ujwalcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 achievements 3.6%...

27
UJWAL Ministry of Power, Coal and New & Renewable Energy 1 ACHIEVEMENTS AND INITIATIVES OF GOVERNMENT OF INDIA YEAR ST

Upload: others

Post on 12-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

UJWAL

Ministry of Power, Coal and New & Renewable Energy

1ACHIEVEMENTS AND

INITIATIVES OF

GOVERNMENT OF INDIA

YEAR

ST

Page 2: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

2

Record breaking progress towards fulfilling Hon’ble Prime Minister Shri Narendra Modi’s vision of...

POWER FOR ALL24X7

A Year which started the journey towards ‘Year Round Power for All’

3

Page 3: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

4

ACHIEVEMENTS

3.6%

22,566 MW

22,100 ckm

65,554 MVA

Power deficit reduced to

the lowest ever

Highest ever generation capacity addition

Highest ever increase in Transmission lines

Highest ever increase inSub-station capacity

5

3.35 LAKH Cr.

Highest coal production growth

in 23 years

8.3%

8.4%Power Generation Growth

(Highest in 20 years)

of potential revenues to coal bearing states through transparent coal e-auctions & allotments

A Year which surpassed past records

First time ever,

exceeded renewable capacity addition targets in solar, wind, small hydro etc.

Over

Page 4: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

6

TARGETS

100 Cr.tonnes/year by 2020

Doubling Coal India’s production to

50%by 2020

Power Generation to increase by

>5 Times1,75,000 MW

10%

by 2022

increase in renewable capacity to

of current consumption

Energy saving to increase to

7

Page 5: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

MISSION

BY 2019POWER FOR ALL24X7

8

BY 2019POWER FOR ALL24X7

9

Page 6: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

FRO

MDA

RK

NES

STO

LI

GH

T

POWER IS DELIVERED THROUGH A CHAIN OF ACTIVITIESA chain is only as strong as the weakest link

FUEL GENERATION

Annual production growth of Coal only 1.5% between 2010-14

Loss of ` 1.86 lakh Cr. estimated by CAG in Coal allocation

>24,000 MW of power capacity idle due to lack of fuel

Less than 1% of solar potential realized

Power generation exceeds 1 lakh Cr. units for the first time

Plans to increase solar capacity by > 30 times

Highest coal production growth in 23 years

Increased coal & gas availability to revive stalled projects

10

TRANSMISSION DISTRIBUTION CONSUMPTION

Measures to build an exceptionally strong power delivery chain are on and are showing results

Discoms losing 70,000 Cr. annually

and accumulated losses of > 2,50,000 Cr.

Spiralling consumer tariffs

Lack of focused energy conservation efforts

28 Cr. people without access to power

Largest power outage in history with 62 Cr. people in darkness in 2012

Approved new schemes for investment of 1.09 lakh Cr. in

Discoms

Overall energy deficit down to 3.6%, the lowest ever

Highest ever increase in Transmission lines & sub station capacity (22,100 ckm and 65,559 MVA respectively)

11

Page 7: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

12 13

COALTAINT

CLEANING

REMOVING THE

Page 8: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

COALTAINT

CLEANING

REMOVING THE

ENERGY EMPLOYMENTShutdown of plants dependant on cancelled coal mines

Livelihood of thousands of workers endangered

Crisis averted by focused action through implementation of transparent e-auction process in just four months

14

ECONOMY

Cancellation of 204 coal blocks by Supreme Court presented a potential grave crisis of:

Economic activity halts, NPAs mount

15

Page 9: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

REGIONAL DEVELOPMENTCoal bearing states like Jharkhand, Chhattisgarh, Odisha, West Bengal, Madhya Pradesh, Maharashtra and Telangana to get potential revenue (including auction proceeds and royalties) of

over the lifetime of the mines

From auction of 29 Coal blocks & allotments of 38 coal blocks to states/PSUs

3.35 lakh Cr.

Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to

Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas

16

REJUVENATED ECONOMYReduced import potential and generated momentum for ‘Make in India’

3.35 lakh Cr.

Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to

Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas

17

Page 10: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

18

PRODUCTIONIMPROVEMENT

INCREASINGTHROUGH EFFICIENCY

RFID/GPS tagging

Reduced Transportation Cost

Reduction in coal theft using

Coal linkage rationalization to reduce transportation costs and save environment

19

Coal Project Monitoring Portal

Improved coal quality

for quicker decision making, faster dispute resolution and accelerated removal of bottlenecks

using compulsory crushing, washing and third party sampling

Page 11: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

20

100 Cr. Tonnes

by 2020

Double coal production to

21

DOUBLINGCOAL INDIAPRODUCTIONIN 5 YEARS

Better evacuation of coal planned by investing massively in new railway rakes, expediting railway lines, modern equipment and mechanization

Partnership between Railways,coal-bearing states and Coal India to strengthen infrastructure creation. Signed MoUs with Odisha and Jharkhand

Trebling exploration activities for enhancing coal production

Over 60 new mines to be opened

Page 12: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

22

7,900 Cr. units of power 24,150 MW of

Innovative and transparent new scheme for making gas available for power generation and generating

over the next two years from

gas based capacity

SUPPLY RESUMED23

Gas BasedPowerPlants

Reviving these

will reduce peak load shortages in summer and ensure grid stability.

Below` 4.70/unit

First round of auctionhas resulted in power

Many of the stranded gas based power projects are located in the Southern region which is power deficit due to transmission constraints

Page 13: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

RAPID INCREASE INGENERATION CAPACITY

5 NEW Ultra Mega Power Projects of

20,000 MW to be setup inplug-and-play mode attracting an investment of

> 1 LAKH Cr.

24

RAPID INCREASE INGENERATION CAPACITY

GENERATION

All clearances and linkages will be in place before the project is awarded by a transparent system

Old plants to be upgraded to enhance capacity and reduce emission

Agreement signed for expansion of Patratu Thermal Power Station, Jharkhand to

4,000 MW

25

Page 14: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

GENERATION

MORE THAN

32,000 MW to 1,75,000 MW5 TIMES

India is running the largest renewable capacity expansion

program in the world

Increasing the overall renewable capacity target by

Opportunity for unemployed graduates & farmers to

become solar enterpreneures

from

by 2022

Green Generation for Clean & Energy

Secure India

100,000 MW of Solar and 60,000 MW of Wind capacity

Renewable Purchase Obligation (RPO) and Renewable Generation

Obligation ( RGO) to boost renewable energy

26

GENERATIONRE-Invest

2015

Financing Green Energy

World’s largest renewable energy financing meet. Commitments of

of renewable manufacturing commitment

of renewable financing commitment

62,000 MW1187

exhibitors from

countries 70,000 MW

2500 delegates200 globalinvestors &financiers 202 speakers including

Nearly

International speakers from 29 countries

from 32 countries

2,73,000 MW

27

Page 15: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

RAPIDGREENPROGRESS

We are like tenant farmerschopping down the fence around our

house for fuel when we should be using Nature's inexhaustible sources of

energy — sun, wind and tide.

– Thomas Edison

28

1,112 MW42%Highest ever increase in

solar capacity of increase in solar capacity during

2014-15

` 50 to ` 200/tonnes

Coal cess quadrupled from

to help finance clean energy projects and Ganga rejuvenation

Accelerated depreciation restored for wind power

from July 2014 to help increase wind capacity

25solar parks

~1000 MW with capacity of

each planned

17solar parks

in 14 states have already

been approved

29

Tender by NTPC to setup

of Solar Projects2,170 MW

Page 16: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

TRANSMITTING & DISTRIBUTING POWER POWERLESS TO POWERFUL

SMART GRIDNational Smart Grid Mission approved to bring efficiency in power supply network and facilitate reduction in losses & outages

SMARTGRID

30

GREEN ENERGY CORRIDOR` 38,000 Cr.projects being rolled out to ensure evacuation from renewable energy plants

CREATING COMPETITION

` 1 LAKH Cr.

Electricity Act being amended to give consumers a choice to choose and change power service provider like a mobile connection. Competition will lead to lower tariffs & better service

transmission projects to be bid out over the next year

Level playing field in transmission through seperation of POSOCO and POWERGRID

31

Page 17: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)

` 63,027 Cr.Total Govt. expenditure

to rural homes, micro small and cottage industries

Feeder segregation for 24x7 power

Now small hamlets also covered

Adequate power to farmers

New transformers and upgradation

Remote Villages

of last mile infrastructure

to be covered: Off-grids and micro-grids

Solar Installationsby Discoms to promote clean and green energy

Total investment of 1.09 Lakh Cr.

32

(IPDS)

Total investment of 1.09 Lakh Cr. Integrated Power Development Scheme

` 45,816 Cr.

tamper-proof meters at homes

infrastructure upgradation in urban areas

Underground cabling and high tech GIS transformers in densely populated areas

IT implementation for better customer service

Solar installations like rooftop solar also covered

Total Govt. expenditure

Smart-metering for large consumers and

Comprehensive sub-transmission & distribution

An integrated scheme for urban areas covering:

33

Page 18: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

34

ENERGY EFFICIENCY PROGRAMMES

TARGETTO SAVE 10% of CURRENT ENERGY CONSUMPTION

ENERGY EFFICIENCY PROGRAMMES

NATIONWIDE CAMPAIGNFOR ENERGY CONSERVATIONLAUNCHED

ENERGY EFFICIENCY:

POWER SAVEDIS WORTH 1.33 UNITS PRODUCED

ONE UNIT OF

35

Page 19: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

(DELP) taken up in about 151 cities in 18 states to replace 20.45 Cr. bulbs in 6.3 Cr. households by 2016

Distribution of bulbs has already commenced in Andhra Pradesh where 45 Lakh LED bulbs have been distributed to about 22.5 Lakh consumers

ALL INCANDESCENT BULBS TO BE CHANGED TO LED IN THREE YEARS

CONSUMPTION36

DOMESTIC EFFICIENT LIGHTING PROGRAMME

Due to transparent procurement, price of LED has reduced by 74% from ` 310 in Feb 2014 to ` 82 in Mar 2015

` 310

` 204

149` 104

` 82

Energy Efficient Street Lighting Programme to cover 251 municipalities across India to replace 90 lakh street lights by 2016

Installation of LED street lights has already been completed in Greater Vishakhapatnam Municipal Corporation and Jhalawar Municipal Corporation

CONSUMPTION

Feb-14 Aug-14 Nov-14 Feb-15 Mar-15

74% Reduction

37

LED PRICE

Page 20: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

38

SABKA SAATH, SABKA VIKAS

39

Massive thrust to expedite projects in North East to overcome power shortages and increase prosperity. Investment of 9,865 Cr. for upgrading power systems in

8 North Eastern States (Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura)

For the first time, National State Power Ministers’ conference was held in Guwahati where Ministers & Officials from all over India converged in North East

24X7 power plans made for Andhra Pradesh and Rajasthan. Action plans for other states at advanced stage of finalization

Entire Coal auction revenue will go to coal bearing states especially under developed states of Eastern India like Jharkhand, Chhattisgarh, Odisha, West Bengal etc.

CO-OPERATIVE FEDERALISM

Page 21: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

Massive thrust on renewables to increase share of clean energy

More than 1 lakh solar pumps sanctioned in the past year

40

Solar pumps helped lakhs of farmers increase output, income and also provide drinking water

Drinking water problem will be solved for more than 7.6 lakh families through solar pumps for drinking water

41

UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year

Compulsory crushing and washing of coal to reduce ash transport by linking plants to their closest mines

ZERO EFFECT ON ENVIRONMENT

Page 22: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

42

o Massive thrust for ‘MAKE IN INDIA’ program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy

43

o Massive thrust for ‘MAKE IN INDIA’ program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy

o Domestic industry being encouraged to scale up and become more cost effective o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India o Defence establishments will buy 300 MW solar plants o Similar initiatives across sectors

Page 23: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

SwachhBharatThe PSUs under the three Ministries are committed to active involvement in this effort. As a first step, they are investing over

44

` 2,250 Cr. for over 1,25,000 toiletsseparately for boys and girls by 15th August, 2015 particularly in the needy states such as Bihar, Odisha, West Bengal, Jharkhand, Chhattisgarh, Andhra Pradesh and Rajasthan.

After construction, the PSUs will also maintain these toilets for a period of five years thus ensuring a complete sanitation programme.

Awareness is being created in local communities to improve over all sanitation.

45

Page 24: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

46

National Transmission Asset Management Centre (NTAMC) to remotely monitor national power grid and help increase power availability

Optical fiber network to connect all high voltage substations thus reducing outages

47

TRANSPARENCY & EFFICIENCY in USING TECHNOLOGY

DIGITAL

Reduction in coal theft using RFID/GPS tagging

Coal project monitoring portal for quick decision making, faster dispute resolution and accelerated removal of bottlenecks

Smart Grid & Smart Metering to improve power availability

e-Office implemented in Ministries

Page 25: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

TRANSPARENCY

48

TRANSPARENCY

Fully transparent and online process for coal auctions adopted

Support for restarting stranded gas-based power plants on the basis of reverse e-bidding process to discover lowest customer tariff

Reduced red-tape and paper-work through delegation of powers and expansion of online interface

49

Page 26: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

50

24365

A GOVERNMENT WHICH CARES

51

RapidEmergencyResponse

Delhi: After transmission tower collapse in May 2014, central government worked day and night to restore power in 15 days which would have otherwise taken more than six months

Cyclone Hudhud: Central teams assigned to restore power in cyclone hit areas. Damaged streetlights converted to LED within six weeks to restore as well as improve lighting

J&K Floods: Special teams rushed to the state to restore power on war footing

Nepal: Helped Nepal's electricity grid come online after the earthquake and is now working towards rebuilding the distribution network

Page 27: UJWALcoal.nic.in/sites/upload_files/coal/files/coalupload/... · 2015-08-02 · 4 ACHIEVEMENTS 3.6% 22,566 MW 22,100 ckm 65,554 MVA Power deficit reduced to the lowest ever Highest

www.ujwalbharat.gov.in

Ministry of Power, Coal and New & Renewable Energy

GOVERNMENT OF INDIA

UjwalBharat2015@UjwalBharat

Prime Minister Narendra Modiat RE-Invest 2015

India has now graduated from megawatts to

gigawatts in terms of renewable energy production.