*2015-16 included the transfer to capital reserve for ies and wes · 2020-04-14 · *2015-16...

12
1

Upload: others

Post on 22-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

1

Page 2: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

2

Page 3: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

3

*2015-16 Included the Transfer to Capital Reserve for IES and WES**In 2014-15, the District Began the General Obligation Bond Refunding Plan

***

Page 4: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

4

Summary of Radnor High School Potential Improvements as Related to Proposed Project

Page 5: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

TIMELINE

Facilities Committee

8.21.18Facilities Committee

Administration reports bleacher companies could not bid on project

because of ADA access issues around the site and apparent

condition of the retaining wall underneath bleachers.

9.11.18 Committee recommends the architectural firm The Schrader Group be approved to conduct a feasibility study of RHS athletics infrastructure.

Facilities Committee

10.2018Steering CommitteeSteering Committee formed to

guide feasibility study.

11.2018 Two public meetings held for community members to share input.

Public Feedback

1.2019-4.2019

Steering CommitteeSteering Committee meets on

several occasions to review public input, seek student feedback, and

develop concepts.

5.7.19 Steering Committee presents feasibility study completed by The Schrader Group.

6.4.19Update on project provided.

Facilities Committee

ADA ACCESSIBILITY AND WELLNESS INFRASTRUCTURE PROJECT at RADNOR HIGH SCHOOL

*

*As of Dec. 13, 2019

11.16.16Facilities Committee

Administration reports Prevost Field home bleachers at Radnor

High School must be replaced and are not ADA compliant

1.10.17Administration provides report on tours of neighboring schools and administrative request for broader vision, including replacement of Prevost home bleachers and Encke Field bleachers; full ADA compliance; and addition of team rooms, bathrooms, storage rooms, and concession stand.

Facilities Committee

10.10.17Facilities  Committee

Committee approves obtaining Requests for Proposal from

architects for design of bleachers at RHS fields

2.12.18Five architects interviewed to provide analysis for three phases: 1. Prevost bleachers; 2. Encke bleachers; and 3. Team rooms, concession stand, and bathroom options.

Planning Meeting

3.6.18Facilities Committee

Committee tables all proposals from architects, questions need for

architect to do bleacher install and requests Administration contact

bleacher companies to do install.

4.10.18Administration requests two-prong approach: contact bleacher companies while retaining architect to examine other improvements in coordination with bleacher installation.

Facilities Committee

5

Page 6: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

6

Other Options Considered

• Home Press Box• Parking Garage: Two Different Locations• Pool ADA Viewing Area on the Prevost Field Side• FIFA Soccer Field• Pushing Back Visitors Bleachers• Stairs from Upper Student Lot• Multiple Concession Stands• Indoor Field House• Making Raider Road One Way• Additional Parking Along Raider Road• Widen Raider Road• Indoor Track• Reconfiguring/Relocating Track• Auxiliary Gym Seating/Elevated View• Use Encke Field as Practice Only

Page 7: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

7

ADA Accessibility and Wellness Infrastructure Project Goals

• We need to make the Radnor High School campus accessible for people of all abilities and all ages

• We need to evaluate space needs based upon our 2019-20 Priority Project of “developing a long-term RTSD facilities plan that reflects enrollment, program needs, and building requirements”

• We need to think long term and explore unintended consequences

• We need to prepare our students for a lifelong health and wellness culture

• We need to right size our facilities to meet the academic and interscholastic needs of our students

• We need to replace and upgrade infrastructure that has reached or exceeded its useful life

Page 8: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

8

Page 9: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

9

Page 10: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

10

Page 11: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

TOTAL: $28,327,192Total Less 9, 10 & 11: $24,242,192 11

Page 12: *2015-16 Included the Transfer to Capital Reserve for IES and WES · 2020-04-14 · *2015-16 Included the Transfer to Capital Reserve for IES and WES **In 2014-15, the District Began

12