2007 preliminary results presentation 13th march...

48
2007 Preliminary Results Presentation 13 th March 2008

Upload: others

Post on 30-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

2007 Preliminary Results Presentation 13th March 2008

Page 2: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Forward looking statements

This presentation may contain forward-looking statements and information that both represents management's current expectations or beliefs concerning future events and are subject to known and unknown risks and uncertainties.

A number of factors could cause actual results, performance or events to differ materially from those expressed or implied by

these forward-looking statements.

Page 3: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Agenda

Strategy and highlights Simon Lockett

2007 Financial results Tony Durrant

Production and development update Neil Hawkings

Exploration update Robin Allan

Summary Simon Lockett

Page 4: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Strategy and highlights

Page 5: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2007 highlights

• Delivered value through acquisitions

• Signed gas sales agreements

• Advanced development projects

• Added significant reserves and resources

Page 6: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Strategy

Strategy

• Targetingproduction growthto 50,000 bopd by end 2010

• High impact exploration programme within disciplined spend

• Acquisition focuson core areas

• Addressing post 2010 growth

Progress

• On target to deliver 50,000 boepd by end 2010 with potential to achieve 80,000 boepd in 2012

• 13 exploration and appraisal wells planned for 2008, focused on Vietnam and Congo

• People, funding and capability in place to execute planned projects

Page 7: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2007 regional highlights

North Sea• Completion of Scott acquisition and infill well programme

• Kyle gas lift project completed

• Bream licences awarded

• Frøy development planning progressed

• Qualified as an operator to work in the Norwegian sector

West Africa• Progressed Congo prospects to drill ready status

• Mauritania sale terminated

• Working with new operator on progressing Banda and Tiof developments

• Exited Gabon and Guinea Bissau

Page 8: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2007 regional highlights

Middle East/Pakistan• Record production from Pakistan (12,700 boepd)

• Project to increase Qadirpur capacity to 600 mmscfdprogressed

• Qadirpur Deep well drilled, now awaiting testing

• Kadanwari K-18 successfully drilled and tested

• Zamzama Phase 2 development onstream

• Bhit phase 2 completed increasing capacity to 315 mmscfd

• Execution of shareholder agreements for EIIC JV

Asia• Significant progress on gas sales to Singapore, Batam and

North Sumatra Block A

• 2 discoveries in Indonesia

• Acquisition of additional 25% interest in North Sumatra Block A

• Subsurface facilities and planning for Vietnam progressed

• Block 12W 3D seismic completed

• Block 12W well planning progressed

Page 9: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2007 financial results

Page 10: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2007 financial highlights

• Operating profit

• Operating cashflow

• Production

• Reserves

Up 35% to $219 million (2006 - $163 million)

Up 10% to $270 million (2006 - $245 million)

Up 39% to 212 mmboe (2006 – 152 mmboe)

Up 8% to 35.8 kboepd(2006 - 33.0 kboepd)

Page 11: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Production and income statement

Average gas pricing ($/mcf)2007 2006

Singapore $11.3 $9.4Pakistan $3.0 $3.1

Working Interest Production (kboepd)Entitlement Interest Production (kboepd)Realised oil price ($/bbl)Realised gas price ($/mcf)

Sales and other operating revenuesCost of salesGross profitExploration/New BusinessGeneral and administration costsOperating profit Financial ItemsProfit before taxationTaxationProfit after tax

Prepared in accordance with IFRS

12 months to31 Dec 2006

33.028.964.95.11

$m402

(179)223(44)(17)163(6)

157(89)

68

Highlights12 months to31 Dec 2007

35.831.572.35.60

$m578

(268)310(74)(18)219(72)147

(108)39

Effective tax rate of 35% of gross profit (2006 – 40%)

In line with Brent average oil price

Operating costs per barrel2007 2006

UK $18.5 $13.6Indonesia $7.1 $6.0Pakistan $1.8 $1.8

Includes hedging provision of $65m (pre-tax)

Page 12: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Hedging

Accounting• No revaluation on oil hedges required post

1st July 2008 due to embedding hedges within physical offtake contracts

• Cumulative oil provision of $39.5m will be written back to income statement over 5 years

• No changes in underlying hedge position• Minimal cash impact during 2007

45

24

21

2007 Post-Tax

65Total

24Gas

41Oil

2007 Pre-Tax

600

HSFO (1 month average) 2007($/tonne)

400

300

0 J F D

100

200

500

J JM MA A S O N

Cap $5001 month averageFloor $245 120

Oil (6 month average) 2007(Brent $)

80

60

0J F D

20

40

100

J JM MA A S O N

Cap $1006 month averageFloor $39.90

2007 mark to market revaluation impact ($m)

Page 13: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Cashflow

361(116)245

(176)69

(26)(2)41

Cash flow from operationsTaxationOperating cash flowCapital expenditureNet cashflow

Opening net cash/(debt)Net cash from financingClosing net cash/(debt)

12 months to31 Dec 2007

$m

360(90)270

(269)1

413779

Operating Cashflow Capex

MEP

North Sea 104

24West Africa 3213

270

59

97

269

Asia 109101

Regional split ($m)12 months to31 Dec 2006

$m

2007 2006

Development

Pre-licence 22

90Acquisitions 1789

269

67

8

176

Exploration 47105

Page 14: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Premier’s financial strength

• Strong balance sheet position ($332m cash at 31 Dec 2007)

• Pre-funded $1bn capital programme, even at much lower oil prices:

– 7-year $250m convertible issued on favourable terms in May 2007

– Undrawn bank facilities of $224m at year-end

– $300m post tax annual operating cashflow at forward curve

• 2008 outlook:

– Target exploration spend of $100m (pre-tax)

– Planned Development spend of $150-$175m

Page 15: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Production and development update

Page 16: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

40000

Production (Working Interest)(boepd)

30000

25000

10000

5000

02005 2006 2007

15000

20000

35000

AsiaPakistanWest AfricaNorth Sea

Producing fields update

North Sea• Production run rates are touching 12,000 boepd• Strong production from Scott and Kyle• Scott infill programme expected Q4 2008• 2008 full year infill drilling campaign on Wytch Farm• Suspension of production on Fife

West Africa• Two new wells and three workovers on Chinguetti planned

for 2008

Pakistan• Production run rates are touching 15,000 boepd• Badhra field came on stream in January • Increased production from Zamzama, Kadanwari and

Qadirpur• An appraisal well on Badhra is currently being drilled, and

testing of the Qadirpur Deep Well is expected in June

Asia• Production run rates are touching 12,000 boepd• Singapore gas demand remained strong• Extensive drilling campaign planned for 2009/10 on Anoa

Page 17: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Field development schedule

2008 2009 2010 2011

Gajah BaruAlur SiwahChim Sáo / DuaFrøy

ProjectInitiation

ConceptSelection

ProjectSanction

FirstProduction

Study Design ExecuteOperated

Non-operated

Page 18: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Indonesia - Gajah Baru

Gas contract update• HoA for a DCQ of 90 bbtud to Sembgas was

signed in November 2007• HoA’s for up to 40 bbtud to Batam for power

generation were signed in December 2007• Fully termed GSA was initialled with Sembgas

at the end of February 2008• Gas transportation agreements (GTAs) under

negotiation with the West Natuna Transportation System

Gajah Baru development update• A draft POD has been submitted to BPMigas

for approval• The tendering process for the EPCI contract is

about to commence• Formal project sanction now expected in mid

2008 after GTA completion• First gas targeted for Q4 2010

Page 19: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Indonesia - North Sumatra Block A

• GSA signed with PIM for the sale of 110 Bbtud in December 2007• Plan of Development has been approved by BPMigas• Engineering/subsurface work underway to optimise development• Negotiations ongoing with:

• ExxonMobil for Gas Transportation Arrangements• PLN for an additional gas sale to their IPP• BP Migas for PSC extension expected imminently

• Project sanction is anticipated mid year, first gas Q4 2010• Re-activation of wells and production at Tualang and Lee Tabue planned for 2008• Conceptual studies are underway re Kuala Langsa development

Page 20: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam - Block 12W

• RAR has been approved. Outline Development Plan has been submitted. Final Development Plan approval expected mid year

• First production from Phase 1 Development is targeted for mid 2010 from Chim Sáo

• Chim Sáo North appraisal well expected to spud imminently

• Tie-back possibilities of field extensions and adjacent exploration prospects are being evaluated

• 59 mmbbls of oil and 16 mmboe of gas over Chim Sáo and Dua

• Project team in place in Ho Chi Minh• Design FEED competitions for floating FPSO

and fixed facilities ongoing• FPSO supplier candidates are Modec, EOCP,

Viking and SBM

• Discussions ongoing with PV Gas

Page 21: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

North Sea – Norway - Frøy

• EPCIC contract has been tendered

• Availability of a suitable JUDPSO is limited, installation planned for autumn 2011

• Project costs have risen in line with industry cost environment

• Preferred supplier identified and negotiations are proceeding

• Seeking cost reductions/optimisation prior to PDO submission later in the year

• Break even at ~$60/bbl, 20% return at $90/bbl oil price

Page 22: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Illustrative project metrics

30

8

4

7

Opex/boe

$

50.0

31.875*

41.667

28.67

Premier Equity

Interest

%

90

340

210

180

Net Capex 2008-11

$m

15Norway:Frøy (Lease case)

14Vietnam:Chim Sáo/Dua (Lease case)

11Indonesia:North Sumatra Block A

7Indonesia:GSA2

Net Peak Working Interest

Production kboepd

*Equity level assumes Petrovietnam exercise their right to back in to the project

Illustrative project metrics will be refined as tender processes are completed and partner/Government approvals are received

Page 23: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Production forecast

20

(kboepd Net)

0

10

40

30

50

2008

70

90FrøyGajah Baru, Chim Sáo/Dua, Alur SiwahExisting producing fields

60

80

2009 2010 2011 2012

Page 24: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

100

($ Millions Net)

0

50

200

150

250

2008

450FrøyGajah Baru, Chim Sáo/Dua, Alur SiwahExisting producing fields

300

2009 2010 2011 2012

350

Development capex forecast

400

Page 25: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

4.0

($ per boe)

0.0

2.0

8.0

6.0

10.0

2008

12.0

2009 2010 2011 2012

Opex forecast per boe

Page 26: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

North Sea• Bream• Further Scott Infill• Wytch Farm Beacon• Wytch Farm EOR• Kyle K16• Fife Redevelopment

West Africa• Chinguetti Phase 3• Banda• Tiof

Middle East/Pakistan• Qadirpur Deep

Asia• NSBA Oil• Kuala Langsa• Swan Gas

Other contingent resource projects

Page 27: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

End 2007 2P reserves and contingent resources

369.420.462.7205.580.8Total Reserves & Contingent Resources

2C Contingent Resources

2P Reserves

44.52.318.423.8Development pending

61.217.13.711.928.5Un-clarified oron hold

52.250.91.3Development not currently viable

157.917.16.081.253.6Total Contingent Resources

56.7

2.1

5.9

48.7

MEP

124.3

62.9

24.9

36.5

Asia

211.53.327.2Total Reserves

68.91.32.7Justified for development

34.71.02.8Approved for development

107.91.021.7On production

TotalWest AfricaNorth Sea

These figures include no provision for prospective resources

Page 28: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Year end 2006 vs 2007 reserves and resources

100

2P Reserves and Contingent Resources(mmboe)

0

50

200

150

250

2006

350

400Contingent ResourcesAcquisitionsAdditions and RevisionsProductionReserves

Production 2007

300

Additions and Revisions

Acquisitions

Page 29: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Exploration update

Page 30: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

North Sea• Bream appraisal – Norway - 20%• Sparrow – UK - 25%

West Africa• Banda appraisal – Mauritania - 4.62%• Frida – Congo - 58.5%

Middle East/Pakistan• Al Amir 2 – Egypt - 10%• Al Amir 3 – Egypt - 10%• Badhra deep – Pakistan - 6%• Qadirpur deep 2 – Pakistan - 4.75%

Asia• Chim Sáo appraisal – Vietnam - 37.5%• Chim Ung – Vietnam - 37.5%• Chim Công – Vietnam - 37.5%• Follow on prospect – Vietnam - 37.5%• Monte Cristo – Philippines - 21%

2008 exploration and appraisal drilling

Page 31: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Bream

18/10-1

Brisling

Letfetti

Alsvid

Gardrofa

18/10-1 extPL407

PL406

North Sea – Norway - Bream appraisal

Bream update• Undeveloped Brent age oil field discovered 1971• Appraisal well and contingent test planned June 2008• Operator estimate of 80 mmbbls• Premier 20% equity share

Page 32: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

West Africa – Congo - Marine Block IX - Frida

Block Marine IX – Frida update• Farmout nearing completion – current interest 58.5%• Well planned Q4 2008/Q1 2009• 260 mmbbls gross prospect size• Cretaceous target (1 in 7 commercial success rate)• Water depth 580m

2 km

Frida

Page 33: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam – initial 2008 programme

Block 12W• 37.5% operated equity• Jackup Wilboss on location 11th March• Chim Sáo Appraisal• Chim Ung North• Chim Công• Up to 2 year programme

Page 34: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Chim Sáo

Chim Ung

Chim Công

Block 12W • 37.5% operated equity• Block 12W program targeting 200 mmbbls

Asia – Vietnam – Chim Sáo

Page 35: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam – Chim Ung

Chim Sáo

Chim Ung

Chim Công

Block 12W • 37.5% operated equity• Block 12W program targeting 200 mmbbls

Top Dua

M Dua

MDS 5

12W-CU-1X Proposed well location

Chim Ung (Falcon)Area Depth Map

Chim Boi

Chim Se

Chim Ung

Page 36: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Chim Sáo

Chim Ung

Chim Công

12W-CC-1X Proposed well location

Chim CôngChim En

Asia – Vietnam – Chim Công

Block 12W • 37.5% operated equity• Block 12W program targeting 200 mmbbls

12W-CC-1X

ChimCông

ChimEn

Chim Công / Chim EnTop MDS-5 Depth Map

Page 37: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

2009 exploration drilling

North Sea• Gardrofa(Norway)

West Africa• Ida(Congo)

Asia• Block 07/03 drilling(Vietnam)

• Tuna drilling(Indonesia)

• Buton drilling(Indonesia)

• North Sumatra Block A drilling (Indonesia)

Page 38: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

West Africa – Congo - Marine Block IX - Ida

Block Marine IX – Ida update• Farmout nearing completion – current interest 58.5%• Operated well planned Q4 2008/Q1 2009• 320 mmbbls gross prospect size• Cretaceous target (1 in 7 commercial success rate)• Water depth 580m

2 km

Ida

Page 39: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Sidewinder

North Sidewinder

Block Marine IX – Sidewinder• Joint study over Tertiary prospects completed with

SNPC in 2007• Tertiary targets (1 in 3 commercial success rate)

West Africa – Congo - Sidewinder

Page 40: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Matangprospect

Alur Siwah field

20 km

Structure Map showing the main carbonate build-ups on structural

highs in the block

North SumatraBlock ‘A’ Exploration• 41.67% equity interest• 2 wells planned 2009• 9 leads identified• Unrisked potential of 1.9 tcf gross

Asia – Indonesia - North Sumatra Block A

Page 41: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Indonesia - Tuna

Tuna• 65% operated interest• Farm out planned• First wells expected in 2009• Unrisked potential of ~1.5bn barrels gross• Possible logistical synergies with planned 2009 Vietnam

campaign

NW SEGajah Laut

10km

Page 42: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam - 2009 programme

Block 07/03• 45% operated interest• 2 wells planned 2009• 21 leads identified• Unrisked potential of >3bn barrels gross• Rig identified and negotiations at an advanced stage• Planning to farm down interest

Page 43: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

5 km

NW

Asia – Vietnam - 2009 programme - Silver Sillago

Silver Sillago• 45% operated interest• Well candidate for 2009• Potential of 300 mmbbls

Silver Sillago SE

Page 44: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam - 2009 programme - Blue Marlin

W Blue Marlin E

Blue Marlin• 45% operated interest• Well candidate for 2009• Potential of 500 mmboe

Page 45: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Asia – Vietnam - Block 104-109/05

• Licence awarded February 2008• 50% operated interest• 9,087 square kilometres• 2006 Technical Cooperation agreement with Petrovietnam identified 21

leads• Water depths of 20-60 metres• Firm commitment of seismic acquisition and one exploration well• Carried through first exploration well by MOECO (50% interest)

Page 46: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Exploration drilling schedule

2008MAR

Contingent wells High impact wellsFirm wells

M/East & PakistanEgypt : NW Gemsa Al Amir SE-1X

Gemsa Well-2

West AfricaCongo: Marine IX Frida

IdaMauritania : PSC-A Banda Appraisal

AsiaIndonesia : Natuna Sea Block A

TunaButonNorth Sumatra Block A

Vietnam : Block 12W Chim Sáo North (Blackbird)Chim Ung North (Falcon)Chim Công (Peacock)Block 12W ProspectBlock 07/03

Philippines : Ragay Gulf Monte Cristo

North SeaUK : P1181 Sparrow (23/22b)Norway : PL407 Bream Appraisal

PL406 Gardrofa

APR JUNMAY JUL AUG SEP20091HOCT DECNOV

20092H

Page 47: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008

Summary

• Major progress in 2007:– Delivered value through acquisitions– Signed gas sales agreements – Advanced development projects – Added significant reserves and resources

• On target to deliver 50,000 boepd by end 2010– Potential to achieve 80,000 boepd in 2012

• High quality forward exploration programme within disciplined spend

– Focused on Vietnam and Congo

• Seeking further core area acquisitions– Including via JV with EIIC

• Funding and people in place

Page 48: 2007 Preliminary Results Presentation 13th March 2008premieroil.prod-mid-euw3.investis.com/sites/default/... · 2016. 6. 14. · This presentation may contain forward-looking statements

13th March 2008www.premier-oil.com 13th March 2008