2011 waco annual project listing

13
Waco Metropolitan Planning Organization Annual Listing of Projects Federal Obligations for FY 2011 Purpose To meet the requirements of the Safe, Accountable, Flexible and Efficient Transportation Equity Act – A Legacy for Users (SAFETEA-LU), the MPO publishes the following list of projects for which federal highway or transit funds were obligated within the Waco Metropolitan Area during Fiscal Year 2011. FY 2011 covers the time period between October 1, 2010 to September 30, 2011. Included in this project listing is information regarding the scope of work, project cost, federal funds obligated and the anticipated completion date for each obligation. The Waco MPO Policy Board will review and consider approving this listing on December 13, 2011. Approval by the Policy Board would state that this list is an accurate accounting of all federal highway or transit monies expended within the Waco Metropolitan Area during FY 2011. Public Comment Period The MPO will accept comments on this document through December 8, 2011. All comments will be forwarded to the MPO Policy Board for their consideration prior to any action on this document. A formal public hearing will be conducted to provide comments directly to the Policy Board on this document at the MPO Policy Board meeting scheduled for Tuesday, December 13, 2011. The Policy Board will then consider approval or disapproval of this document following the public hearing. How to comment Comments will be accepted through any means provided that they are received by the MPO staff prior to the deadline of December 8, 2011. The following provides contact information for the MPO: US Postal Service: Phone: (254) 750-5650 Waco MPO Fax: (254) 750-1605 P.O. Box 2570 E-Mail: [email protected] Waco, TX 76702-2570

Upload: others

Post on 23-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Waco Metropolitan Planning Organization Annual Listing of Projects Federal Obligations for FY 2011

Purpose To meet the requirements of the Safe, Accountable, Flexible and Efficient Transportation Equity Act – A Legacy for Users (SAFETEA-LU), the MPO publishes the following list of projects for which federal highway or transit funds were obligated within the Waco Metropolitan Area during Fiscal Year 2011. FY 2011 covers the time period between October 1, 2010 to September 30, 2011. Included in this project listing is information regarding the scope of work, project cost, federal funds obligated and the anticipated completion date for each obligation. The Waco MPO Policy Board will review and consider approving this listing on December 13, 2011. Approval by the Policy Board would state that this list is an accurate accounting of all federal highway or transit monies expended within the Waco Metropolitan Area during FY 2011. Public Comment Period The MPO will accept comments on this document through December 8, 2011. All comments will be forwarded to the MPO Policy Board for their consideration prior to any action on this document. A formal public hearing will be conducted to provide comments directly to the Policy Board on this document at the MPO Policy Board meeting scheduled for Tuesday, December 13, 2011. The Policy Board will then consider approval or disapproval of this document following the public hearing. How to comment Comments will be accepted through any means provided that they are received by the MPO staff prior to the deadline of December 8, 2011. The following provides contact information for the MPO: US Postal Service: Phone: (254) 750-5650 Waco MPO Fax: (254) 750-1605 P.O. Box 2570 E-Mail: [email protected] Waco, TX 76702-2570

Project ID: S-022 PARTS 1 & 2 Federal Cost: $96,045,928.00CSJ Number: 0015-01-186 State Cost: $10,671,770.00Project Name: IH 35 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: S FM 2837 In Lorena Total: $106,717,698.00To: FM 2063 in Hewitt Let Date: 9/1/2011Work Type: Widen to 6 lines. Reconstruct and convert Funding Category: 12 frontage roads to one way Estimated Completion Date: Amt obligated in the program year (2011): $106,717,698.00

Project ID: S-022 PARTS 1 & 2 Federal Cost: $51,731,691.00CSJ Number: 0015-01-187 State Cost: $5,747,966.00Project Name: IH 35 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: Woodlawn Road Total: $57,479,657.00To: S. FM 2837 in Lorena Let Date: 9/1/2011Work Type: Widen, Grade, STR S and Surface Funding Category: 12 Estimated Completion Date: Amt obligated in the program year (2011): $57,479,657.00

Project ID: S-022 Federal Cost: $35,901,502.00CSJ Number: 0015-01-225 State Cost: $3,989,056.00Project Name: IH 35 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: University Parks Drive Total: $39,890,558.00To: ML King Blvd Let Date: 9/1/2011Work Type: Construct frontage road bridges. Funding Category: 12 Estimated Completion Date: Amt obligated in the program year (2011): $39,890,558.00

Total Federal Funds Obligated in FY 2011 (Highway Projects): $183,679,121Total All Funds Obligated in FY 2011 (Highway Projects): $204,087,913

Notes:

Notes:

Highway Projects

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Notes:

Project ID: S-PMR-S Federal Cost: $234,231.00CSJ Number: 0209-01-059 State Cost: $61,610.00Project Name: US 77 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: FM 3148 Total: $295,841.00To: Falls County Line Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $295,841.00

Project ID: S-PMR-S Federal Cost: $210,703.00CSJ Number: 0413-01-029 State Cost: $68,044.00Project Name: SH 164 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: SH 6 Total: $278,747.00To: FM 3529 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $278,747.00

Project ID: S-PMR-S Federal Cost: $38,168.00CSJ Number: 0831-01-016 State Cost: $18,077.00Project Name: FM 939 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: FM 342 Total: $56,245.00To: SH 164 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $56,245.00

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Grouped Projects

Notes:

Notes:

Notes:

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Grouped ProjectsProject ID: S-PMR-S Federal Cost: $132,070.00CSJ Number: 0834-04-022 State Cost: $67,259.00Project Name: FM 308 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: Hill County Line Total: $199,329.00To: Fm 3211 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $199,329.00

Project ID: S-PMR-S Federal Cost: $323,132.00CSJ Number: 1192-01-023 State Cost: $152,191.00Project Name: FM 939 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: FM 342 Total: $475,323.00To: SH 31 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $475,323.00

Project ID: S-PMR-S Federal Cost: $88,061.00CSJ Number: 2311-01-036 State Cost: $38,088.00Project Name: FM 3051 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: ML King Blvd Total: $126,149.00To: FM 1637 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $126,149.00

Notes:

Notes:

Notes:

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Grouped ProjectsProject ID: S-PMR-S Federal Cost: $294,206.00CSJ Number: 3521-010-015 State Cost: $91,899.00Project Name: FM 2837 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: US 84 Total: $386,105.00To: IH 35 Let Date: 10/1/2010Work Type: Seal Coat Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $386,105.00

Project ID: S-PMR-S Federal Cost: $946,330.00CSJ Number: 2311-01-035 State Cost: $425,433.00Project Name: LP 340 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: BU 77 Total: $1,371,763.00To: US 84 Let Date: 10/1/2010Work Type: Plane & Surface Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $1,371,763.00

Project ID: S-PMR-S Federal Cost: $82,064.00CSJ Number: 2362-01-032 State Cost: $33,783.00Project Name: LP 340 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: US 84 Total: $115,847.00To: GreenBriar Drive Let Date: 10/1/2010Work Type: Plane & Surface Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $115,847.00

Notes:

Notes:

Notes:

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Grouped Projects

Project ID: S-PMR-S Federal Cost: $219,346.40CSJ Number: 0055-07-057 State Cost: $54,836.60Project Name: US 84 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: .780 mile W. of SH 317 Total: $274,183.00To: .128 mile E. of SH 31 Let Date: 1/1/2011Work Type: Micro Surface Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $274,183.00

Project ID: S-PMR-S Federal Cost: $153,724.00CSJ Number: 0398-03-056 State Cost: $38,431.00Project Name: SH 317 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: .163 mile N. of US 84 Total: $192,155.00To: .941 mile S. of US 84 Let Date: 1/1/2011Work Type: Micro Surface Funding Category: 1 Estimated Completion Date: Amt obligated in the program year (2011): $192,155.00

Project ID: S-BRI-S Federal Cost: $183,835.00CSJ Number: 0909-22-149 State Cost: $45,959.00Project Name: CS Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: Old Robinson Rd at Castleman Creek Branch Total: $229,794.00To: Let Date: 12/1/2010Work Type: Replace Bridge & Approaches Funding Category: 6 Estimated Completion Date: Amt obligated in the program year (2011): $229,794.00Notes:

Notes:

Notes:

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Grouped ProjectsProject ID: S-BRI-S Federal Cost: $108,844.00CSJ Number: 0909-22-157 State Cost: $27,211.00Project Name: CS Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: Dutton Ave at Waco Creek Total: $136,055.00To: Let Date: 12/1/2010Work Type: Rehab Bridge & Approaches Funding Category: 6 Estimated Completion Date: Amt obligated in the program year (2011): $136,055.00

Project ID: S-Sty-S Federal Cost: $803,115.00CSJ Number: 0258-09-133 State Cost: $89,235.00Project Name: SH 6 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: 0.1 mile N. of Dosher Lane Total: $892,350.00To: .78 mile S. of FM 434 Let Date: 11/1/2010Work Type: Install Median Barrier Funding Category: 8 Estimated Completion Date: Amt obligated in the program year (2011): $892,350.00

Project ID: S-PMR-S Federal Cost: $2,532,711.00CSJ Number: 2305-03-015 State Cost: $633,178.00Project Name: FM 2114 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: Aquilla Creek Total: $3,165,889.00To: IH 35 Let Date: 6/1/2011Work Type: Widen, Grade, BS, Surface add Shoulder Funding Category: 12 & 1 Estimated Completion Date: Amt obligated in the program year (2011): $3,165,889.00

Total Federal Funds Obligated in FY 2011 (Grouped Projects): $6,350,540.40Total All Funds Obligated in FY 2011 (Grouped Projects): $8,195,775.00

Notes:

Notes:

Notes:

Project ID: S-022 PARTS 1 & 2 Federal Cost:CSJ Number: 0014-08-071 State Cost: $43,171,749.00Project Name: IH 35 Local Cost: $0.00County Name: McLennan Local Contribution: $0.00From: FM 1858 in West Total: $43,171,749.00To: Hill County Line Let Date: 2/1/2011Work Type: Widen Road Funding Category: 4 Estimated Completion Date: Amt obligated in the program year (2011): $43,171,749.00

Total Federal Funds Obligated in FY 2011 (Highway Projects): $0Total All Funds Obligated in FY 2011 (Highway Projects): $43,171,749

State Funded Projects

FY 2010 Annual Project ListingWaco Metropolitan Planning Organization

Notes:

Project ID: Waco Transit Federal Cost: $952,149.60CSJ Number: N/A State Cost: $86,045.00

Project Name: Preventative Maintenance Expenses Local Cost: $151,983.40County Name: McLennan Local Contribution: $0.00From: 10/1/2010 Total: $1,190,178.00To: 9/30/2011 Let Date: 10/1/2010Work Type: Operations Funding Category: FTA 5307 Estimated Completion Date: 9/30/2011 Amt of funds programmed in the TIP (multiphased project): $936,000.00Amt obligated in the program year (2011): $1,190,178.00Amt of funds remaining and available for use in subsequent yrs (multiphased project): -$254,178.00

Project ID: Waco Transit Federal Cost: $220,150.40CSJ Number: N/A State Cost: $0.00Project Name: ADA Related Expenses Local Cost: $55,037.60County Name: McLennan Local Contribution: $0.00From: 10/1/2010 Total: $275,188.00To: 9/30/2011 Let Date: 10/1/2010Work Type: Operations Funding Category: FTA 5307 Estimated Completion Date: 9/30/2011

Amt of funds programmed in the TIP (multiphased project): $306,250.00Amt obligated in the program year (2011): $275,188.00Amt of funds remaining and available for use in subsequent yrs (multiphased project): $31,062.00

Project ID: Waco Transit Federal Cost: $102,837.37CSJ Number: N/A State Cost: $0.00Project Name: Short Range Transportation Planning Local Cost: $25,709.34County Name: McLennan Local Contribution: $0.00From: 10/1/2010 Total: $128,546.71To: 9/30/2011 Let Date: 10/1/2010Work Type: Operations Funding Category: FTA 5307 Estimated Completion Date: 9/30/2011

Amt of funds programmed in the TIP (multiphased project): $107,500.00Amt obligated in the program year (2011): $128,546.71Amt of funds remaining and available for use in subsequent yrs (multiphased project): -$21,046.71

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Transit Projects

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Transit Projects

Project ID: Waco Transit Federal Cost: $1,266,859.97CSJ Number: N/A State Cost: $411,982.00Project Name: Operating Assistance Local Cost: $854,877.97County Name: McLennan Local Contribution: $0.00From: 10/1/2010 Total: $2,533,719.94To: 9/30/2011 Let Date: 10/1/2010Work Type: Operations Funding Category: FTA 5307 Estimated Completion Date: 9/30/2011

Amt of funds programmed in the TIP (multiphased project): $1,960,000.00Amt obligated in the program year (2011): $2,533,719.94Amt of funds remaining and available for use in subsequent yrs (multiphased project): -$573,719.94

Total Federal Funds Obligated in FY 2011 (Transit Projects): $2,541,997.34Total All Funds Obligated in FY 2011 (Transit Projects): $4,127,632.65

Note: There were no Bicycle and Pedestrian obligations during FY 2011.

Total Local Funds Obligated in FY 2011: $0.00

Bicycle and Pedestrian Projects

FY 2011 Annual Project ListingWaco Metropolitan Planning Organization

Note: There were no local project obligations during FY 2011.

Total Local Funds Obligated in FY 2011: $0.00

Local ProjectsWaco Metropolitan Planning Organization

FY 2011 Annual Project Listing

£¤84

§̈¦35

§̈¦35

!(6

!(164

!(317

!(317

!(31

185

2113

1637 2490933

308

1860

£¤77 434

2643

§̈¦35

1858

3149933

2311

2114

2957

939

938

185

107

2603

§̈¦35

28372113

1637

3051

434

3148

1860

2416

2188

2416

3047

3268

185

3400

340

2311

308

2114

!(317 £¤84

£¤84

£¤84

2837

!(6

!(6

!(6

!(6

0015-01-187

0015-01-186

0014-08-071

0209-01-059

0413-01-029

0834-04-022

1192-01-023

3521-010-015

0055-07-057

0055-07-057

0909-22-149

0909-22-1570258-09-133

2305-03-015

0398-03-056

2311-01-036

2311-01-035´

2362-01-032´

0015-01-225´ 0831-01-016 ´

0258-09-133

0055-07-057

Projec

t Loc

ation

sFe

dera

l High

way O

bliga

tions

Waco

Metr

opoli

tan A

rea -

FY 20

11

F

Project TypeHighwayState FundedGrouped - MaintenanceGrouped - Safety

0 2 41

Miles

November, 2011

0015-01-187 CSJ NumberGrouped - Bridge