2013 assignment 02 interim submission

7
Assignment 02 option 2. IN SITU-interim submission address:329 Melbourne Road Newport Victoria 3015 634091 Vicky Li Constructing Environments Semester 2 2013

Upload: melon

Post on 23-Mar-2016

221 views

Category:

Documents


3 download

DESCRIPTION

Assignment 02 interim submission Constructing Environments University of Melbourne

TRANSCRIPT

Page 1: 2013 Assignment 02 interim submission

Assignment 02 option 2. IN SITU-interim submission address:329 Melbourne Road Newport

Victoria 3015

634091 Vicky Li

Constructing Environments Semester 2 2013

Page 2: 2013 Assignment 02 interim submission

Structural Concepts

Masonry structural system

Constructing Environments Semester 2 2013

Concrete structural system

Timber structural system -Wall system require diagonal bracing for lateral stability(Ching 2008 page5.03)

Page 3: 2013 Assignment 02 interim submission

Timber--good tensile strength & compressive strength

Materials & Construction

Constructing Environments Semester 2 2013

Masonry(eg:Bricks)-- good compressive strength

Page 4: 2013 Assignment 02 interim submission

Materials & Construction Constructing Environments Semester 2 2013

Masonry ------ mass construction

Timber ------ frame construction

Page 5: 2013 Assignment 02 interim submission

Aesthetic design & Function Constructing Environments Semester 2 2013

Page 6: 2013 Assignment 02 interim submission

More Information

• Three stories • budget: $200,000 • Archtect: Kenny Le

Constructing Environments Semester 2 2013

Page 7: 2013 Assignment 02 interim submission

References

Ching F 2008, Building Construction illustrated (4th edition),John Wiley&Sons, Hoboken

Constructing Environments Semester 2 2013