2012 CAPITAL UPDATESUPER STORM SANDY
and2013 –2017 CAPITAL PLAN
12/6/2012 CITY OF OCEAN CITY
The Capital Financing Process
• The City Council adopts Bond Ordinances to establish the capital appropriations according to the capital plan
• The City borrows BAN's (Bond Anticipation Notes) in order to pay for the improvements based on the schedules of completion
• The City makes interest only payments on BAN's, which are temporary debt and can be borrowed for no longer than terms of 1 year
CITY OF OCEAN CITY December 6, 2012
The Capital Financing Process
• Based on the City's debt service model, several years of BAN's are rolled into bond sales and become "permanently funded“
• When Bonds are sold the City then commences on a schedule to pay back principal and interest over a number of years
• This cycle then repeats itself based upon the next several years of capital plans and projects to be completed
• This capital plan is being formulated with a focus on four bond sales scheduled to occur between 2012 and 2020
CITY OF OCEAN CITY December 6, 2012
2012 Budget
DEBT SERVICEBond Principal $5,980,000Bond Interest 1,942,940Note Interest (BAN’s) 152,125Baker Note Interest 180,000Green Acres 65,155
TOTAL $8,320,220
CAPITAL IMPROVEMENT FUND5% down payment on $10 mil $500,000CIF Ordinance (pay as you go) 320,000
TOTAL $820,000
CITY OF OCEAN CITY December 6, 2012
Total Debt Service AnnuallyYear Debt Service % Increase
• 2006 $6,429,092 3.6%• 2007 $6,840,244 6.4%• 2008 $7,125,000 4.2%• 2009 $7,561,315 6.1%• 2010 $7,812,967 3.3%• 2011 $7,975,087 2.1%• 2012 $8,313,065 4.2%
AVERAGE = 4.27%
• 2013 $9,350,000 12% Increase (Estimated)
CITY OF OCEAN CITY December 6, 2012
Temporary/Unfunded Debt as of Today
Debt as of 12/6/12 $31,005,825Less Reimbursements:FEMA: Dunes & Geotubes ‐1,150,000Library‐ Remaining Debt ‐1,950,000
Subtotal = $27,905,8252013‐2019 Capital Plans7 years @ $10 mil per 70,000,000
Total = $97,905,825
CITY OF OCEAN CITY December 6, 2012
Future Financing of Debt 2012‐2020
Total from previous slide $97,905,825
2012 Bond Sale 9,900,0002016 Bond Sale 27,000,0002019 Bond Sale 45,000,0002020 Bond Sale 24,000,000
$105,900,000
CITY OF OCEAN CITY December 6, 2012
0
2000000
4000000
6000000
8000000
10000000
12000000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
AN
NU
AL
DEB
T SE
RVI
CE
REQ
UIR
EMEN
TSCITY OF OCEAN CITY
EXISTING & FUTURE DEBT SERVICE REQUIREMENTS
Principal Interest Baker & Other BANS 2012 Issue 2016 Issue 2019 Issue 2020 Issue
EXISTING BOND PRINCIPAL
EXISTING INTEREST2012 ISSUE
2016 ISSUE
2019 ISSUE
2020 ISSUE
2012 CAPITAL UPDATE
12/6/2012 CITY OF OCEAN CITY
BEACHFILL
This would occur in the Federal Project Area. (North End near Seaspray Road to 36th Street).
Contract has been awardedScheduled to start after the 1st of the year
CITY OF OCEAN CITY12/6/2012
Beachfront Outfall Upgrades as part of Beachfill = $671,880City Funding = $167,970, State Funding = $503,910
Phase 2:Simpson Road: North
Street to Battersea 1st to St. Charles Alley and4th To Park Place Alley
Atlantic Ave. to the Beach
5th To Brighton Alley11th and Pleasure Ave. Alley
Phase 3:Bayland Drive (South terminus to 28th Street) Valmar Court & Summer CourtWesley Avenue (29th Street to 27th Street)29th Street (Central Avenue to Wesley Avenue)Stormwater management facilities at the street ends
29th, 28th , and 27thStreets
PAVING Contracts for Phase 2, 3 and 4 are complete:
12/6/2012 CITY OF OCEAN CITY
PAVING Contract for Phase 4 is complete
• Phase 4:• Asbury Avenue:
– 45th to 42nd
• 43rd Street: – (the) Bay to Central Asbury Avenue:
– 45th to 42nd
• 43rd Street: – (the) Bay to Central
12/6/2012 CITY OF OCEAN CITY
44th Street: (the) Bay to Central
45th Street – NorthSide: West to Central
Asbury/Central alley: 47th to 46th Streets
Bulkhead Replacements
15th Street4th Street6th Street
Bid Authorization scheduled for December 13th meetingPennlyn Place from Ocean Avenue to the Beach7th Street from West Avenue to the Beach(except intersections)8th Street from West Avenue to Atlantic Avenue(except intersections)West Avenue 9th Street 8th Street
UPCOMING PAVING
CITY OF OCEAN CITY12/6/2012
MP HVAC Replacement underway
City Hall A/C replacements and 6th FH boiler replacements, bid authorization scheduled for December 13th
PW Underground Storage Tank Remediation andPW Fueling Renovations Bid due December 18th
CITY OF OCEAN CITY12/6/2012
Completed Projects:MP Restroom Renovations Demolished the BellevueDemolished the AnnexFinished Tenn. Ave. Boat attendant building and closed out the grantEnergy Grants6th St. FH, City Hall, and 29th Street: Water aerators, light sensors, and A/C condessor replacements for energy cost savingsSewer Lateral Replacements46th, 35th, and 18th Sts.
PUBLIC BUILDINGS
RECREATION FACILITIES
Portable Rest Room completed at 11th St.
Fence at @ 6th & Baycompleted
Concept and Design of Carey Field and adjacent areas completed
CITY OF OCEAN CITY12/6/2012
Downtown Park completed at 9th and Asbury
Safety Netting completed
New sprinkler systems completed at variousgarden plots
5th and Bay Sports Lighting replaced
PARKING AND INTERMODAL TRANSPORTATION
Bike Racks PurchasedDowntown Holiday Decorations PurchasedNew Traffic Signal Installed at 5th and West
DEPARTMENTAL EQUIPMENT
Aerator/Seeder and a Turf Tractor was purchasedMP Chair Replacements were purchased911 Enhancement completed
CITY OF OCEAN CITY12/6/2012
LARGE EQUIPMENT AND TRUCKS
Wheel Loaderwas purchased
Storm Truck Replacement is out to bid
CITY OF OCEAN CITY12/6/2012
Rehabilitation completed on the:
Load n PackBeach Tractor
POST SANDY
DAMAGE AND REPAIRS
12/6/2012 CITY OF OCEAN CITY
WAVERLY BEACH
Sand Loss due to Sandy 850,000 cubic yards = $10 million*
12/6/2012 CITY OF OCEAN CITY
* STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES
SAND LOSS *
LOCATION CYDS COST
Inlet-Terminal Groin to Bridge 5,000 $ 60,000
Terminal Groin to 14th Street 271,111 $3,253,333
14th Street to 34th Street 248,889 $2,986,667
34th Street South 323,556 $3,882,667
12/6/2012 CITY OF OCEAN CITY
* STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES
Additional Outfall Repairs required at 7 Locations = $190,000
Additional Outfall Repairs Cost Confirmed by ACOE
12/6/2012 CITY OF OCEAN CITY
Dune and Sand Fence Repairs = $10M*
12/6/2012 CITY OF OCEAN CITY
* STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES
DUNE REPAIRS
LOCATION COST
Inlet-Terminal Groin to Bridge $ 110,000
Terminal Groin to 14th Street $ 1,450,000
14th Street to 34th Street $ 3,100,000
34th Street South $ 3,300,000
12/6/2012 CITY OF OCEAN CITY
* STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES
BAY FRONT REPAIRS
Bayside
2nd and Bay Avenue
12/6/2012 CITY OF OCEAN CITY
BAYFRONT REPAIRS
• $ 1,000
• $ 11,400• $120,000
• $478,000
• $ 60,000
12/6/2012 CITY OF OCEAN CITY
Cardiff Road Bulkhead Cap Repair
3rd Street Bulkhead Repair (temporary repair completed)Permanent Repair Required
2nd and Bay MarinaDock Damage Electric and Water Service
Bayside Dock Damage Concrete Damage Floating Docks
BOARDWALK‐‐BOARDWALK RAMPS‐‐STEPS
REPAIRS ESTIMATED AT $ 202,000
12/6/2012 CITY OF OCEAN CITY
BOARDWALK & ACCESSORY STRUCTURES
LOCATION COSTSTEPS: 5th , 7th, 8th, 10th, 54th Sts.:
in‐house $ 28,000RAMPS: St. James, 2nd, 3rd, 6th,
55th Sts.: in‐house $ 110,000CROSS OVERS with RAMP:
E. Atlantic And 58th St. $ 17,000Boardwalk deck and 18 cribbing
locations: in‐house $ 25,000Railing: various locations $ 22,000
12/6/2012 CITY OF OCEAN CITY
RECREATIONAL FACILITIES
12/6/2012 CITY OF OCEAN CITY
52nd Street Golf Course
RECREATIONAL FACILITIES
LOCATION COST34th Street Playground Surface, Tennis Surface, and Restroom Deck $ 40,000
Golf Course Netting and Fencing (Post & Rail) $ 10,000
8TH St. Playground Surface $ 25,000
52nd St. Hockey Rink Assembly$ 10,000
12/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS
• Bayside – Water Damage toPool House
– Garage
• Estimated Building Damage Estimated at $15,000 or less
• Estimated BuildingContent Loss = $ 1,200
12/6/2012 CITY OF OCEAN CITY
AIRPORT—GOLF COURSE PRO SHOP
• Runway/Taxiway Lighting & Signage
• AWOS (weather station)• Store novelties • Security Cameras • Security Gate Control Equip.
TOTAL = $ 170,000
• Pro Shop Repairs:– Still awaiting quote– Estimated at $10,000or less
• Building Contents– $3,000
12/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS
• MUSIC PIER DAMAGE
Window , Floor Repair Still awaiting cost estimateEquipment Replacement =
$32,00012/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS
• CITY HALL DAMAGEBuilding Still awaiting cost estimateContents = $ 250,000Document Salvage = $ 67,000
12/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS
• TRANSPORTATION CENTER DAMAGE– Historic Structure Cost
being developed for• Floor replacement• Wainscot Rehabilitation
• Restroom Rehabilitation
• Office Rehabilitation
– Building Contents =• $16,000
Flood Level
12/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS
• VEHICLE MAINTENANCE DAMAGE:– Repair of Displaced Concrete Floor = $ 200,000– Building Contents = $ 45,000
Water Level
12/6/2012 CITY OF OCEAN CITY
PUBLIC BUILDINGS—BEACH PATROL
12/6/2012 CITY OF OCEAN CITY
Total Beach Patrol Damages = $26,500
PUBLIC BUILDINGS—BEACH PATROL
12/6/2012 CITY OF OCEAN CITY
1st Street BeachPatrol
Stanley Metal Security Doors‐Front & Side Entrance‐‐two $1,500Storage Sheds ( 10' Wide X 14' Deep X 10' High) Double doors ( 3' 1/4" each) two $5,800
12th Street Beach Patrol
Storage Sheds ( 12' Wide X 12' Deep X 12' High) Double doors ( 3' doors) two $6,000Storage Sheds ( 11' Wide X 14' Deep X 8' High) Double doors ( 3' doors)‐‐ shared with OCPD $2,850
Siding Damage $1,000
PUBLIC BUILDINGS—BEACH PATROL
12/6/2012 CITY OF OCEAN CITY
34th Street Beach Patrol
Stanley Metal Security Door‐Front Entrance $ 750Storage Shed ( 6' Wide X 14' Deep X 6' High) Single door ( 3' door) $2,500
58th Street Beach Patrol
Stanley Metal Security Doors‐Front & Side Entrance—two $1,500Storage Sheds ( 10' Wide X 12' Deep X 10' High) Double doors ( 3' doors)‐ two $5,600Roof Damage‐ Leaking in the Headquarters $1,500
PUBLIC BUILDINGS Community Center Damage
12/6/2012 CITY OF OCEAN CITY
Pool Pump Room Repairs = $7,500
(2) Lobby Areas Remediated = $3,000
Foundation Fill Replacement still under review
PUBLIC BUILDINGS29th Firehouse Damage
12/6/2012 CITY OF OCEAN CITY
Currently investigating cost benefit of repair vs. replacementBuilding Contents = $ 61,000
PUBLIC BUILDINGS
• 46th Fire House, Post Office, and Beach Fee Office Damage
12/6/2012 CITY OF OCEAN CITY
Building Repairs = $25,000 estimated
Building Contents = $ 8,700
• Traffic Signal Repairs by CMC: – 6th St. = $ 47,000 (5)– 8th St. = $ 43,000 (3)– 10th St. = $ 36,000 (4)– 14th St. = $ 25,782 (3)
Total = $151,782
12/6/2012 CITY OF OCEAN CITY
• Communication Repairs– WWAN = $ 5,000– Alarms = $52,900
INTERMODAL AND COMMUNICATIONS
DAMAGES TO DATE
12/6/2012 CITY OF OCEAN CITY
$18,150,000
$673,000
$202,000 $85,000
$170,000 $275,500 $200,000
$151,782
$57,900
Beach
Bay Front
Boardwalk
Playgrounds/Golf Course
Airport
Buildings (Incomplete)
Parking
Traffic Signals
Communications
2013—2016 Capital Plan
CATEGORY PROJECTS THAT INTERFACE WITH STORM RELATED REPAIRS AND/OR REPLACEMENTS ARE NOTED
WITH AN ASTERISK
12/6/2012 CITY OF OCEAN CITY
BEACH AND BAY
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
ADA Beach Paths* $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
Dune Fence* $ 15,000 $ 15,000 $ 15,000 $ 15,000
Beach Fill $750,000 $ 1,750,000
Contingency $100,000 $150,000 $ 100,000
Dredging $250,000 $ 500,000
TOTALS = $1.015M $ 130K $ 1.78M $180K $630K
PAVING DRAINAGE AND BULKHEADS
2013‐2014 Planned Funding Level = $5M
12/6/2012 CITY OF OCEAN CITY
12/6/2012 CITY OF OCEAN CITY
2013‐2014Simpson/Haven alley 7th Street 6th StreetSimpson/Haven alley 5th Street 4th StreetSimpson/Haven alley 4th Street 3rd StreetCentral/Wesley alley 3rd Street 2nd Street2nd Street West Avenue Asbury Avenue2nd Street Asbury Avenue Atlantic Avenue3rd Street West Avenue Central Avenue3rd Street Wesley Avenue Atlantic AvenueHaven Avenue 3rd Street 2nd StreetHaven Avenue 4th Street 3rd StreetSimpson/Haven alley 3rd Street 2nd StreetMoore Avenue 8th Street 7th StreetPleasure Avenue 7th Street 6th Street
12/6/2012 CITY OF OCEAN CITY
2013‐2014Bayonne Place Bay Avenue Pleasure AvenueHaven Avenue 17th Street 16th Street16th Street Bay West AvenueSunset Place Pleasure Avenue Bay AvenuePleasure Avenue 16th Street 14th StreetBay/Simpson alley 17th Street 16th Street14th Street Bay Bay Avenue15th Street Bay Bay AvenueBayview/14th alley Bay Avenue Prospect AvenueProspect Avenue 15th Street 14th Street
12/6/2012 CITY OF OCEAN CITY
2013‐2014Asbury Avenue 42nd Street 39th StreetDrainage Pipes 41st, 40th, and 39th
40th Street West Avenue Asbury Avenue42nd Street West Avenue Central Avenue
NJAW and SJG Associated ImprovementsPelham Place ‐ SJG Atlantic Avenue Wayne AvenueSimpson Avenue ‐ NJAW 12th Street 11th Street
12/6/2012 CITY OF OCEAN CITY
2013‐2014 Bulkheads
7th Street ‐ Bulkhead
16th Street – Bulkhead
Battersea Road ‐ Bulkhead
Tonga Harbor ‐ Bulkhead
PAVING, DRAINAGE AND BULKHEADS
12/6/2012 CITY OF OCEAN CITY
2014 2015 2016 2017
Paving
Drainage
Bulkheads
YEARLY TOTALS $5,000,000 $ 4,000,000 $ 5,000,000 $ 5,000,000
BOARDWALK
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Isolated Replacements $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000
Reconstruction Averages $1,700,000 per year 2014 through 2017
No new funding in 2013;
2012 planned funding has not been expended
PUBLIC BUILDINGS
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
4th St. LLS (interior) $200,000 $200,000
New PS & Court Bldg @6th St. Design
$550,000 $ 550,000
Construction $2,000,000 $2,000,000 $2,000,000
$2M/Yr. for 2 additional Years 2018 and 2019
PUBLIC BUILDINGS
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
MP Fire Suppression, Downspouts,
& Painting
$ 300,000
City HallGround Floor* $ 220,000
HVACImprovement $ 75,000
PUBLIC BUILDINGS
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
6th Street FH $ 75,000
29th St. FH * $510,000
PUBLIC WORKS
Fleet Maint.* $200,000
Storage Facilities $100,000 $150,000
General $100,000 $100,000 $100,000 $100,000 $100,000
TOTALS = $ 2M $1.25M $2.75M $2.1M $2.1M
PUBLIC FACILITIES
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Fenton CareyFld. Track &playing Fld.
$ 750,000
General Property
Improvements: Irrigation, Fencing,
Landscaping
$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
RECREATION FACILITIES
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
15th Street Playground$ 100,000
52nd Street Playground*
Safety Surface and Play Equip.
$150,000
Fountains and Foot Baths
(Bdwk) $ 25,000 $ 25,000 $ 25,000
TOTALS =$ 225,000 $1,000,000 $ 125,000 $ 100,000 $ 125,000
PARKING & INTERMODAL
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Traffic Signal Installation:
18th & Central$ 150,000
5th St. & the Beach ParkingLot Upgrade
$ 220,000
Moorlyn—8th
StreetConnector
$ 300,000
PARKING & INTERMODAL
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Meter UpgradesAnd
Replacements *$ 40,000 $ 25,000 $ 25,000 $ 25,000
DowntownImprovements
Multi‐year$ 50,000 $ 50,000
General $ 50,000 $ 50,000 $ 50,000
TOTALS $560,000 $275,000 $125,000 $ 75,000
Existing funds are available in 2013 for:Bike/Ped Improvements ($150k)
Downtown Improvements ($160K)
DEPARTMENTAL EQUIPMENT
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Recreational $ 20,000 $ 30,000
Buildings & Grounds $ 20,000 $ 10,000
Music Pier$ 50,000
Public Works$ 20,000 $ 20,000 $ 45,000 $ 20,000
CommunicationsAll Depts. RadioReplacements
$ 25,000 $ 50,000 $ 125,000 $ 75,000
TOTALS =$ 95,000 $ 70,000 $125,000 $160,000 $ 60,000
LARGE EQUIPMENT, TRUCKS & REHAB
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Rehabilitation$ 25,000 $ 25,000 $ 50,000
PumperReplacement
$ 675,000
33K DT w/SS Dump Body, Snow plow & Salt Sprdr
$ 160,000 $ 175,000
4 X 4 Mini Dumpw/SS DB, Snow
Plow & saltSpreader
$ 170,000
LARGE EQUIPMENT, TRUCKS & REHAB
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
66KHook LiftTruck with Snowplow &
Salt Spreader $220,000
Mini Trash Packer $ 80,000
Hot Patcher $ 60,000 Utility Body Pick
Ups (2)$ 50,000
4WD Utility Body Pick Up with snow
plow & Salt Spreader Insert
$ 35,000 $ 35,000
LARGE EQUIPMENT, TRUCKS & REHAB
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
4 X 4 Stake Body Crew Cab Beach
truck$ 35,000
Load N Pack $ 185,000
Beach Tractor $ 80,000
4WD Extended Cab Pickup$ 22,000
4WD Pickup $ 25,000
LARGE EQUIPMENT, TRUCKS & REHAB
12/6/2012 CITY OF OCEAN CITY
2013 2014 2015 2016 2017
Sweeper $ 185,000
Surf Rake $ 75,000
Mini 4x4 Ext Cab Pick Up $ 25,000
Mini Pickup $ 22,000
Mini Utility Vans (2)$ 41,000
TOTALS =$ 1,018,000 $497,000 $395,000 $460,000 $135,000
12/6/2012 CITY OF OCEAN CITY
$3,735,000
$24,000,000
$7,175,000
$10,205,000
$1,575,000
$1,035,000 $510,000
$2,505,000
5 YR. TOTALSBEACH & BAY
PAVING
BOARDWALK
BUILDINGS
RECREATION
INTERMODAL
DEPT. EQUIPMENT
LARGE EQUIPMENT
5 YR. TOTALS
CATEGORY • BEACH & BAY $ 3,735,000 • PAVING $ 24,000,000 • BOARDWALK $ 7,175,000 • BUILDINGS $ 10,205,000 • RECREATION $ 1,575,000 • INTERMODAL $ 1,035,000 • DEPT. EQUIPMENT $ 510,000 • LARGE EQUIPMENT $ 2,505,000
12/6/2012 CITY OF OCEAN CITY