Presentation Outline: Non-Financial Performance 2014/15 Financial Year
• Introduction and Mandate
• The role of the department in assisting the Ingonyama Trust Board
• Organisational concerns and options
• Performance of the department – Departmental performance in years 2009/10 – 2014/15
– Programme 1 : Administration
– Programme 2 : Geospatial and Cadastral Services
– Programme 3 : Rural Development
– Programme 4 : Restitution
– Programme 5 : Land Reform
• Employment equity
• Capital projects implemented in 2014/15 and costs
2
INTRODUCTION
Manifesto 2009 NDP MTSF
Rural Development Improved land admin Improved admin
Land Reform Improve food security Improved food security,Sustainable land reform
Agrarian change Small holder farmer development
Small holder producers development
Descent work and sustainable livelihoods
Access to quality basic services
Increased access to basic services
Education, Crime, Health Growth of sustainable rural enterprises
Growth of sustainable rural enterprise
3
MANDATE OF THE DEPARTMENT
Rural Development:- Improving both economic and Social infrastructure
in rural South Africa.
Land Reform:- Restitution, Redistribution and Land tenure.
Agrarian Change:- Driving social transformation and Increasing
agricultural production in rural areas.
4
LEGISLATION, POLICIES AND INSTITUTIONS LEGISLATIONS
The department has thusfar developed/amended and/or proposed key pieces of legislation. SECTIONAL TITLES AMENDMENT ACT, 2010 (Act 11 of 2010)
RURAL DEVELOPMENT AND LAND REFORM GENERAL AMENDEMENT ACT, 2011 (Act 4 of 2011)
GEOMTATICS PROFESSIONS ACT, 2013 (Act 19 of 2013)
SPATIAL PLANNING AND LAND USE MANAGEMENT ACT, 2013 (Act 16 OF 2013)
PROPERTY VALUATION ACT, 2014 ( Act 17 of 2014)
RESTITUTION OF LAND RIGHTS AMENDMENT ACT, (Act 15 of 2014)
EXTENSION OF SECURITY OF TENURE AMENDMENT BILL, 2013
DEEDS REGISTRIES AMENDMENT ACT, 2013 (Act 34 of 2013)
POLICIESVarious policies were developed and approved internally by Minister: Rural Development Framework Policy, 2013 Land Tenure Security Policy for Commercial Farming Areas, 2013 Recapitalization and Development Programme Policy, 2013 State Land Lease and Disposal Policy, 2013 Agricultural Landholding Policy Framework, 2013 The Green Paper on Land Reform, 2012
INSTITUTIONS Land Commission, Land Rights Management Board and Office of the Valuer-General.
5
Entity reporting to the Minister Ingonyama Trust Board [ITB]
The relationship with the ITB is governed through legislation and this is
complimented in various by assisting the Trust in the following areas:
Policy development.
The development and compilation of Strategic Plans, Annual
Performance Plans, Operational Plans and Annual Reports.
Funding to augment it’s budget to assist it to achieve its strategic
objectives, with an emphasis on land administration.
6
Non-Financial Performanceof the Department
7
8
Programme 01 : Administration
Provides strategic and logistical support in the form of;
Executive support services; Corporate support services; Financial services; and Corporate governance;
9
Programme 1: Administration
Strategic Objective : Ensure 100% compliance with government regulations and legal prescripts by 2019
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
% of allocated budget spent
99.9% 100% 99.9% The variance is due to;
- vacant positions not filled timeously;- some projects which did not progress as envisaged;
% of valid invoices paid within 30
days upon receipt by supply chain
management
91% 100% 92% The variance is due to;
- invoice discrepancies;- Tax Clearance Certificates that have expired;- ex-post facto invoices;
10
Programme 1: AdministrationStrategic objective : Obtain an unqualified regularity opinion on financial and non-financial performance by 2019
Performance indicator Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Unqualified financial statements
New IndicatorUnqualified audit without findings
on financial statements
Partially Achieved .
The Department achieved an
unqualified audit opinion with
findings.
The variance is due to some of the systems, controls and policies taking longer to finalise
due to development processes and consultations.
% of external audit findings resolved 92% 100% 92%
The process to approve policies in some branches took longer than anticipated. There
were also delays in the process of sourcing service providers.
11
Programme 1: AdministrationStrategic Objective : Improve employees’ and prospective employees skills to enhance service delivery by 2019
Performance indicator
Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
DRDLR Human Resource
Development Strategy approved
New Indicator
DRDLR Human Resource
Development Strategy
developed
Partially Achieved.
Draft strategy was finalised pending
approval
Consultation process took longer than anticipated.
Number of people trained in Geomatics 65 60 61
The project has been a significant contributor in addressing the shortage of skilled black professionals in
this field.
12
Programme 02 :
Geospatial and Cadastral Services
The purpose of Geospatial and Cadastral Services programme is to
provide geospatial information, cadastral surveys, deeds registration,
spatial planning and information as well as technical services in support
of sustainable land development.
13
Programme 2 : Geospatial and Cadastral Services Strategic Objective :Facilitate integrated spatial planning and land use management in all provinces through the application of relevant
legislation by 2019
Performance indicator Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
National Spatial Development Framework
(NSDF) developed and Implemented
New Indicator
Approved research report and
consultation on NSDF
Partially Achieved. Draft Researchreport available
and consultation onNSDF Research
Report conducted in various provinces
The partial achievement was due to the consultation process which took longer than anticipated
% of municipalities supported to implement the Spatial Planning and
Land Use Management Act (SPLUMA)
New Indicator 60%: SDFs
61% (170 municipalities
supported)
The over-achievement was due to Municipalities that were eager to have compliant SDFs as it’s a requirement in terms of
the Integrated Development Plan (IDP) and the SPLUMA, which came into effect on 01 July 2015.
14
Programme 2 : Geospatial and Cadastral Services
Strategic Objective: Strategic Objective :Facilitate integrated spatial planning and land use management in all provinces through the application of relevant legislation by 2019
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
% of municipalities supported to
implement the Spatial Planning and
Land Use Management Act
(SPLUMA)
New Indicator 20% Land Use Schemes
31% (86 Municipalities
supported)
The over-achievement was due to Municipalities that were eager to be compliant with the requirements in terms of
SPLUMA, which came into effect on 01 July 2015.
New Indicator 80%: Functional Land Use Regulator
0% (0 municipalities
supported).
The achievement was dependent on the finalisation of the land use regulations. The regulations were published on 23 March
2015 and Provincial Offices are now facilitating the establishment of Land Use Regulators in all municipalities.
Number of provinces supported to
develop Provincial SDFs
New Indicator 4 4 provinces (NC, FS, NW, LIM) None
15
Programme 2 : Geospatial and Cadastral Services
Strategic Objective :Ensure an integrated and comprehensive land administration system
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number of State Domestic Facilities
(SDFs) surveyed
New Indicator 1 500 1 669
The over-achievement was due to the implementation of a turn-around strategy to catch up with the backlog in the surveying of
SDF’s.
Number of deeds and documents registered New indicator 953 424
961 518
The over-achievement was due a higher number of documents received than
anticipated.
Number of maps of the national map series produced
New Indicator 1 688
1 800
The achievement of the indicator is dependent the amount of detail in the area
being mapped. The lesser the detail, e.g. the Karoo, the quicker the production and
thus more maps can be produced in a short space of time.
16
Programme 03: Rural Development
Purpose of this Programme is to initiate, facilitate, coordinate and act as a catalyst for the implementation of the Comprehensive Rural Development Programme(CRDP) that leads to sustainable and vibrant communities. The programme covers rural infrastructure and enterprise development, skills and youth development
17
Programme 3: Rural Development
Strategic Objective : Provide support to rural communities in all districts to improve their livelihoods
Performance indicator
Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Rural Livelihoods Strategy
approvedNew Indicator
Rural Livelihoods Strategy
approved
Partially achieved .A draft
concept document and draft strategy
was done
The draft Enterprise and Industrial Development policy was adopted by Senior Manangement with the proviso that it be
further consulted with DAFF after which a final draft be presented by both departments for consideration in order to
avoid duplication and overlapping.
Norms and standards for access to rural
services developed
New Indicator
Norms and standards for
access to rural services
developed
Partially achieved.Draft norms and standards have been finalised.
The partial-achievement was due to the consultation process which took longer than anticipated
Rural Development Strategy and
Systems developed and implemented
New Indicator
Rural Development Strategy and
systems developed and
approved
Not achieved The target was not achieved due to the consultation process taking longer than anticipated
18
Programme 3: Rural Development
Strategic Objective : Improve access to services in rural areas by coordinating and providing integrated infrastructure by 2019
Performance indicator Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Number of socio-economic infrastructure
Projects coordinated and facilitated
109 114 123The achievement was slightly higher due to some ICT
projects that were scheduled for completion in 2015/16 being finalised in 2014/15.
Number of Households supported with basic
services infrastructure475 8000 8087 In collaboration with the Independent Development Trust
more projects could be completed.
Number of projects implemented in support
of the River Valley Catalystic Programme
New Indicator 14 31
The over-achievement was due tomore irrigation schems being commisioned in KZN and EC.
A number of goverments 27 Priority Districts also fall within these two province.
19
Programme 3: Rural Development
Strategic Objective : Improve access to services in rural areas by coordinating and providing integrated infrastructure by 2019
Performance indicator Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number of Animal and Veld Management
Programme projects implemented
281 200 208 A few more projects than planned were commissioned in KZN.
Strategic Objective : Facilitate the development of rural enterprises in areas with economic development potential and opportunities by 2019
Rural Enterprises and Industrial Development Strategy Implemented
New Indicator
Rural Enterprises and
Industrial Development
Strategy developed
Not achieved
The non-achievement was due to prolonged consultation with other stakeholders
Number of enterprises supported in rural
development initiatives(agriculture and
other sectors) by government stakeholders
433 210 442
The over-achievement was due to:- The registration of more co-operatives than
planned; - ASNAPP SLA projects delivered on large scale
20
Programme 3: Rural DevelopmentStrategic Objective : Increase job opportunities and ensure skills development through CRDP and land reform initiatives by 2019
Performance indicator
Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Number of skills development opportunities
provided to support rural initiatives
6302 4200 9509
The over-achievement was due to;- increased demand for more community members to be trained
in Fire Fighting Skills;- training provided raising awareness and interest in
communities;
Number of youth skilled in rural development
initiatives
1273 5000 2822
The target was under-achieved due to problems linked to the SETA registration and uploading process which resulted in 2000
certificates not being issued to confirm completion of the training by the youth during the year under review.
Number of jobs created in rural development
initiatives
5044 4 000 4916 The target was over achieved due to more budget allocated to employment opportunities for community members
21
Programme 3: Rural DevelopmentStrategic Objective : Increase job opportunities and ensure skills development through CRDP and land reform initiatives by 2019
Performance indicator
Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Mega cooperative established to
facilitate support to NARYSEC Youth
New Indicator
Mega cooperative
established to facilitate support
Not achieved
The Mega cooperative was not achieved due to the requirements of the amended Cooperatives Act(Act 6 of 2013). The new
requirement stipulates a minimum of two operational secondary cooperatives before a tertiary cooperative can be considered.
Number of youth skilled through the
National Rural Youth Service Corps
programme
5 881 4 600 1273The variance is attributed to the fact that multiple skills training
opportunities provided to individual youth were regarded as one achievement.
Number of rural enterprises supported
New Indicator 90 433
The initial target was based on projects with monetary value (budget). During implementation this year, it became clear that
enterprise support goes beyond monetary value and many cooperatives were assisted with registration, and other facilitation
functions.
22
Programme 04 :
Restitution
The Restitution Programme exists to facilitate the settlement of claims,
and provide restitution or equitable forms of redress to victims of
racially motivated land dispossession, in line with the provisions of the
Restitution of Land Rights Act, 1994( Act No.22 of 1994), as amended.
23
Programme 4: Restitution
Strategic Objective : Facilitate the restoration of land rights and alternative forms of equitable redress by 2019
Performance indicator Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Number of land claims settled
270 379 428 The target was exceeded because the focus was on settling financial compensation claims with a claim count which could contribute towards the settled claims target e.g. Kraaibosch (WC) settled 30 claims; District Six (WC) settled 15 claims; New Pietersburg (LP) settled 10 claims; Ramputas Individual Claimants (LP) settled 8 claims; St Francis Xavier Community (KZN) settled 6 claims.
Number of claims finalised
292 239 372 The target was exceeded because of the regional teams that were put in place to clean up the backlog on Commitments.
Systems were also put in place to ensure alignment where claims are settled and finalised in the same financial year, e.g. 53 of the finalised claims were settled in the 2014/15 financial year.
24
Programme 4: RestitutionStrategic Objective : Facilitate the restoration of land rights and alternative forms of equitable redress by 2019
Performance indicator
Baseline (Actual output)
2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number of phased projects
approvedNew Indicator
53 119
Additional funding was made available during the third and fourth quarter which allowed for ;
- claims which were in the pipeline to be processed for the 2015/16 financial year to be moved forward for settlement and payment;
An increasein the number of sittings of the Quality Control Committee.
Number of claims lodged by
1998to be researched
New Indicator
1 445 1 516
The achievement was due to:- An intervention plan implemented in February 2015 to
make-up the shortfall of 639 researched claims in terms of the annual target;
- The operational staff from the regional offices being tasked to prioritise the claims for research which assisted with the cleaning out of the annual backlog.
25
Programme 4: Restitution
Strategic Objective : Facilitate the reopening and finalisation of the lodgement of restitution land claims people who did not meet the 1998 deadline
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number of lodgement offices
FunctionalNew Indicator
14 Lodgementoffices opened and
functional
14 Lodgement
offices opened andfunctional
None
26
Programme 05
Land Reform
The purpose of this programme is to promote equitable land
redistribution and provide support to small holder farmers. It also
ensures the establishment of institutional arrangements for
tenure security and land administration
27
Programme 5: Land Reform
Strategic Objective : Promote equitable land redistribution and agricultural development by acquiring hectares of strategically located land by 2019
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number ofhectares
acquired andallocated
153 586ha 390 000ha 354 802haThe under-achievement was due to
farms being withdrawn by the sellers and no longer being available for purchase.
Office ofthe Valuer-
General (OVG)established
Newindicator 50% 87%
The target was exceeded due tointerventions put in place to expedite
the process to establish the office.
28
Programme 5: Land Reform
Strategic Objective : Provide comprehensive farm development support to smallholder farmers and land reform beneficiaries for agrarian transformation by 2019
Performance indicator
Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15) Actual (2014/15)
Number of landreform farmsrecapitalised
and developed323 303 217
Non-achievement of this target was due to the complexities and control mechansms put
in place during the application approval processwhich resulted in these taking longer
than planned.
Number of jobscreated in landreform projects
(RADP)2 484 909 1 925
The over-achievement was dueto seasonal work (specifically for
harvesting) resulting in a number ofemployees being appointed to assist
during this season.
Number offarm personneltrained through
the RADPprogramme
1 262 909 440
Poor performance on this indicator was due to most of the employment opportunities
experienced in the year which did not necessitate training since it was general
work; planting, harvesting, etc.
29
Programme 5: Land Reform
Strategic Objective : Functional systems and institutional arrangements for tenure and land administration to enable agrarian reform in all provinces by 2019
Performance indicator Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Number of CommunalProperty Associations
compliant with legislation
New indicator 180 0
The non-achievement was due to;- lack of capacity dedicated specifically to CPAs both at
National and Provincial level;- Some CPAs not owning land or having lost land;- New policy developments within the department;
Number oflabour tenants
applicationssettled 98 130 0
The non-achievement was due to;- new policy developments within the department viz:.
Circular 1 of 2010. - There being no dedicated budget to deal with Labour
Tenants applications.
Number ofland parcelstransferred
underTRANCRAA
(Transformationof Certain Rural
Areas Act)
New indicator 40 6
Non-achievement was due to the following reasons:- Community dynamics & disputes;- Complex verification of beneficiaries and land rights
enquires;- Some communities demanding development before
transfer.
30
Programme 5: Land Reform
Strategic Objective : Functional systems and institutional arrangements for tenure and land administration to enable agrarian reform in all provinces by 2019
Performance indicator Baseline (Actual output) 2013/14
Actual performance against target
Reasons for variance
Target (2014/15)
Actual (2014/15)
Number ofState Land
parcelsconfirmed as
vested
863 1 787 1 646
The under-achievement was due to technical uncertainty affecting a holiday resort, registered as Die Bron
Vakansiedorp which was regarded as one parcel of land by the DEEDS office whilst the unit regarded it as more than
one.
% CompleteImmovable
Asset RegisterNew
Indicator 100% 100% None
31
Employment Equity
32
Workforce Profile (Persons with disabilities included)
RACE
GENDER
F M Total % Target VARIANCE
African 2406 2314 4720 81 75% +6%
Coloured 226 155 381 7 11% -4%
Indian 72 50 122 2 3% -1%
White 360 215 575 10 11% -1%
Total 3064 2734 5798
33
Persons with disabilities
RACE
GENDER
F M Total % Target VARIANCE
African 26 31 57 56% 75% -19%
Coloured 4 5 9 9% 11% -2%
Indian 1 3 4 4% 3% +1%
White 15 16 31 31% 11% +20%
Total 46 55 101
34
Persons with disabilities as a percentage of total workforce
RACE Total Grand Total % Target VARIANCE
African 57 4720 1 2% -1
Coloured 7 381 2 2% 0
Indian 4 122 3 2% +1
White 31 575 5 2% +3
Total 101 5798 2 2%
THE MINIMUM TARGET OF 2% REACHED
35
Employment Equity (EE) Way forward
• A new five year EE plan (2014-2019) has been developed and consulted with all relevant stakeholders with the aim of ensuring equitable representation of all race groups within the Department.
• Human Resources has been tasked to develop specific interventions to attract and retain PWD’s and Woman;
• Branches have been directed to comply with the 50/50 gender split in Senior Management;
36
Org
an
izatio
nal c
on
cern
s a
nd
op
tion
s
37
Organizational concerns and future Plans
CAPACITY CONSTRAINTSThe ability to attract and retain employees with the requisite skills and competencies is negatively influenced by the push and pull effects of the labour market, as the country develops. As such the Department has embarked on a number of projects to mitigate this; An analysis of the organisational structure to determine alignment to the
Department’s strategic and service delivery mandates; Improved diversity management project make employees voices heard and to
ascertain how they are experiencing diversity issues; Skills Audit in order to develop a talent pipeline to ensure the department has
the right people, with the right skills executing its mandate; Consistent efforts to reduce the vacancy rate ;
SOCIAL TRANSFORMATION CONCERNS The implementation of a single system for spatial planning and land use
management to replace the complex, disjointed and discriminatory spatial planning and land use management system. As a response various milestones set for spatial transformation including the 70% of municipalities supported to implement the SPLUMA
38
Organizational concerns and future plans cont….
REVITALISATION OF THE RURAL ECONOMY
In making land reform work – land reform is necessary to unlock the potential for a dynamic, growing and employment-creating-agricultural sector. Enable a more rapid transfer of agricultural land to black beneficiaries without distorting land markets or business confidence in the agri-business sector is required. To assit in this process a number of initiaitves are being initiated and/or explored;
Establishment of the Office of the Valuer-General (OVG) 50/50 Stregthening the Realtive Rights Policy Framework AVMP RVCP District Land Reform Committees Agri-Parks
39
Capital projects
40
The following is a list of capital projects implemented by the Department in the year 2014/15 with costs
Province Number of projects 2014/15
Total cost of projects
Eastern Cape 107 R73 021 587.30
Free State 28 R10 732 573.74
Gauteng 62 R20 525 567.86
Kwa-Zulu Natal 151 R85 812 644.83
Limpopo 83 R42 731 176.27
Mpumalanga 111 R69 219 500.43
Northern Cape 08 R 4 637 573.87
North West 43 R25 584 102.82
Western Cape 86 R65 785 759.57
Total 679 R398 050 486.69