2011 Transmission Customer Meeting October 12, 2011. 2011 Transmission Customer Meeting. Agenda Minnesota Power and MISO Rates Structure 2010 True Up 2012 Rates Supporting Documentation Questions. Minnesota Power and MISO Rate Structure. ALLETE Attachment O to the MISO Tariff - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 2011 Transmission Customer  Meeting October 12, 2011

2011 Transmission Customer Meeting

October 12, 2011

Page 2: 2011 Transmission Customer  Meeting October 12, 2011

Agenda◦ Minnesota Power and MISO Rates Structure◦ 2010 True Up◦ 2012 Rates◦ Supporting Documentation◦ Questions

2011 Transmission Customer Meeting

Page 3: 2011 Transmission Customer  Meeting October 12, 2011

◦ ALLETE Attachment O to the MISO Tariff

Develops rates for the AC system

Schedule 7 Firm Point to Point Transactions Schedule 8 Non Firm Point to Point Transactions Schedule 9 Network Transmission Service

Develops rates for the HVDC system

Schedule 7 Firm Point to Point Transactions Schedule 8 Non Firm Point to Point Transactions Schedule 9 Network Transmission Service

Minnesota Power and MISO Rate Structure

Page 4: 2011 Transmission Customer  Meeting October 12, 2011

◦ ALLETE Attachment GG to the MISO Tariff

Develops rates for the AC system Schedule 26 Network Upgrade Charge

Develops rates for the HVDC system Schedule 26 Network Upgrade Charge

Minnesota Power and MISO Rate Structure

Page 5: 2011 Transmission Customer  Meeting October 12, 2011

◦ Minnesota Power is required to perform a true up of the 2010 forecasted rates to actual cost during 2011.

◦ This true up has been completed based on the 2010 FERC Form 1 .

◦ Any adjustments as a result of the true up will be included as part of the 2012 forward looking test year.

These adjustments will also include an interest calculation.

2010 True Up

Page 6: 2011 Transmission Customer  Meeting October 12, 2011

2010 True Up Results

Page 7: 2011 Transmission Customer  Meeting October 12, 2011

MISO Attachment O True Up Calculation•Annual Transmission Revenue Requirement True Up AC System DC System

Historic Year Actual RR $ 29,913,575 $ 15,754,008

Historic Year Projected RR $ 32,028,415 $ 15,985,088

Historic Year True Up $ (2,114,840) $ (231,080)

•Divisor True Up (KW Peak)Historic Year Actual Divisor 1,488,400

500,000Historic Year Projected Divisor 1,445,500

500,000Difference in Divisor 42,900

0

Historic Year Projected Annual Rate ($/kw/yr) $ 22.157 $ 31.970

Divisor True Up (Rate * Difference) $ 950,549

•SummaryRevenue Requirement True Up $ (2,114,840) $

(231,080)Divisor True Up $ 950,549 $

0Total 2010 True Up Before Interest $ (1,164,291) $

(231,080)

•Interest Calculation $ ( 75,679) $ (15,020)Minnesota Power Average Prime Interest RateInterest for 24 Months (Jan-10 to Dec-11) 3.25% 3.25%

•Total True Up $(1,239,970) $ (246,100)

2010 True Up Results

Page 8: 2011 Transmission Customer  Meeting October 12, 2011

MISO Attachment GG True Up Calculation

Annual Attachment GG Revenue Requirement True Up AC System DC System

Historic Year Actual RR for GG $ 4,770,799 $ 0 Historic Year Projected RR for GG $ 3,801,425 $ 0

Historic Year True Up $ 969,354 $ 0   

Interest Calculation $ 9,965 $ 0

 Minnesota Power Short Term Interest RateInterest for 24 Months (Jan-10 to Dec-11) .514%

 

 Total True Up $ 979,319 $ 0

2010 True Up Results

Page 9: 2011 Transmission Customer  Meeting October 12, 2011

2012 MISO Rate Projections

Page 10: 2011 Transmission Customer  Meeting October 12, 2011

AC System DC System

Gross Plant in Service (13 month avg.) $291,453,512 $127,421,467CWIP (13 month avg.) $ 33,078,662 Rate Base $ 168,002,502 $ 60,274,065

Attachment GG Credits ( $ 16,192.567)

Net Revenue Requirements $ 38,753,394 $ 16,329,538(Before True Up Credits)

True Up Credits ($,1,239,970) ( $ 231,080)

Net Revenue Req. $ 37,513,424 $ 16,098,458

2012 Projected Peak (MW) 1,520.2 500.0

Annual 2012MISO Transmission Rate $24,677 $32,197 ( Net RR / Peak = $/MW Yr)

2012 MISO Rate ProjectionsRevenue Requirements Based on MP 2012 Budget

Page 11: 2011 Transmission Customer  Meeting October 12, 2011

AC System DC System

Annual Rates $24,677 $32,197

Monthly Rates (Annual rates / 12)

Schedule 7 (Firm) $2,056 $2,683

Schedule 8 (Non Firm) $2,056 $730*

Schedule 9 (Network) $2,056 N/A

* HVDC Non Firm Transactions are charged $ 1 per MW/Hrdue to non firm losses being incremental

2012 MISO Rate ProjectionsAnnual Rates Converted to Monthly Rates

Page 12: 2011 Transmission Customer  Meeting October 12, 2011

Comparison of Monthly Rates2011 compared to 2012

2011 2012

AC System $2,223 $2,056

DC System $2,482 $2,683

2012 MISO Rate Projections

Page 13: 2011 Transmission Customer  Meeting October 12, 2011

◦ AC Load up from 2011. DC Load steady

◦ AC Plant Balances up due to completion of the Phase 1 of the Essar Steel Project, the St. Cloud to Monticello CAPX Line and the Boswell to Bemidji CAPX Line.

◦ CWIP Balances are up to reflect the continuation of the St. Cloud to Fargo CAPX project

◦ AC Revenue Requirements have been offset by $16,192,567 in Attachment GG Credits

2012 Rate Analysis

Page 14: 2011 Transmission Customer  Meeting October 12, 2011

Schedule 26 Network Upgrade Charge

Until MISO publishes 2012 allocations from all MISO TO’s a complete rate can not be projected. The 2012 allocations will be posted by MISO in December 2011.

Minnesota Power will be collecting revenue requirements for the following projects through Schedule 26 in 2012.

115 KV Badoura Area Upgrades In Service $ 5,930,346

(Includes 2010 True Up Amount)

230 kV Boswell to Bemidji CAPX Project In Service Sept 2012 $ 2,231,332

345 kV St Cloud to Monticello CAPX Project In Service Dec 2011 $ 2,770,511

345 kV St Could to Fargo CAPX Project CWIP $ 4,503,690

115 kV 9 Line Upgrade In Service Dec 2012 $ 1,736,007

Page 15: 2011 Transmission Customer  Meeting October 12, 2011

◦ A revised Attachment O and GG were posted to the MP page of the MISO OASIS earlier this week

◦ A complete set of working papers can also be found at the same location

◦ https://oasis.midwestiso.org/oasis/MP

2012 Supporting Documentation

Page 16: 2011 Transmission Customer  Meeting October 12, 2011

Questions

2011 Transmission Customer Meeting

Page 17: 2011 Transmission Customer  Meeting October 12, 2011

Contacts: Mike [email protected](218) 355-2617

Jeanne [email protected](218) 355-2648

Kara [email protected](218) 355-2869

2011 Transmission Customer Meeting