2. profile of the district - rural development department salooni, chamba.pdf2. profile of the...

39
IWMP -XIV (2011-12) Chamba [Page-1] 2. Profile of the District 2. Profile of the District 2. Profile of the District 2. Profile of the District Location Location Location Location Situated between north latitude 32 0 11’030’’ and 33 0 13’6’’, and east longitude 75 0 49’ and 77 0 3’30’’ with J&K on the north-west and west; Lahaul and Bara Bhangal on the north –east; District of Knagra on the south –east; District of Gaudaspur (Punjab) on the south Area Area Area Area 6,528 aq. Km. (11.72% of HP) Elevation Elevation Elevation Elevation The district is wholly mountainous with elevation ranging from 2000 to 21000 ft Climate Climate Climate Climate Range from semi-tropical to semi-arctic. Population Population Population Population Total population of Chamba is 460887 as per the 2001 census out of which 235218 are females and 225669 females. The rural population of the district is 426345. There are 87029 household in the district. The secretion is 959 females to 1000 males. The total scheduled cast population is 1,17569. The density & population per Sq. km is 71 persons and the decadal growth of population 18.22 present. The district Chamba is surrounded by the state of Gurdaspur and with in the state boundary of Chamba toches district of Lahaul and Kangra.

Upload: voliem

Post on 10-Apr-2018

231 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-1]

2. Profile of the District 2. Profile of the District 2. Profile of the District 2. Profile of the District

Location Location Location Location

Situated between north latitude 32011’030’’ and 33013’6’’, and east longitude 75049’

and 7703’30’’ with J&K on the north-west and west; Lahaul and Bara Bhangal on the

north –east; District of Knagra on the south –east; District of Gaudaspur (Punjab) on the

south

Area Area Area Area

6,528 aq. Km. (11.72% of HP)

Elevation Elevation Elevation Elevation

The district is wholly mountainous with elevation ranging from 2000 to 21000 ft

Climate Climate Climate Climate

Range from semi-tropical to semi-arctic.

Population Population Population Population

Total population of Chamba is 460887 as per the 2001 census out of which 235218 are

females and 225669 females. The rural population of the district is 426345. There are

87029 household in the district. The secretion is 959 females to 1000 males. The total

scheduled cast population is 1,17569. The density & population per Sq. km is 71

persons and the decadal growth of population 18.22 present. The district Chamba is

surrounded by the state of Gurdaspur and with in the state boundary of Chamba toches

district of Lahaul and Kangra.

Page 2: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-2]

2012012012011111----2012012012012222

Land use Pattern of Chamba District Land use Pattern of Chamba District Land use Pattern of Chamba District Land use Pattern of Chamba District

Classification of Area Classification of Area Classification of Area Classification of Area

Sr. No.Sr. No.Sr. No.Sr. No. Particular Particular Particular Particular Total Area (ha)Total Area (ha)Total Area (ha)Total Area (ha) 1. Total geographical area 692419

2. Forest Land 272008 3. Irrigated Land 4332

4. Pasture Land 348869 5. Waste/ Barren Land 6871

6. Fellow Land 733

7. Uncultural Land 4748 8. Land put to Non Agriculture use 75380

(I)(I)(I)(I) Cropping PatternCropping PatternCropping PatternCropping Pattern

Sr.No.Sr.No.Sr.No.Sr.No. Particular Particular Particular Particular Total Area (ha)Total Area (ha)Total Area (ha)Total Area (ha) 1. Wheat 20801

2. Maize 27871

3. Paddy 3507 4. Barley 3756

5. Small cereal others 1320 6. Pulses 3369

7. Vegetable 1631 8. Fruit 2194

9. Oil seed 3135

10. Others, Tomato, Cherry 45 11. Spices 146

(II) Detail of the live stock population (II) Detail of the live stock population (II) Detail of the live stock population (II) Detail of the live stock population

Sr.No.Sr.No.Sr.No.Sr.No. Particular Particular Particular Particular Total population Total population Total population Total population

1. Cattle 317256 2. Buffalo 39409

3. Yak 220

4. Sheep 316565 5. Goat 240564

6. Horse 764 7. Pony 54

8. Mule 423 9. Donkey 406

10. Pig 4 Source:Source:Source:Source:---- Department of Animal Husbandry, 2007

Page 3: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-3]

ChapterChapterChapterChapter---- IIII

1.01.01.01.0 INTRODUCTIONINTRODUCTIONINTRODUCTIONINTRODUCTION

1.1 INTRODUCTION OF THE PROJECT AREAINTRODUCTION OF THE PROJECT AREAINTRODUCTION OF THE PROJECT AREAINTRODUCTION OF THE PROJECT AREA

The IWMP-XIV (Integrated Watershed Management Programme) Chamba was

sanctioned for the Salooni Development Block in the year 2011-12 by the ministry of

rural development (GOI). The project is being executed by the state government under

rural development department. The district rural development agency is the nodal

agency to execute the programme at district level. At the block level Block

Development Officer Salooni is the project implementing agency (PIA) to coordinate

with different gram panchayats at field level. There are 5 Gram Panchayats in Salooni

block. The IWMP project is being started in 5 Gram Panchayat in different watershed/

catchment area. The different Nallahas and Khuds of the watershed drains into Suel and

Neem khad which is a tributary of river Ravi. The main feature of the watershed area is

as under:

1. Acute shortage of drinking water.

2. The water resources for irrigation are drying day by day and existing resources

have been fully utilized.

3. Problems of soil erosion.

4. The contiguity of the watershed area.

5. People awareness and participation of the watershed area for natural resource

management is good.

6. The watershed area comprises of schedule caste and schedule tribe population

too.

7. Productivity potential of the land is high.

8. Whole area of the watershed is rain fed.

9. Fruit crops, cereals, Pulses and vegetables are the major crops of the

watershed.

10. Animal rearing is also an integral part of the watershed.

11. Basic infrastructure of roads, electricity and communication are available.

12. Majority of people are dependent on farm land based activities.

Page 4: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-4]

1.1a Sanctioned Budgetary ProvisionsSanctioned Budgetary ProvisionsSanctioned Budgetary ProvisionsSanctioned Budgetary Provisions

Watershed Watershed Watershed Watershed : IWMP: IWMP: IWMP: IWMP----XIXIXIXIV V V V ---- ChambaChambaChambaChamba

Area Area Area Area :::: 5628 5628 5628 5628 hahahaha

Amount Amount Amount Amount : : : : 8,44,20,0008,44,20,0008,44,20,0008,44,20,000

Gram panchayats under Gram panchayats under Gram panchayats under Gram panchayats under IWMPIWMPIWMPIWMP---- XIXIXIXIV V V V ----ChambaChambaChambaChamba

Sr. No.Sr. No.Sr. No.Sr. No. Gram PanchayatGram PanchayatGram PanchayatGram Panchayat Area (ha.)Area (ha.)Area (ha.)Area (ha.) AmountAmountAmountAmount

1. Ail 792 11880000

2. Ail (Sau) 930 13950000

3. Ail (Khangu) 758 11370000

4. Bhananter 577 8655000

5. Lanot 297 4455000

6. Singadhar 1443 21645000

7. Khadjota 831 12465000

Total Total Total Total 5628562856285628 8,44,20,0008,44,20,0008,44,20,0008,44,20,000

a) Total funds available under watershed ` 8,44,20,000` 8,44,20,000` 8,44,20,000` 8,44,20,000

b) Convergence proposed under works, Component with MGNERGs 1,68,36,4001,68,36,4001,68,36,4001,68,36,400

c) Grant in aid proposed to the selected beneficiaries 26.70% 26.70% 26.70% 26.70% under Livelihood

activities for ` 20,29,000 ` 20,29,000 ` 20,29,000 ` 20,29,000 and ` 5` 5` 5` 55555,6,6,6,68888,800 ,800 ,800 ,800 kept as Revolving funds which is

73.3073.3073.3073.30% % % % available under livelihood

d) As per the provision provided under the Guidelines of GOI for livelihood

activities 70 % 70 % 70 % 70 % revolving funds is maximum and to be kept support of livelihood

and maximum 30 %30 %30 %30 % to be given as grant in aid. The funds not to be utilized

under grant in aid will be treated under revolving fund

Page 5: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-5]

1.1b1.1b1.1b1.1b:::: ACTIVITY ANDACTIVITY ANDACTIVITY ANDACTIVITY AND BUDGETBUDGETBUDGETBUDGET

Amount Amount Amount Amount

Sr.Sr.Sr.Sr.

NoNoNoNo

Budget ComponentBudget ComponentBudget ComponentBudget Component % of % of % of % of

the the the the

budget budget budget budget

Ail Ail (Sau) Ail

(Khangu)

Bhananter Lanot Singadhar Khadjota Total

Budget

A)A)A)A) Administrative CostAdministrative CostAdministrative CostAdministrative Cost

1 Administrative cost 10% 1188000 1395000 1137000 865500 445500 2164500 1246500 8442000

2 Monitoring 1% 118800 139500 113700 86550 44550 216450 124650 844200

3 Evaluation 1% 118800 139500 113700 86550 44550 216450 124650 844200

B)B)B)B) Preparatory Phase Preparatory Phase Preparatory Phase Preparatory Phase

1 Entry point activities 4% 475200 558000 454800 346200 178200 865800 498600 3376800

2 Institution &

capacity building

5% 594000 697500 568500 432750 222750 1082250 623250 4221000

3 Detailed Project

Report (DPR)

1% 118800 139500 113700 86550 44550 216450 124650 844200

C)C)C)C) Watershed Works Phase Watershed Works Phase Watershed Works Phase Watershed Works Phase

1 Watershed

Development Works

56% 6652800 7812000 6367200 4846800 2494800 12121200 6980400 47275200

2 Livelihood activities

for the asset less

persons

9% 1069200 1255500 1023300 778950 400950 1948050 1121850 7597800

3 Production system

& micro enterprises

10% 1188000 1395000 1137000 865500 445500 2164500 1246500 8442000

D)D)D)D) Consolidation phase 3% 356400 418500 341100 259650 133650 649350 373950 2532600

Total Total Total Total 100%100%100%100% 1111,,,,18181818,,,,80808080,,,,000000000000 1111,,,,39393939,,,,50505050,,,,000000000000 1111,,,,13131313,,,,70707070,,,,000000000000 86868686,,,,55555555,,,,000000000000 44444444,,,,55555555,,,,000000000000 2222,,,,16161616,,,,45454545,,,,000000000000 1111,,,,24242424,,,,65656565,,,,000000000000 8888,,,,44444444,,,,20202020,,,,000000000000

Page 6: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-6]

1.1.1.1.1111dddd Methodology Methodology Methodology Methodology A.A.A.A. District level exercise District level exercise District level exercise District level exercise

a. Collection of data at district level

1. DRDA and Line department

b. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments

B. B. B. B. Block level Exercise Block level Exercise Block level Exercise Block level Exercise

a. Data collection

b. One day orientation with pradhan secretaries and panchayat sahayak at block

level

c. Meeting with line department officials of agriculture, horticulture and animal

husbandry department for convergence

C.C.C.C. Micro watershed /Panchayat /Revenue village wise Micro watershed /Panchayat /Revenue village wise Micro watershed /Panchayat /Revenue village wise Micro watershed /Panchayat /Revenue village wise Exercise Exercise Exercise Exercise

a. General meeting at Panchayat level with members of Panchayat Samiti, Pradhan

and Ward members

b. Collection of revenue data from Patwari

c. Collection of socio economic data from Panchayat Secretary

d. Village level meeting organized, PRA exercises and transect walks

e. Identification of beneficiary group for different activities

f. Participatory Rural Appraisal Exercise with the local community while contacting

the peoples

g. Transit walk with the line department and local community to ascertain the

position of back ward and forward linkage

h. Selection of site with technical expert /Junior Engineer and expert of soil science

to analyses soil strata for construction of Check Dam .Irrigation tank and other

mega projects

i. Selection of need based community and homogeneous Groups for involvement

under liveliood activities

j. Selection of landless/assetsless community under the watershed catchment area

k. Selection of SC/ST community under the project.

l. Social economical condition of the watershed community.

Page 7: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-7]

ChapterChapterChapterChapter---- IIIIIIII

2.02.02.02.0 GENERAL DESCRIPTION OF PROJECT AREA GENERAL DESCRIPTION OF PROJECT AREA GENERAL DESCRIPTION OF PROJECT AREA GENERAL DESCRIPTION OF PROJECT AREA 2.12.12.12.1 Socio economic profile of Socio economic profile of Socio economic profile of Socio economic profile of IWMPIWMPIWMPIWMP----XIXIXIXIV V V V ----ChambaChambaChambaChamba

Total number of Panchayat : 05 Total number of families : 1700 Total population of the Panchayat : 9540 General families : 762 ( 2109 male + 2148 female = 4257) Schedule caste families : 611( 1599male +1610 female = 3209) Schedule Tribe/OBC families : 321( 979male + 1050 female = 2029)

Other families : 45 ( 22male + 23 female = 45)

2.2.2.2.101101101101:::: Population of different categories (ward wise/village wise)Population of different categories (ward wise/village wise)Population of different categories (ward wise/village wise)Population of different categories (ward wise/village wise)

Name of Name of Name of Name of

Panchayat Panchayat Panchayat Panchayat

General FamiliesGeneral FamiliesGeneral FamiliesGeneral Families SC FamiliesSC FamiliesSC FamiliesSC Families Schedule Tribe/OBCSchedule Tribe/OBCSchedule Tribe/OBCSchedule Tribe/OBC Other FamiliesOther FamiliesOther FamiliesOther Families Grand Grand Grand Grand

TotalTotalTotalTotal

No of No of No of No of

familiesfamiliesfamiliesfamilies

MaleMaleMaleMale FemaleFemaleFemaleFemale TotalTotalTotalTotal No of No of No of No of

familiesfamiliesfamiliesfamilies

MaleMaleMaleMale FemaleFemaleFemaleFemale TotalTotalTotalTotal No. of No. of No. of No. of

families families families families

MaleMaleMaleMale FemaleFemaleFemaleFemale TotalTotalTotalTotal No of No of No of No of

familiesfamiliesfamiliesfamilies

MaleMaleMaleMale FemaleFemaleFemaleFemale TotalTotalTotalTotal

Ail 167 563 574 1137 53 242 201 443 49 144 118 262 6 22 23 45 1887

Ail (Sau) 60 198 192

390

- - - - - - - - - - - - 390

Ail

(Khangu)

8 6 14 20 27 77 71 148 5 16 71 87 - - - - 255

Bhananter 131 311 301 612 164 375 381 756 57 114 135 249 - - - - 1617

Lanot 98 267 243 510 144 390 417 807 44 134 116 250 - - - - 1567

Singadhar 207 495 533 1028 97 249 275 524 86 200 206 406 - - - - 1958

Khadjota 91 269 291 560 126 266 265 531 80 371 404 775 - - - - 1866

Total Total Total Total 762762762762 2109210921092109 2148214821482148 4257425742574257 611611611611 1599159915991599 1610161016101610 3209320932093209 321321321321 979979979979 1050105010501050 2029202920292029 6666 22222222 23232323 45454545 9540954095409540

Source: Gram Panchayat, 2012

2.2.2.2.2222 BPL FamiliesBPL FamiliesBPL FamiliesBPL Families

Total BPL families : 703 Total Antodaya Families : 525 2222....201201201201aaaa Population of BPL and Population of BPL and Population of BPL and Population of BPL and AntoAntoAntoAntodaya familiesdaya familiesdaya familiesdaya families (ward wise)(ward wise)(ward wise)(ward wise)

Name of Name of Name of Name of

panchayatpanchayatpanchayatpanchayat

AntodayaAntodayaAntodayaAntodaya BPLBPLBPLBPL Grand Total Grand Total Grand Total Grand Total

GeneralGeneralGeneralGeneral SCSCSCSC OBCOBCOBCOBC Total Total Total Total GeneralGeneralGeneralGeneral SCSCSCSC OBCOBCOBCOBC Total Total Total Total AntodayaAntodayaAntodayaAntodaya BPLBPLBPLBPL Total Total Total Total

Ail 45 21 - 66 56 48 - 104 66 104 170

Ail (Sau) 22 - - 22 11 - - 11 22 11 33

Ail (Khangu) 3 6 - 9 2 6 - 8 9 8 17

Bhananter 52 83 28 163 84 126 40 250 163 250 413

Lanot 21 24 12 57 54 78 - 132 57 132 189

Singadhar 53 35 26 114 37 7 11 55 114 55 169

Khadjota 25 37 32 94 33 64 46 143 94 143 237

Total Total Total Total 221221221221 206206206206 98989898 525525525525 277277277277 329329329329 97979797 703703703703 525525525525 703703703703 1228122812281228

Source: Gram Panchayat, 2012

Page 8: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-8]

2.32.32.32.3 Land use pattern Land use pattern Land use pattern Land use pattern

The total land of IWMP-XIV panchayats as per revenue record provided by the revenue department is 6356.87 hectare and existing land fall under watershed treatment area is rainfed. The unirrigated land as per the record available is 4821.38 hectare and 976.73 hectare cultivated land is used under different farming system i.e. agriculture and horticulture. The barren land is 146.59 hectare, pasture 2573.17 hectare, Ghasni, forest and other land is 2660.38 ha and Barren is 146.59 hectare.

2.301 2.301 2.301 2.301 Areas (ha) of micro watershed/ panchayat (village wise) under different land use Areas (ha) of micro watershed/ panchayat (village wise) under different land use Areas (ha) of micro watershed/ panchayat (village wise) under different land use Areas (ha) of micro watershed/ panchayat (village wise) under different land use systems systems systems systems

Name of Name of Name of Name of

Panchayat Panchayat Panchayat Panchayat

Total landTotal landTotal landTotal land UnUnUnUn

IrrigatedIrrigatedIrrigatedIrrigated

landlandlandland

Agri.Agri.Agri.Agri. Horti.Horti.Horti.Horti. BarrenBarrenBarrenBarren PasturePasturePasturePasture GhasniGhasniGhasniGhasni ForestForestForestForest OtherOtherOtherOther

Ail 1282 1282 254 3 24 753 86 80 82

Ail (Sau) 992 992 75 - 1 889 2 - 25

Ail

(Khangu)

770 770 55 3 37 400 73 100 102

Bhananter 584.76 445.8 155.81 - 71.17 171.83 15.9 124.62 45.43

Lanot 320.43 320.43 111.06 3.55 - - 27.37 64.06 114.39

Singadhar 1539.1 142.57 135.68 6.89 - 359.34 72.47 768.21 196.51

Khadjota 868.58 868.58 169.93 3.81 13.42 - 39.61 0.17 641.64

Total Total Total Total 6356.876356.876356.876356.87 4821.384821.384821.384821.38 956.48956.48956.48956.48 20.2520.2520.2520.25 146.59146.59146.59146.59 2573.172573.172573.172573.17 316.35316.35316.35316.35 1137.061137.061137.061137.06 1206.971206.971206.971206.97

Source: Revenue department

2.3022.3022.3022.302 Status of LivestockStatus of LivestockStatus of LivestockStatus of Livestock

The animal rearing is the integrated part of farming system in the watershed area. The major animals are cows (local and improved), buffaloes, sheep, goats etc. The peoples are facing acute problem and shortage of fodder and drinking water for their animals during the stress period. The details of livestock reared by the people in panchayat are given below:

2.302a2.302a2.302a2.302a Livestock population (ward wise) including NumberLivestock population (ward wise) including NumberLivestock population (ward wise) including NumberLivestock population (ward wise) including Number of milch and dry cows (Local of milch and dry cows (Local of milch and dry cows (Local of milch and dry cows (Local and improved) and Buffaloes and improved) and Buffaloes and improved) and Buffaloes and improved) and Buffaloes

Name of Name of Name of Name of

Panchayat Panchayat Panchayat Panchayat

BuffaloesBuffaloesBuffaloesBuffaloes Local cowLocal cowLocal cowLocal cow Improved cowImproved cowImproved cowImproved cow BullockBullockBullockBullock CalfCalfCalfCalf GoatGoatGoatGoat sheepsheepsheepsheep PoultryPoultryPoultryPoultry Grand Grand Grand Grand

TotalTotalTotalTotal MilchMilchMilchMilch DryDryDryDry TotalTotalTotalTotal MilchMilchMilchMilch DryDryDryDry TotalTotalTotalTotal MilchMilchMilchMilch DryDryDryDry TotalTotalTotalTotal

Ail 140 140 280 245 255 500 8 4 12 239 105 1400 1750 100 4386

Ail (Sau) 30 40 70 60 40 100 7 5 12 50 20 1000 950 50 2252

Ail (Khangu) 24 26 50 120 80 200 4 3 7 60 45 350 300 50 1062

Bhananter 49 53 102 360 310 670 - - - 496 265 410 680 15 2638

Lanot 16 11 27 348 182 350 4 6 10 212 115 655 750 315 2434

Singadhar 560 470 1030 10 10 20 320 305 625 250 310 155 1165 800 4355

Khadjota 64 50 114 500 310 810 8 9 17 369 170 1210 1610 65 4365

Total Total Total Total 883883883883 790790790790 1673167316731673 1643164316431643 1187118711871187 2650265026502650 351351351351 332332332332 683683683683 1676167616761676 1030103010301030 5180518051805180 7205720572057205 1395139513951395 21492214922149221492

Source: RC, NAEB

Page 9: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-9]

ChapterChapterChapterChapter---- IIIIIIIIIIII

3.03.03.03.0 SWOT ANALYSES SWOT ANALYSES SWOT ANALYSES SWOT ANALYSES

A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of

any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out. 3.13.13.13.1 Strengths of the watershed area Strengths of the watershed area Strengths of the watershed area Strengths of the watershed area

• Road infrastructure is available in some Panchayats.

• Agriculture is the main cash crop

• Nearest market is available at Chamba, Sundla

• People are well versed with animal husbandry.

• Farmers are innovative and ready to adopt new technologies.

3.23.23.23.2 WeaknessesWeaknessesWeaknessesWeaknesses

• Area is rainfed.

• Road infrastructure is not available

• Soil erosion in the cropped area.

• Unconsolidated land holding

• Unconsolidated land holding

• Scarcity of fodder.

• Hailstorm prone area.

• The pasture land/ grazing land are shrinking.

• Unequal distribution of available water for irrigation. 3.33.33.33.3 OpportunitiesOpportunitiesOpportunitiesOpportunities

• Introduction of organic farming

• Roof water harvesting

• Training to the farmers on horticulture, vegetable and dairy management.

• Revival of Mahila Mandals and SHGs which are dysfunctional presently.

• Installation of vegetable collection centre at ward/panchayat level

• Introduction of crossbred animals 3.43.43.43.4 ThreatsThreatsThreatsThreats

• Available land for agriculture is declining Due to the land sliding.

• Soil erosion in the sloppy lands.

• Wild animal/stay cattle are the major threat of the area.

• Unscientific farming practices.

• Deforestation

• Declining of the traditional artisans.

• Social distress.

• Declining of fodder sources.

Page 10: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-10]

ChapterChapterChapterChapter---- IVIVIVIV

4.0 4.0 4.0 4.0 ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES

Entry point activities play a very important role in the rural area to orient the

local community members towards thrift and credit activities of the project. Success of government initiated program largely depends upon the preference given to the entry point activities suggested under the program. Main objective of entry point activities is to increase social mobilization and people participation and collectiveness in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount provided under this component play a indispensible role of community involvement in different activities. Proposed for project implementation. The entry point activity attracts the people participation of local community for social mobilization under one platform.

Need base and priority driven entry point activities suggested by farmers during PRA and transit walk exercise are as given below. 4.1 4.1 4.1 4.1 Entry point Entry point Entry point Entry point activities suggested at different locations of watershed activities suggested at different locations of watershed activities suggested at different locations of watershed activities suggested at different locations of watershed

Name of Panchayat Name of Panchayat Name of Panchayat Name of Panchayat Activity Activity Activity Activity No. of structure No. of structure No. of structure No. of structure Amount (`)Amount (`)Amount (`)Amount (`)

Singadhar WST 3 330624

Pacca talab 5 535176

Ail (Sau) - - 558000

Ail (Khangu) - - 454800

Bhananter Kuhal 1 346200

Lanot Kuhal 1 178200

Ail - 475200

Khadjota WST with pipe line 2 498600

Total Total Total Total 12121212 33,76,80033,76,80033,76,80033,76,800

Page 11: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-11]

CHAPTER - V

5.0 5.0 5.0 5.0 CAPACITY BUILDING CAPACITY BUILDING CAPACITY BUILDING CAPACITY BUILDING

To implement watershed activities more effectively skill development and

capacity building at the various level ie. Panchayat /micro watershed level, block level

and district level is prerequisite condition before initiating the implementation of the

project. The activities proposed are given below:

5.15.15.15.1 ModulesModulesModulesModules 5.1a5.1a5.1a5.1a Awareness Camps Awareness Camps Awareness Camps Awareness Camps

• Will be organized at Panchayat level 5.1b5.1b5.1b5.1b Training: Training: Training: Training:

Training will be organized at

• Block level

• DRDA level

• Institutional level 5.1c5.1c5.1c5.1c Exposure Visits: Exposure Visits: Exposure Visits: Exposure Visits:

• Exposure visits will be conducted at University/ Institutions /Field 5.1d5.1d5.1d5.1d Special Trainings will be organized in the professional institutesSpecial Trainings will be organized in the professional institutesSpecial Trainings will be organized in the professional institutesSpecial Trainings will be organized in the professional institutes 5.1015.1015.1015.101 Activities with number of participants Activities with number of participants Activities with number of participants Activities with number of participants 5.101a:5.101a:5.101a:5.101a: Target groups and location of program Target groups and location of program Target groups and location of program Target groups and location of program Target group Target group Target group Target group No. of No. of No. of No. of

participants participants participants participants ActivityActivityActivityActivity LocationLocationLocationLocation DurationDurationDurationDuration

(days)(days)(days)(days) No. of No. of No. of No. of trainingtrainingtrainingtraining

BudgetBudgetBudgetBudget

Member of Gram Shabha Panchayat secretaries and progressive farmers

All Awareness camps on watershed management

Panchayat level 7 15 370000

PRI, Pradhan ward members& Secretary/ Farmers

140 person Training and exposure visit on watershed management

Block level/ Instructional/ University

5-6 11 420000

VLI Members Mahila mandal and youvak mandal

140persons watershed implementation and management

Institutional/ University

3-5 8 450000

Self Help Groups User Groups WDT, PIA and exposure visit

1 to 14 Panchayats (max.)210 person

Exposure visit professional institutional field

State /Outside State

3-4 8 380000

1 to 14 Kissan Melas/ State/Outside 3-5 7 370000

Page 12: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-12]

Self Help Groups, User Groups exposure visit

panchayats (max.)210 person

Pradashanis State/

Self Help Groups, User Groups exposure visit

1 to 2/ ward/Panchayat (max.) 210 person

Specialized trainings ( C & t, Masonry, Carperntry, Khaddi, Achar Chatni)

Professional institutes/ University

3-5 14 1405000

PIAs, WDTs members

105person Project implementation and management trainings, report writing and accounts maintenance

Professional institutes/ University (State Outside State)

25 7 342000

Miscellaneous/Expert visit

Expert visits/services and Misc.

Professional institutes/ University (State Outside State)

7 0 484000

TotalTotalTotalTotal 32323232 70707070 42,21,00042,21,00042,21,00042,21,000

The capacity building of farmers and youth in the watershed areas can also be

done under the micro enterprises and livelihood through Industrial Training Institute

(ITI) occupation\trades as well as other entrepreneurs programme which provide self-

employment or wage employment within the watershed areas.

Page 13: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-13]

CHAPTER - VI

6.0 Land6.0 Land6.0 Land6.0 Land Development for Sub activity Development for Sub activity Development for Sub activity Development for Sub activity

Land Development is a basic tool for raising of fuel and fodder plantation and

Hybrid grasses for sowing healthy species and land for this purpose have been

selected during peoples participatory appraisal exercise with the local community. The

land comprises of hill steep slopes having mixed layers of soil, facing acute problems of

massive soil erosion during rainy season. During the field visit the interaction was made

with the local people and farmers, it was observed that soil erosion is increasing at a

faster rate, due to the degradation of land. On the suggestion of soil science expert

some vegetative measure supported with the fuel plantation of fodder species /Hybrid

grasses are recommended to check the soil erosion.

6.1 Land6.1 Land6.1 Land6.1 Land Development and sub activity Development and sub activity Development and sub activity Development and sub activity ((((Plantation of fodder trees and Plantation of fodder trees and Plantation of fodder trees and Plantation of fodder trees and

improved Seeds of grasses in wardsimproved Seeds of grasses in wardsimproved Seeds of grasses in wardsimproved Seeds of grasses in wards

Name of the Scheme Name of the Scheme Name of the Scheme Name of the Scheme Area to be treated Area to be treated Area to be treated Area to be treated Unit cost per Unit cost per Unit cost per Unit cost per Watershed (`)Watershed (`)Watershed (`)Watershed (`) Amount (`) Amount (`) Amount (`) Amount (`)

145 42000 6090000 6090000

Total Total Total Total 145145145145 60,90,00060,90,00060,90,00060,90,000 60,90,00060,90,00060,90,00060,90,000

6.26.26.26.2 BudgetBudgetBudgetBudget form form form form WatershedWatershedWatershedWatershed

Name of Panchayat Name of Panchayat Name of Panchayat Name of Panchayat GrassesGrassesGrassesGrasses

Area (ha.)Area (ha.)Area (ha.)Area (ha.) Quantity of seeds (kg) Quantity of seeds (kg) Quantity of seeds (kg) Quantity of seeds (kg) Rate per Kg(`)Rate per Kg(`)Rate per Kg(`)Rate per Kg(`) watershed ` watershed ` watershed ` watershed `

Ail 3 105 4200 12600

Ail (Sau) 10 350 4200 42000

Ail (Khangu) 10 350 4200 42000

Bhananter 5 175 4200 21000

Lanot 5 175 4200 21000

Singadhar 15 525 4200 63000

Khadjota 15 525 4200 63000

Total Total Total Total 63636363 2205220522052205 2,64,6002,64,6002,64,6002,64,600

Note: Note: Note: Note: Target for 4th year

6.26.26.26.2 (a) (a) (a) (a) ::::Variety and rates of fodder species and Variety and rates of fodder species and Variety and rates of fodder species and Variety and rates of fodder species and hybrid grasseshybrid grasseshybrid grasseshybrid grasses Budget form Production Budget form Production Budget form Production Budget form Production system and micro enterprises system and micro enterprises system and micro enterprises system and micro enterprises

Activity Activity Activity Activity /Item /Item /Item /Item

Breed Breed Breed Breed Area Area Area Area Rate per Rate per Rate per Rate per ha. (`)ha. (`)ha. (`)ha. (`)

Total cost Total cost Total cost Total cost (`)(`)(`)(`)

Beneficiaries share ` 10% cash Beneficiaries share ` 10% cash Beneficiaries share ` 10% cash Beneficiaries share ` 10% cash or kind used as WDF or kind used as WDF or kind used as WDF or kind used as WDF

Fodder 145 42000 1595000 Nil

Grasses Napeir, Steria and orchard grass

63 4200 264600 Nil

Total Total Total Total 208208208208 18,59,60018,59,60018,59,60018,59,600 Nil

Page 14: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-14]

CHAPTER - VII

7.0 Vegetative7.0 Vegetative7.0 Vegetative7.0 Vegetative and Engineering structureand Engineering structureand Engineering structureand Engineering structure In situ-soil conservation under watershed treatment area comprises of hill steep

slopes having mixed layers of soil, facing acute problems of massive soil erosion during

rainy season. During the field visit the interaction was made with the local people and

farmers, it was observed that soil erosion is increasing at a faster rate, due to the

following reasons

• Deforestation in the watershed areas

• Construction of roads and dumping of debris along Nala side

• Cutting of bushes and hedges by local people for fuel and fodder purpose

• Lake of physical and bio logical structures, which facilitate water conservation

• Excessive use of cultivated land for Veg. purpose.

7.1 Structures7.1 Structures7.1 Structures7.1 Structures proposed to check proposed to check proposed to check proposed to check massive soilmassive soilmassive soilmassive soil erosion, erosion, erosion, erosion, the followingthe followingthe followingthe following interventions are interventions are interventions are interventions are

recommendation andrecommendation andrecommendation andrecommendation and PIA can planning according PIA can planning according PIA can planning according PIA can planning according

• Construction of check dams from top to bottom to minimize the high runoff water

during raining season.

• Construction of Gabion Structures to sloppy land sliding area.

• Construction of Continue Contour / trenches to check soil erosion.

• Proper bunding on the cultivated lands by planting grasses and fodder tree

• Biological/vegetative engineering measures along the slope land

• Construction of Gully plugging

• Construction of Loose boarder check dam

• Loose Boulder to check high runoff and stop flooding of fertile soil

• Bank stabilization proposed to be constructed where the massive soil is flooding

7.27.27.27.2 various structures are proposed to be constructed at different location for various structures are proposed to be constructed at different location for various structures are proposed to be constructed at different location for various structures are proposed to be constructed at different location for checking soil erosionchecking soil erosionchecking soil erosionchecking soil erosion

TableTableTableTable7.27.27.27.2aaaa: : : : Structure withStructure withStructure withStructure with number of beneficiaries number of beneficiaries number of beneficiaries number of beneficiaries ActivityActivityActivityActivity ProposedProposedProposedProposed

(No)(No)(No)(No) Watershed Budget(`)Watershed Budget(`)Watershed Budget(`)Watershed Budget(`) Convergence Budget (`)Convergence Budget (`)Convergence Budget (`)Convergence Budget (`) Amount Amount Amount Amount

Gabion structure 353 3322000 3322000 23 - 253000 253000

Loose boulder 63 380100 - 380100 26 - 63200 63200

Contour trenches 1596 98368 - 98368 Drainage 6 1143240 - 1143240

3 - 723000 723000 Total Total Total Total 2070207020702070 49494949,,,,43434343,,,,708708708708 10101010,,,,39393939,,,,200200200200 59595959,,,,82828282,,,,908908908908

Note: Note: Note: Note: Target for 3rd year

Soil conservation work includes formation of Loose Boulders and other suitable

structure to be constructed to conserve the fertile soil and to protect from high runoff.

Page 15: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-15]

In this micro watershed total 89 Loose Boulder and 376 gabion structure will be

constructed which will benefit all families.

Vegetative MeasureVegetative MeasureVegetative MeasureVegetative Measure:::: Various types of trees (Robinia, kenth), Shrubs (Berbris, Ruses) and

grasses (Chrysopogon falues, Cynodon dactylon, Napier etc.) can be grown in the areas

prone to soil erosion. Fodder grasses newly bride groom asses like Napier grass can be

used on farm bunds. For demonstration in each panchayat about........ cuttings could be

planted/ distributed to farmers.

OutcomeOutcomeOutcomeOutcome

• To minimize the impact of rainfall

• To reduce high velocity of soil erosion

• To improve moisture rention conditions of the area

• To improve soil properties, etc.

• To improve fertility of cultivated soil

Page 16: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-16]

CHAPTER - VIII

8.0 WATER8.0 WATER8.0 WATER8.0 WATER HARVESTING HARVESTING HARVESTING HARVESTING

The main sources of irrigation in the gram Panchayat are Percolation tank, roof

water, Check Dam, irrigation tanks and water schemes. The most of the cultivated area

is rainfed. The existing water resources are drying due to climatic change and deletion

of water. The watershed community /people face acute problem of water during stress

period, specifically for the irrigation of vegetable crops etc.

8.1 8.1 8.1 8.1 (a(a(a(a) Existing) Existing) Existing) Existing and proposed and proposed and proposed and proposed water harvesting structureswater harvesting structureswater harvesting structureswater harvesting structures with storage capacitywith storage capacitywith storage capacitywith storage capacity Name of Name of Name of Name of structurstructurstructurstructure e e e

No. of No. of No. of No. of structurstructurstructurstructure e e e

Capacity in (mCapacity in (mCapacity in (mCapacity in (m3333)))) Project Project Project Project interventioninterventioninterventionintervention

No. of No. of No. of No. of beneficiaries beneficiaries beneficiaries beneficiaries benefited benefited benefited benefited

Existing Existing Existing Existing structure structure structure structure

(m(m(m(m3333)))) Repairable Repairable Repairable Repairable No.No.No.No.

(m(m(m(m3333)))) New New New New structurestructurestructurestructure

(m(m(m(m3333)))) Capacity Capacity Capacity Capacity of of of of Existing Existing Existing Existing

New New New New

Kaccha talab

15 1504 1 10(con.)

72 11(con.)

4502 787 (con.)

1504 5289 Entire catchment area

Pacca talab

- - - - 1 (con.) - - -

Roof water

- - - - 92 35(con.)

952.1 344.4 (con.)

- 1296.5

WST 52 846 1 9(con.) 52 33(con.)

597.66 330.56 (con.)

- 928.22

Kuhal 4 - - - 3 - - -

Poly tank

- - - 22 4 (con.)

372 48(con.)

- 420 -

Pipe line

- - - - 44 6(con.)

- - - -

Total Total Total Total 71717171 2350235023502350 12121212 9999 375375375375 6423.76 6423.76 6423.76 6423.76 (w.)(w.)(w.)(w.) 1509.96 1509.96 1509.96 1509.96 (con.)(con.)(con.)(con.)

1504150415041504 7933.727933.727933.727933.72 ----

Page 17: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-17]

8.2 Repairable water bodies and construction of New structure with size, capacity and budget of each structure under 8.2 Repairable water bodies and construction of New structure with size, capacity and budget of each structure under 8.2 Repairable water bodies and construction of New structure with size, capacity and budget of each structure under 8.2 Repairable water bodies and construction of New structure with size, capacity and budget of each structure under water harvestingwater harvestingwater harvestingwater harvesting

Sr. Sr. Sr. Sr. No.No.No.No.

Name of Name of Name of Name of structurestructurestructurestructure

Existing Existing Existing Existing structure / repairable and storage capacity (`)structure / repairable and storage capacity (`)structure / repairable and storage capacity (`)structure / repairable and storage capacity (`) Construction of New structure storage capacity cost (`)Construction of New structure storage capacity cost (`)Construction of New structure storage capacity cost (`)Construction of New structure storage capacity cost (`)

No.No.No.No. Capacity Capacity Capacity Capacity (m(m(m(m3333))))

Unit Unit Unit Unit cost cost cost cost (`)(`)(`)(`)

SizeSizeSizeSize Total Total Total Total WatershedWatershedWatershedWatershed Con. Con. Con. Con. No.No.No.No. Capacity Capacity Capacity Capacity (m(m(m(m3333))))

Unit Unit Unit Unit cost cost cost cost (`)(`)(`)(`)

Size mSize mSize mSize m Total Total Total Total WatershedWatershedWatershedWatershed Con. Con. Con. Con.

1. kaccha talab

15 1504 8x6x2 0 0 0 41 3874.5 10x8x1.5 1284300 0

0 0 0 0 0 0 0 31 1627.5 8x6x1.5 796700 0

0 0 0 0 0 0 0 11 787 0 309000

2. Pacca talab

0 0 0 0 0 0 0 1 0 0 100000

3. Roof water

0 0 0 0 0 0 0 70 677.6 2.2x2.2x2 10298000 0

0 0 0 0 0 0 0 21 262.5 2.5x2.5x2 2861000 0

0 0 0 0 0 0 0 1 12 2.4x2.5x2 134000 0

0 0 0 0 0 0 0 35 (con.)

344.4 0 4376000

4. WST 52 702 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 27 261.36 2.2x2.2x2 3374240 0

0 0 0 0 0 0 0 15 172.8 2.4x2.4x2 2089000 0

0 0 0 0 0 0 0 3 37.5 2.5x2.5x2 353000 0

0 0 0 0 0 0 0 7 126 3x3x2 941000 0

0 0 0 0 0 0 0 33 330.56 2.2x2.2x2 0 4945000

5. Kuhal 4 3 0 750 mtr 758000 0

6. Poly tank 0 0 0 0 0 0 0 13 156 4x3x2 279000 0

0 0 0 0 0 0 0 9 216 5x4x2 317000 0

0 0 0 0 0 0 0 4 48 4x3x2 0 84000

7. Pipe line 0 0 0 0 0 0 0 44 0 98640(Rmt) 5677600 0

0 0 0 0 0 0 0 6 0 9.900(Rmt) 0 970000

8. Kaccha talab (rep.)

1 1120 0 0 0 211044 0 0 0 0 0

10 938 0 0 0 0 299200 0 0 0 0

9. WST (rep.) 1 9 0 0 0 0 40000 0 0 0 0

Total Total Total Total 71717171 12121212

1120 1120 1120 1120 (w)(w)(w)(w) 947 947 947 947 (con.)(con.)(con.)(con.)

211044211044211044211044 339200339200339200339200 164164164164 7423.76(w)7423.76(w)7423.76(w)7423.76(w) 1509.96(con.)1509.96(con.)1509.96(con.)1509.96(con.)

29162840291628402916284029162840 10784000107840001078400010784000

Grand Grand Grand Grand total total total total

83838383 2067206720672067 211044211044211044211044 339200339200339200339200 164164164164 7933.727933.727933.727933.72 29162840291628402916284029162840 10784000107840001078400010784000

Page 18: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-18]

8.8.8.8.1111 (II)(II)(II)(II) Total storage capacity and cost through watershed and convergence programme Total storage capacity and cost through watershed and convergence programme Total storage capacity and cost through watershed and convergence programme Total storage capacity and cost through watershed and convergence programme

Particulars Particulars Particulars Particulars Capacity (mCapacity (mCapacity (mCapacity (m3333)))) Cost (`)Cost (`)Cost (`)Cost (`) Watershed 8543.7 29373884 Convergence 2456.9 11123200 Total Total Total Total 11000.611000.611000.611000.6 4444,,,,04040404,,,,97979797,,,,084084084084

Page 19: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-19]

8.018.018.018.01 DRINKING WATER DRINKING WATER DRINKING WATER DRINKING WATER

The Panchayat area falls in the rainfed area. Water resources are very limited

which has been taped fully by the local people for drinking and irrigation purposes. In earlier days there were water bodies (Bawaries) from which the people used to take water for drinking purpose. During the field visit and interaction with the local people and transit walk of the watershed area source some of fact regarding drinking water comes up.

• Dried up of the water bawaries due to the climate change.

• Heavy pressure on the existing water bodies due to increase in population.

• Less care of maintenance of water bodies, which is due to the habit of tap water provided at door step provided by the IPH department, lifted from Ravi River.

• Less percolation for the existing Bawaries due to less range and drying up of Johar at the watershed area

• Presently people take the water through taps, which is provided in alternative days.

8.028.028.028.02 Availability of water in the panchayatAvailability of water in the panchayatAvailability of water in the panchayatAvailability of water in the panchayat

8.028.028.028.02(a)(a)(a)(a): : : : Availability of water before and project interventionsAvailability of water before and project interventionsAvailability of water before and project interventionsAvailability of water before and project interventions Sr. NoSr. NoSr. NoSr. No ParticularsParticularsParticularsParticulars Capacity (lt)Capacity (lt)Capacity (lt)Capacity (lt)

Present Present Present Present After After After After Project interventionProject interventionProject interventionProject intervention 1 Total supply of water per day 280500 757140 2 Total House holds 1700 1700 3 Total population 9540 9540 4 Water Available per house hold per day 165 445.3 5 Per capita Availability 29.4 79.36

8.03 Status8.03 Status8.03 Status8.03 Status of Drinking water in different wards of Panchayatof Drinking water in different wards of Panchayatof Drinking water in different wards of Panchayatof Drinking water in different wards of Panchayat 8.038.038.038.03 (a) Existing (a) Existing (a) Existing (a) Existing Structure ofStructure ofStructure ofStructure of water water water water bodies availabilitybodies availabilitybodies availabilitybodies availability on dailyon dailyon dailyon daily and monthly basisand monthly basisand monthly basisand monthly basis

Panchayats Panchayats Panchayats Panchayats Name of StructureName of StructureName of StructureName of Structure Availability of Availability of Availability of Availability of

water per day water per day water per day water per day

from the from the from the from the

source source source source

No. of months No. of months No. of months No. of months

water available water available water available water available

during the year during the year during the year during the year

Tap/ WST Tap/ WST Tap/ WST Tap/ WST Hand pump Hand pump Hand pump Hand pump Bawaries Bawaries Bawaries Bawaries

No.No.No.No. CapacityCapacityCapacityCapacity No.No.No.No. CapacityCapacityCapacityCapacity No.No.No.No. CapacityCapacityCapacityCapacity

Lanot 8 31000 3 3000 18 18000 52000 8 month/year

Singdhar 3 3000 3 3000 15 22500 28500 8 month/year

Bhananter 6 22000 0 0 43 43000 65000 8 month/year

Khadjota 8 36000 3 3000 15 15000 54000 8 month/year

Ail 5 20000 0 0 29 29000 49000 8 month/year

Ail (Sau) 3 15000 0 0 6 6000 21000 8 month/year

Khangu 1 5000 0 0 6 6000 11000 8 month/year

Total Total Total Total 34343434 1,32,0001,32,0001,32,0001,32,000 9999 9000900090009000 132132132132 1,39,5001,39,5001,39,5001,39,500 2,80,5002,80,5002,80,5002,80,500

Page 20: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-20]

8.04a: 8.04a: 8.04a: 8.04a: ConstructionConstructionConstructionConstruction/Proposed of Drinking water Structure with number and dimensions. /Proposed of Drinking water Structure with number and dimensions. /Proposed of Drinking water Structure with number and dimensions. /Proposed of Drinking water Structure with number and dimensions.

Name of Schemes Name of Schemes Name of Schemes Name of Schemes No. of schemes No. of schemes No. of schemes No. of schemes Watershed `Watershed `Watershed `Watershed ` Convergence Convergence Convergence Convergence

`̀̀̀

Total `Total `Total `Total `

Bawari/Panihara 25 2220508 0 2220508

33 0 2459000 2459000

Drinking water tank 30 4382500 0 4382500

12 0 1610000 1610000

Grand total Grand total Grand total Grand total 100100100100 66,03,00866,03,00866,03,00866,03,008 40,69,00040,69,00040,69,00040,69,000 1,06,72,0081,06,72,0081,06,72,0081,06,72,008

8.058.058.058.05 Storage capacity and availability of water from existing structures Storage capacity and availability of water from existing structures Storage capacity and availability of water from existing structures Storage capacity and availability of water from existing structures

8.068.068.068.06 Proposed activities for increase in the water capacity/ availability through Proposed activities for increase in the water capacity/ availability through Proposed activities for increase in the water capacity/ availability through Proposed activities for increase in the water capacity/ availability through

renovation/new construction of structure renovation/new construction of structure renovation/new construction of structure renovation/new construction of structure

8.068.068.068.06(a) Size, location, capacity of structures with beneficiaries (a) Size, location, capacity of structures with beneficiaries (a) Size, location, capacity of structures with beneficiaries (a) Size, location, capacity of structures with beneficiaries

StructureStructureStructureStructure No. of No. of No. of No. of

structure structure structure structure

Repair Repair Repair Repair LocationLocationLocationLocation capacity (lt)capacity (lt)capacity (lt)capacity (lt) TotalTotalTotalTotal Benefited Benefited Benefited Benefited

familiesfamiliesfamiliesfamilies

Old Old Old Old NewNewNewNew Old Old Old Old NewNewNewNew Old Old Old Old NewNewNewNew After After After After

intervention intervention intervention intervention

(lt)(lt)(lt)(lt)

WST/Taps 34 42 -

-

132000 396640 528640 528640

1700 Handpump 9 0 - 9000 0 9000 9000

Bawari/Panihara 132 58 - 139500 80000 219500 219500

TotalTotalTotalTotal 175175175175 100100100100 ---- ---- 2222,,,,80808080,,,,500500500500 4444,,,,76767676,,,,640640640640 7777,,,,57575757,,,,140140140140 7777,,,,57575757,,,,140140140140 1700170017001700

8.078.078.078.07 Critical Gaps to be covered (item/activity)Critical Gaps to be covered (item/activity)Critical Gaps to be covered (item/activity)Critical Gaps to be covered (item/activity)

1) Regular Supply of drinking water

2) Cleanness and colorization of water

3) Proper drainage of the catchment area to the pound/Johar

4) To sensitization of the community for judicious use of water sources

5) After project intervention the fresh and hygienic drinking water will be available

to the local community

6) Sufficient amount of water can be provided to the beneficiaries within the

stress period

7) The supplement irrigation facility will provided to the local community

Sr.Sr.Sr.Sr.

NoNoNoNo.

SourceSourceSourceSource No.No.No.No. Present capacity (lt.)Present capacity (lt.)Present capacity (lt.)Present capacity (lt.) Availability of Availability of Availability of Availability of

water/day from water/day from water/day from water/day from

the sourcethe sourcethe sourcethe source

No. of months water No. of months water No. of months water No. of months water

available during the available during the available during the available during the

yearyearyearyear

Collecting Collecting Collecting Collecting

structurestructurestructurestructure

Storage CapacityStorage CapacityStorage CapacityStorage Capacity

1 WST/Tap 34 132000 132000 9-12 month

2 Handpump 9 9000 9000 9-10 Months

3 Bawaries 132 139500 139500 11 Months

TotalTotalTotalTotal 175175175175 2222,,,,80808080,,,,500500500500 2222,,,,80808080,,,,500500500500

Page 21: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-21]

8) The livestock will get the water at the door step during stress period

9) The water cycle of the project area will improve

10) Local hedges and bushes to be planted catchment of the water bodies

11) The tradition custom may be revived through worship the specific water

bodies to maintain sacredness of the bodies for example the coming up of

newly bride groom during local festival which will establish sentimental relation

on sustainable basis for the generation to come.

Table 8.08:Table 8.08:Table 8.08:Table 8.08: OutcomeOutcomeOutcomeOutcome

SourceSourceSourceSource Present Present Present Present

storage storage storage storage

CapacityCapacityCapacityCapacity

ProposedProposedProposedProposed

StorageStorageStorageStorage

CapacityCapacityCapacityCapacity

Total Total Total Total

StorageStorageStorageStorage

CapacityCapacityCapacityCapacity

Total Total Total Total

Families Families Families Families

benefittedbenefittedbenefittedbenefitted

PresentPresentPresentPresent

Requirement/Requirement/Requirement/Requirement/

DayDayDayDay

QuantityQuantityQuantityQuantity

AfterAfterAfterAfter

Intervention Intervention Intervention Intervention

(lts)(lts)(lts)(lts)

WST/tap 132000 396640 528640

1700 165 445.3 Hand

pump

9000 0 9000

Bawaries 139500 80000 219500

TotalTotalTotalTotal 2222,,,,80808080,,,,500500500500 4444,,,,76767676,,,,640640640640 7777,,,,57575757,,,,140140140140 1700170017001700 165165165165 445.3445.3445.3445.3

Page 22: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-22]

CHAPTER -IX

9.0 9.0 9.0 9.0 CONVERGENCES CONVERGENCES CONVERGENCES CONVERGENCES

The linkage of the IWMP-XIV, with the other development programme is also one

of the important components. The possibilities of identifying different activities under

the IWMP and their association with other activities of different line departments can be

explore through convergence. This is the best tool to derive support from different line

departments to share their experiences with the farmers and providing funds for the

scheme works

The following activities can be converged from one head to another:

• Developmental activities like roads and irrigation facilities can be converged with

PMGSY, PWD, IPH and MNREGA programs

• Employment Generation with MNREGA program run by Rural Development

Department

• To improve productivity, distribution of improved seeds, fertilizers, insecticides

and pesticides can be converged with State Agriculture Department under Pandit Pandit Pandit Pandit

Dindayal Krishi YojnaDindayal Krishi YojnaDindayal Krishi YojnaDindayal Krishi Yojna

• Construction of poly houses and vegetable Collection Centers at watershed level

can be constructed under the Horticulture Technology Mission run by

Department of Horticulture

• Income generating activities and micro-enterprises with rural employment

program, Prime Minster Employment Generation Program. Self –Employment

Schemes etc.

• Diary development and sheep-goats rearing for the resource less people under

Dudh Ganga PariyojanaDudh Ganga PariyojanaDudh Ganga PariyojanaDudh Ganga Pariyojana run by the Animal Husbandry DepartmentAnimal Husbandry DepartmentAnimal Husbandry DepartmentAnimal Husbandry Department 9.019.019.019.01: : : : Activity/ work to be taken other programme/schemeActivity/ work to be taken other programme/schemeActivity/ work to be taken other programme/schemeActivity/ work to be taken other programme/scheme Sr.Sr.Sr.Sr. No.No.No.No.

ActivityActivityActivityActivity /work/work/work/work

Programme Programme Programme Programme /scheme for /scheme for /scheme for /scheme for convergenceconvergenceconvergenceconvergence

Agency/Agency/Agency/Agency/ DepttDepttDepttDeptt

Budget contribution(`)Budget contribution(`)Budget contribution(`)Budget contribution(`)

Watershed Watershed Watershed Watershed

`̀̀̀ Convergence Convergence Convergence Convergence

`̀̀̀ Total Total Total Total `̀̀̀

1.

Kaccha Talab MNREGA RD 2081000 309000 2390000

2. Pacca talab MNREGA RD 0 100000 100000

3. Roof water MNREGA RD 13293000 4376000 17669000

4. WST

MNREGA RD 6757240 4945000 11702240

5. Kuhal MNREGA RD 758000 0 758000

6. Poly tank MNREGA RD 596000 84000 680000

7. Pipe line MNREGA RD 5677600 970000 6647600

8. Kaccha talab (rep.) MNREGA RD 211044 299200 510244

9. WST (rep.) MNREGA RD 0 40000 40000

10. Panihara MNREGA RD 2220508 2459000 4679508

11. Drinking water tank

MNREGA IPH 4382500 1610000 5992500

12. Gabion structure MNREGA soil conservation 3322000 253000 3575000

13. Loose boulder MNREGA soil conservation 380100 63200 443300

14. Contour trenches MNREGA soil conservation 98368 0 98368

15. Drainage MNREGA soil conservation 1143240 723000 1876240

16. Poly house MNREGA Horticulture 0 500000 500000

17. Vermicompost MNREGA Horticulture 692000 105000 797000

TotalTotalTotalTotal 4444,,,,16161616,,,,12121212,,,,600600600600 1111,,,,68686868,,,,36363636,,,,400400400400 5555,,,,84848484,,,,59595959,,,,000000000000

Page 23: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-23]

CHAPTER -X

10.0 LIVELIHOOD10.0 LIVELIHOOD10.0 LIVELIHOOD10.0 LIVELIHOOD ACTIVITYACTIVITYACTIVITYACTIVITY Income generating activity reported in the watershed areas are carpentry,

masonry, and weavers, embroidery, black smith poultry, sheep and goats rearing, pattal and basket making etc. These income generating activities can transform the rural poor, if they have given more opportunities in the form of trainings, equipments and machine etc. cutting and tailoring, pickle making, jam, jelly, candy and juices making can be other options for rural women to improve their socio-economic conditions.

The skills of local artisans can be improved by providing more opportunities at their door steps. Keeping in view the above mentioned facts, the following activities will be taken up under watershed program for innovative farmers. The provision for training programme for the tradition rural artisan have been provided with in training budget to develop their capacity building.

10.101 10.101 10.101 10.101 Income enhancement and employment generation through different income Income enhancement and employment generation through different income Income enhancement and employment generation through different income Income enhancement and employment generation through different income

generating activitiesgenerating activitiesgenerating activitiesgenerating activities 10.10.10.10.101a Number of households with activities and income, The list of beneficiaries 101a Number of households with activities and income, The list of beneficiaries 101a Number of households with activities and income, The list of beneficiaries 101a Number of households with activities and income, The list of beneficiaries

selected during the PRA exercise attached.selected during the PRA exercise attached.selected during the PRA exercise attached.selected during the PRA exercise attached. S. NoS. NoS. NoS. No ActivityActivityActivityActivity Existing No. of household Existing No. of household Existing No. of household Existing No. of household Proposed NoProposed NoProposed NoProposed No.... of household of household of household of household

1 Carpentry 15 19

2 Masonry 20 4

3 C & T Embroidery - 38

4 Weaver+Black Smith - 1

5 Achar -Chatni - 2

6 Weaver 20 13

7 Welding - 1

8 Carpenter+ Masonry - 2

Total Total Total Total 55555555 80808080

Page 24: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-24]

10.102 Livelihood10.102 Livelihood10.102 Livelihood10.102 Livelihood Plan For Landless/Asset less (9% BudgetPlan For Landless/Asset less (9% BudgetPlan For Landless/Asset less (9% BudgetPlan For Landless/Asset less (9% Budget))))

As per the provision provided in the common Guideline for livelihood, 2008As per the provision provided in the common Guideline for livelihood, 2008As per the provision provided in the common Guideline for livelihood, 2008As per the provision provided in the common Guideline for livelihood, 2008

Name of Name of Name of Name of BlockBlockBlockBlock: Salooni LLLLivelihood budget (9%)ivelihood budget (9%)ivelihood budget (9%)ivelihood budget (9%): : : : `̀̀̀ 75,97,80075,97,80075,97,80075,97,800

i. Revolving funds Revolving funds Revolving funds Revolving funds (SHG/Individuals) ((SHG/Individuals) ((SHG/Individuals) ((SHG/Individuals) (73.3073.3073.3073.30%)%)%)%): ` ` ` ` 55,68,80055,68,80055,68,80055,68,800

ii. Grant Grant Grant Grant ––––in in in in –––– aid (SHGs/SHG Federations) (aid (SHGs/SHG Federations) (aid (SHGs/SHG Federations) (aid (SHGs/SHG Federations) (22226.706.706.706.70%)%)%)%): ` ` ` ` 20,29,00020,29,00020,29,00020,29,000

Need base planning under livelihood activities for landless /asset less beneficiaries of watershed area by PIANeed base planning under livelihood activities for landless /asset less beneficiaries of watershed area by PIANeed base planning under livelihood activities for landless /asset less beneficiaries of watershed area by PIANeed base planning under livelihood activities for landless /asset less beneficiaries of watershed area by PIA

Sr. Sr. Sr. Sr.

NoNoNoNo

ActivityActivityActivityActivity No. of No. of No. of No. of

BeneficiariesBeneficiariesBeneficiariesBeneficiaries

Total Project cost to be decided by PIA Total Project cost to be decided by PIA Total Project cost to be decided by PIA Total Project cost to be decided by PIA

on the basis applicationon the basis applicationon the basis applicationon the basis application

Watershed Project funds `Watershed Project funds `Watershed Project funds `Watershed Project funds `

Grant in aid `Grant in aid `Grant in aid `Grant in aid `

1. Carpentry 19 Micro enterprise component Revolving fund for

individual beneficiaries should be maximum `5000/-

and ` 25,000/- for SHGs. GIA should be maximum

24,000 (30,000-6000) for General beneficiaries and

`27,000(30,000-3000) for SC/ST beneficiaries. GIA

for SHGs/ SHG Federation should be 50% of the

Project Cost or maximum of ` 2.00lacs.

662000

2. Masonry 4 60000

3. C & T Embroidery 38 832000

4. Weaver+Black

Smith

1 15000

5. Achar -Chatni 2 50000

6. Weaver 13 335000

7. Welding 1 25000

8. Carpenter+

Masonry

2 50000

Revolving fund 0 5568800

total total total total 80808080 75,97,80075,97,80075,97,80075,97,800

.

Page 25: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-25]

10.102 (a) Livelihood Plan For Landless/Asset less (9% Budget)10.102 (a) Livelihood Plan For Landless/Asset less (9% Budget)10.102 (a) Livelihood Plan For Landless/Asset less (9% Budget)10.102 (a) Livelihood Plan For Landless/Asset less (9% Budget)

Name of the Name of the Name of the Name of the

panchayatpanchayatpanchayatpanchayat

Carpenter Carpenter Carpenter Carpenter MasonryMasonryMasonryMasonry Achar Achar Achar Achar

ChatniChatniChatniChatni

Weaver + Weaver + Weaver + Weaver +

Black smithBlack smithBlack smithBlack smith

Welder Welder Welder Welder C&T/ C&T/ C&T/ C&T/

Embroidery Embroidery Embroidery Embroidery

Carpenter+ Carpenter+ Carpenter+ Carpenter+

MasonryMasonryMasonryMasonry

WeaverWeaverWeaverWeaver Revolving Revolving Revolving Revolving

fund (`)fund (`)fund (`)fund (`)

Grand Grand Grand Grand

TotalTotalTotalTotal

Total Total Total Total

no. no. no. no.

Cost(`) Cost(`) Cost(`) Cost(`) Total Total Total Total

no. no. no. no.

Cost(`) Cost(`) Cost(`) Cost(`)

@5000@5000@5000@5000

Total Total Total Total

no. no. no. no.

Cost(`) Cost(`) Cost(`) Cost(`)

@@@@

Total Total Total Total

no. no. no. no.

Cost(`) Cost(`) Cost(`) Cost(`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) Total Total Total Total

no. no. no. no.

Cost(`) Cost(`) Cost(`) Cost(`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) Total Cost Total Cost Total Cost Total Cost

(`)(`)(`)(`)

Khadjota 5 90000 0 0 0 0 1 15000 0 0 9 180000 2 50000 0 0 786850 1121850

Ail (Sau) 0 0 0 0 0 0 0 0 0 0 2 50000 0 0 3 180000 1025500 1255500

Ail (Khangu) 5 250000 0 0 0 0 0 0 0 0 1 25000 0 0 1 25000 723300 1023300

Bhananter 4 100000 2 10000 0 0 0 0 0 0 3 75000 0 0 6 48000 545950 778950

Lanot 0 0 0

0

0 0 0 0 1 25000 6 87000 0 0 0 0 288950 400950

Ail 2 72000 0 0 0 0 0 0 0 0 9 215000 0 0 1 32000 750200 1069200

Singadhar 3 150000 2

50000

2 50000 0 0 0 0 8 200000 0 0 2 50000 1448050 1948050

Total Total Total Total 19191919 6,62,0006,62,0006,62,0006,62,000 4444 60,00060,00060,00060,000 2222 50,00050,00050,00050,000 1111 15,00015,00015,00015,000 1111 25,00025,00025,00025,000 38383838 8,32,0008,32,0008,32,0008,32,000 2222 50,00050,00050,00050,000 13131313 3,35,0003,35,0003,35,0003,35,000 55,68,80055,68,80055,68,80055,68,800 7597800759780075978007597800

Page 26: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-26]

CHAPTER - XI

11.0 PRODUCTION11.0 PRODUCTION11.0 PRODUCTION11.0 PRODUCTION SYSTEMSYSTEMSYSTEMSYSTEM &&&&MICRO ENTERPRISES MICRO ENTERPRISES MICRO ENTERPRISES MICRO ENTERPRISES

The land resource is the primary and major source of livelihood activities in the

watershed area. These natural resources can be used properly by adopting integrated farming system to get more return per unit space per unit time. Area is suitable for the cultivation of apple, pear, pomegranate and walnut. These fruits plants can be integrated with agriculture and animal’s husbandry to increase the productivity of land. The shortage of fodder leads farmers to rear only local breeds of animals that are too for self consumption of milk and farm yard manure. This shortage of fodder can be overcome by introducing multipurpose tree species. Other option of livelihood is the revival of rural artisans and for this best options with the rural artisans are carpenter, masonry, weaving, crafting and shoe making. The rural poor can earn good amount of money from these professions. These are some of important income generating activities need to be introduced in the watershed area. There is a dire need to aware, motivate and trained the local poor artisans. These artisans should be provided with equipments to earn their livelihood and to improve their socio economic conditions. 11.101 11.101 11.101 11.101 Income enhancement and employment generation through different income Income enhancement and employment generation through different income Income enhancement and employment generation through different income Income enhancement and employment generation through different income

generating activitiesgenerating activitiesgenerating activitiesgenerating activities 11.101a :11.101a :11.101a :11.101a : Number of households with activities and income, The list of beneficiaries Number of households with activities and income, The list of beneficiaries Number of households with activities and income, The list of beneficiaries Number of households with activities and income, The list of beneficiaries

selected during the PRA exercise attached.selected during the PRA exercise attached.selected during the PRA exercise attached.selected during the PRA exercise attached.

S. S. S. S.

NoNoNoNo

ActivityActivityActivityActivity Existing No. of hExisting No. of hExisting No. of hExisting No. of household ousehold ousehold ousehold Proposed No of household Proposed No of household Proposed No of household Proposed No of household

1 Agriculture seed Whole panchayat Whole panchayat

2 Vermicompost - 43

3 Goatry - 44

4 Dairy - 48

5 Poultry - 11

6 Mule - 44

7 Poly house (con.) - 4

8 Vermicompost (con.) - 15

9 Nursery raising - 1

10 Insecticide /Pesticide - 210

Page 27: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-27]

Production System and MicroSystem and MicroSystem and MicroSystem and Micro---- Enterprises (10% Budget)Enterprises (10% Budget)Enterprises (10% Budget)Enterprises (10% Budget)

Name of Watershed IWMPName of Watershed IWMPName of Watershed IWMPName of Watershed IWMP----XIVXIVXIVXIV Production budget (10%) ` Production budget (10%) ` Production budget (10%) ` Production budget (10%) ` 8442000844200084420008442000

11.10111.10111.10111.101aaaa: Income enhancement and employment: Income enhancement and employment: Income enhancement and employment: Income enhancement and employment generation through different income generating activitiesgeneration through different income generating activitiesgeneration through different income generating activitiesgeneration through different income generating activities

Name of the Name of the Name of the Name of the

panchayats panchayats panchayats panchayats

Agriculture Agriculture Agriculture Agriculture Vermin Vermin Vermin Vermin

compost compost compost compost

Goatry Goatry Goatry Goatry Dairy Dairy Dairy Dairy MuleMuleMuleMule VegetableVegetableVegetableVegetable Poultry Poultry Poultry Poultry Fruit Fruit Fruit Fruit

Plant Plant Plant Plant

(Proposed)(Proposed)(Proposed)(Proposed)

Fruit Fruit Fruit Fruit

PlantPlantPlantPlant

MischanceMischanceMischanceMischance NurseryNurseryNurseryNursery Insecticide/Insecticide/Insecticide/Insecticide/

PesticidePesticidePesticidePesticide

poly poly poly poly

house house house house

(con.)(con.)(con.)(con.)

VVVVeeeerrrrmmmmiiiinnnn

ccccoooommmmppppoooosssstttt

(con.)(con.)(con.)(con.)

Cost (`) Cost (`) Cost (`) Cost (`) Total Total Total Total

no. no. no. no.

Cost (`)Cost (`)Cost (`)Cost (`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) No. of No. of No. of No. of

plants plants plants plants

Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Total Total Total Total

no. no. no. no.

Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) Cost (`) 0 0 0 0 0 0

Khadjota 325500 12 222000 7 70000 1 25000 0 0 268000 0 0 311850 24150 0 0 0 0

Ail (Sau) 175500 7 210000 11 110000 7 175000 15 450000 93360 0 0 21760 126000 33380 0 0 0 0

Ail (Khangu)

134400 4 120000 0 0 10 300000 0 0 201600 0 0 19200 52000 309800 0 0 0 0

Bhananter 78300 7 49000 7 56000 5 100000 16 320000 99000 2 20000 114400 0 28800 0 0 0 0

Lanot 67080 10 70000 0 0 3 90000 2 60000 18210 5 25000 71500 0 11050 30000 3710 0 0

Ail 31800 3 21000 11 300000 11 275000 11 330000 24480 2 20000 55680 62725 67315 0 0 500000 105000

Singadhar 322500 0 0 8 80000 11 275000 0 0 957600 2 60000 409500 32175 27725 0 0 0 0

Total Total Total Total 1135080113508011350801135080 43434343 692000692000692000692000 44444444 616000616000616000616000 48484848 1240000124000012400001240000 44444444 1160000116000011600001160000 1662250166225016622501662250 11111111 125000125000125000125000 1003890100389010038901003890 272900272900272900272900 502220502220502220502220 30000300003000030000 3710371037103710 500000500000500000500000 111100005555000000000000

Page 28: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-28]

11.1 1 1 1 AGRICULTUREAGRICULTUREAGRICULTUREAGRICULTURE

The main stay of the farmers of watershed catchment area is agricultural

crops grown such as wheat, maize, among cereal crops Rajmash and Mash among

pulses. The productivity of crop was observed very low due to rainfed condition and

texture and structure of soil is rough. This can be increased through supplementary

irrigation facilities and adoption of latest technology for conservation of fertile soil.

The ridge to valley method is to be adopted for water management

11.101(a11.101(a11.101(a11.101(a) Prevalent) Prevalent) Prevalent) Prevalent Farming System uFarming System uFarming System uFarming System under Agriculturender Agriculturender Agriculturender Agriculture

1. Agriculture (Maize/ pulses + Wheat/mustard) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans

11.10211.10211.10211.102bbbb Present status of Agriculture Present status of Agriculture Present status of Agriculture Present status of Agriculture Crops and Proposed interventions:Crops and Proposed interventions:Crops and Proposed interventions:Crops and Proposed interventions:

11.1011.1011.1011.101c1c1c1c Cereals CropsCereals CropsCereals CropsCereals Crops

Crops grownCrops grownCrops grownCrops grown : : : : Maize and wheat

Total ProductionsTotal ProductionsTotal ProductionsTotal Productions ::::13450qt (based on PRA exercise)

On the demand of the farmer the following activities under Agriculture is proposed On the demand of the farmer the following activities under Agriculture is proposed On the demand of the farmer the following activities under Agriculture is proposed On the demand of the farmer the following activities under Agriculture is proposed

StatusStatusStatusStatus ParticularsParticularsParticularsParticulars MaizeMaizeMaizeMaize WheatWheatWheatWheat Barley Barley Barley Barley ExistingExistingExistingExisting Area under

cultivation 4800 Bigha 3200 Bigha 900 Bigha

Production 9600 qt 3200 qt 650 qt Productivity 2 qt/ bigha 1 qt/ bigha 0.72 qt/ bigha

Variety Local, Pioneer

Madurai S-308 Sonalika and local

Local

Technology Kera method Broad casting Broad casting ProposedProposedProposedProposed Increase in area 1400 bigha 850 bighas 150 bighas Variety Proline,

pioneer Kalyan, S-308 Sonalika and local

Kalyan, S-308 Sonalika and local

Seed Quantity required by beneficiary group

18600 Kg 60750 kg 15750 kg

Source: Household survey, Regional Centre, NAEB, UHF, 2012

11.10111.10111.10111.101d d d d Pulses Pulses Pulses Pulses

Crops grownCrops grownCrops grownCrops grown : : : : Rajmash, Sarson, Urad, Kulth, Soyabeen Total ProductionsTotal ProductionsTotal ProductionsTotal Productions : : : : 735 qt (based on PRA exercise)

Source: Household survey, Regional Centre, NAEB, UHF, 2012

StatusStatusStatusStatus ParticularsParticularsParticularsParticulars Rajmash Rajmash Rajmash Rajmash SarsonSarsonSarsonSarson Urad Urad Urad Urad ExistingExistingExistingExisting Area under cultivation 300 bigha

(Intercropping

with maize)

900 Bigha

(Intercropping

with maize)

50 Bigha

(Intercropping

with maize)

Production 150 Q. 560 Q. 25 Q.

Productivity 0.5 kg/bigha 0.56 kg/ bigha 0.5 kg/ bigha

Variety Local Local Local

Technology Line method Line method Line method

ProposedProposedProposedProposed Increase in area 7.5 bigha 240 Bigha 10 Bigha

Variety Red capsule Red capsule Red capsule

Seed Quantity required

by beneficiary group

3750 kg 1140 Kg 240 Kg

Page 29: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-29]

11.101 11.101 11.101 11.101 eeee Requirement of improved seed under different crops Requirement of improved seed under different crops Requirement of improved seed under different crops Requirement of improved seed under different crops

ParticularsParticularsParticularsParticulars Quantity Quantity Quantity Quantity ( kg)( kg)( kg)( kg)

Project contribution with 10%Project contribution with 10%Project contribution with 10%Project contribution with 10% & & & & 20%20%20%20% Seed replacement rate Seed replacement rate Seed replacement rate Seed replacement rate (Kg)(Kg)(Kg)(Kg)

Market Market Market Market rate per rate per rate per rate per kg (`)kg (`)kg (`)kg (`)

Estimated Estimated Estimated Estimated Budget (`)Budget (`)Budget (`)Budget (`)

CerealsCerealsCerealsCereals

Maize 18600 3240 80 259200 Wheat 60750 11325 50 566250 Barley 15750 3450 50 172500

Rajmash 3750 690 150 103500 Urad 240 24 120 2880 Sarson 1140 205 150 30750

TotalTotalTotalTotal 18934189341893418934 11,35,08011,35,08011,35,08011,35,080

• Lack of irrigation facilities.

• Lack of scientific agricultural practices.

• Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.

• Improved seed varieties not adequately used.

11.101 11.101 11.101 11.101 g Marketing g Marketing g Marketing g Marketing

• Agriculture produced are not sold in the market used only for self consumption

11.101 11.101 11.101 11.101 h Projecth Projecth Projecth Project InterventionsInterventionsInterventionsInterventions

a)a)a)a) Introduction of improved seedIntroduction of improved seedIntroduction of improved seedIntroduction of improved seed

Improved seed of maize, wheat and pulses will be introduced as demonstration units & 74 unit of vermicompost will be introduced as demonstration

b)b)b)b) Human Resource Development (HRD)/ Capacity Building and training in Human Resource Development (HRD)/ Capacity Building and training in Human Resource Development (HRD)/ Capacity Building and training in Human Resource Development (HRD)/ Capacity Building and training in AgricultureAgricultureAgricultureAgriculture

• Training on cultivation practices of various agriculture crops.

• Training on insects & pests management.

• Training on vermin composting for organic farming

• Exposure visits and experience sharing outside state progressive farmers

c)c)c)c) Numbers of trainings / Exposure visitsNumbers of trainings / Exposure visitsNumbers of trainings / Exposure visitsNumbers of trainings / Exposure visits

• Number of Trainings =1

• Number of Trainees =30 to35

• Duration = 2-3 days

d)d)d)d) Exposure visitExposure visitExposure visitExposure visit

• One exposure visit of 30 to 40 farmers

Page 30: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-30]

11.10111.10111.10111.101i Project Impacti Project Impacti Project Impacti Project Impact Crops Crops Crops Crops Existing Existing Existing Existing

area area area area Addition Addition Addition Addition in areain areain areain area

Total area after Total area after Total area after Total area after project project project project interventions interventions interventions interventions

Seed requirement Seed requirement Seed requirement Seed requirement after project after project after project after project intervention (kg)intervention (kg)intervention (kg)intervention (kg)

Unit Unit Unit Unit cost cost cost cost (`)(`)(`)(`)

Amount (`)Amount (`)Amount (`)Amount (`)

Maize 4800 1400 6200 18600 80 1488000 Wheat 3200 850 4050 60750 50 3037500 Barley 900 150 1050 15750 50 787500 Sarson (oil seeds)

900 240 1140 1140 150 171000

Urad 50 10 60 240 120 28800

Rajmash 300 75 375 3750 150 562500 Total Total Total Total 10150101501015010150 2725272527252725 12875128751287512875 100230100230100230100230 60606060,,,,75757575,,,,300300300300 b) Skill development and capacity building of about 25 to 30 farmers from the Panchayat for adoption of latest technology of watershed management c) Encouragement towards organic farming and improving fertility of soils through

vermin compost

Page 31: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-31]

11.2 .2 .2 .2 HORTICULTURE HORTICULTURE HORTICULTURE HORTICULTURE

The chapter deals with the vegetable crops. among fruits Plum, apricot

Pear, peach and walnut etc. are grown. Vegetable is the major cash crop. The

watershed area is also cultivated with different types of vegetables. These includes

cabbage, beans, peas etc. the vegetable production is the main farm activity and a

good source of employment and income.

11.201(a) 11.201(a) 11.201(a) 11.201(a) Prevalent Farming Practices under Horticulture Prevalent Farming Practices under Horticulture Prevalent Farming Practices under Horticulture Prevalent Farming Practices under Horticulture

• Horticulture + vegetables

• Vegetable + Animal rearing

• Vegetable crops(Cabbage+Beans) (Tomato +Peas)

• Fruit crop (Lemon + Peach+ Pomegranate + Apricot )

• Agriculture + Horticulture + Animal rearing.

11.201(b) Present status of horticulture crops and proposed interventions:11.201(b) Present status of horticulture crops and proposed interventions:11.201(b) Present status of horticulture crops and proposed interventions:11.201(b) Present status of horticulture crops and proposed interventions: 11.201(c) Fruits11.201(c) Fruits11.201(c) Fruits11.201(c) Fruits

StatusStatusStatusStatus ParticularParticularParticularParticular GalgalGalgalGalgalGalgal Peach Peach Peach Peach Apple Apple Apple Apple Apricot Apricot Apricot Apricot Existing Area under

cultivation 86 bigha 22 bigha 143.25bigha 100 bigha

Present Production

1720 qt 880 qt 1708.5 qt 508qt

Productivity 20 qt 40 qt/bigha 12 qt/bigha 5.08 qt/bigha

Variety Local Local Local Local Technology Indigenous Indigenous Indigenous Indigenous Proposed Increase in

area 136.6 Bigha

36.6 Bigha 437.8 bigha 349.7 bigha

Varieties Local Kegzi lime Royal Delicious

New casel

Plants requirement

5330plants 1430 plants 14011plants 7695plants

10 mixed plant as demonstration

StatusStatusStatusStatus ParticularParticularParticularParticular Pomegranate Pomegranate Pomegranate Pomegranate Galgal Galgal Galgal Galgal Lemon Lemon Lemon Lemon Walnut Walnut Walnut Walnut Existing Area under

cultivation Nil Nil Nil 199.5bigha

Present Production

Nil Nil Nil 1727.6 qt

Productivity Nil Nil Nil 8.65qt/bigha Variety Nil Nil Nil Local

Technology Nil Nil Nil Indigenous Proposed Increase in

area 33 Bigha 343 bigha 33 bigha 672.5 bigha

Varieties Kandhari,Ganesh Local Local Local

Plants requirement

1295 plants 5330plants 1287 plants 8070plants

Page 32: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-32]

11.201(e): Present status of horticulture crops and proposed interventions:

Fruit plants Name of the Name of the Name of the Name of the panchayat panchayat panchayat panchayat

Area Area Area Area LemonLemonLemonLemon PomegranatePomegranatePomegranatePomegranate Apple Apple Apple Apple Galgal Galgal Galgal Galgal Walnut Walnut Walnut Walnut ApricotApricotApricotApricot

No. of No. of No. of No. of householdhouseholdhouseholdhousehold

AreaAreaAreaArea No. of No. of No. of No. of PlantPlantPlantPlant

CostCostCostCost (`) @(`) @(`) @(`) @ 25/Pl25/Pl25/Pl25/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

CostCostCostCost (`) @(`) @(`) @(`) @ 25/Pl25/Pl25/Pl25/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

CostCostCostCost (`) @(`) @(`) @(`) @ 50/Pl50/Pl50/Pl50/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

Cost (`) Cost (`) Cost (`) Cost (`) @@@@

25/Pl25/Pl25/Pl25/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

CostCostCostCost (`) @(`) @(`) @(`) @ 30/Pl30/Pl30/Pl30/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

Cost (`) Cost (`) Cost (`) Cost (`) @@@@

30/Pl30/Pl30/Pl30/Pl

No. of No. of No. of No. of PlantPlantPlantPlant

WaterWaterWaterWater shedshedshedshed cost (`)cost (`)cost (`)cost (`)

Lanot 286 36.6 1430 35750 0 0 0 0 1430 35750 0 0 0 0 2860 71500

Singdhar 390 0 0 0 1287 32175 3900 156000 3900 97500 3900 156000 0 0 12987 441675

Bhananter 352 0 0 0 0 0 1760 70400 0 0 0 0 1760 44000 3520 114400

Khadjota 297 0 0 0 0 0 2970 118800 0 0 2970 118800 2970 74250 8910 311850

Ail 275 0 0 0 0 0 2357 94280 0 0 0 0 965 24125 3322 118405

Khangu 40 0 0 0 0 0 1280 51200 0 0 0 0 800 20000 2080 71200

Ail (Sau) 60 0 0 0 0 0 1744 69760 0 0 1200 48000 1200 30000 4144 147760

Total Total Total Total 1700170017001700 36.636.636.636.6 1430143014301430 35750357503575035750 1287128712871287 32175321753217532175 14011140111401114011 560440560440560440560440 5330533053305330 133250133250133250133250 8070807080708070 322800322800322800322800 7695769576957695 192375192375192375192375 37823378233782337823 1276790127679012767901276790

11.201 (f)11.201 (f)11.201 (f)11.201 (f) Vegetables cropsVegetables cropsVegetables cropsVegetables crops

StatusStatusStatusStatus Vegetable crops Vegetable crops Vegetable crops Vegetable crops BeanBeanBeanBean Peas Peas Peas Peas TomatoTomatoTomatoTomato Cabbage Cabbage Cabbage Cabbage PotatoPotatoPotatoPotato

Existing Area under cultivation 840 bigha 1330 bigha 150 bigha 420 bigha 500 bigha

Present Production 3680qt 8100 qt 750 qt 2850 qt 4000 qt

Productivity 4.3 qt 6 qt 5 qt 6.7.qt/bigha 8 qt/bigha

Variety Falguni Azad, P-1, Linken Himsona Local Improved

Technology Indigenous Indigenous Indigenous Indigenous Indigenous

Proposed Increase in area 290 Bighas 695 Bighas 75 Bighas 115 Bighas 310 bigha

Variety Falguni Azad, P-1,Linken Himsona Improved hybrid

Total seed requirement 6780 Kg 12150 kg 2700gm 21400 gm 121500 kg

Page 33: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-33]

The quantity of plant for each crop has been determined by the total number of

plants x Bigha i. e Lemon 40, Pomegranate 40, Apricot 30, Galgal 40,Walnut 10 and

Apple 35 /bigha.

Project impact Project impact Project impact Project impact

Species Species Species Species Existing Existing Existing Existing

areaareaareaarea

Additional in Additional in Additional in Additional in

areaareaareaarea

Total Total Total Total

area area area area

Total area after project Total area after project Total area after project Total area after project

intervention intervention intervention intervention

Fruits Fruits Fruits Fruits

Lemon - 33 33

2216.95

Pomegranate - - -

Apricot 100 349.7 449.7

Galgal 86 136.6 222.6

Peach 22 36.6 58.6

Walnut 199.5 672.5 872

Apple 143.25 437.8 581.05

Total Total Total Total 550.75550.75550.75550.75 1666.21666.21666.21666.2 2216.952216.952216.952216.95 2216.952216.952216.952216.95

Vegetable Vegetable Vegetable Vegetable

Cabbage 420 115 535

4725

Bean 840 290 1130

Peas 1330 695 2025

Potato 500 310 810

Tomato 150 75 225

Total Total Total Total 3240324032403240 1485148514851485 4725472547254725 4725472547254725

11.201(g) Critical Gaps in Horticulture ProductionCritical Gaps in Horticulture ProductionCritical Gaps in Horticulture ProductionCritical Gaps in Horticulture Production

• Lack of vegetable collection centre

• Lack of sufficient irrigation facilities

• Quality seedling of fruit crop.

• Lack of technical knowledge for cultural operation

• Knowledge about Post Harvesting Technology .

• Lack of value addition.

• Availability of fertilizers

• Lake of post harvesting Management

• Lake of CCA Store to improve shelf life of the produce

11.201(h) 11.201(h) 11.201(h) 11.201(h) Marketing Marketing Marketing Marketing

• Vegetable produced are sold at Chamba & Dalhousie 11.201 (i) Project InterventionsProject InterventionsProject InterventionsProject Interventions

a) Supply of improved verities of fruit crops seedlings. b) Vegetable collection centre. c) Training on cultural operations and on value addition. d) Farm based enterprises

Page 34: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-34]

e) Irrigation through moisture conservation measures f) Drip irrigation Sprinkler g) Vegetable seed production area

11.201 (j) Community 11.201 (j) Community 11.201 (j) Community 11.201 (j) Community requirement of Improved Vegetable Seed in Project Arearequirement of Improved Vegetable Seed in Project Arearequirement of Improved Vegetable Seed in Project Arearequirement of Improved Vegetable Seed in Project Area

CropsCropsCropsCrops Seed requirementSeed requirementSeed requirementSeed requirement Quantity (Kg)Quantity (Kg)Quantity (Kg)Quantity (Kg)

Project contribution withProject contribution withProject contribution withProject contribution with 20% & 60% seed replacement 20% & 60% seed replacement 20% & 60% seed replacement 20% & 60% seed replacement (kg)(kg)(kg)(kg)

Estimated Budget(`)Estimated Budget(`)Estimated Budget(`)Estimated Budget(`) Cabbage 21400 gm 3950 gm 137200

Potato 121500 11700 kg 702000 Beans 6780 1050 kg 525000 Peas 12150 1530 kg 275400 Tomato 2700 gm 540 gm 21600 Total Total Total Total 14284.4614284.4614284.4614284.46 1661200166120016612001661200

The quantity of seed for each vegetable crop has been determined by multiplying the seed rate per bigha with the total area cultivated under different crops i.e. Beans (4 kg), Peas (5 kg), tomato(20), by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as samples among the beneficiaries for development and demonstration units

11.201(k) Impact/Project Outcomes 11.201(k) Impact/Project Outcomes 11.201(k) Impact/Project Outcomes 11.201(k) Impact/Project Outcomes

1. Skill development /capacity building of 40 farmers 2. Conventional Cropping pattern changed. Area under vegetable increased

(1412.6 bighas) 3. Mono crop to cash crop 4. Farming systems changed. Areas under fruit crops increased (413.4 bighas) 5. Production of fruit and vegetable enhanced through supplementary irrigation

facility 6. Livelihood of 40 more farming families linked with horticulture practice.

Page 35: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-35]

11.3 ANIMAL HUSBANDRY 11.3 ANIMAL HUSBANDRY 11.3 ANIMAL HUSBANDRY 11.3 ANIMAL HUSBANDRY

Animal rearing is the secondary thought for livelihood activity after Agriculture.

Animals are reared by farmers mainly for milk, FYM, meat as well as for wool. Cows and

buffaloes are reared for milk production which is used for self consumption. Milch

animals are local as well as improved. Hence milk production is low due to non

availability of green fodder and nutrient feeding to the animals.

11.301 11.301 11.301 11.301 Milk Production and fodder requirement Milk Production and fodder requirement Milk Production and fodder requirement Milk Production and fodder requirement

Total no. of milch cattle in the watershed area is 2891 and average production of

milk per day is 4 lt. from buffalo’s local cows, 5 lt. from cow improved and 5 lt. per day

from local cow.

11.301(a) 11.301(a) 11.301(a) 11.301(a) Average and Total milk productionAverage and Total milk productionAverage and Total milk productionAverage and Total milk production Milch cattleMilch cattleMilch cattleMilch cattle Total MilchTotal MilchTotal MilchTotal Milch Average milk production lt./dayAverage milk production lt./dayAverage milk production lt./dayAverage milk production lt./day Total production Total production Total production Total production (lt.)(lt.)(lt.)(lt.)

Buffaloes 643 4 2572 Local cows 2193 5 10965 Cows (improved)

55 5 275

TotalTotalTotalTotal 2891289128912891 13812138121381213812

11.301 (b)11.301 (b)11.301 (b)11.301 (b) Fodder availability, requirement and Deficit (tons)Fodder availability, requirement and Deficit (tons)Fodder availability, requirement and Deficit (tons)Fodder availability, requirement and Deficit (tons) Green fodder available in project area is 67698 tons whereas dry fodder available is 32495 ton. Total 100193 ton fodder is available in project area. But requirement of green fodder is 162475 ton whereas requirement of dry fodder is 54158 ton. Total fodder required is 216633 ton. Deficit of green fodder in project area is 94777 ton and that of dry fodder is 21663 tons.

11.301(b11.301(b11.301(b11.301(b----i)i)i)i) Fodder availability, requirement and Deficit (tons) Fodder availability, requirement and Deficit (tons) Fodder availability, requirement and Deficit (tons) Fodder availability, requirement and Deficit (tons)

AvailableAvailableAvailableAvailable RequiredRequiredRequiredRequired DeficitDeficitDeficitDeficit GreenGreenGreenGreen DryDryDryDry TotalTotalTotalTotal Green Green Green Green DryDryDryDry TotalTotalTotalTotal Green Green Green Green DryDryDryDry TotalTotalTotalTotal

67698 32495 100193 162475 54158 216633 94777 21663 116440 Total Animal : 15044 Note Note Note Note ---- Available FodderAvailable FodderAvailable FodderAvailable Fodder Green Green Green Green - 25kg/day x 30 days x 6months x Total live stock DryDryDryDry - 12 kg/day x 30days x 6months x Total live stock Required FodderRequired FodderRequired FodderRequired Fodder GreenGreenGreenGreen - 30kg/day x 30days x 12months x Total live stock Dry Dry Dry Dry - 10kg/day x 30days x 12months x Total live stock

11.301(b11.301(b11.301(b11.301(b----ii)ii)ii)ii) Gap between Demand and supply of total Fodder Gap between Demand and supply of total Fodder Gap between Demand and supply of total Fodder Gap between Demand and supply of total Fodder

Supply 100193 Demand 216633 Deficit 116440

Page 36: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-36]

11.301(c)11.301(c)11.301(c)11.301(c) Project interventionsProject interventionsProject interventionsProject interventions

� Plantation and cultivation of fodder trees and grasses � Construction of talabs , Johars in grass land and community lands � Training/Capacity building

a) Plantation and cultivation of fodder trees and grasses Species:Species:Species:Species:

Tree: Morus, Ban, Robinia , Shatoot, Beul. Kachnar Grasses: Steria, Berseem, Orchard, Napier etc.

11.301(c11.301(c11.301(c11.301(c----i): Budgeti): Budgeti): Budgeti): Budget form Production system and micro enterprises form Production system and micro enterprises form Production system and micro enterprises form Production system and micro enterprises

Name of Name of Name of Name of

Panchayat Panchayat Panchayat Panchayat

Fodder TreesFodder TreesFodder TreesFodder Trees GrassesGrassesGrassesGrasses Total Total Total Total Amount `Amount `Amount `Amount ` AreaAreaAreaArea

(ha.)(ha.)(ha.)(ha.)

No. of No. of No. of No. of

PlantsPlantsPlantsPlants

Unit Unit Unit Unit

cost cost cost cost

per ha per ha per ha per ha

`̀̀̀

Watershed Watershed Watershed Watershed

` ` ` `

Area Area Area Area

(ha.)(ha.)(ha.)(ha.)

Quantity Quantity Quantity Quantity

of seeds of seeds of seeds of seeds

(kg) (kg) (kg) (kg)

Rate Rate Rate Rate

per per per per

Kg(`)Kg(`)Kg(`)Kg(`)

watershed watershed watershed watershed

` ` ` `

Ail 25 27500 10 275000 3 105 4200 12600 287600

Ail (Sau) 40 44000 10 440000 10 350 4200 42000 482000

Ail (Khangu)

40 44000 10 440000 10 350 4200 42000 482000

Bhananter 5 5500 10 55000 5 175 4200 21000 76000

Lanot 5 5500 10 55000 5 175 4200 21000 76000

Singadhar 15 16500 10 165000 15 525 4200 63000 228000

Khadjota 15 16500 10 165000 15 525 4200 63000 228000

Total Total Total Total 145145145145 1,59,5001,59,5001,59,5001,59,500 15,95,00015,95,00015,95,00015,95,000 63636363 2205220522052205 2,64,6002,64,6002,64,6002,64,600 18,59,60018,59,60018,59,60018,59,600

11.301(c11.301(c11.301(c11.301(c----ii) b :Variety and rates of fodder species and hybrid grasses ii) b :Variety and rates of fodder species and hybrid grasses ii) b :Variety and rates of fodder species and hybrid grasses ii) b :Variety and rates of fodder species and hybrid grasses Budget form Budget form Budget form Budget form Production system and micro enterprisesProduction system and micro enterprisesProduction system and micro enterprisesProduction system and micro enterprises Activity Activity Activity Activity /Item /Item /Item /Item

Area Area Area Area Rate per Rate per Rate per Rate per ha. (`)ha. (`)ha. (`)ha. (`)

Total cost (`)Total cost (`)Total cost (`)Total cost (`) Beneficiaries share ` 10% Beneficiaries share ` 10% Beneficiaries share ` 10% Beneficiaries share ` 10% cash or kind used as WDF cash or kind used as WDF cash or kind used as WDF cash or kind used as WDF

Fodder 145 10 1595000 Nil Grasses 63 4200 264600 Nil Total Total Total Total 208208208208 18,59,60018,59,60018,59,60018,59,600 Nil b) Construction of talabs , Johars in grass land and community lands

c) Training and Capacity Building

• Live stock management

• Animal Health

• Artificial insemination

• Improved grasses / Fodder trees

• Exposure visits Number of TrainingNumber of TrainingNumber of TrainingNumber of Training

• Four trainings with 5-7 farmers in each trainings

• Exposure visits for 5-7 farmers

Page 37: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-37]

11.301(d) 11.301(d) 11.301(d) 11.301(d) Project outcome/impact Project outcome/impact Project outcome/impact Project outcome/impact 11.301(d11.301(d11.301(d11.301(d----i)i)i)i) Estimated production of milk after project interventionEstimated production of milk after project interventionEstimated production of milk after project interventionEstimated production of milk after project intervention

Milk production after project intervention will increase to 5 to 6 lt. /day and total

production of milk after project intervention will be 16703 liters.

11.301(d11.301(d11.301(d11.301(d----ii) Milk production from cows and buffaloesii) Milk production from cows and buffaloesii) Milk production from cows and buffaloesii) Milk production from cows and buffaloes after project interventionafter project interventionafter project interventionafter project intervention

Sr. No.Sr. No.Sr. No.Sr. No. Milch cattleMilch cattleMilch cattleMilch cattle Milch No.Milch No.Milch No.Milch No. Milk production lt./dayMilk production lt./dayMilk production lt./dayMilk production lt./day Total production (lt.)Total production (lt.)Total production (lt.)Total production (lt.) 1 Buffaloes 643 5 3215 2 Local cows 2193 6 13158 3 Cows (improved) 55 6 330 TotalTotalTotalTotal 2891289128912891 16703167031670316703

11.301(d11.301(d11.301(d11.301(d----iiiiiiiiiiii) Total m) Total m) Total m) Total milk production before and after project intervention.ilk production before and after project intervention.ilk production before and after project intervention.ilk production before and after project intervention.

Increase in milk production is 2891lt. with total production of 16703 lt.

Sr. Sr. Sr. Sr. No.No.No.No.

Milch cattleMilch cattleMilch cattleMilch cattle Production Before Production Before Production Before Production Before project (lt.)project (lt.)project (lt.)project (lt.)

Production After Production After Production After Production After project (lt.)project (lt.)project (lt.)project (lt.)

Quantity of milk Quantity of milk Quantity of milk Quantity of milk Increase after project Increase after project Increase after project Increase after project (lt.)(lt.)(lt.)(lt.)

1 Buffaloes 2572 3215 643 2 Local cows 10965 13158 2193 3 Cows

(improved) 275 330 55

TotalTotalTotalTotal 13812138121381213812 16703167031670316703 2891289128912891

Page 38: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-38]

CHAPTER -XII

12.0 PISCICULTURE

Fisheries can be one of the additional sources of income to the farmers of the

watershed area, but due to the lack of plenty of fresh water, the people enable to take up

this activity as a additional source of income. Secondly the people of the watershed area

are practicing agriculture, horticulture and vegetable cultivation which is a main stay of the

farmers. Hence fish cultivation cannot suggest for the watershed areas of the Salooni Block.

12.101a Existing and Proposed water bodies for fish culture

Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size (ft) Location

1 Nil Nil Nil Nil Nil Nil 2 Nil Nil Nil Nil Nil Nil

12.101b Availability and requirement of fish seed /fingerlings Ward Existing

families Proposed families

Present quantity of fish

Requirement of fish seed

Breeds

1 Nil Nil Nil Nil Nil 2 Nil Nil Nil Nil Nil 12.102 Project Interventions

• Introducing of fisheries among more families

• Requirement of improved seed (fingerlings)

• Training on fish culture

Page 39: 2. Profile of the District - Rural Development Department Salooni, Chamba.pdf2. Profile of the District 2. Profile of the District Location Location Situated between north latitude

IWMP -XIV (2011-12) Chamba [Page-39]

CONTENTSCONTENTSCONTENTSCONTENTS

SR .No.SR .No.SR .No.SR .No. PARTICULARSPARTICULARSPARTICULARSPARTICULARS PAGE No. PAGE No. PAGE No. PAGE No.

PROFILE OF THE DISTRPROFILE OF THE DISTRPROFILE OF THE DISTRPROFILE OF THE DISTRICT ICT ICT ICT 1111

LAND USE PATTERN LAND USE PATTERN LAND USE PATTERN LAND USE PATTERN 2222

1.01.01.01.0 INTRODUCTIONINTRODUCTIONINTRODUCTIONINTRODUCTION 3333

1.1a1.1a1.1a1.1a

SANCTIONED BUDGETARY PROVISIONSSANCTIONED BUDGETARY PROVISIONSSANCTIONED BUDGETARY PROVISIONSSANCTIONED BUDGETARY PROVISIONS 4444

1.1b1.1b1.1b1.1b ACTIVITY AND BUDGET ACTIVITY AND BUDGET ACTIVITY AND BUDGET ACTIVITY AND BUDGET 5555

1.1c1.1c1.1c1.1c COMPONENT WISE PHYSICOMPONENT WISE PHYSICOMPONENT WISE PHYSICOMPONENT WISE PHYSICAL AND FINANCIAL DECAL AND FINANCIAL DECAL AND FINANCIAL DECAL AND FINANCIAL DETAILS TAILS TAILS TAILS

(AS PER MIS)(AS PER MIS)(AS PER MIS)(AS PER MIS)

1.1d1.1d1.1d1.1d METHODOLOGY METHODOLOGY METHODOLOGY METHODOLOGY 6666

2.02.02.02.0 GENERAL DESCRIPTION OF PROJECT AREAS GENERAL DESCRIPTION OF PROJECT AREAS GENERAL DESCRIPTION OF PROJECT AREAS GENERAL DESCRIPTION OF PROJECT AREAS 7777----8888

3.03.03.03.0 SWOT ANALYSISSWOT ANALYSISSWOT ANALYSISSWOT ANALYSIS 9999

4.04.04.04.0 ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES ENTRY POINT ACTIVITIES 10101010

5.05.05.05.0 CAPACITY BUILDING CAPACITY BUILDING CAPACITY BUILDING CAPACITY BUILDING 11111111----12121212

6.06.06.06.0 LAND DEVELOPMENT FORLAND DEVELOPMENT FORLAND DEVELOPMENT FORLAND DEVELOPMENT FOR SUBACTIVITY SUBACTIVITY SUBACTIVITY SUBACTIVITY 13131313

7.07.07.07.0 VEGETATIVE AND ENGINEERING STRUCTURE VEGETATIVE AND ENGINEERING STRUCTURE VEGETATIVE AND ENGINEERING STRUCTURE VEGETATIVE AND ENGINEERING STRUCTURE 14141414----15151515

8.08.08.08.0 WATER HARVESTING WATER HARVESTING WATER HARVESTING WATER HARVESTING 16161616----18181818

8.018.018.018.01 DRINKING WATER DRINKING WATER DRINKING WATER DRINKING WATER 19191919----21212121

9.09.09.09.0 CONVERGENCESCONVERGENCESCONVERGENCESCONVERGENCES 22222222

10.010.010.010.0 LIVELIHOOD ACTIVITY LIVELIHOOD ACTIVITY LIVELIHOOD ACTIVITY LIVELIHOOD ACTIVITY 23232323----25252525

11.011.011.011.0 PRODUCTION SYSTEM & PRODUCTION SYSTEM & PRODUCTION SYSTEM & PRODUCTION SYSTEM & MICRO ENTERPRISES MICRO ENTERPRISES MICRO ENTERPRISES MICRO ENTERPRISES 26262626----27272727

11.111.111.111.1 AGRICULTURE AGRICULTURE AGRICULTURE AGRICULTURE 28282828----30303030

11.211.211.211.2 HORTICULTURE HORTICULTURE HORTICULTURE HORTICULTURE 31313131----34343434

11.311.311.311.3 ANIMAL HUSBANDRY ANIMAL HUSBANDRY ANIMAL HUSBANDRY ANIMAL HUSBANDRY 35353535----37373737