California Environmental Quality ActTrevor Macenski- Principal/ Director of Environmental Services- MBA/ First Carbon Solutions
![Page 2: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/2.jpg)
Rules and Regulations
• The Statute Public Resources Code §§ 21000-21178
(PRC)• The Guidelines
California Code of Regulations Title 14, §15000 et seq. (CCR)
• The Courts Ongoing court decisions (Case law)
![Page 3: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/3.jpg)
CEQA LingoCEQA: California Environmental Quality Act
IS: Initial Study
ND: Negative Declaration
NOP: Notice of Preparation of EIR
EIR: Environmental Impact Report
DEIR: Draft EIR
FEIR: Final EIR
NOC: Notice of Completion
NOD: Notice of Determination
NOA: Notice of Availability
![Page 4: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/4.jpg)
Introduction to CEQA• 1969: President Nixon signs National
Environmental Policy Act (NEPA)
• 1970: Governor Reagan signs California Environmental Quality Act (CEQA)
• CEQA (the Statute): Established by Legislature . . . and continuously modified by Legislature . . . and “interpreted” by the Courts
![Page 5: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/5.jpg)
Introduction to CEQA (cont.)
• Initially intended to apply to publicly-sponsored projects only
• 1972: Friends of Mammoth v. Board of Supervisors: CEQA applies to ‘all’ projects subject to public
agency discretionary action
![Page 6: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/6.jpg)
Who is “in charge” of CEQA? Lead Agency
CEQA is a “Self-executing Statute” meaning it is the Lead-Agency’s duty to determine what is and is not subject to CEQA, and to follow the process.
Public can go through the legal process (suing) to challenge decisions
![Page 7: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/7.jpg)
Basic Purposes of CEQA
1. Inform government decision makers and the public about the potential significant environmental impacts of proposed activities.
2. Identify ways that environmental impact(s) can be avoided or significantly reduced.
![Page 8: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/8.jpg)
Basic Purposes of CEQA (cont.)
3. Prevent significant avoidable damage to the environment by requiring changes in the project through the use of alternatives and mitigation
4. Disclose to the public the reason that an agency approved a project notwithstanding its environmental impacts
![Page 9: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/9.jpg)
The CEQAProcess
The CEQAProcess
(It can be a lengthy one!)
![Page 10: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/10.jpg)
![Page 11: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/11.jpg)
CEQA Process Overview
• An action is brought forth to the Lead Agency
• Is it a “project” or is it “exempt”?
• If subject to CEQA, what are the potential impacts? (prepare an Initial Study)
• Based on initial study, what type of CEQA document do you need? (Neg Dec, MND, EIR?)
• Prepare appropriate environmental document
• Public reviews and comments on document
• Decision and findings made on the project
![Page 12: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/12.jpg)
What is a “project” under CEQA?
• Comply with CEQA when you have a “project.”
• Project: activity undertaken by a public agency or a private activity which may cause a change in the environment and must receive discretionary approval from a government agency.
![Page 13: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/13.jpg)
• Discretionary projects (CEQA) Tentative maps
General plans
Conditional use permits
• Ministerial projects (no CEQA) Demolition permits
Building permits
Discretionary vs. Ministerial Projects
![Page 14: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/14.jpg)
Typical CEQA Projects Residential
Commercial
Transportation projects
Water and energy infrastructure
![Page 15: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/15.jpg)
Exemptions to CEQA
• Statutory Activities exempted from all or part of CEQA
by the State Legislature regardless of impacts (policy decision)
• Categorical Classes of projects which are exempted from
CEQA because they typically do not have significant impacts (there are exceptions)
![Page 16: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/16.jpg)
Statutory Exemption ExamplesArticle 18
• 1984 L.A. Olympic games• Family day care homes• Specified mass transit projects• State and regional transportation improvement
programs• Projects located outside California• Certain pipeline work • Air quality permits• Ministerial projects• Emergency projects• Other miscellaneous per CCR §15282
![Page 17: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/17.jpg)
Categorical ExemptionsArticle 19
• Classes of projects that do not have a significant impact on the environment
• Not applicable when cumulative impact is significant or when there is a potential significant impact due to unusual circumstances
Scenic highways
Hazardous waste sites
Historical resources
![Page 18: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/18.jpg)
Categorical Exemptions
• Existing facilities
• Reconstruction
• Small structures
• Minor alterations to land or land use
• Actions by regulatory agencies for natural resources protection or protection of the environment
• Surplus property sales
• Land acquisition for wildlife conservation
• Minor additions to school
• Minor land divisions
• Transfer of ownership for parks
• Total of 33 categories outlined in section 15301 of Guidelines
![Page 19: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/19.jpg)
Notice of Exemption
• If your “project” is exempt, a Notice of Exemption (NOE) may be filed with County Clerk
• The filing of an NOE shortens the time that someone can file a legal challenge to the exemption from 180 days to 35 days
![Page 20: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/20.jpg)
Preparing an Initial Study
![Page 21: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/21.jpg)
Initial Study
• Purpose Complete a project description
To decide between a Negative Declaration, Mitigated Negative Declaration, or EIR
Refine issues to be addressed in an EIR
• Initial Study is not required if it is known an EIR will be prepared
![Page 22: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/22.jpg)
Contents of Initial StudiesCCR §15063(d)
• Project description - location, project objectives and characteristics
• Environmental setting
• Discussion of environmental impacts using Appendix G checklist
• Mitigation measures if necessary
• List of preparers
![Page 23: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/23.jpg)
Checklist topics Aesthetics
Agriculture
Air Quality (GHG)
Biology
Cultural
Geology
Hazards
Hydrology
Land Use Minerals Noise Population/Housing Public
Services/Utilities Recreation Transportation/traffic Urban decay
![Page 24: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/24.jpg)
Appendix G Checklist
![Page 25: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/25.jpg)
Definition of“Significant Impact on the Environment”
• Substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance. A social or economic change by itself shall not be considered a significant effect on the environment (CCR §15382)
![Page 26: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/26.jpg)
After the checklist . . .
The IS checklist will help you determine what type of CEQA environmental document the Lead Agency will need to prepare (or have prepared for them)
![Page 27: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/27.jpg)
Environmental Documents
• Negative Declaration
• Mitigated Negative Declaration
• Environmental Impact Report
![Page 28: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/28.jpg)
Mitigation Measures Required for all potentially significant impacts if
possible
Should identify who, what, where and when
Be legally, technically, socially, politically and economically feasible
Should avoid the impact altogether or minimize impacts by limiting the magnitude
May rectify by repairing, rehabilitating, restoring
May reduce or eliminate over time
May compensate by replacing or providing substitute resources
![Page 29: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/29.jpg)
Preparing an Environmental Impact Report (EIR)
![Page 30: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/30.jpg)
When to Prepare an EIR
Substantial evidence in the record supports a fair argument that significant impacts may occur.
Fair Argument – Very Low Threshold
If there is any substantial evidence to support a fair argument that project may have significant environmental impacts, an EIR must be prepared
There is a presumption in CEQA in favor of preparing EIRs instead of Neg Decs
![Page 31: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/31.jpg)
Basic Types of EIRs
Project EIR
Program EIR
Tiered EIR
Subsequent/Supplemental
Focused EIR
![Page 32: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/32.jpg)
EIR Versions
Administrative Draft EIR (not public)
Draft EIR (public review)
Final EIR
![Page 33: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/33.jpg)
EIR Process Overview• Notice of Preparation (NOP) released for 30 days• Scoping meeting• Notice of Completion (NOC) and Notice of
Availability (NOA) to start minimum 45-day Draft EIR public review
• Responses to comments sent to responding public agencies 10 days before EIR certification
• Public hearing generally held for discretionary approval
• EIR certification, project approval, CEQA findings, statement of overriding considerations
• File Notice of Determination (NOD)
![Page 34: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/34.jpg)
![Page 35: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/35.jpg)
Diamond Springs Parkway EIR
Joint lead Agency
New Roadway
Existing Roadway Improvements
Water and Sewer Improvements
Sound walls
Power Lines
Much, much more
![Page 36: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/36.jpg)
Include:Description, location, and a discussion of the probable environmental effects.
EIR can be initiated while waiting for comments
Responsible agencies and public have 30 days to comment on an NOP.
The comments should to be addressed in the EIR.
EIR cannot be released for public review until 30 days after
distribution of the NOP.
Notice of Preparation (NOP)
![Page 37: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/37.jpg)
![Page 38: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/38.jpg)
Scoping Process During these 30 days, a scoping meeting
may be held to identify key environmental concerns and issues Identify possible impacts
Encourage inter-agency consultation
Consult with recognized experts
Involve public at an early stage of the review process (though not required)
![Page 39: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/39.jpg)
![Page 40: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/40.jpg)
What needs to be in the EIR?• Project description
• Environmental Setting
• Significant environmental effects
• Unavoidable significant adverse effects
• Growth-inducing impacts
• Cumulative impacts
• Mitigation measures
• Alternatives
• FEIR contains response to comments
![Page 41: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/41.jpg)
Typical EIR Impact Analysis Issues
• Air quality
• Biology
• Hydrology/Water quality
• Energy
• Geology/Soils
• Land Use & Planning
• Public Services
• Cultural Resources
• Traffic
• Recreation
• Agriculture
• Seismic safety
• Noise
• Aesthetics
• Hazardous materials
• Climate Change
![Page 42: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/42.jpg)
![Page 43: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/43.jpg)
Technical Studies Help provide supporting evidence for
the CEQA documents Useful to see what checklist questions
the consultant or planner is using, and tailor your report to answering those questions
Technical experts often called to give testimony at public hearing
![Page 44: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/44.jpg)
DSP EIR Challenges Surrounding Property Owners Noise Impacts Lighting Impacts Biological Impacts
RLF CTS
Utilities Cultural
![Page 45: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/45.jpg)
When the DEIR is Complete:
• Issue Public Notice of Availability (NOA)
Mailed to those previously requesting notice and,
General circulation newspaper or,
Posting in the project area or,
Direct mailing to owners/occupants of contiguous parcels
![Page 46: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/46.jpg)
![Page 47: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/47.jpg)
Sent to SCH
Brief description of project
Location
Address where environmental document is available
Notice of hearings(if one is scheduled)
Begins the 45-day public review period
Issue Notice of Completion (NOC)
![Page 48: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/48.jpg)
Final EIR• Includes text revisions to Draft EIR
• Includes responses to comments
• No separate public review period
• Written response to commenting agencies 10 days prior to certification
• Better to discuss everything than ignore difficult issues
![Page 49: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/49.jpg)
Final Decision Process
1. Consider and Certify EIR
2. Approve Project
Make Findings
Adopt Mitigation, Monitoring Program
Adopt Statement of Overriding Considerations (if necessary)
![Page 50: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/50.jpg)
Final CEQA Step: Notice of Determination (NOD)
• Filed within 5 working days after project
approval
• Posted with the county clerk and State
Clearinghouse for at least 30 days
![Page 51: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/51.jpg)
Project description Location Date of approval Determination whether will
have a significant effect on the environment
That ND/MND or EIR was prepared/certified pursuant to CEQA
Whether mitigation measures are a condition and whether Statement of Overriding Considerations was adopted
Address of where ND/MND or EIR and certification can be examined
Notice of Determination (NOD)
![Page 52: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/52.jpg)
The real final CEQA step . . .
After the NOD is filed…project isn’t “out of the woods”
Litigation timeframe = 30 days after NOD (or 180 days if NOD is not filed with the clerk’s office)
![Page 53: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/53.jpg)
CEQA and Engineers
Engineers provide: the tech studies on items such as hydrology and
drainage, traffic, geotechnical analysis
the drawings that enable CEQA writers to understand and analyze the Project
practical comments on mitigation measures
specific project design features, often to comply with mitigation measures
potential stumbling blocks for CEQA writers
![Page 54: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/54.jpg)
CEQA and the Public CEQA is the bridge between the hard
sciences and the public.
Technical studies will need to cater to public understanding.
Often, site plans, engineering drawings will need to be simplified for CEQA purposes.
![Page 55: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/55.jpg)
Take Home Tips• Be aware of possible environmental consequences of
your projects.
• When in doubt, contact the environmental division of your group. Early consultation will keep you and your project out of trouble.
• CEQA is can be a long, tedious process, but not following procedure could cause even more delays for the project.
• Engineers and environmental planners/consultants must be in close contact throughout a project to efficiently and effectively navigate the project through the environmental process.
![Page 56: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/56.jpg)
Helpful Websites
CEQA Statute and Guidelineshttp://ceres.ca.gov/ceqa/
Land Use Planning Information Network (LUPIN)http://ceres.ca.gov/planning/index.html
California Association of Environmental Professionals (AEP)http://www.califaep.org/
![Page 57: 2012 ceqa presentation for ce class](https://reader036.vdocuments.net/reader036/viewer/2022062319/55682010d8b42afe5c8b526d/html5/thumbnails/57.jpg)
Michael Brandman AssociatesEnvironmental Services ☼ Planning ☼
Natural Resources Management
Trevor Macenski, MSc, REAPrincipal/ Director Environmental ServicesBishop Ranch 32633 Camino Ramon, Suite 460San Ramon, CA 94583Office: 925.830.2733Mobile: 916.508.4170Email: [email protected]: CEQAplanner