*2015-16 Included the Transfer to Capital Reserve for IES and WES**In 2014-15, the District Began the General Obligation Bond Refunding Plan
***
4
Summary of Radnor High School Potential Improvements as Related to Proposed Project
TIMELINE
Facilities Committee
8.21.18Facilities Committee
Administration reports bleacher companies could not bid on project
because of ADA access issues around the site and apparent
condition of the retaining wall underneath bleachers.
9.11.18 Committee recommends the architectural firm The Schrader Group be approved to conduct a feasibility study of RHS athletics infrastructure.
Facilities Committee
10.2018Steering CommitteeSteering Committee formed to
guide feasibility study.
11.2018 Two public meetings held for community members to share input.
Public Feedback
1.2019-4.2019
Steering CommitteeSteering Committee meets on
several occasions to review public input, seek student feedback, and
develop concepts.
5.7.19 Steering Committee presents feasibility study completed by The Schrader Group.
6.4.19Update on project provided.
Facilities Committee
ADA ACCESSIBILITY AND WELLNESS INFRASTRUCTURE PROJECT at RADNOR HIGH SCHOOL
*
*As of Dec. 13, 2019
11.16.16Facilities Committee
Administration reports Prevost Field home bleachers at Radnor
High School must be replaced and are not ADA compliant
1.10.17Administration provides report on tours of neighboring schools and administrative request for broader vision, including replacement of Prevost home bleachers and Encke Field bleachers; full ADA compliance; and addition of team rooms, bathrooms, storage rooms, and concession stand.
Facilities Committee
10.10.17Facilities Committee
Committee approves obtaining Requests for Proposal from
architects for design of bleachers at RHS fields
2.12.18Five architects interviewed to provide analysis for three phases: 1. Prevost bleachers; 2. Encke bleachers; and 3. Team rooms, concession stand, and bathroom options.
Planning Meeting
3.6.18Facilities Committee
Committee tables all proposals from architects, questions need for
architect to do bleacher install and requests Administration contact
bleacher companies to do install.
4.10.18Administration requests two-prong approach: contact bleacher companies while retaining architect to examine other improvements in coordination with bleacher installation.
Facilities Committee
5
6
Other Options Considered
• Home Press Box• Parking Garage: Two Different Locations• Pool ADA Viewing Area on the Prevost Field Side• FIFA Soccer Field• Pushing Back Visitors Bleachers• Stairs from Upper Student Lot• Multiple Concession Stands• Indoor Field House• Making Raider Road One Way• Additional Parking Along Raider Road• Widen Raider Road• Indoor Track• Reconfiguring/Relocating Track• Auxiliary Gym Seating/Elevated View• Use Encke Field as Practice Only
7
ADA Accessibility and Wellness Infrastructure Project Goals
• We need to make the Radnor High School campus accessible for people of all abilities and all ages
• We need to evaluate space needs based upon our 2019-20 Priority Project of “developing a long-term RTSD facilities plan that reflects enrollment, program needs, and building requirements”
• We need to think long term and explore unintended consequences
• We need to prepare our students for a lifelong health and wellness culture
• We need to right size our facilities to meet the academic and interscholastic needs of our students
• We need to replace and upgrade infrastructure that has reached or exceeded its useful life
8
9
10
TOTAL: $28,327,192Total Less 9, 10 & 11: $24,242,192 11