2- related post construction codes and standards
TRANSCRIPT
-
8/3/2019 2- Related Post Construction Codes and Standards
1/38
ABS CABS CONSULTINGONSULTING IINC.NC.
Boiler/Vessel and Piping-Repair
and Alteration Course
11ABS Consulting IncABS Consulting Inc
-
8/3/2019 2- Related Post Construction Codes and Standards
2/38
ABS CONSULTING INC. / Thailand BranchABS CONSULTING INC. / Thailand Branch
2-Related post construction Codes and Standards
22ABS Consulting IncABS Consulting Inc
-
8/3/2019 2- Related Post Construction Codes and Standards
3/38
ASME CODE, STANDARS, GUIDEASME CODE, STANDARS, GUIDERELATED TORELATED TO
AFTER INITIAL CONSTRUCTIONAFTER INITIAL CONSTRUCTION
FORFOR
PRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS
-
8/3/2019 2- Related Post Construction Codes and Standards
4/38
This guide provides aThis guide provides a
summary of some of thesummary of some of the
more commonly used codes, stmore commonly used codes, st
andards, recommended pandards, recommended p
ractices, specifications and guractices, specifications and gu
idelines produced byidelines produced byorganizations for maintainingorganizations for maintaining
the integrity of fixed pressurethe integrity of fixed pressure
equipment in process plantsequipment in process plants
and in general industrial use.and in general industrial use.
ABS Consulting IncABS Consulting Inc 44
SCOPE (ASME PTBSCOPE (ASME PTB--22))
-
8/3/2019 2- Related Post Construction Codes and Standards
5/38
Organization of this
Guide (ASME PTB-2)
This guide is organized by
type of equipment as
described below.
a. Boilers.
b. Pressure vessels.c. Storage tanks.
d. Piping systems.
e. Overpressure protection
f. Etc.
ABS Consulting Inc 5
-
8/3/2019 2- Related Post Construction Codes and Standards
6/38
(ASME PTB-2)
It like ae ROADMAP
ABS Consulting Inc 6
-
8/3/2019 2- Related Post Construction Codes and Standards
7/38
(ASME PTB-2)
It like ae ROADMAP
ABS Consulting Inc 7
-
8/3/2019 2- Related Post Construction Codes and Standards
8/38
SCOPE
(ASME PCC-1)
The bolted flange joint
assembly (BFJA) guidelines
described in this documentapply to pressure-boundary
flanged joints with ring-typegaskets that are entirely within
the circle enclosed by the bolt
holes and with no contact
outside this circle. Etc.
ABS Consulting Inc 8
-
8/3/2019 2- Related Post Construction Codes and Standards
9/38
SCOPE
(ASME PCC-2)
This Standard provides methods
for repair of equipment and pipin
g within the scope of ASME Pressure Technol
ogy Codes and Standards after ithas been placed in servi
ce.
These repair methods include
relevant design, fabrication,examination, and testing practices
and may be temporary or
permanent, depending on the
circumstances.
ABS Consulting Inc 9
-
8/3/2019 2- Related Post Construction Codes and Standards
10/38
Organization(ASME PCC-2)
This Standard is divided into
five parts.
(a) Part 1 covers the scope, or
ganization, and intent
and is applicable to all articlesin this Standard.
(b) Part 2 covers repair
methods and techniques that
include the use of welding,
brazing, soldering, or other
methods involving metal deposi
t.
ABS Consulting Inc 10
-
8/3/2019 2- Related Post Construction Codes and Standards
11/38
Organization(ASME PCC-2)
This Standard is divided into
five parts. Contd d
(c) Part 3 covers mechanical
repairs, with or without
sealant, such as bolteclamps or fixtures aninclu es all repair metho s
not covere in Part 2 or
Part 4.
( ) Part 4 covers repairsusing nonmetallic means,
such as nonmetallic liners
an wraps, an bon ing (e.g,
joining by epoxy), etc.
ABS Consulting Inc 11
-
8/3/2019 2- Related Post Construction Codes and Standards
12/38
Organization(ASME PCC-2)
This Standard is divided into
five parts. Contd d
(e) Part 5 covers examinatio
n an testing metho s
an techniques.
ABS Consulting Inc 12
-
8/3/2019 2- Related Post Construction Codes and Standards
13/38
-
8/3/2019 2- Related Post Construction Codes and Standards
14/38
NBICNBIC CODECODERELATED TORELATED TOAFTER INITIAL CONSTRUCTIONAFTER INITIAL CONSTRUCTION
FORFORPRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS
-
8/3/2019 2- Related Post Construction Codes and Standards
15/38
SCOPE
NBIC-NB-23
The NBIC recognized three
areas of post-construction
activities, and divided into
three parts.
Part-1 Installation
Part-2 Inspection
Part-3 Repairs and Alterations
ABS Consulting Inc 15
-
8/3/2019 2- Related Post Construction Codes and Standards
16/38
ORGANIZATION
NBIC-NB-23
The NBIC is oragnized into three parts. Each
part provides general and specific rules,
information, and guidance within each
application post-construction activity. NBIC parts
are identified as:
Part 1, Installation- This part provides
requirements and guidance to ensure all types o
f pressure-retaining items are installed and
function properly.
Installation includes meeting specific safetycriteria for construction, materials, design,supports, safety devices, operation, testing, and
maintenance.
ABS Consulting Inc 16
-
8/3/2019 2- Related Post Construction Codes and Standards
17/38
ORGANIZATION
NBIC-NB-23(cont )
The NBIC is oragnized into three parts. Each
part provides general and specific rules,
information, and guidance within each application
post-construction activity.
NBIC parts are identified as:
Part 2, Inspection- This part provides informationand guidance needed to perform and document
inspections for all types of pressure-retaining
items.
Includes information on personnel safety,
non-destructive examination, tests, failuremechanism, types of pressure equipment,fitness for service, risk-base assessments, and p
erformance-based standards.
ABS Consulting Inc 17
-
8/3/2019 2- Related Post Construction Codes and Standards
18/38
ORGANIZATION
NBIC-NB-23(cont )
The NBIC is oragnized into three parts. Each
part provides general and specific rules,
information, and guidance within each application
post-construction activity.
NBIC parts are identified as:
Part 3, Repairs and Alterations- This part provides information and guidance needed to perform
verify, and document acceptable repairs or
alterations to pressure-retaining items regardless of
code of construction.
Alternative methods for examination, testing, heat treatment, etc., are provided when theoriginal code of construction requirements cannot
be met. Specific acceptable and proven repair
methods are also provided.
ABS Consulting Inc 18
-
8/3/2019 2- Related Post Construction Codes and Standards
19/38
APIAPI Code,STD,RPCode,STD,RP and Guideand GuideRELATED TORELATED TO
AFTER INITIAL CONSTRUCTIOAFTER INITIAL CONSTRUCTIONN
FORFORPRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS
-
8/3/2019 2- Related Post Construction Codes and Standards
20/38
SCOPE
API 510
In-service inspection, repair,
alteration, and rerating
pressure vessels, piping,
and pressure relief device.
ABS Consulting Inc 20
-
8/3/2019 2- Related Post Construction Codes and Standards
21/38
ORGANIZATION
API 510
This Code is divided into ten (10) section and five (5) appendix A, B, etc.
ABS Consulting Inc 21
-
8/3/2019 2- Related Post Construction Codes and Standards
22/38
SCOPE
API RP 572
This recommended practice
(RP) covers the inspection of
pressure vessel. It includes a
description of the various types
of pressure vessela a a .. a ..
This RP also includes reasons
for inspection, causes of
deterioration, frequency and
methods of inspection,methods of repair, and
preparation of records andreports.
ABS Consulting Inc 22
-
8/3/2019 2- Related Post Construction Codes and Standards
23/38
ORGANIZATION
API RP 572
This Code is divided into eleven (11) section and three (3) appendix A, B, andC.
ABS Consulting Inc 23
-
8/3/2019 2- Related Post Construction Codes and Standards
24/38
SCOPE
API 570
Cover inspection, rating,
repair, and alteration
procedures for metallic an
d fiberglass reinforced plast
ic (FRP) piping systems and
their associated pressurerelieving devices that have
been placed in-service.
ABS Consulting Inc 24
-
8/3/2019 2- Related Post Construction Codes and Standards
25/38
ORGANIZATION
API 570
This Code is divided into nine (9) section and three (3) appendix A, B,C.
ABS Consulting Inc 25
-
8/3/2019 2- Related Post Construction Codes and Standards
26/38
SCOPE
API RP 574
This RP covers the inspection
practices for piping, tubing, valves
(other than control valves), and
pttings used in petroleum refineries
and chemical plants.
Common piping components,
valve types, pipe joining methods,
inspection planning processes,
inspection intervals and techniques,
and types of records are describedto aid the inspector in fulfilling the
ir role implementing API 570.
ABS Consulting Inc 26
-
8/3/2019 2- Related Post Construction Codes and Standards
27/38
-
8/3/2019 2- Related Post Construction Codes and Standards
28/38
SCOPE
API STANDARD 653
This standard covers steel
storage tanks built to API 650.
It provides minimum
requirements for maintaining the
integrity of such tanks after
they have been placed inservice and addresses
inspection, repair, alteration,
relocation, and reconstruction.
ABS Consulting Inc 28
-
8/3/2019 2- Related Post Construction Codes and Standards
29/38
ORGANIZATION
API STANDARD 653
This Code is divided into thirteen (13) section and nine (9) appendix a,b, etc.
ABS Consulting Inc 29
-
8/3/2019 2- Related Post Construction Codes and Standards
30/38
SCOPE
API RP 575
This document provides informat
ion and recommended
practices for the maintenance
and inspection of atmospheric
and low-pressure storage tanks.
This recommended practiceincludes:
a. Descriptions of the various
types of storage tanks.
b. Construction standards.
c. Maintenance practices.
d. Reasons for inspection.
ABS Consulting Inc 30
-
8/3/2019 2- Related Post Construction Codes and Standards
31/38
SCOPE
API RP 575 (cont )
This document provides informat
ion and recommended
practices for the maintenance
and inspection of atmospheric
and low-pressure storage tanks.
This recommended practiceincludes:
e. Causes of deterioration.
f. Frequency of inspection.
g. Methods of inspection.
h. Inspection of repairs. Etc..
ABS Consulting Inc 31
-
8/3/2019 2- Related Post Construction Codes and Standards
32/38
ORGANIZATION
API RP 575
This Code is divided into ten (10) section and three (3) appendix. a,
b, and c.
ABS Consulting Inc 32
-
8/3/2019 2- Related Post Construction Codes and Standards
33/38
NACENACE,STD,STD--RP and GuideRP and GuideRELATED TORELATED TO
AFTER INITIAL CONSTRUCTIOAFTER INITIAL CONSTRUCTIONN
FORFOR
PRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS
-
8/3/2019 2- Related Post Construction Codes and Standards
34/38
SCOPE
NACE Standard RP0472
This standard establishes guideli
nes to prevent most
forms of environmental crackin
g of weldments in carbon steel
refinery equipment and piping.
Weldments are defined toinclude the weld deposit, base
metal HAZs, and adjacent base
metal zones subject to residual
stresses from welding.
ABS Consulting Inc 34
-
8/3/2019 2- Related Post Construction Codes and Standards
35/38
ORGANIZATION
NACE Standard RP0472
This Standard RP is divided into six (6) section and one (1) appendix.
A.
ABS Consulting Inc 35
-
8/3/2019 2- Related Post Construction Codes and Standards
36/38
-
8/3/2019 2- Related Post Construction Codes and Standards
37/38
ORGANIZATION
NACE Standard RP RP0296
This Standard RP is divided into five (5) section and three (3) appendix.
A, B, C.
ABS Consulting Inc 37
-
8/3/2019 2- Related Post Construction Codes and Standards
38/38
ENDEND
ANY QUESTION?ANY QUESTION?