©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 10 Chapter 10 Variance Analysis – A Variance Analysis – A Tool for Cost Control Tool for Cost Control & Performance & Performance Evaluation Evaluation

Upload: gwendolyn-franklin

Post on 18-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

Standard Cost A budget for a single unit of a product or a service is known as its standard cost. Just as the cost of a product consists of three components—direct materials, direct labor, and manufacturing overhead —a standard cost will be developed for each component.

TRANSCRIPT

Page 1: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 10Chapter 10

Variance Analysis – A Tool for Variance Analysis – A Tool for Cost Control & Performance Cost Control & Performance

EvaluationEvaluation

Page 2: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Introduction• Control decisions include questions of how to

evaluate performance, what measures to use, and what types of incentives to use.

• Managers can use the budget as a control tool by comparing budgeted sales, budgeted production, and budgeted manufacturing costs with actual sales, production, and manufacturing costs.

• These comparisons are typically made through a process called variance analysis.

Page 3: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Standard Cost

A budget for a single unit of a product or a service is known as its standard cost. Just as the cost of a product consists of three components—direct materials, direct labor, and manufacturing overhead —a standard cost will be developed for each component.

Page 4: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Standard Cost ComponentsThere are two separate cost

components for each part of a product cost:

A standard quantity or amount of materials, labor or overhead.

A standard or budgeted price of materials, labor or overhead.

Page 5: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Setting Standards Standards can be determined in a couple of ways.

Page 6: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Ideal Versus Practical Standards

Most managers would agree that practical standards encourage employees to be more positive and productive.

An ideal standard is one that is attained

only when near-perfect conditions are present.

An ideal standard assumes that every aspect of the production process, from

purchasing through shipment, is at peak

efficiency.

A practical standard should be attainable

under normal, efficient operating conditions.

Practical standards take into consideration

that machines break down

occasionally, waste occurs in materials, etc.

Page 7: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Flexible Budgeting with Standard Costs

Page 8: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Flexible Budget Variance

Page 9: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Breaking Down the Variable Manufacturing Cost Variance

The flexible budget variance may show that actual variable manufacturing costs are higher than budgeted, but what is the true cause?

Incurred more labor cost than usual??

Spent more

than budgeted on

electricity or

supplies??

Spent too much

on materials??

Page 10: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

The Basic Variance Analysis Model

Price variance = Actual X Actual - Standard quantity (AQ) price (AP) price (SP)[ ]Usage variance = Standard X Actual - Standard price (SP) quantity (AQ) quantity (SQ)[ ]

Page 11: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Interpreting and Using Variance Analysis

Standard costs and variance analysis are useful for diagnosing organizational performance in companies that are stable, mature, and reliant on direct labor.

They are not very helpful in rapidly changing companies.

Page 12: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Information from variance analysis is typically too aggregated for operating managers to use.

Drawbacks of Variance Analysis Summary Reports

Information from variance analysis is usually not timely enough to be useful to managers.Traditional variance analysis of variable and fixed overhead provides little useful information for managers.

Traditional variance analysis focuses on cost control instead of performance measures.

Page 13: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Using and Interpreting VariancesIdentifying management’s objectives is vitally important in deciding how to use

and interpret variances.

Understand management’s primary objective. Is it cost control

or producing a high-quality product is important?

Once managers are sure of the root cause(s) of a variance and have considered their own objectives in utilizing variance analysis, they

can intelligently consider options available to deal with the problem.

Page 14: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

Behavioral ConsiderationsDysfunctional behavioral examples include:

The use of ideal standards can

lead to resentment as

managers always face unfavorable

variances.

Too much emphasis on direct material

usage variance causes managers to increase production

while causing inventories to rise

unacceptably.

Purchasing manager

evaluations linked to price variances can

cause purchases of inferior materials.

Page 15: 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part

End of Chapter 10