1 ArevaEPRDCPEm Resource From: WILLIFORD Dennis (AREVA) [[email protected]] Sent: Thursday, May 23, 2013 4:46 PM To: Snyder, Amy Cc: Gleaves, Bill; HOLM Jerald (EXTERNAL AREVA); GUCWA Len (EXTERNAL AREVA); VANCE Brian (AREVA); UYEDA Graydon (AREVA) Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed SPND Presentation NON-PROPRIETARY.pdf Attached is AREVA NP’s presentation for the public meeting next Thursday, May 30th at 1 pm to provide an update on the status of U.S. EPR Open Item RAI 505 Q 07.01-33 [Undetected Single Failure of a Self-Powered Neutron Detector (SPND)] . AREVA NP considers some of the material contained in the slides to be proprietary information. Attached is the redacted PUBLIC version of the presentation. The Proprietary version and accompanying affidavit will be submitted separately. Thanks, Dennis Dennis Williford, P.E. U.S. EPR Design Certification Licensing Manager AREVA NP Inc. 7207 IBM Drive, Mail Code CLT 2B Charlotte, NC 28262 Phone: 704-805-2223 Email: [email protected]

Upload: others

Post on 15-Oct-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

1

ArevaEPRDCPEm Resource

From: WILLIFORD Dennis (AREVA) [[email protected]]Sent: Thursday, May 23, 2013 4:46 PMTo: Snyder, AmyCc: Gleaves, Bill; HOLM Jerald (EXTERNAL AREVA); GUCWA Len (EXTERNAL AREVA);

VANCE Brian (AREVA); UYEDA Graydon (AREVA)Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPNDAttachments: Single Failed SPND Presentation NON-PROPRIETARY.pdf

Attached is AREVA NP’s presentation for the public meeting next Thursday, May 30th at 1 pm to provide an update on the status of U.S. EPR Open Item RAI 505 Q 07.01-33 [Undetected Single Failure of a Self-Powered Neutron Detector (SPND)] . AREVA NP considers some of the material contained in the slides to be proprietary information. Attached is the redacted PUBLIC version of the presentation. The Proprietary version and accompanying affidavit will be submitted separately. Thanks, Dennis Dennis Williford, P.E. U.S. EPR Design Certification Licensing Manager AREVA NP Inc. 7207 IBM Drive, Mail Code CLT 2B Charlotte, NC 28262 Phone: 704-805-2223 Email: [email protected]

Page 2: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

Hearing Identifier: AREVA_EPR_DC_RAIs Email Number: 4494 Mail Envelope Properties (554210743EFE354B8D5741BEB695E65616A4FE) Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Sent Date: 5/23/2013 4:45:55 PM Received Date: 5/23/2013 4:46:18 PM From: WILLIFORD Dennis (AREVA) Created By: [email protected] Recipients: "Gleaves, Bill" <[email protected]> Tracking Status: None "HOLM Jerald (EXTERNAL AREVA)" <[email protected]> Tracking Status: None "GUCWA Len (EXTERNAL AREVA)" <[email protected]> Tracking Status: None "VANCE Brian (AREVA)" <[email protected]> Tracking Status: None "UYEDA Graydon (AREVA)" <[email protected]> Tracking Status: None "Snyder, Amy" <[email protected]> Tracking Status: None Post Office: FUSLYNCMX03.fdom.ad.corp Files Size Date & Time MESSAGE 772 5/23/2013 4:46:18 PM Single Failed SPND Presentation NON-PROPRIETARY.pdf 1125831 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

Page 3: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

Publ

ic M

eetin

g to

Pro

vide

U

pdat

e on

U.S

. EPR

FSA

R

Ope

n Ite

m o

n R

AI 5

05 Q

07

.01-

33 –

Sing

le F

ailu

re

SPN

DA

RE

VA/N

RC

Mee

ting

5/30

/201

3

Ran

dy E

llison

Jerr

y H

olm

Will

iam

Wal

ters

Page 4: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

2U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Age

nda

�In

trod

uctio

n�

Ove

rvie

w o

f Iss

ue�

Stat

ic S

etpo

ints

�D

ynam

ic C

ompe

nsat

ion

�Su

mm

ary

�N

ext S

teps

Page 5: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

3U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Purp

ose

and

Bac

kgro

und

�Pu

rpos

e�

Upd

ate

the

NR

C o

n st

atus

of U

.S. E

PR F

SAR

ope

n ite

ms

for R

AI 5

05 Q

07.

01-3

3 –

unde

tect

ed s

ingl

e fa

ilure

of a

se

lf po

wer

ed n

eutr

on d

etec

tor (

SPN

D)

�Pr

ovid

e pr

elim

inar

y re

sults

and

und

erst

andi

ng o

f the

is

sue

Page 6: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

4U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

RA

I Q

uest

ion

No.

Topi

c/Su

bjec

tA

dvan

ce to

N

RC

Fina

l to

NR

C50

507

.01-

33S

ingl

e fa

ilure

inan

SP

ND

6/28

/201

37/

30/2

013

Rev

ised

topi

cal r

epor

t AN

P-1

0287

P6/

28/2

013*

8/30

/201

3**

*mar

kups

and

inse

rts**

Rec

omm

end

7/30

/201

3to

mat

ch R

AI

Sche

dule

for O

pen

Item

s fo

r RA

I 505

Q

07.

01-3

3

Page 7: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

5U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

RA

I 505

Q 0

7.01

-33

�Q

uest

ion

07.0

1-33

:�

OPE

N IT

EM�

Prov

ide

an e

valu

atio

n of

the

mos

t lim

iting

loca

tion

of th

e un

dete

cted

si

ngle

failu

re o

f a s

elf-p

ower

ed n

eutr

on d

etec

tor (

SPN

D).

In a

dditi

on,

iden

tify

any

chan

ges

to th

e In

spec

tions

, Tes

ts, A

naly

ses,

and

A

ccep

tanc

e C

riter

ia (I

TAA

C) a

nd C

ombi

ned

Lice

nse

(CO

L) a

ctio

n ite

ms

asso

ciat

ed w

ith th

e ne

w s

etpo

int m

etho

d.�

In A

ttach

men

t 2 o

f the

lette

r dat

ed, M

ay 2

4, 2

011,

the

appl

ican

t pr

opos

ed to

revi

se th

e To

pica

l Rep

ort A

NP-

1028

7P, “

Inco

re T

rip

Setp

oint

and

Tra

nsie

nt M

etho

dolo

gy F

or U

.S. E

PR,”

Rev

isio

n 0,

to

add

the

met

hod

for i

nclu

ding

the

unde

tect

ed S

PND

failu

re a

nd

perf

orm

nec

essa

ry C

hapt

er 1

5 tr

ansi

ent a

naly

ses

taki

ng c

redi

t of t

his

SPN

D-b

ased

inco

re lo

w d

epar

ture

from

nuc

leat

e bo

iling

ratio

n (L

DN

BR

) and

hig

h lin

ear p

ower

den

sity

(HLP

D) t

rips.

In th

ese

two

new

sub

mitt

als,

the

staf

f req

uest

s th

e ap

plic

ant t

o (1

) inc

lude

the

unce

rtai

nty

anal

ysis

and

met

hod

taki

ng in

to a

ccou

nt th

e po

ssib

le

unde

tect

ed s

ingl

e fa

ilure

of S

PND

at t

he m

ost l

imiti

ng lo

catio

n; (2

) pr

ovid

e an

eva

luat

ion

of th

e m

ost l

imiti

ng lo

catio

n of

the

unde

tect

ed

sing

le fa

ilure

of S

PND

; (3)

eva

luat

e th

e im

pact

on

the

DN

BR

un

ders

hoot

due

to th

is n

ew S

PND

und

etec

ted

sing

le fa

ilure

; and

(4)

iden

tify

any

chan

ges

to th

e IT

AA

C a

nd C

OL

actio

n ite

ms

asso

ciat

ed

with

the

new

set

poin

t met

hod.

Page 8: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

Ran

dy E

llison

Ove

rvie

w o

f Iss

ue

Page 9: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

7U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Obj

ectiv

e

�Pr

ovid

e an

ove

rvie

w o

f the

app

roac

h to

inco

rpor

ate

the

unde

tect

ed fa

ilure

of a

n SP

ND

in th

e U

.S. E

PR™

sa

fety

ana

lysi

s ba

ses.

�H

ighl

ight

how

the

failu

re is

impl

emen

ted

in m

etho

ds�

Dis

cuss

the

setp

oint

met

hod

(AN

P-10

287P

) in

conj

unct

ion

with

th

e SP

ND

failu

re�

Des

crib

e th

e m

anne

r in

whi

ch th

e m

etho

d of

trip

thre

shol

d ge

nera

tion

prov

ides

the

sam

e le

vel o

f pro

tect

ion

for t

he s

afet

y lim

its

Page 10: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

8U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Bac

kgro

und

�R

edun

danc

y, s

ingl

e fa

ilure

and

the

SPN

Ds

�A

ll 72

SPN

D s

igna

ls a

re d

istr

ibut

ed to

eac

h of

the

four

redu

ndan

t pr

otec

tion

syst

em d

ivis

ions

The

SPN

Ds

them

selv

es a

re n

ot re

dund

ant t

o ea

ch o

ther

�Th

e al

tern

ativ

e re

ques

t, ac

cept

able

leve

l of p

rote

ctio

n, a

nd

cons

erva

tive

setp

oint

sel

ectio

n•

Det

ecte

d fa

ilure

-Trip

thre

shol

d sh

ift to

mor

e re

stric

tive

valu

e-T

hres

hold

is c

alcu

late

d th

roug

h ap

plic

atio

n of

the

stat

istic

al m

etho

ds to

a s

erie

s of

ra

ndom

faile

d se

nsor

cal

cula

tions

•U

ndet

ecte

d fa

ilure

-Low

pro

babi

lity,

non

-sel

f ann

ounc

ing

failu

res

may

be

post

ulat

ed in

the

SP

ND

am

plifi

catio

n an

d si

gnal

mul

tiplic

atio

n eq

uipm

ent

-Inc

lude

failu

re o

f the

mos

t lim

iting

SP

ND

resp

onse

as

an in

itial

con

ditio

n in

the

trip

thre

shol

d de

term

inat

ion

and

trans

ient

com

pens

atio

n co

nfirm

atio

n in

add

ition

to

any

det

ecte

d fa

ilure

s

Page 11: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

9U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Bac

kgro

und

(Con

tinue

d)

�U

.S. E

PR™

FSA

R C

hapt

er 1

5�

Orig

inal

sub

mis

sion

did

not

incl

ude

an u

ndet

ecte

d SP

ND

failu

re

as a

cre

dibl

e si

ngle

failu

re�

Non

sel

f-ann

ounc

ing

failu

re w

ithin

sig

nal c

ondi

tioni

ng m

odul

es

can

be in

corp

orat

ed a

s pr

opos

ed in

the

alte

rnat

ive

requ

est

�A

ltern

ativ

e re

ques

t app

roac

h�

Util

ize

the

exis

ting

AN

P-10

287P

met

hodo

logy

Mod

ify in

puts

and

met

hods

to e

xplic

itly

acco

unt f

or th

e un

dete

cted

failu

re o

f the

mos

t lim

iting

SPN

D re

spon

se•

Rem

ove

mos

t lim

iting

stri

ng (D

NB

R/Q

ualit

y) o

r SP

ND

(HLP

D) w

hen

dete

rmin

ing

the

stat

ic s

etpo

ints

or v

erify

ing

the

dyna

mic

com

pens

atio

n�

DC

R a

ppro

ved

to re

stric

t the

failu

res

to a

sin

gle

unde

tect

ed

SPN

D fa

ilure

per

am

plifi

er m

odul

e

Page 12: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

10U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Con

cept

ual P

ath

Ove

rvie

w

�A

NP-

1028

7P�

Sens

ed v

s. R

efer

ence

(LPD

&

DN

BR

)•

Fund

amen

tal c

once

pt o

f the

m

etho

dolo

gy•

Des

ire to

qua

ntify

the

diffe

renc

e be

twee

n w

hat t

he P

S s

ense

s an

d th

e re

al c

ore

cond

ition

�C

ore

pow

er d

istr

ibut

ion

is p

rovi

ded

to th

e m

etho

dolo

gy a

s si

mul

ated

SP

ND

resp

onse

s•

Faci

litat

es s

imul

atio

n of

the

refe

renc

e co

re c

ondi

tion

and

the

sens

ed c

ore

cond

ition

with

the

requ

isite

un

certa

intie

s

y

SPN

D R

espo

nses

(Pow

er D

istr

ibut

ions

)O

ther

Par

amet

ers

(Unc

erta

intie

s, p

ress

ure,

te

mpe

ratu

re, f

low

, …)

S-R

ELA

P5(P

lant

Res

pons

e 15

.1, 1

5.2,

etc

.)

AN

P-10

287P

Trip

Thr

esho

ld D

eter

min

atio

n D

ynam

ic C

ompe

nsat

ion

Con

firm

atio

n

Dyn

amic

C

ompe

nsat

ion

Con

firm

ed (y

/n)

FSA

R R

esul

ts

ΔDN

BR

D

eter

min

e R

equi

red

Initi

al

Mar

gin

for L

CO

n

Page 13: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

11U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Clo

sed

mee

ting

Page 14: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

12U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic T

rip T

hres

hold

Det

erm

inat

ion

Page 15: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

13U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Con

cept

ual I

llust

ratio

n of

M

onito

red

DN

BR

Dis

trib

utio

n

Page 16: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

14U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Exam

ple

-Tra

nsie

nt P

S R

espo

nse

and

RT

Thre

shol

d�

The

refe

renc

e D

NB

R re

mai

ns

the

sam

e�

The

eval

uatio

n of

the

dyna

mic

co

mpe

nsat

ion

acco

unts

for

dete

cted

failu

res

and

the

unde

tect

ed

failu

re�

The

safe

ty li

mit

is re

spec

ted

with

the

sam

e co

vera

ge a

nd

conf

iden

ce

Page 17: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

15U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

2.5

DN

BR

LC

O

Exam

ple

Illus

trat

ion

–Im

bala

nce

/ Rod

D

rop

1 of

4 T

rip T

hres

hold

Mod

ifica

tion

2.1

IMB

DN

BR

RT

3.2

Bes

t Est

imat

e N

omin

al

1.0

Safe

ty L

imit

2.5

DN

BR

LC

OIM

B D

NB

R R

T

1.0

Safe

ty L

imit

3.2

Bes

t Est

imat

e N

omin

al

•Lev

el o

f pro

tect

ion

of th

e sa

fety

lim

it is

unc

hang

ed.

•The

impa

ct is

see

n as

a re

duct

ion

in o

pera

ting

mar

gin

DN

BR

RT

setp

oint

in

crea

se

Page 18: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

16U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3Sum

mar

y �

The

unde

tect

ed fa

ilure

of t

he m

ost l

imiti

ng S

PND

is

impl

emen

ted

as a

mod

ifica

tion

of th

e ex

istin

g A

NP-

1028

7P m

etho

dolo

gy�

AN

P-10

287P

des

crib

es th

e st

atis

tical

tech

niqu

es u

tiliz

ed in

U.S

. EPR

se

tpoi

nt m

etho

ds, a

s w

ell a

s th

e de

sign

bas

is fo

r the

inco

re tr

ip a

nd

LCO

func

tions

�Th

e st

atis

tical

tech

niqu

es a

nd d

esig

n ba

sis

are

not a

ltere

d by

co

nsid

erat

ion

of a

n un

dete

cted

failu

re�

The

inco

re tr

ip th

resh

olds

will

be

decr

ease

d (H

LPD

) and

incr

ease

d (L

ow D

NB

R) a

s di

ctat

ed b

y th

e A

NP-

1028

7P m

etho

dolo

gy to

pro

vide

th

e re

quire

d sa

fety

lim

it pr

otec

tion.

�D

iscu

ssio

n of

the

trea

tmen

t of t

he u

ndet

ecte

d SP

ND

failu

re w

ill b

e ad

ded

�C

hang

es to

the

FSA

R�

Upd

ate

of th

e m

odifi

ed tr

ip th

resh

olds

�In

clus

ion

of a

n ad

ditio

nal s

ectio

n in

Cha

pter

15

to d

escr

ibe

the

man

ner i

n w

hich

the

unde

tect

ed S

PND

failu

re is

add

ress

ed in

the

safe

ty a

naly

ses.

�U

pdat

es to

the

affe

cted

tran

sien

ts d

iscu

ssio

n an

d pl

ots

Page 19: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

17U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Proc

ess

�R

evie

wed

cal

cula

tions

and

repo

rts

for t

he ti

me

of D

C

subm

ittal

and

pre

viou

s R

AI r

espo

nses

�Ex

amin

ed m

etho

dolo

gy fo

r com

plia

nce

with

topi

cal

repo

rts

�Pe

rfor

med

fres

h re

view

of t

he is

sues

to d

efin

e w

orks

cope

and

iden

tify

any

pote

ntia

l err

ors/

omis

sion

s in

the

met

hod

�D

ivid

ed w

orks

cope

into

thre

e m

ajor

effo

rts

�St

atic

set

poin

t ana

lysi

s�

Tran

sien

t set

poin

t app

licat

ion

(dyn

amic

com

pens

atio

n)�

Tran

sien

t ass

essm

ent

�C

ondi

tion

Rep

orts

wer

e id

entif

ied

and

reso

lutio

ns

incl

uded

Page 20: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

18U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Sum

mar

y of

Con

ditio

n R

epor

ts

�Im

bala

nce

calc

ulat

ion

in th

e st

atic

set

poin

t as

sess

men

t ove

r pre

dict

ed im

bala

nce

by fa

ctor

of

two

�C

ompl

ianc

e w

ith to

pica

l rep

orts

�C

HF

unce

rtai

nty

appl

icat

ion

�In

cons

iste

nt in

puts

at v

ario

us s

tage

s�

Unc

erta

intie

s an

d di

strib

utio

n of

unc

erta

intie

s us

ed�

Con

ditio

ns in

the

tran

sien

t ana

lysi

s ev

alua

tion

�Tr

ansi

ent a

naly

sis

did

not c

onsi

der d

etec

ted

SPN

D fa

ilure

s�

Unv

erifi

ed a

ssum

ptio

ns u

sed

�C

ore

shap

e sc

alin

g m

etho

ds in

com

plet

e or

inap

prop

riate

�C

ondi

tions

foun

d in

the

calc

ulat

ions

sup

port

ing

the

asym

met

ric

even

ts

Page 21: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

19U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Sum

mar

y of

Con

ditio

n R

epor

ts

�In

corr

ect t

ext i

n to

pica

l rep

ort

AN

P-10

287P

(not

rela

ted

to S

PND

failu

res)

�D

ue to

num

ber o

f iss

ues

foun

d, a

hig

her

leve

l Con

ditio

n R

epor

t was

writ

ten

�R

oot c

ause

ana

lysi

s

Page 22: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

Ran

dy E

llison

Stat

ic S

etpo

ints

Page 23: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

21U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

�C

ode

and

inpu

ts m

odifi

ed to

add

ress

the

incl

usio

n of

an

und

etec

ted

failu

re�

[

]�

Und

etec

ted

failu

re a

ssum

ed in

the

mos

t con

serv

ativ

e lo

catio

n in

the

core

for t

he g

iven

mon

itore

d pa

ram

eter

�D

NB

R/Q

ualit

y –

wor

st s

trin

g lo

catio

n�

HLP

D/S

PND

Imba

lanc

e –

wor

st s

enso

r loc

atio

n�

Rel

ativ

ely

smal

l diff

eren

ces

due

to th

e in

clus

ion

of th

e un

dete

cted

failu

re fo

r sym

met

ric c

ases

�A

ll de

tect

ors

are

clos

e in

thei

r sen

sed

read

ing,

resu

lting

in s

imila

r th

resh

olds

Page 24: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

22U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

�A

sym

met

ric c

ases

sho

w g

reat

er im

pact

�A

s ex

pect

ed, a

larg

er n

umbe

r of f

ailu

res

will

lead

to m

ore

cons

erva

tive

thre

shol

ds (h

ighe

r DN

BR

and

low

er H

LPD

) due

to le

ss

accu

rate

sen

sing

of t

he c

ore

pow

er•

Mos

t lim

iting

loca

tion

alw

ays

assu

med

for t

he u

ndet

ecte

d fa

ilure

•Th

e ef

fect

on

the

thre

shol

d is

gre

ater

than

the

stat

istic

al tr

eatm

ent o

f det

ecte

d fa

ilure

s si

nce

it de

term

inis

tical

ly re

mov

es th

e m

ost l

imiti

ng c

ondi

tion

from

the

thre

shol

d de

term

inat

ion

�Th

resh

old

used

for b

inni

ng s

ymm

etric

and

asy

mm

etric

cas

es

impo

rtan

t for

ass

essi

ng th

e im

pact

•A

n er

ror i

n th

e ca

lcul

atio

n of

the

imba

lanc

e le

d to

mor

e ca

ses

endi

ng u

p in

the

asym

met

ric b

in th

an s

houl

d ha

ve b

een

plac

ed th

ere

(Con

ditio

n R

epor

t iss

ued)

•C

orre

cted

the

erro

r and

the

sym

met

ric th

resh

old

was

affe

cted

�Th

resh

old

valu

es in

crea

se a

s a

resu

lt of

the

com

bina

tion

of th

e

unde

tect

ed fa

ilure

and

the

erro

r in

the

imba

lanc

e ca

lcul

atio

n �

Ove

rly c

onse

rvat

ive

asym

met

ric te

mpe

ratu

re

prof

iles

have

bee

n re

mov

ed•

90°

F qu

adra

nt-to

-qua

dran

t �T

case

s re

mov

ed w

ith b

enef

it to

the

imba

lanc

e th

resh

old

Page 25: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

23U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

�D

eter

min

atio

n of

the

wor

st S

PND

loca

tion

ensu

res

the

wor

st lo

catio

n is

cho

sen

for e

ach

trip

func

tion

�Fo

r DN

BR

, the

ass

umed

und

etec

ted

failu

re is

alw

ays

plac

ed in

the

mos

t lim

iting

str

ing,

that

bei

ng th

e on

e w

hich

wou

ld le

ad to

a g

reat

er

setp

oint

•If

the

trip

thre

shol

d w

ould

be

base

d up

on th

e 2n

dm

inim

um, t

he u

ndet

ecte

d fa

ilure

re

sults

in a

thre

shol

d ba

sed

upon

the

3rd

min

imum

(rai

ses

the

requ

ired

thre

shol

d)�

For Q

ualit

y, th

e as

sum

ed u

ndet

ecte

d fa

ilure

is a

lway

s pl

aced

in th

e m

ost l

imiti

ng s

trin

g, th

at b

eing

the

one

whi

ch w

ould

lead

to a

low

er

setp

oint

•If

the

trip

thre

shol

d w

ould

be

base

d up

on th

e 2n

dm

axim

um, t

he u

ndet

ecte

d fa

ilure

re

sults

in a

thre

shol

d ba

sed

upon

the

3rd

max

imum

(low

ers

the

thre

shol

d)�

For H

LPD

, the

ass

umed

und

etec

ted

failu

re is

alw

ays

plac

ed in

the

mos

t lim

iting

SPN

D lo

catio

n , t

hat b

eing

the

one

whi

ch w

ould

lead

to a

low

er

setp

oint

•If

the

trip

thre

shol

d w

ould

be

base

d up

on th

e 2n

dm

axim

um, t

he u

ndet

ecte

d fa

ilure

re

sults

in th

e th

resh

old

base

d up

on th

e 3r

dm

axim

um (l

ower

s th

e th

resh

old)

Page 26: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

24U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

�O

bser

vatio

ns�

Very

con

serv

ativ

e as

ymm

etric

tem

pera

ture

sha

pes

are

driv

ing

setp

oint

thre

shol

ds�

Rem

oved

som

e sh

apes

repr

esen

ting

very

hig

h qu

adra

nt-

to-q

uadr

ant t

empe

ratu

re d

iffer

ence

s ba

sed

upon

ve

rific

atio

n of

tran

sien

t beh

avio

rs•

Impr

oved

thre

shol

d va

lues

in s

ome

case

s

Page 27: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

25U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

�O

bser

vatio

ns o

f the

und

etec

ted

failu

re e

ffect

s�

Incr

ease

s th

e lik

elih

ood

of a

n en

tire

quad

rant

(thr

ee S

PND

str

ings

) be

ing

rem

oved

for c

onsi

dera

tion

in D

NB

R/q

ualit

y•

Pre

viou

s an

alys

is a

ssum

ed fa

ilure

s in

stri

ngs

inde

pend

ent o

f the

loca

tions

w

hen

rand

omly

sam

plin

g w

hich

led

to m

ore

case

s w

ith a

ll qu

adra

nts

repr

esen

ted

�Lo

ss o

f an

entir

e qu

adra

nt o

f str

ings

has

a s

igni

fican

t im

pact

on

asym

met

ric c

ore

pow

er s

hape

s•

The

wor

st p

ower

pea

king

may

not

be

mea

sure

d�

With

out p

reve

ntin

g th

e lo

ss o

f a fu

ll qu

adra

nt, a

llow

ing

for t

he

unde

tect

ed fa

ilure

resu

lts in

not

icea

ble

loss

of o

pera

ting

mar

gin

�To

pre

vent

loss

of a

full

quad

rant

, ana

lysi

s ru

les

are

used

to e

nsur

e pr

otec

tion

and

redu

ce c

hanc

e of

spu

rious

trip

s�

Rul

es to

be

impl

emen

ted

by T

echn

ical

Spe

cific

atio

n an

d C

OLR

Page 28: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

26U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Rul

es fo

r Det

ecte

d Fa

ilure

s

�N

umbe

r of S

PND

str

ings

with

det

ecte

d fa

ilure

s lim

ited

to o

ne s

trin

g pe

r qua

dran

t�

A s

trin

g is

con

side

red

faile

d if

one

or m

ore

SPN

Ds

in th

e st

ring

are

faile

d�

With

und

etec

ted

failu

re, e

ach

quad

rant

will

hav

e at

leas

t one

st

ring

avai

labl

e�

Lim

its th

e to

tal n

umbe

r of s

trin

gs a

llow

ed to

be

faile

d to

fo

ur (4

)

�N

umbe

r of S

PND

failu

res

limite

d to

five

�Ev

alua

ted

coin

cide

nt w

ith ru

le o

n st

rings

�Fi

ve S

PND

failu

res

requ

ires

that

at l

east

two

of th

e fa

ilure

s ha

ve to

be

in th

e sa

me

strin

g

Page 29: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

27U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Rul

es fo

r Det

ecte

d Fa

ilure

s

Page 30: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

28U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

Rec

omm

ende

dD

NB

R S

etpo

ints

Num

bero

f D

etec

ted

SP

ND

Stri

ng

Failu

res

Orig

inal

R

T S

etpo

int

RT

Set

poin

tR

T RD

/IMB

Set

poin

tLC

O

01.

952.

302.

352.

501

Not

ca

lcul

ated

2.35

2.40

2.50

2N

ot

calc

ulat

ed2.

402.

502.

55

3N

ot

calc

ulat

ed2.

452.

552.

60

4N

ot

calc

ulat

ed2.

502.

602.

65

52.

10N

/AN

/AN

/A

Page 31: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

29U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

Rec

omm

ende

d Q

ualit

y Th

resh

olds

Num

bero

f D

etec

ted

SP

ND

S

tring

Fa

ilure

s

Orig

inal

RT

Set

poin

tR

TS

etpo

int

RT I

MB

/RD

00.

250.

250.

201

Not

calc

ulat

ed0.

250.

202

Not

calc

ulat

ed0.

250.

203

Not

calc

ulat

ed0.

250.

204

Not

calc

ulat

ed0.

250.

205

0.25

N/A

N/A

Page 32: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

30U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

ic S

etpo

ints

Rec

omm

ende

dH

LPD

Set

poin

ts (W

/cm

)N

umbe

rof

Det

ecte

d S

PN

D F

ailu

res

Orig

inal

R

T S

etpo

int

RT

Set

poin

tR

T RD

/IMB

Set

poin

tLC

O

046

046

038

535

01

Not

calc

ulat

ed46

038

535

0

2N

otca

lcul

ated

445

385

350

3N

otca

lcul

ated

445

385

350

4N

otca

lcul

ated

440

385

350

546

044

038

535

0

Page 33: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

31U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Plan

ned

Topi

cal R

epor

t Cha

nges

�U

pdat

es fo

r des

crip

tion

of u

ndet

ecte

d SP

ND

failu

res

in m

etho

ds�

Des

crip

tion

of a

llow

ed S

PND

failu

re ru

les

�C

hang

es to

App

endi

ces

F an

d G

(not

re

late

d to

SPN

D fa

ilure

s)

Page 34: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

Willi

am F

. Wal

ters

Prin

cipa

l Eng

inee

r

Dyn

amic

Com

pens

atio

n w

ith a

n U

ndet

ecte

d SP

ND

Fai

lure

Page 35: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

33U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Age

nda

�Ef

fect

of a

n un

dete

cted

SPN

D fa

ilure

on

the

inco

re tr

ansi

ent a

naly

sis

�SP

ND

failu

re lo

catio

n de

term

inat

ion

�Ex

ampl

es w

ith a

n un

dete

cted

SPN

D fa

ilure

�In

crea

se in

Fee

dwat

er F

low

(IFF

) Eve

nt (S

RP

15.1

.2)

�Su

mm

ary

�St

atus

Upd

ate

Page 36: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

34U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Inco

re T

rans

ient

Ana

lysi

s R

evie

w

Page 37: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

35U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Com

pens

ated

Trip

Mod

el

Page 38: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

36U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Unc

ompe

nsat

ed T

rip M

odel

Page 39: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

37U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

SPN

D Im

bala

nce

by A

xial

Lev

el

Page 40: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

38U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Det

erm

inin

g Li

miti

ng F

ailu

re

Loca

tion

Page 41: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

39U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Lim

iting

Fai

lure

Loc

atio

n fo

r DN

BR

Page 42: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

40U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Lim

iting

Fai

lure

Loc

atio

n fo

r HLP

D

Page 43: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

41U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Lim

iting

Fai

lure

Loc

atio

n fo

r SP

ND

Imba

lanc

e

Page 44: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

42U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

DN

BR

for a

Sym

met

ric E

vent

Page 45: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

43U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Sym

met

ric D

NB

R T

rip w

ith n

o SP

ND

Fai

lure

s

Page 46: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

44U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Sym

met

ric D

NB

R T

rip w

ith a

n U

ndet

ecte

d SP

ND

Fai

lure

Page 47: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

45U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Com

pens

ated

DN

BR

for I

FF E

vent

Page 48: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

46U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

IFF

Trip

with

out S

PND

Fai

lure

s

Page 49: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

47U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

IFF

Unc

ompe

nsat

ed T

rip M

odel

Page 50: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

48U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

IFF

with

Und

etec

ted

SPN

D F

ailu

re

Page 51: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

49U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

IFF

with

1 U

ndet

ecte

d +

1 D

etec

ted

SPN

D S

trin

g Fa

ilure

Page 52: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

50U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

IFF

with

1 U

ndet

ecte

d +

2 D

etec

ted

SPN

D S

trin

g Fa

ilure

s

Page 53: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

51U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Tran

sien

t Ana

lysi

s Su

mm

ary

�A

sym

met

ric e

vent

s ar

e m

ore

sens

itive

to S

PND

fa

ilure

s th

an s

ymm

etric

eve

nts.

Page 54: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

52U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Stat

us U

pdat

e

�Th

e C

hapt

er 1

5 tr

ansi

ent a

naly

ses

have

bee

n re

view

ed to

det

erm

ine

whi

ch e

vent

s m

ust b

e re

-ev

alua

ted

with

an

unde

tect

ed S

PND

failu

re.

�M

ost s

ymm

etric

eve

nts

rem

ain

repr

esen

tativ

e.

•Th

e co

ntro

l rod

ban

k dr

op e

vent

is b

eing

re-e

valu

ated

. �

The

asym

met

ric e

vent

s ar

e be

ing

re-e

valu

ated

.

�Th

e tr

ansi

ent e

valu

atio

ns fo

r inc

ore

trip

with

an

unde

tect

ed S

PND

failu

re a

re p

repa

red

and

are

unde

r rev

iew

.

Page 55: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

53U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3

Expe

cted

FSA

R C

hang

es

�Th

e ov

eral

l con

clus

ions

to th

e tr

ansi

ent a

naly

ses

in C

hapt

er 1

5 of

the

FSA

R a

re e

xpec

ted

to re

mai

n un

chan

ged.

Figu

re 1

5.1-

58 –

Incr

ease

in M

ain

Feed

wat

er F

low

–R

epre

sent

ativ

e Pl

ot o

f Nor

mal

ized

Min

imum

DN

BR

and

M

axim

um L

PD to

SA

FDL

will

be

upda

ted

�C

hang

es a

re n

eede

d to

dis

cuss

the

unde

tect

ed

SPN

D fa

ilure

and

upd

ate

the

setp

oint

s�

Tabl

e 4.

4-1

–D

NB

LC

O s

etpo

int

�C

hapt

er 1

5.0

(incl

udin

g Ta

ble

15.0

-7 –

Trip

Set

poin

ts)

�Se

ctio

n 7.

2.1.

2.1

and

7.2.

1.2.

2 –

Des

crib

e th

e in

core

trip

s

Page 56: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

54U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3Sum

mar

y

�Th

is p

rese

ntat

ion

has

expl

aine

d th

e an

alys

is a

nd

met

hod

used

to c

alcu

late

the

stat

ic tr

ip s

etpo

ints

w

hile

acc

ount

ing

for t

he u

ndet

ecte

d si

ngle

failu

re

of a

n SP

ND

at t

he m

ost l

imiti

ng lo

catio

n.

�Th

is p

rese

ntat

ion

has

expl

aine

d ho

w th

e m

ost

limiti

ng lo

catio

n of

an

unde

tect

ed s

ingl

e fa

ilure

of

an S

PND

is d

eter

min

ed.

�Fi

nally

, thi

s pr

esen

tatio

n ha

s de

mon

stra

ted

the

impa

ct o

f the

und

etec

ted

SPN

D fa

ilure

on

the

DN

BR

und

ersh

oot a

naly

sis.

Page 57: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

55U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3Nex

t Ste

ps

�A

dvan

ced

Res

pons

e to

RA

I 505

6/28

/201

3�

Res

pons

e to

Q07

.01-

33�

Upd

ates

to A

NP-

1028

7P

�A

udit

July

201

3�

Fina

l Res

pons

e to

RA

I 505

7/30

/201

3�

Res

pons

e to

Q07

.01-

33�

Upd

ates

to A

NP-

1028

7P

Page 58: 2013/05/23 Areva EPR DC - AREVA Presentation for Public ... · Subject: AREVA Presentation for Public Meeting on May 30th to Discuss Single Failed SPND Attachments: Single Failed

56U

pdat

e on

U.S

. EPR

FSA

R O

pen

Item

on

RA

I 505

Q 0

7.01

-33

–Si

ngle

Fai

lure

SPN

D–

5/30

/201

3Acr

onym

sC

OL

Com

bine

d Li

cens

eD

CR

Des

ign

Cha

nge

Req

uest

DN

BR

Dep

artu

re fr

omN

ucle

ate

Boi

ling

Rat

ioH

LPD

Hig

h Li

near

Pow

er D

ensi

tyIF

FIn

crea

se in

Fee

dwat

er F

low

ITA

AC

Insp

ectio

ns, T

ests

, Ana

lyse

s, a

nd

Acc

epta

nce

Crit

eria

PS

Pro

tect

ion

Sys

tem

RT

Rea

ctor

Trip

RT I

MB

Rea

ctor

Trip

forI

mba

lanc

e C

ondi

tion

RT R

DR

eact

or tr

ip fo

r Rod

Dro

p C

ondi

tion

SP

ND

Sel

f-Pow

ered

Neu

tron

Det

ecto

r