20-1. 20-2 chapter20 job order costing 20-3 previewofchapter20
TRANSCRIPT
![Page 1: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/1.jpg)
20-1
![Page 2: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/2.jpg)
20-2
CHAPTER20Job Order
Costing
![Page 3: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/3.jpg)
20-3
PreviewofCHAPTER20
![Page 4: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/4.jpg)
20-4 SO 1 Explain the characteristics and purposes of cost accounting.
Cost Accounting Systems
Cost accounting involves the measuring, recording,
and reporting of product costs.
Important feature is the use of a perpetual inventory
system.
Two basic types of cost accounting systems:
1. a job order cost system and
2. a process cost system.
![Page 5: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/5.jpg)
20-5
Costs are assigned to each job or batch.
Job may be for a specific order or inventory.
Each job or batch has its own distinguishing
characteristics.
Objective is to compute the cost per job.
Measures costs for each job completed – not for set time
periods.
Job Order Cost System
Cost Accounting Systems
SO 1 Explain the characteristics and purposes of cost accounting.
![Page 6: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/6.jpg)
20-6
Illustration 20-1
Job Order Cost System
Cost Accounting Systems
SO 1 Explain the characteristics and purposes of cost accounting.
![Page 7: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/7.jpg)
20-7
Used when a large volume of similar products are
manufactured - Cereal, Automobiles, Compact
Discs, Paint.
Costs are accumulated for a specific time period.
Costs are assigned to departments or processes for a
set period of time.
Process Cost System
Cost Accounting Systems
SO 1 Explain the characteristics and purposes of cost accounting.
![Page 8: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/8.jpg)
20-8
Illustration 20-2
Process Cost System
Cost Accounting Systems
SO 1 Explain the characteristics and purposes of cost accounting.
![Page 9: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/9.jpg)
20-9
Cost accounting involves the measuring, recording, and
reporting of:
a. Product costs.
b. Future costs.
c. Manufacturing processes.
d. Managerial accounting decisions.
Question
Cost Accounting Systems
SO 1 Explain the characteristics and purposes of cost accounting.
![Page 10: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/10.jpg)
20-10
![Page 11: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/11.jpg)
20-11
Cost flow parallels the physical flow of the materials as
they are converted into finished goods.
Manufacturing costs are assigned to Work in Process.
Cost of completed jobs is transferred to Finished Goods.
When units are sold, the cost is transferred to Cost of
Goods Sold.
SO 2 Describe the flow of costs in a job order cost accounting system.
Job Order Cost Flow
![Page 12: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/12.jpg)
20-12
Job Order Cost Flow
SO 2 Describe the flow of costs in a job order cost accounting system.
Illustration 20-3Flow of costs in job order costing
![Page 13: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/13.jpg)
20-13
Job Order Cost Flow
SO 2
Illustration 20-4Job order costing system
![Page 14: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/14.jpg)
20-14
Accumulate the manufacturing costs incurred.
► Raw Materials
► Factory Labor
► Manufacturing Overhead
Assign the accumulated costs to the work done.
Two Major Steps in Flow of Costs
Job Order Cost Flow
SO 2 Describe the flow of costs in a job order cost accounting system.
![Page 15: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/15.jpg)
20-15
Raw materials purchased are debited to Raw Materials
Inventory.
Debit this account for invoice cost of raw materials and
freight costs chargeable to purchaser.
Credit this account for purchase discounts taken and
purchase returns and allowances.
Raw Materials Costs
SO 2 Describe the flow of costs in a job order cost accounting system.
Job Order Cost Flow
Accumulating Manufacturing Costs
![Page 16: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/16.jpg)
20-16
Illustration: Wallace Manufacturing purchases 2,000 handles
(Stock No. AA2746) at $5 per unit ($10,000) and 800 modules
(Stock No. AA2850) at $40 per unit ($32,000) for a total cost of
$42,000 ($10,000 + $32,000). The entry to record this purchase
on January 4 is:
SO 2 Describe the flow of costs in a job order cost accounting system.
Accumulating Manufacturing Costs
Raw Materials Inventory 42,000
Accounts Payable 42,000
Jan. 4
![Page 17: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/17.jpg)
20-17
Debit labor costs to Factory Labor as costs are incurred.
Consists of:
1) Gross earnings of factory workers,
2) Employer payroll taxes on such earnings, and
3) Fringe benefits incurred by the employer.
Factory Labor Costs
SO 2 Describe the flow of costs in a job order cost accounting system.
Job Order Cost Flow
![Page 18: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/18.jpg)
20-18
Illustration: Wallace Manufacturing incurs $32,000 of factory
labor costs. Of that amount, $27,000 relates to wages payable
and $5,000 relates to payroll taxes payable in January. The entry
to record factory labor for the month is:
SO 2 Describe the flow of costs in a job order cost accounting system.
Factory Labor 32,000
Factory Wages Payable 27,000
Employer Payroll Taxes Payable
5,000
Jan. 31
Job Order Cost Flow
![Page 19: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/19.jpg)
20-19
Company may
► recognize these costs daily, or,
► periodically through adjusting entries.
Companies record property taxes, depreciation, and
insurance periodically.
Manufacturing Overhead Costs
SO 2 Describe the flow of costs in a job order cost accounting system.
Job Order Cost Flow
![Page 20: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/20.jpg)
20-20
Illustration: Using assumed data, the summary entry for
manufacturing overhead in Wallace Manufacturing Company is:
SO 2 Describe the flow of costs in a job order cost accounting system.
Manufacturing Overhead 13,800
Utilities Payable 4,800
Prepaid Insurance 2,000
Accounts Payable (for repairs)
2,600
Accumulated Depreciation 3,000
Property Taxes Payable 1,400
Jan. 31
Job Order Cost Flow
![Page 21: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/21.jpg)
20-21
When incurred, factory labor costs are debited to
a. Work in Process.
b. Factory Wages Expense.
c. Factory Labor.
d. Factory Wages Payable.
Question
SO 2 Describe the flow of costs in a job order cost accounting system.
Job Order Cost Flow
![Page 22: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/22.jpg)
20-22
Manufacturing costs are assigned to Work in Process with
Debits to Work in Process Inventory
Credits to Raw Materials Inventory
Factory Labor
Manufacturing Overhead
Entries are usually made monthly.
Essential accounting record is a job cost sheet.
Job Order Cost Flow
Assigning Manufacturing Costs to Work in Process
SO 3 Explain the nature and importance of a job cost sheet.
![Page 23: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/23.jpg)
20-23
Used to record costs of a specific job.
Used to determine total and unit costs of a completed job.
Postings are made daily.
Each entry to a Work in Process Inventory must be
accompanied by a corresponding posting to one or more
job cost sheets.
Job Cost Sheet
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 24: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/24.jpg)
20-24
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
Illustration 20-5
![Page 25: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/25.jpg)
20-25
Companies assign raw materials costs when their
materials storeroom issues the materials.
Materials requisition slip:
► Should indicate quantity and type of materials
withdrawn and account to be charged.
► Direct materials are charged to WIP Inventory, and
indirect materials to Manufacturing Overhead.
Raw Materials Costs
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 26: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/26.jpg)
20-26
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
Illustration 20-6
![Page 27: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/27.jpg)
20-27
Illustration: Wallace Manufacturing uses $24,000 of direct
materials and $6,000 of indirect materials in January, the
entry is:
Work in Process Inventory 24,000
Manufacturing Overhead 6,000
Raw Materials Inventory 30,000
Jan. 31
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 28: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/28.jpg)
20-28
Assigning Manufacturing Costs to WIP
Illustration 20-6
Illustration 20-7
The sum of the
direct materials
columns of the
job cost sheets
should equal the
direct materials
debited to Work
in Process
Inventory.
![Page 29: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/29.jpg)
20-29
Assigned to jobs on the basis of time tickets.
Time tickets are prepared when work is performed.
Time tickets indicate:
► Employee
► Hours worked
Factory Labor Costs
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
► Account and job charged
► Total labor cost
![Page 30: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/30.jpg)
20-30
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
Illustration 20-8
![Page 31: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/31.jpg)
20-31
Time tickets are sent to payroll to be sorted, totaled, and
journalized.
► Work in Process is debited for direct labor costs.
► Manufacturing overhead is debited for indirect labor
costs.
► Factory labor is left with a zero balance.
Factory Labor Costs
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 32: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/32.jpg)
20-32
Illustration: Assume the $32,000 total factory labor cost
consists of $28,000 of direct labor and $4,000 of indirect
labor, the entry is:
Work in Process Inventory 28,000
Manufacturing Overhead 4,000
Factory Labor 32,000
Jan. 31
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 33: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/33.jpg)
20-33
Assume the labor
costs chargeable to
Wallace’s three jobs
are $15,000, $9,000,
and $4,000.
The sum of the direct
labor columns of the
job cost sheets
should equal the
direct labor debited to
Work in Process
Inventory.
Illustration 20-9
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 34: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/34.jpg)
20-34
The source documents for assigning material and
factory labor costs to job cost sheets are:
a. Invoices and time tickets.
b. Invoices and payroll register.
c. Materials requisition slips and payroll register.
d. Materials requisition slips and time tickets.
Question
Assigning Manufacturing Costs to WIP
SO 3 Explain the nature and importance of a job cost sheet.
![Page 35: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/35.jpg)
20-35
Relates to production operations as a whole.
Cannot be assigned to specific jobs based on actual costs
incurred.
Must be assigned to work in process and to specific jobs
on an estimated basis through the use of a
predetermined overhead rate.
Manufacturing Overhead Costs
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
![Page 36: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/36.jpg)
20-36
Based on the relationship between estimated annual
overhead costs and expected annual operating activity.
Expressed in terms of an activity base such as
► Direct labor costs.
► Direct labor hours.
► Machine hours.
► Any other activity that is an equitable base for applying
overhead costs to jobs.
Predetermined Overhead Rate
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
![Page 37: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/37.jpg)
20-37
Established at the beginning of the year.
May use a single, company-wide predetermined rate.
May use a different rate for each department and each
department may have a different activity base.
Formula:
Predetermined Overhead Rate
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Illustration 20-10
![Page 38: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/38.jpg)
20-38
Predetermined Overhead Rate
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Illustration 20-11
More companies are using machine hours as the activity base
due to increased automation in manufacturing operations.
![Page 39: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/39.jpg)
20-39
Illustration: Wallace Manufacturing uses direct labor cost as
the activity base. Wallace expects annual overhead costs to
be $280,000 and direct labor costs for the year to be
$350,000, the overhead rate is 80%, computed as follows:
$280,000 ÷ $350,000 = 80%
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
For every dollar of direct labor, Wallace will assign 80 cents of
manufacturing overhead to a job.
![Page 40: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/40.jpg)
20-40
Illustration: Wallace Manufacturing applies manufacturing
overhead to work in process when it assigns direct labor
costs. It also applies manufacturing overhead to specific jobs
at the same time. For Wallace Manufacturing, overhead
applied for January is $22,400 (direct labor cost of $28,000 x
80%). The following entry records this application.
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Work in Process Inventory 22,400
Manufacturing Overhead 22,400
Jan. 31
![Page 41: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/41.jpg)
20-41
The sum of the
manufacturing
overhead columns of
the job cost sheets
should equal the
manufacturing
overhead debited
(i.e., applied) to
Work in Process
Inventory.
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Illustration 20-12Job cost sheets—manufacturing overhead applied
![Page 42: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/42.jpg)
20-42
At the end of each month, the balance in the Work in
Process Inventory should equal the sum of the costs shown
on the job cost sheets of unfinished jobs.
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Illustration 20-13
![Page 43: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/43.jpg)
20-43
The formula for computing the predetermined manufacturing
overhead rate is estimated annual overhead costs divided
by an expected annual operating activity, expressed as:
a. Direct labor cost.
b. Direct labor hours.
c. Machine hours.
d. Any of the above.
Assigning Manufacturing Costs to WIP
SO 4 Indicate how the predetermined overhead rate is determined and used.
Question
![Page 44: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/44.jpg)
20-44
Assigning Costs to Finished Goods
SO 5 Prepare entries for jobs completed and sold.
Illustration 20-14Completed job cost sheet
Job Order Cost Flow
![Page 45: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/45.jpg)
20-45
Illustration: When a job
is finished, Wallace
makes an entry to transfer
its total cost to finished
goods inventory. The
entry is as follows:
Assigning Costs to Finished Goods
Finished Goods Inventory 39,000
Work in Process Inventory 39,000
Jan. 31
SO 5 Prepare entries for jobs completed and sold.
Illustration 20-14
![Page 46: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/46.jpg)
20-46
Illustration: On January 31, Wallace Manufacturing sells on
account Job 101. The job cost $39,000, and it sold for
$50,000. The entries to record the sale and recognize cost of
goods sold are:
Accounts Receivable 50,000
Sales 50,000
Cost of Goods Sold 39,000
Finished Goods Inventory 39,000
Jan. 31
SO 5 Prepare entries for jobs completed and sold.
Assigning Costs to Cost of Goods Sold
Job Order Cost Flow
![Page 47: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/47.jpg)
20-47
In M Company, Job No. 26 is completed at a cost of $4,500 and later sold for $7,000 cash. A correct entry is:
a. Debit Finished Goods Inventory $7,000 and credit Work in Process Inventory $7,000.
b. Debit Cost of Goods Sold $7,000 and credit Finished Goods Inventory $7,000.
c. Debit Finished Goods Inventory $4,500 and credit Work in Process Inventory $4,500.
d. Debit Accounts Receivable $7,000 and credit Sales $7,000.
SO 5 Prepare entries for jobs completed and sold.
Assigning Costs to Cost of Goods Sold
Question
![Page 48: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/48.jpg)
20-48
Service companies do not have inventory.
For example:
Mayo Clinic (health care),
PricewaterhouseCoopers (accounting firm), and
Goldman Sachs (financial services firm).
SO 5 Prepare entries for jobs completed and sold.
Job Order Costing for Service Companies
These firms need to keep track of the cost of jobs performed for
specific customers to evaluate the profitability of medical treatments,
audits, or consulting engagements.
Job Order Cost Flow
![Page 49: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/49.jpg)
20-49
![Page 50: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/50.jpg)
20-50
Illustration 20-16
SO 5 Prepare entries for jobs completed and sold.
Summary of Job Order Cost Flows
![Page 51: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/51.jpg)
20-51 SO 5 Prepare entries for jobs completed and sold.
Summary of Job Order Cost Flows
Illustration 20-17
![Page 52: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/52.jpg)
20-52
Advantages of Job Order Costing
It is more precise in assignment of costs to projects than
process costing.
Provides useful information for determining the profitability and
for estimating costs when preparing bids on future jobs.
SO 5 Prepare entries for jobs completed and sold.
Advantages and Disadvantages
Disadvantages of Job Order Costing
Requires a significant amount of data entry.
How to allocate overhead to the finished product (common to
all costing systems).
![Page 53: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/53.jpg)
20-53
Companies prepare the cost of goods manufactured schedule
directly from the Work in Process Inventory account.
Reporting Job Cost Data
Illustration 20-18
SO 5 Prepare entries for jobs completed and sold.
![Page 54: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/54.jpg)
20-54
Debit balance in manufacturing overhead means overhead is
underapplied. Overhead assigned to work in process is less
than overhead incurred.
Under- or Overapplied Overhead
Illustration 20-20
Credit balance in manufacturing overhead means overhead
is overapplied. Overhead assigned to work in process is
greater than overhead incurred.
SO 6 Distinguish between under- and overapplied manufacturing overhead.
![Page 55: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/55.jpg)
20-55
Illustration: Wallace Manufacturing has a $2,500 credit
balance in Manufacturing Overhead at December 31. Wallace
considers under- or overapplied overhead to be an adjustment
to cost of goods sold. The adjusting entry for the overapplied
overhead is:
Under- or Overapplied Overhead
SO 6 Distinguish between under- and overapplied manufacturing overhead.
Manufacturing Overhead 2,500
Cost of Goods Sold 2,500
Dec. 31
![Page 56: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/56.jpg)
20-56
Manufacturing overhead is underapplied if:
a. Actual overhead is less than applied.
b. Actual overhead is greater than applied.
c. The predetermined rate equals the actual rate.
d. Actual overhead equals applied overhead.
Under- or Overapplied Overhead
SO 6 Distinguish between under- and overapplied manufacturing overhead.
Question
![Page 57: 20-1. 20-2 CHAPTER20 Job Order Costing 20-3 PreviewofCHAPTER20](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649db55503460f94aa6ce8/html5/thumbnails/57.jpg)
20-57
“Copyright © 2011 John Wiley & Sons, Inc. All rights reserved.
Reproduction or translation of this work beyond that permitted in
Section 117 of the 1976 United States Copyright Act without the
express written permission of the copyright owner is unlawful.
Request for further information should be addressed to the
Permissions Department, John Wiley & Sons, Inc. The purchaser
may make back-up copies for his/her own use only and not for
distribution or resale. The Publisher assumes no responsibility for
errors, omissions, or damages, caused by the use of these
programs or from the use of the information contained herein.”
Copyright