2013-09-30 thomas parker, head of energy division responsible renewable recyclable thomas parker...

13
2013-09-30 Thomas Parker, Head of Energy Division Responsible Renewable Recyclable Thomas Parker October 2013

Upload: kenia-walkley

Post on 15-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

2013-09-30Thomas Parker, Head of Energy Division

Responsible Renewable Recyclable Thomas Parker

October 2013

2013-09-30Thomas Parker, Head of Energy Division

What is the European Spallation Source ?

Japan 2008:JPARC (<1MW)

Europe 2019: The European Spallation Source (<5 MW)

USA 2006:SNS (<1.4 MW)

• One of Europe's largest planned research infrastructure

• Will bring new insights to the grand challenges of science and innovation

• Collaborative project: Includes more than 17 countries

• 2014: Start of construction phase of the world's most powerful linear proton accelerator

• 2019: Provide the world's most advanced tools for studying materials with neutrons

(~ 450 employees; > 2500 users / year)

Lund, Sweden

2013-09-30Thomas Parker, Head of Energy Division

Neutrons for Energy Research

Energy Storage

Photovoltaics

PhotosynthesisFuel Cells

Superconduction

Extreme Materials

Carbon Capture and Storage

The main contribution from ESS to a more sustainable society is the science

2013-09-30Thomas Parker, Head of Energy Division

Responsible

Energy Efficiency

Renewable

Power from renewable sources

Recyclable

ESS’s cooling is Lund’s heating

The Scandinavian Commitment: A Sustainable Research Centre

2013-09-30Thomas Parker, Head of Energy Division

Energy InventorySpallation Neutron Source atOak Ridge National LaboratoryAt 1 MW beam from accelerator

150 GWh power 140 GWh waste heat

Accelerator incl klystron gallery

Acceleratorcryo

Target cryo

Accumulator ring Cooling

Target

2013-09-30Thomas Parker, Head of Energy Division

Energy InventoryESS Pan-European Project 20025 MW beam on target

610 GWh power

580 GWh waste heat

Accelerator incl klystron gallery

Acceleratorcryogenics

Targetcryogenics

Accumulator-ring

Coolling

Target Station

2013-09-30Thomas Parker, Head of Energy Division

Energy Inventory ESS 2012, 5 MW

270 GWh renewable power

200 GWh recycled

Accelerator incl klystron gallery

Cooling Target stationTargetCryo Accelerator

Cryogenics

Ion Source

Instruments

20°C40°C90°C

2013-09-30Thomas Parker, Head of Energy Division

Responsible – Renewable – Recyclable

RenewableCO2: -120 000 t.

ResponsibleCO2: - 30 000 t.

RecyclableCO2: - 15 000 t.

2013-09-30Thomas Parker, Head of Energy Division

Klystrons Helium Compressors

High-temperature cooling

2013-09-30Thomas Parker, Head of Energy Division

Open Call for heat recycling solutions

Recycle heat without using electricity

Open now!

2013-09-30Thomas Parker, Head of Energy Division

Key Success Factors

• Government commitment• Green Field effort• Functioning free market for electrical power• “Blessed” with heat demand• District heating predominant heating form, 80°C sufficient• Low temperature heating in buildings 40°C

2013-09-30Thomas Parker, Head of Energy Division

Conclusions

• The energy strategy Responsible Renewable Recyclable was instrumental in winning ESS

• “Responsible, Renewable, Responsible” is neither perfect nor universal, but is being implemented and will be a benchmark for future development.

• Attention to temperature in design of machine and buildings

• Collaboration is a key success factor.

• Innovation is a requirement.

2013-09-30Thomas Parker, Head of Energy Division

Thank You !

2010 ESS AB

- "Design Update Phase"

2014 ESS AB

- ”Project Phase"

2019ESS European Research

Infrastructure Consortium

- "Operations Phase"

2007 ESS Secretariat

- "Campaign Phase"