval methods 3. Markets

2: Physical processes1. Ship construction 2. Repair, offshore and Scrapping

3: Management processes1. Construction 2. Repair and Scrapping

4: Enabling technologies1. 2. 3. 4. 5. Planning Product work breakdown Design for production Accuracy and rework Procurement and material control 6. Competitiveness

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Mudbank careening (ancient)

Mudbank careening (modern)

Mudbank launching (ancient)

Mudbank launching (modern)

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Crane from quayside

Crane from ship

Crane from barge

Crane from barge

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Launching barge

Launching barge: loadout

Launching barge: loadout

Launching barge: launch

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Boat lift

Boat lift

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Slipway: end launch

http://ssa.nls.uk/film.cfm?fid=0286A&search_term=ship%2 0launch&search_join_type=AND&search_fuzzy=yes

http://www.youtube.com/watch?v=vuo7CclA2o&feature=related

Slipway: side launch

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Marine railway

Marine railway

Marine railway

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Floating dock: repair

Floating dock: repair

Floating dock: newbuild

http://www.shi.samsung.co.kr/Eng/product/t ech_prd01.aspx

Requirements for a floating dock Sheltered water Deep water (ship draft + keel blocks + pontoons) Delivery to site and moorings Access

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Ship lift

Ship lift

Ship lift: transfer system

Ship lift: transfer system

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Graving dock (repair)

Building dock (ship construction)

Building dock (ship construction)

Building dock (ship construction)

Drydock (differences)Repair (Tuas) Newbuild (HHI Ulsan)

Cranes

2 x 30T JIB 1 x 80T JIB

1 x 1290T GOLIATH 2 x 450T GOLIATH 2 x 40T JIB 2 x 30T JIB700m x 115m

Dock area

355m x 60m

Draft capability Cope areaDe-watering time

Docking draft LimitedFast

Float-out draft Extensive for block assembly and storageSlow

Building dock (offshore / civil construction)

Launching and retrieval methods Careening / mud bank Crane Launching barge Boat lift Slipway Marine railway Floating dock Ship lift DrydockIncreasing investment

Comparison of methods is on Blackboard

Materials on Blackboard1. Todays powerpoint slides 2. Comparison of launching and retrieval types important reading and understanding. 3. Overview of the international commercial shipbuilding industry, EU/First Marine, 2003: Read Section 2 (Key Terminology) before next week. Knowledge of terms is essential for the rest of the course. Good further reading for the shipbuilding sector if wished. 4. Compensated Gross Tonnage system, OECD, 2007: reference work for use during the course.