20120507 national strategy to drive broadband nationwide ...€¦ · provide 4k ultra hd contents...

26
www.iirme.com/ictleaders National Strategy to Drive Broadband Nationwide in Korea May 10, 2012 Byung-ik, Choi Director of Gigabit Internet Project, Network Planning Department, Digital Infrastructure Division

Upload: others

Post on 27-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

www.iirme.com/ictleaders

National Strategy to Drive Broadband Nationwide in Korea

May 10, 2012

Byung-ik, Choi

Director of Gigabit Internet Project,

Network Planning Department,

Digital Infrastructure Division

Page 2: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

History of Broadband Policy ⅠⅠⅠⅠⅠⅠⅠⅠ

Current Status of Broadband PolicyIIII

Directions for Future Broadband PolicyIIIIII

Page 3: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

History of Broadband Policy ⅠⅠⅠⅠⅠⅠⅠⅠ

- 3 -

Page 4: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Brief History of Broadband PolicyBrief History of Broadband Policy

· · · ·· · · 1998 · · · · · · · ·· · 2003 · · · · · · · 2007 · · · ··· 2010 · · · · 2015

1995199519951995 1999199919991999 2001200120012001 2002200220022002 2009200920092009

KII Project (~ a few Mbps)1995

2004

2005

* KII : Korea Information Infrastructure

* Korea Population : 50m

KII

Program

PCs : 10M

Internet :10M

e-Banking

10M

m-phone

30M

Internet: 36M

m-phone: 48M

e-banking: 59M

IPTV: 2.6M

UBcN Project (up to 1Gbps)2009

BcN Project (50~100Mbps) 2010

* UBcN : Ultra Broadband Convergence Network

- 4 -

• Gigabit Internet

Commercialization(2011~)

• Rural Broadband

Expansion(2010~)

• Future Network R&D

2012201220122012

* BcN : Broadband Convergence Network

Page 5: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: ’95 ~ ‘05: Korea Information Infrastructure (KII)

• (Outcome) By 2005, endowing a few Mbps Speed of Internet with 90% to household nationwide

• ICT policy & Success Factors

– Policy

• Establishing government department(MIC), legislating a law and writing a plan for nation information infrastructure

• Competition in Market structure

• Incentives for new investment

– Market

• Free internet service for one million schools(2000)

• Broadband certification system for new apartment house

• Internet charge program, a fixed rate for unlimited usage of Internet

• In 03, Government enriched E-learning service, EBS’s Internet education, with increasing speed of broadband

Broadband Network

- 5 -

Page 6: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

• (Outcome) 2010, endowing a 50~100Mbps Speed of Internet

with 71% to household nationwide

– Promoting converged service such as IP-Telephony, IPTV

– Converging ICT technology with chief industries in similar to education,

health, transportation, vehicles and Logistics

: ’04 ~ ‘10: Broadband converged Network (BcN)

Broadband Network & Convergence

- 6 -

• ICT Policy & Success Factors

– In 2004 year, established the plan of Next generation

Network(BcN)

– In 2004 year, Broadband and telecommunication market was

matured by a strong three players, including SKT, KT and LGU+

– Toward Service-driven policy

• Implementing network tailored for new services, including

IPTV and VoIP on video etc.

• Exercising pilot-project as matching-fund

Page 7: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Status of Broadband in KoreaStatus of Broadband in Korea

2000

3,950

2001

7,810

2003

11,180

Household Subscribers

2002

10,410

(Unit: thousands)

By 2009 Nationwide Broadband Networks established with almost 100%

coverage

- Almost 100% of households have access to High-Speed Internet (Up to 2Mbps)

* 2010, the number of household in Korea: 17,359,000

- 2011, The number of BcN(50~100Mbps) Subscribers : 15,951,000

National Broadband

Status

Seoul2Seoul2

Seoul1Seoul1

BusanBusan

KwangjuKwangju

DaeguDaegu

DaejeonDaejeon

Broadband Penetration at Home

$

2009

16,348

- 7 -

2010

17,236

2011

17,826

Page 8: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

- 8 -

Current Status of Broadband PolicyIIII

Page 9: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Current Status of Broadband Policy

- 9 -

Policy Objectives Projects

Provide high-quality & effective

network service to meet the

future demand including ever-

increasing data traffics

Provide high-quality & effective

network service to meet the

future demand including ever-

increasing data traffics

Bridge the digital divide in

network infrastructure between

rural and urban areas

Bridge the digital divide in

network infrastructure between

rural and urban areas

Provide a testbed for R&D of

network technologies

Provide a testbed for R&D of

network technologies

Gigabit Internet Project

(GTTH : Gbps To The Home)

Gigabit Internet Project

(GTTH : Gbps To The Home)

Rural Broadband Project

(Rural village)

Rural Broadband Project

(Rural village)

KOREN Project

(KOrea advanced REsearch

Network)

KOREN Project

(KOrea advanced REsearch

Network)

Page 10: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

1. Gigabit Internet Project (GTTH)

- 10 -

Objective

▷Establish the world best IT infrastructure in response to advanced IT

devices (SmartTV, tele-conference, UHDTV, 3DTV etc.) that require

massive data transmission

Provide commercial gigabit internet service 10 times faster than

current BcN, and promote development of gigabit based applications

* GTTH : Gbps To The Home

Agenda

Incremental Approach : 1st Stage : Initial Pilot(‘09~’10), 2nd Stage : Commercialization(‘11~’12)3rd Stage : Expansion (’13~)

Public Private Partnership to realize Gigabit Internet pilot project▷

Provide 100M~1Gbps Internet Service through ultra broadband

subscriber network technology (FTTH, RFoG, Gigabit-LAN)

Page 11: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: Current Status

1. Gigabit Internet Project

- 11 -

(Seoul)

(Yongin]

(Daejeon)

(Guangju) (Changwon)

(Daegu(Busan]

(Kimpo)

(Bucheon) Gigabit Applications

Giga webzoneFull HD/UHDTV3D VoD3D multi-angle IPTV

Giga wireless homenScreenHD bi-directional video communications

Network

Quality Control/Standardization

Partners

*10 cities for 2012:

Gongju, Kimhae, Suwon, Ansung, Yeosu, Icheon, Incheon, Paju, Hongsung(Seoul, Daegu, Busan)

Page 12: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: Deployed Technologies

1. Gigabit Internet Project

<Deployed Technologies (1)>

▷ The ISPs use FTTH for subscriber lines to provide gigabit internet

▷ 4 technologies including WDM-PON, 10G/1G E-PON, G-PON, RFoG+E-PON

are adopted to deploy gigabit internet network.

16λ, 32λ WDM-PON 10G/1G E-PON

- 12 -

Page 13: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: Deployed Technologies

1. Gigabit Internet Project

G-PON RFoG + PON

* RFoG(Radio Frequency over Glass)

2.5Gbps

OLT

1Gbps Data

ONTIP Video

VoIP

Internet

RN

<Deployed technologies(2)>

PON technologies are preferred by telecom operators, and cable companies use RFoG technology that are backward compatible with the current cable broadcasting system.

- 13 -

Page 14: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: pilot application

1. Gigabit Internet Project

< case no. 1 : interactive 3D e-learning >

Provide a media platform that receives and provides interactive 3D educational contents,

Provide an application that deliver 3D educations contents through Smart TV

IP Network

Smart Network

SG

SN

SN

3D educational

Contents

SN

SN

Kinder

Garten

Giga internet3D&Smart TV

hospital3D&Smart TV

Giga internet

앱 Intro

(영상)

Intro

(영상)

Main(정지화면)

Main-EP01

(icon영상)

Main-EP01

(icon 영상)

Main-EP01

(icon 영상)

Main-EP01

(icon 영상)

Main(정지화면)

Main(정지화면)

22

33

44

11Main

학습하기학습하기

Main

학습하기학습하기

Main

학습하기학습하기

Main

학습하기학습하기

EP01

(학습영상)

EP02

(학습영상)

EP03

(학습영상)

EP04

(학습영상)

11

22

11

22

11

22

11

22

Contents Flow

- 14 -

Page 15: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: pilot application

1. Gigabit Internet Project

< case no. 2 : 3D Multi-angle IPTV>

Provide not only tangible 3D videos but also videos shot from many different

angles as multi-screens on a single TV (for sports, performances, etc.)

- 15 -

Page 16: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: pilot application

1. Gigabit Internet Project

< case no. 3 : N-Screen service >

Multi-channel service through which users can watch the same broadcasted

contents on many different terminals at home and each terminal can send

contents using an independent IP channel

FTTH

IP STB Digital Broadcasting

Internet + PC

broadcasting

Wireless internet + mobile

broadcasting

Multi Room IP STB

Watch TV broadcast

with IP STB at diverse rooms

- 16 -

Page 17: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: pilot application

1. Gigabit Internet Project

< case no. 4 : UHDTV >

Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents

4K UHD A/V4K UHD A/V4K UHD Encoding

module4K UHD Encoding

moduleRAW Video

Live Server, VOD ServerLive Server, VOD Server 4K UHD Decoding Module4K UHD Decoding Module

4K LCD Display

RAW Video(HDMI X 4)

Giga Internet

Stream Request

A/V Stream

- 17 -

Page 18: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

: pilot application

1. Gigabit Internet Project

< case no. 5 : Giga Cloud Service >

The giga cloud service allows people to access and use data anywhere,

anytime

Wire/Wireless

convergence

Cloud Service

- 18 -

Page 19: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

2. Rural Broadband Project

Build broadband networks in rural areas (small towns) to provide high speed internet service, and provide applications specifically developed for rural residents

• Towns with less than 50 households : matching fund from central gov. local gov. and telco operators (1:1:2)

• Towns with more than 50 households : government loans & telco M&A conditions

Objective

* Built with Telco operators’ funds only** Applications developed to process image information*** Applications include Home safe guard, Agricultural training app., CCTV for towns, e-health, App. to manage agriculture & live stocks**** Currently reviewing applications designed to meet the demand of rural residents including WiFi Zones

Achievement & Plan

Category Total In Plan

Achievement

Total 2010 2011 2012 (on going)

BB Deployment(No. of Towns)

13,217 2,531 658 (85*) 925 925

Applications(No. of Applications)

7** 5*** n.a.****

- 19 -

Page 20: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

3. KOREN Project

� KOrea advanced REsearch Network

� Deploy broadcasting & communication convergence, future network testbed

- Promotion through sharing research results based on collaborative

relationship among academia, industry and government

- Provide Future internet research environments (DCN,OF ….)

� Up to 100Gbps Backbone Capacity & 1/10Gbps User Connections

� 60-Gigabit Member institutes (mainly for research & development)

� KOREN based research activity

� Provide a testing environment for researches based on the future network

(DCN, Openflow)

� Research on ICT application technologies in many areas including physics,

meteorology, medical treatment and cultural performances

- 20 -

Page 21: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

- 21 -

Directions for Future Broadband PolicyIIIIII

Page 22: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Success Factors of Korea’s Broadband [1]

Policy

Basic Informatization Promotion Law

- Consistent and strong policy implementation

Policies for rural areas

- Financial support with matching fund programs

- Low interest loan for IT infra in rural areas

- Tax reduction

Demand Generation

Competition

Government-leading

Investment

Communication N/W for government use was established by the government

Multi-provider competition enabled by lowered entry barrier

( Hanaro : 1998) and privatization of KT (1993-2002)

Promotion of competition through service quality evaluation

E-Government services, Free internet services in schools

Page 23: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Success Factors of Korea’s Broadband [2]

▶ More than 50% of the population in Korea live in the

dense residential area

▶ Enthusiasm for education

▶ Early adoptor

▶ Intensive investment in broadband Internet, CDMA,

WiBro, LTE etc.

▶ Promotion of e-commerce & ICT adoption by traditional

industries

Environ-

ment

Company

Individual

- 23 -

Page 24: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

IT Infrastructure Promotion Policy in KOREA

- 24 -

Page 25: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

What’s next?

- 25 -

Need to predict and think out an effective way to manage future data traffic which will be generated through a variety of advanced devices in high tech era (e.g. cloud computing)- Redesign ISPs’ networks for effective delivery of high quality contents

Considering future demand, FTTH is crucial for gigabit network- Build a base for future services . In the long run, it’s more economic and cost effective

The gigabit internet world: gigabit network+new applications- Create a bundle service in cooperation with CP, Broadcasting companies, electronics companies, portals, CDN, and P2P- Bring down industrial boundaries, and make an alliance among industries to stand up to IT giants like Google & Apple - Design a way to link new industries and the gigabit world

Page 26: 20120507 National Strategy to Drive Broadband Nationwide ...€¦ · Provide 4K ultra HD contents live or on demand, which are 4 times more vivid than existing full HD contents 4K

Thank You

E-mail : [email protected]

EXPO 2012 YEOSU KOREA(`12.5.12-8.12)